Multi-surface embedded part mounting and concrete pouring construction device and construction method

By using an integrated climbing device and an adjustable lateral support device in water conservancy projects, combined with a light steel structure skeleton and an adjustable screw, the problem of low installation accuracy and efficiency in the pouring of door groove concrete is solved, and multi-faceted embedded parts are realized The precise installation and one-time pouring of concrete improve construction efficiency and structural stability.

CN118997076AActive Publication Date: 2024-11-22CHINA GEZHOUBA GROUP MACHINERY & SHIP

Patent Information

Application Number
CN202411146146.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-22
Estimated Expiration
2044-08-20

AI Technical Summary

Technical Problem

In water conservancy projects, the accuracy requirements for the concrete pouring and metal structure installation of door grooves are high, but existing construction devices are difficult to ensure installation accuracy during the pouring process, resulting in low construction efficiency and poor structural stability, especially the side rails and main concrete formwork. Difficulty in connection, resulting in large offsets and errors.

Method used

The integrated climbing device and adjustable lateral support device are adopted to combine the light steel structure skeleton and adjustable screw to achieve accurate installation of multi-faceted embedded parts and one-time pouring of concrete, avoiding phased pouring, and improving construction efficiency and structure. stability.

Benefits of technology

The precise installation of multi-faceted embedded parts is achieved, the construction efficiency is improved, the overall stability and safety of the structure is ensured, friction resistance is reduced, and error and offset problems in traditional construction are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997076A_ABST
    Figure CN118997076A_ABST
Patent Text Reader

Abstract

The multi-face embedded part installation and concrete pouring construction device comprises a structural framework, a plurality of climbing devices are arranged on the structural framework, the climbing devices are used for moving along a platform ascending climbing rod, and the platform ascending climbing rod is used for being embedded in concrete; the structural framework is connected with the template through the template connecting rod; a plurality of adjustable lateral supporting devices are arranged on the edge of the structural framework and symmetrically distributed on the two sides of the structural framework. The integrated climbing device and the adjustable lateral supporting device are adopted, accurate installation of the multi-face embedded part and one-time pouring of concrete are achieved, the tedious process of first-stage pouring and second-stage pouring in traditional construction is avoided, and the construction efficiency is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of infrastructure engineering, and particularly relates to a multi-faceted embedded part installation and concrete pouring construction device and a construction method. Background Art

[0002] In the water retaining construction of water conservancy projects, the concrete pouring and metal structure installation of the gate slot are particularly important. The installation accuracy of the main and reverse rails of the gate slot directly affects whether the water retaining parts behind can fall smoothly and whether the water-stopping water seals of various parts can effectively ensure the water-stopping effect and meet the actual needs of the project. In many gate slot constructions, there are main reverse rails and side rails, and the processing requirements and precision requirements of each track surface are relatively high. A supporting slide with a large protruding surface thickness is designed on the main rail to contact the gate slider, play a guiding and friction-reducing role, so the installation position and verticality requirements of the slide at this position are particularly high; there is also a water-stopping stainless steel surface with a thin protruding surface thickness on the main rail, which requires mechanical processing, and secondary operations or welding and installation of various auxiliary tooling are prohibited on the surface.

[0003] The counter-rail is designed with a protruding surface with a thicker part as a reverse support. The side rail is designed to be separated from the main counter-rail, and the three do not form a whole. Therefore, during the pouring process, the side still needs a template to cooperate with the pouring of concrete. According to the above, it is particularly important to grasp the installation accuracy during the track installation process, so the concrete pouring construction device must be non-destructive to the track. Existing construction platform devices all weld corresponding auxiliary tooling on the poured door slot to ensure the stability of the platform and the load-bearing force. This method not only affects the surface structure of the embedded parts of the door slot, but also requires a long period of high-altitude work to clean, grind, polish and re-anticorrosion the original welding tooling surface after the overall construction is completed. The construction requirements are high and the process is complicated.

