Fabricated mixed tower fan foundation and construction method thereof
By alternately setting prefabricated components along the circumference of the wind turbine foundation and connecting them by insertion, the problem of needing to pour concrete on site for existing prefabricated wind turbine foundations has been solved, realizing a prefabricated mixed tower wind turbine foundation that is simple to construct, firmly connected, and quick to install.
Patent Information
- Application Number
- CN202411228435.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-22
AI Technical Summary
The existing prefabricated wind turbine foundations still require on-site concrete pouring, which involves complex construction processes and the connections between the various assembly units are not secure enough.
Precast components one and two are alternately arranged in the circumferential direction and connected by a plug-in structure. Fasteners are set at the plug-in positions, and anchor bolt holes are set at the slots and plugs. The anchor bolts serve as fasteners, and shock-absorbing buffers can also be set in the plug-in structure.
It eliminates the need for on-site concrete pouring, making construction simple and quick, ensuring strong and reliable connections, saving time and manpower, and improving construction efficiency and stability.
Smart Images

Figure CN118997213A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power generation, and in particular to an assembled mixed-tower wind turbine foundation and a construction method thereof. Background Art
[0002] With the continuous growth of wind turbine installation capacity and the increase of wind turbine unit capacity, land use constraints have also been brought about, requiring better wind resources within the limited scope of available construction land, which means that wind turbines need a higher hub height. In order to meet this requirement, a combined wind turbine tower structure, a steel-concrete tower, was designed based on the traditional steel tower. The steel-concrete tower is divided into two layers, the lower layer adopts a reinforced concrete structure tower, and the upper layer still adopts a steel tower structure. The hybrid tower wind turbine using a steel-concrete tower can optimally configure the height of the two-layer tower structure according to the required hub height to achieve a higher hub height.
[0003] The mixed tower fan needs to be installed on the fan foundation. The traditional fan foundation construction method is to cast concrete on site. This construction method has the disadvantages of a long construction period and requires a lot of manpower and material resources. Therefore, the fan foundation of the steel-concrete tower is usually an assembled fan foundation. The components are prefabricated in the factory and then installed on the construction site. The existing fan foundation includes a plurality of assembly units arranged in a ring on the cushion layer. By pouring concrete between the gaps of the assembly units, each assembly unit and the cushion layer are solidified into a whole to form a fan foundation, which is then connected to the mixed tower fan. The existing fan foundation still needs to be cast in concrete on site, the construction process is complicated, and the connection between the assembly units is not firm enough. Summary of the invention
[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defects in the prior art that the assembled fan foundation still needs to be poured with concrete on site, the construction process is complicated, and the connection between the assembly units is not firm enough, thereby providing an assembled mixed tower fan foundation and a construction method thereof that do not require on-site pouring of concrete, have a simple construction process, and have firm and reliable connections between the assembly units.
[0005] In order to solve the above problems, the present invention provides an assembled mixed tower fan foundation, comprising: a plurality of prefabricated components 1 and a plurality of prefabricated components 2 arranged alternately along the annular direction;
[0006] The adjacent prefabricated component 1 and the adjacent prefabricated component 2 are plug-connected via a plug-in structure, and fasteners are provided at the plug-in connection positions.
[0007] Optionally, the plug-in structure includes an insert block formed on one of the adjacent prefabricated component 1 and the prefabricated component 2 and a slot on the other one, and the insert block is plugged into the slot.
[0008] Optionally, anchor holes are provided at the slot and the insert block, the fastener is an anchor bolt, and the anchor bolt is provided in the anchor bolt hole.
[0009] Optionally, the prefabricated component 1 includes: a first base plate, a first ring beam, a first column and a first rib beam, the first ring beam, the first column and the first rib beam are all arranged on the first base plate, the first ring beam is located on the side of the first column away from the center of the wind turbine foundation, one end of the first rib beam is connected to the first column, and the other end is connected to the first ring beam.
[0010] Optionally, the second prefabricated component includes: a second base plate, a second ring beam, a second column and a second rib beam, the second ring beam, the second column and the second rib beam are all arranged on the second base plate, the second ring beam is located on the side of the second column away from the center of the wind turbine foundation, and there is a hollow groove between the second column and the second base plate, one end of the second rib beam is connected to the second column, and the other end is connected to the second ring beam.