[0004] For this type of track arrangement, the main civil engineering concrete structure can use either flip formwork or climbing formwork. However, when pouring the side rails, the side rails cannot be connected to the main concrete formwork after the main counter-rails on both sides are installed. Only the simplest method of pouring and supporting can be used. The outside of the formwork must also be fixed by an installed (unpoured) metal structure, which means that the installed metal structure will bear the lateral pressure of all concrete on the opposite side formwork, causing the installed structure to shift. The re-measurement results after the entire concrete pouring will have a large error compared to the initial installation. The lateral support of the side formwork is provided by the door slot. The existing supporting devices and positioning devices all use the door slot as the main force point, and it is difficult to cooperate with the flip formwork and sliding formwork during the synchronous pouring process, which reduces construction efficiency and makes it difficult to ensure installation accuracy. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a multi-sided embedded parts installation and concrete pouring construction device and construction method, which adopts an integrated climbing device and an adjustable lateral support device to achieve the precise installation of multi-sided embedded parts and the one-time pouring of concrete, avoiding the cumbersome process of one-phase and two-phase pouring in traditional construction, and significantly improving the construction efficiency.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: A multi-faceted embedded parts installation and concrete pouring construction device comprises a structural frame, on which are provided a plurality of climbing devices, the climbing devices being used to move along a platform ascending climbing rod, the platform ascending climbing rod being used to be embedded in concrete; the structural frame is connected to a template via a template connecting rod; a plurality of adjustable lateral support devices are provided at the edge of the structural frame, and the plurality of adjustable lateral support devices are symmetrically distributed on both sides of the structural frame.

[0007] Preferably, the adjustable lateral support device comprises a fixed screw sleeve connected to the structural frame, the fixed screw sleeve is threadably matched with the adjustable screw, and the adjustable screw is connected to the lateral support slider.

[0008] Preferably, an adjusting nut is coaxially arranged on the adjustable screw rod. Preferably, the climbing device is a climbing hydraulic device, and the climbing hydraulic device adopts a hollow hydraulic jack, and the hollow hydraulic jack is used to move the climbing rod along the platform.

[0009] Preferably, the number of climbing devices is at least four, and the multiple climbing devices are evenly distributed on the edge of the structural frame.

[0010] Preferably, the structural frame is a light steel structural frame, the frame structure is Q355C steel, the slider is MGB steel, and the others are Q235B steel.

[0011] Preferably, the template is a sliding fit with the side rails.

[0012] Preferably, a concave groove cooperating with the side rail is provided on the side of the template, a plurality of positive sliders are provided in the concave groove, a reverse slider is provided on the side opposite to the positive slider, the reverse slider is connected to the template through a reverse slider bracket, and the reverse slider cooperates with the positive slider to clamp the side rail.

[0013] A construction method for a multi-faceted embedded part installation and concrete pouring construction device comprises the following steps: S1. Pour the first warehouse concrete, and pre-embed and install the platform climbing rod. Precisely position it during installation to ensure that the entire structure can be aligned later. After the concrete is finally set, the light steel structure frame can be installed. S2. After the climbing hydraulic device has passed the acceptance pressure test, it is installed on the platform climbing pole. The light steel structure skeleton and formwork are adjusted using the laser level scanner, water cup automatic control device, laser plumb meter, automatic leveling laser plumb meter, theodolite and plumb bob. S3. After the installation is completed, adjust the adjusting nuts to fix the entire light steel structure frame, and then start the subsequent pouring; S4. After pouring of one section, first adjust the adjusting nut to release the constraints of the light steel structure frame and the door grooves on both sides, and then start operating the climbing hydraulic device to allow the light steel structure frame to drive the formwork to climb to the next section to continue construction.

[0014] The present invention can achieve the following beneficial effects: 1. The present invention realizes the precise installation of multi-faceted embedded parts and one-time pouring of concrete by adopting an integrated climbing device and an adjustable lateral support device, avoiding the cumbersome process of pouring in one or two phases in traditional construction, and significantly improving construction efficiency.

[0015] 2. Through the precise control of the climbing hydraulic device and the fine-tuning function of the adjustable lateral support device, the accurate installation of the embedded parts can be ensured to meet the design requirements and improve the overall stability and safety of the structure.

[0016] 3. The combination of a light steel structure frame and an adjustable lateral support device improves the overall rigidity and stability of the structure, ensuring that no deviation or deformation occurs during concrete pouring.

[0017] 4. The length of the adjustable screw can be easily adjusted by adjusting the nut, so that the lateral support force can be adjusted according to the actual situation. At the same time, the adjustable screw can be retracted when lifting the structural frame, reducing friction resistance and making the lifting of the entire structure smoother. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a three-dimensional structural diagram of the multi-faceted embedded parts installation and concrete pouring construction device of the present invention; Figure 2 The three-dimensional structure diagram of the adjustable lateral support device of the present invention Figure 1 ; Figure 3 The three-dimensional structure diagram of the adjustable lateral support device of the present invention Figure 2 ; Figure 4 The template and the side rail connection structure diagram of the present invention; Figure 5 It is a cross-sectional view of the template and side rails of the present invention; Figure 6 This is a front structural diagram of the template of the present invention; Figure 7 This is a structural diagram of the connection between the platform climbing rod and the climbing device of the present invention; Figure 8 This is a structural diagram of the back side of the template of the present invention; Fig. 9 This is a structural diagram of the reverse slider bracket of the present invention; Fig.10 This is a structural diagram of the reverse slider bracket and the reverse slider connection of the present invention; Fig.11 This is a diagram showing the effect of using the multi-faceted embedded parts installation and concrete pouring construction device of the present invention; Fig.12 This is a structural diagram of the template connecting rod installation of the present invention.

[0019] In the figure: structural frame 1, lateral supporting slider 2, adjustable screw 3, formwork 4, platform rising climbing rod 5, climbing device 6, connecting bolts 7, formwork connecting rod 8, forward slider 9, reverse slider bracket 10, reverse slider 11, adjusting nut 12, fixed screw sleeve 13, side rail 14, door slot 15. DETAILED DESCRIPTION

[0020] In the existing concrete pouring of piers and door slots, there is an embedded part installation, which means that the pouring process can only be divided into one phase and two phases. In some cases, the one-time pouring of the first phase requires the use of many auxiliary lifting equipment and machinery, which not only leads to a sharp increase in costs, but also the installation accuracy is difficult to meet the design requirements. In response to this series of problems, the present invention provides a concrete pouring construction device and construction method. The specific scheme is as follows: The preferred solution is Figures 1 to 12 As shown, a multi-faceted embedded parts installation and concrete pouring construction device includes a structural frame 1, on which are provided a plurality of climbing devices 6, the climbing devices 6 are used to move along a platform rising climbing rod 5, and the platform rising climbing rod 5 is used to be embedded in concrete; the structural frame 1 is connected to the template 4 through a template connecting rod 8; the edge of the structural frame 1 is provided with a plurality of adjustable lateral support devices, and the plurality of adjustable lateral support devices are symmetrically distributed on both sides of the structural frame 1.

[0021] The structural frame 1 is used to be installed in the door slot. The structural frame 1 is mainly used for bearing weight and force. It is welded from profiles and can be made into a steel frame that meets the construction requirements according to different working conditions. The structural frame 1 can be lifted in the vertical direction along the platform climbing rod 5. When the structural frame 1 is lifted, the adjustable lateral support device is in a retracted state, so that there is no friction between the adjustable lateral support device and the door slot. The platform climbing rod 5 is fixed in the poured first warehouse concrete. The platform climbing rod 5 is partially exposed in the part to be poured. The platform climbing rod 5 is installed vertically so that the structural frame 1 can rise smoothly. The climbing device 6 is installed on the bracket of the structural frame 1 through the connecting bolts 7. The bracket is fixed to the structural frame 1.

[0022] Furthermore, the adjustable lateral support device includes a fixed screw sleeve 13 connected to the structural frame 1, the fixed screw sleeve 13 is threadedly matched with the adjustable screw 3, and the adjustable screw 3 is connected to the lateral support slider 2. An adjusting nut 12 is coaxially arranged on the adjustable screw 3. Several groups of lateral supporting sliders are arranged at the contact positions with the door groove tracks on both sides of the light steel structure frame. The fixed screw sleeve is reliably fixed to the light steel structure frame and is on the same center line as the transverse beam of the light steel structure frame. The adjustable screw is installed together with the fixed screw sleeve. The other side of the adjustable screw is connected to the lateral supporting slider. The slider can provide sufficient friction and hydraulic climbing device to maintain the stability of the whole structure and ensure the bearing capacity. The number of lateral supporting sliders on both sides is arranged according to actual needs. After the whole structure is installed and leveled, the length of the adjustable screw is controlled by adjusting the nut. When the whole structure needs to be lifted, the adjustable screw is retracted into the fixed screw sleeve. At this time, there is no friction resistance between the door groove surface and the whole structure, and the steel structure can be lifted.