[0011] Optionally, the first column and the first ring beam are provided with the slot on one side and the plug block on the other side;
[0012] The slot is arranged on one side of the second column and the second ring beam, and the insert block is arranged on the other side.
[0013] Optionally, the height of the first column is greater than the height of the first ring beam;
[0014] The height of the second column is greater than the height of the second ring beam, and a prestressed cable channel is provided on the surface of the second column.
[0015] Optionally, the top surface of the first rib beam is an inclined surface sloping downward from the first column to the first ring beam;
[0016] The top surface of the second rib beam is an inclined surface that slopes downward from the second column to the second ring beam.
[0017] Optionally, a shock-proof buffer is provided in the slot.
[0018] A method for constructing an assembled mixed-tower fan foundation, applied to the assembled mixed-tower fan foundation, comprises the following steps:
[0019] A plurality of prefabricated components 1 and a plurality of prefabricated components 2 are alternately arranged along the annular direction, and adjacent prefabricated components 1 and 2 are connected by a plug-in structure;
[0020] A fastener is arranged at the plug-in position of the prefabricated component 1 and the prefabricated component 2.
[0021] The present invention has the following advantages:
[0022] 1. The assembled mixed tower fan foundation provided by the present invention comprises: a plurality of prefabricated components 1 and a plurality of prefabricated components 2 arranged alternately in the circumferential direction; adjacent prefabricated components 1 and 2 are plug-connected by a plug-in structure, and fasteners are provided at the plug-in connection position. Prefabricated components 1 and 2 are factory prefabricated components, and are plug-connected to each other by a plug-in structure during on-site installation, without the need for on-site concrete pouring, and the construction process is simple, saving time and effort. Moreover, adjacent prefabricated components 1 and 2 are reinforced by fasteners after being plug-connected, and the connection is firm and reliable.
[0023] 2. The assembled mixed tower fan foundation provided by the present invention has a plug-in structure including an insert block formed on one of the adjacent prefabricated components one and two and a slot on the other, and the connection between the adjacent prefabricated components one and two is completed by plugging the insert block into the slot. The connection method is simple and fast, which can speed up the construction progress and improve the construction efficiency.
[0024] 3. The assembled mixed tower fan foundation provided by the present invention has anchor holes at the slot and the plug block, and the fastener is an anchor bolt, which is arranged in the anchor hole. By arranging the anchor bolt, the connection between the plug block and the slot is reinforced to prevent the plug block from loosening or separating from the slot, and the connection between the prefabricated component 1 and the prefabricated component 2 is more firmly established.
[0025] 4. In the assembled hybrid tower fan foundation provided by the present invention, a prestressed cable channel is provided on the surface of the second column to facilitate the installation of prestressed cable tensioned steel-concrete tower.
[0026] 5. In the assembled mixed tower fan foundation provided by the present invention, the top surface of the first rib beam is a slope that slopes downward from the first column to the first ring beam; the top surface of the second rib beam is a slope that slopes downward from the second column to the second ring beam. This can reduce the material used in processing the first rib beam and the second rib beam, saving production costs.
[0027] 6. The method for constructing the foundation of an assembled mixed-tower fan provided by the present invention comprises: alternately arranging a plurality of prefabricated components 1 and a plurality of prefabricated components 2 along the annular direction, and connecting adjacent prefabricated components 1 and 2 through a plug-in structure; and arranging fasteners at the plug-in position of prefabricated components 1 and 2. This construction method does not require on-site pouring work during the construction of the fan foundation, and the connection between the prefabricated components is simple and quick, and the connection is firm and reliable, the construction speed is fast, and the construction efficiency is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 It is a schematic diagram of the foundation of the assembled mixing tower fan of the present invention;
[0030] Figure 2 It is a schematic diagram of one side of a slot of a prefabricated component in the assembled mixed tower fan foundation of the present invention;
[0031] Figure 3 It is a schematic diagram of one side of an insert block of a prefabricated component in the foundation of the assembled mixed tower fan of the present invention;
[0032] Figure 4 It is a schematic diagram of one side of the second slot of the prefabricated component in the assembled mixed tower fan foundation of the present invention;
[0033] Figure 5 It is a schematic diagram of one side of the second plug-in block of the prefabricated component in the assembled mixed tower fan foundation of the present invention.