[0023] Furthermore, the climbing device 6 is a climbing hydraulic device, which uses a hollow hydraulic jack, and the hollow hydraulic jack is used to move along the platform climbing rod 5. The hollow hydraulic jack climbs on the platform climbing rod 5 through the oil injection and oil return actions of the hydraulic station. The hollow hydraulic jack can solve the problem of mismatching the concrete coagulation speed with the main body during pouring, so that it can climb in unison with the main body when pouring lateral concrete.

[0024] Furthermore, the number of climbing devices 6 is at least four, and the multiple climbing devices 6 are evenly distributed on the edge of the structural frame 1.

[0025] The entire climb is carried out by the hydraulic climbing device along the platform climbing rod for vertical upward lifting. The power source of the hydraulic climbing device is a special hollow hydraulic jack. The arrangement of the hollow hydraulic jack should make the jack force balanced. The hollow hydraulic jacks are evenly arranged or arranged in groups with equal spacing. The buried depth and maximum clearance distance of the platform climbing rod in the concrete must comply with the relevant specifications and the actual construction environment on site.

[0026] Construction accuracy control mainly includes: the limit leveling device of the lifting equipment itself, the observation and adjustment control facilities of the horizontality and verticality of the device during construction, etc. The jack synchronization control device can adopt the limit card block, laser level scanner, water cup automatic control device, etc. The verticality observation equipment can adopt laser plumb, automatic leveling laser plumb, theodolite and plumb bob, etc., and its accuracy should not be less than 1 / 10000. The number of jacks supplied by each hydraulic control console can be calculated according to the oil consumption of each jack and the oil delivery capacity and time of the gear pump. If the oil tank capacity is insufficient, an auxiliary oil tank can be added. For projects with large working surfaces, many jacks installed and the same operating platform, more than two sets of hydraulic control consoles can be installed together.

[0027] After the hydraulic system is installed, a test run should be carried out. First, fill it with oil and exhaust the air. Then, pressurize it to 12N / mm and hold the pressure for 5 minutes each time. Repeat this three times. Make sure there is no leakage at all sealing points and conduct a comprehensive inspection. After all parts are working normally, insert the platform rising climbing pole.

[0028] The platform climbing rod is the track for the jack to move and supports all the loads acting on the jack. In order to prevent the support rod from buckling, it should be made of round steel or steel pipe with a certain strength. It is necessary to ensure that the upper and lower centers coincide on a vertical line so that the hollow hydraulic jack can pass smoothly when climbing.

[0029] Furthermore, the structural frame 1 is a light steel structural frame, the frame structure is Q355C, the slider is MGB, and the others are Q235B.

[0030] Furthermore, the template 4 is slidably matched with the side rail 14. The template is reliably fixedly connected to the light steel structure frame. After the light steel structure frame is installed and adjusted, the side template is adjusted to a suitable position according to the drawing requirements to meet the concrete pouring requirements. During the entire structure lifting process, the template device is lifted together with the structure.

[0031] Specifically, the side of the template 4 is provided with a concave groove that cooperates with the side rail 14, and a plurality of positive sliders 9 are provided in the concave groove. A reverse slider 11 is provided on the side opposite to the positive slider 9. The reverse slider 11 is connected to the template 4 through a reverse slider bracket 1, and the reverse slider 11 cooperates with the positive slider 9 to clamp the side rail 14. The template 4 includes a steel template, which is made of profile plates and has reinforcing ribs. The steel template is connected to the structural frame 1 through a template connecting rod 8. A concave groove is provided on the steel template, and the length and width of the concave groove are consistent with the size of the side rail 14. The concave groove is provided with a plurality of positive sliders or rollers. The design purpose of the reverse slider 11 and the positive slider 9 is to reduce friction and provide good support when the entire device slides, while ensuring the overall installation accuracy.

[0032] A construction method for a multi-faceted embedded part installation and concrete pouring construction device comprises the following steps: S1. Pour the first warehouse concrete, and pre-embed and install the platform climbing rod. Precisely position it during installation to ensure that the entire structure can be aligned later. After the concrete is finally set, the light steel structure frame can be installed. S2. After the climbing hydraulic device has passed the acceptance pressure test, it is installed on the platform climbing pole. The light steel structure skeleton and formwork are adjusted using the laser level scanner, water cup automatic control device, laser plumb meter, automatic leveling laser plumb meter, theodolite and plumb bob. S3. After the installation is completed, adjust the adjusting nuts to fix the entire light steel structure frame, and then start the subsequent pouring; S4. After pouring of one section, first adjust the adjusting nut to release the constraints of the light steel structure frame and the door grooves on both sides, and then start operating the climbing hydraulic device to allow the light steel structure frame to drive the formwork to climb to the next section to continue construction.

[0033] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A multi-faceted embedded parts installation and concrete pouring construction device, characterized in that: The invention comprises a structural frame (1), wherein a plurality of climbing devices (6) are provided on the structural frame (1), and the climbing devices (6) are used to move along a platform ascending climbing rod (5), and the platform ascending climbing rod (5) is used to be embedded in the concrete; the structural frame (1) is connected to the formwork (4) via a formwork connecting rod (8); and a plurality of adjustable lateral support devices are provided at the edge of the structural frame (1), and the plurality of adjustable lateral support devices are symmetrically distributed on both sides of the structural frame (1).

2. A multi-faceted embedded parts installation and concrete pouring construction device according to claim 1, characterized in that: The adjustable lateral support device comprises a fixed screw sleeve (13) connected to the structural frame (1), the fixed screw sleeve (13) is threadably matched with an adjustable screw (3), and the adjustable screw (3) is connected to the lateral support slider (2).

3. A multi-faceted embedded parts installation and concrete pouring construction device according to claim 2, characterized in that: An adjusting nut (12) is coaxially arranged on the adjustable screw rod (3).

4. The multi-faceted embedded parts installation and concrete pouring construction device according to claim 1, characterized in that: The climbing device (6) is a climbing hydraulic device, which uses a hollow hydraulic jack. The hollow hydraulic jack is used to move the climbing rod (5) along the platform rise.

5. The multi-faceted embedded parts installation and concrete pouring construction device according to claim 4 is characterized in that: The number of climbing devices (6) is at least four, and the plurality of climbing devices (6) are evenly distributed on the edge of the structural frame (1).

6. The multi-faceted embedded parts installation and concrete pouring construction device according to claim 1, characterized in that: The structural frame (1) is a light steel structural frame, which is welded from Q355C steel.

7. The multi-faceted embedded parts installation and concrete pouring construction device according to claim 1, characterized in that: The template (4) is slidably matched with the side rail (14).

8. The multi-faceted embedded parts installation and concrete pouring construction device according to claim 7, characterized in that: A concave groove cooperating with the side rail (14) is provided on the side of the template (4), a plurality of positive sliders (9) are provided in the concave groove, a reverse slider (11) is provided on the side opposite to the positive slider (9), the reverse slider (11) is connected to the template (4) via a reverse slider bracket (10), and the reverse slider (11) cooperates with the positive slider (9) to clamp the side rail (14).

9. A construction method for a multi-faceted embedded part installation and concrete pouring construction device according to any one of claims 1 to 8, characterized in that The following steps are involved: S1. Pour the first warehouse concrete, and pre-embed and install the platform climbing rod. Precisely position it during installation to ensure that the entire structure can be aligned later. After the concrete is finally set, the light steel structure frame can be installed. S2. After the climbing hydraulic device has passed the acceptance pressure test, it is installed on the platform climbing pole. The light steel structure skeleton and formwork are adjusted using the laser level scanner, water cup automatic control device, laser plumb meter, automatic leveling laser plumb meter, theodolite and plumb bob. S3. After the installation is completed, adjust the adjusting nuts to fix the entire light steel structure frame, and then start the subsequent pouring; S4. After pouring of one section, first adjust the adjusting nut to release the constraints of the light steel structure frame and the door grooves on both sides, and then start operating the climbing hydraulic device to allow the light steel structure frame to drive the formwork to climb to the next section to continue construction.

Citation Information

Patent Citations

  • Hydraulic creeping formwork initial mounting construction technique

    CN101413342A

  • Sliding formwork device for second-stage concrete of gate groove and construction method

    CN112127332A

  • Gate slot second-stage concrete self-climbing slip form pouring system and construction method

    CN112482317A

  • Method for synchronous construction of gate groove installation and concrete pouring

    CN117344701A

  • One-time forming method for work overhaul valve well door groove of ship lock water conveying system

    CN120350708A

Cited By

  • Synchronous one-time pouring forming method for multi-hole gate shaft and gate groove

    CN122428648A