[0034] Description of reference numerals:
[0035] 1. Prefabricated component 1, 11. First bottom plate, 12. First ring beam, 13. First pedestal column, 14. First rib beam;
[0036] 2. Prefabricated component 2, 21. Second bottom plate, 22. Second ring beam, 23. Second pedestal, 24. Second rib beam, 25. Prestressed cable channel;
[0037] 31. plug-in block, 32. slot;
[0038] 4. Anchor bolt hole. DETAILED DESCRIPTION
[0039] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0042] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0043] like Figure 1 As shown, it is a preferred embodiment of the assembled mixed tower wind turbine foundation of the present invention. When the mixed tower wind turbine is set up on land, this assembled mixed tower wind turbine foundation can be used to connect the steel-concrete tower of the mixed tower wind turbine.
[0044] The above-mentioned assembled mixed tower wind turbine foundation includes: a plurality of prefabricated components 1 and a plurality of prefabricated components 2, which are alternately arranged along the annular direction, that is, both sides of each prefabricated component 1 are arranged with prefabricated components 2, and similarly, both sides of each prefabricated component 2 are arranged with prefabricated components 1, and a nearly circular wind turbine foundation is formed by connecting a plurality of prefabricated components 1 and a plurality of prefabricated components 2. Adjacent prefabricated components 1 and 2 are plug-in connected by a plug-in structure, and after the plug-in connection, fasteners are also provided at the connection position to tighten to prevent the plug-in from loosening or separation. Since the prefabricated components 1 and 2 are factory prefabricated components, they can be directly installed on site after being prefabricated, and they are plug-in connected to each other through the plug-in structure during on-site installation, without the need to pour concrete on site, and the construction process is simpler, saving time and effort. After the adjacent prefabricated components 1 and 2 are plug-in connected to each other, fasteners are provided for reinforcement, and the connection is firm and reliable.
[0045] Furthermore, the plug-in structure includes an insert block 31 formed on one of the adjacent prefabricated components 1 and 2 and a slot 32 on the other, and the insert block 31 and the slot 32 are matched in shape for plugging. Specifically, in this embodiment, the insert block 31 is provided on one side of the prefabricated component 1 and the slot 32 is provided on the other side, and correspondingly, the insert block 31 is provided on one side of the prefabricated component 2 and the slot 32 is provided on the other side, so that the plug-in connection of the prefabricated component 1 and the prefabricated component 2 can be achieved.
[0046] In other embodiments, plug blocks 31 may be provided on both sides of the prefabricated component 1, and slots 32 may be provided on both sides of the prefabricated component 2, so as to realize the plug-in connection between the prefabricated component 1 and the prefabricated component 2. On the contrary, slots 32 may be provided on both sides of the prefabricated component 1, and plug blocks 31 may be provided on both sides of the prefabricated component 2.
[0047] like Figure 2 , Figure 3 As shown, the prefabricated component 1 includes: a first base plate 11, a first ring beam 12, a first column 13 and a first rib beam 14. The first base plate 11 is an isosceles triangle when viewed from the top of the wind turbine foundation. The first ring beam 12, the first column 13 and the first rib beam 14 are all arranged on the first base plate 11. The first ring beam 12 is located on the side of the first column 13 away from the center of the wind turbine foundation, that is, the position of the first column 13 is closer to the center of the wind turbine foundation than the position of the first ring beam 12, and the height of the first column 13 is greater than the height of the first ring beam 12. Specifically, when viewed from the top of the wind turbine foundation, the first ring beam 12 and the first column 13 are both isosceles trapezoids. The two hypotenuses of the isosceles trapezoid projected by the first ring beam 12 and the first column 13 are flush with the two sides of the isosceles triangle projected by the first base plate 11, and the long side of the isosceles trapezoid projected by the first ring beam 12 is flush with the base of the triangle projected by the first base plate 11.
[0048] In addition, a slot 32 is provided on one side of the first column 13 and the first ring beam 12, and an insert block 31 is provided on the other side. Specifically, the insert block 31 is a square block, and correspondingly, the slot 32 is a square groove matching it. Moreover, the depth of the slot 32 provided on the first column 13 is greater than the depth of the slot 32 provided on the first ring beam 12, and correspondingly, the height of the insert block 31 provided on the first column 13 is also greater than the height of the insert block 31 provided on the first ring beam 12.
[0049] In other embodiments, the shape of the insert block 31 may also be a wedge or other shapes, and the shape of the corresponding slot 32 may also be other shapes that match the insert block 31 .
[0050] In other embodiments, there may be multiple slots 32 and insert blocks 31 disposed on the first column 13 , and there may be multiple slots 32 and insert blocks 31 disposed on the first ring beam 12 .
[0051] Anchor holes 4 are also provided at the plug block 31 and the slot 32, and the axial direction of the anchor holes 4 is along the radial direction of the wind turbine foundation. The anchor holes 4 provided on the plug block 31 directly penetrate the two side surfaces of the plug block 31, and the plug block 31 provided on the first column 13 is provided with two columns and four rows of eight anchor holes 4, and the plug block 31 provided on the first ring beam 12 is provided with two columns and two rows of four anchor holes 4. The anchor holes 4 provided at the slot 32 on the first column 13 penetrate from the side of the first column 13 away from the center of the wind turbine foundation to the slot 32, and then extend from the side of the slot 32 close to the center of the wind turbine foundation to the first column 13. The anchor holes 4 provided at the slot 32 on the first ring beam 12 penetrate from the side of the first ring beam 12 away from the center of the wind turbine foundation to the slot 32, and then extend from the side of the slot 32 close to the center of the wind turbine foundation to the first ring beam 12. Similarly, the slot 32 provided on the first column 13 is provided with two columns and four rows of eight anchor holes 4, and the slot 32 provided on the first ring beam 12 is provided with two columns and two rows of four anchor holes 4. The anchor holes 4 are provided for setting fasteners. In this example, the fasteners are preferably anchor bolts. Inserting the anchor bolts into the anchor holes 4 can fasten the plug block 31 and the slot 32 together, and the plug block 31 and the slot 32 will not loosen or separate. The connection between the prefabricated component 1 and the prefabricated component 2 is more firm and reliable. Moreover, after the anchor bolts are provided, grouting can be poured into the anchor holes 4 to fill the gaps, and the connection effect is better.
[0052] One end of the first rib beam 14 is connected to the first column 13, and the other end is connected to the first ring beam 12. And the top surface of the first rib beam 14 is a slope that slopes downward from the first column 13 to the first ring beam 12, so that materials can be saved when prefabricating the first rib beam 14.
[0053] like Figure 4 , Figure 5As shown, the prefabricated component 2 includes: a second base plate 21, a second ring beam 22, a second column 23 and a second rib beam 24. The second base plate 21 is an isosceles triangle when viewed from the top of the wind turbine foundation. The second ring beam 22, the second column 23 and the second rib beam 24 are all arranged on the second base plate 21. The second ring beam 22 is located on the side of the second column 23 away from the center of the wind turbine foundation, that is, the position of the second column 23 is closer to the center of the wind turbine foundation than the position of the second ring beam 22, and the height of the second column 23 is greater than the height of the second ring beam 22. Specifically, when viewed from the top of the wind turbine foundation, the second ring beam 22 and the second column 23 are both isosceles trapezoids. The two hypotenuses of the isosceles trapezoid projected by the second ring beam 22 and the second column 23 are flush with the two sides of the isosceles triangle projected by the second base plate 21, and the long side of the isosceles trapezoid projected by the second ring beam 22 is flush with the base of the triangle projected by the second base plate 21. Moreover, there is an empty slot between the second column 23 and the second bottom plate 21, that is, unlike the bottom surface of the first column 13 which is completely fitted with the top surface of the first bottom plate 11, the second column 23 and the second bottom plate 21 are not completely fitted, but have an empty slot of a certain height. In addition, a prestressed cable channel 25 is provided on the surface of the second column 23, and the axial direction of the prestressed cable channel 25 is parallel to the height direction of the second column 23. The prestressed cable connects the wind turbine foundation to the steel-concrete tower through the prestressed cable channel 25 on the second column 23.
[0054] In addition, a slot 32 is provided on one side of the second column 23 and the second ring beam 22, and an insert block 31 is provided on the other side. Specifically, the insert block 31 is a square block, and correspondingly, the slot 32 is a square groove matching it. Moreover, the depth of the slot 32 provided on the second column 23 is greater than the depth of the slot 32 provided on the second ring beam 22, and correspondingly, the height of the insert block 31 provided on the second column 23 is also greater than the height of the insert block 31 provided on the second ring beam 22.
[0055] In other embodiments, the shape of the insert block 31 may also be a wedge or other shapes, and the shape of the corresponding slot 32 may also be other shapes that match the insert block 31 .
[0056] In other embodiments, there may be multiple slots 32 and insert blocks 31 disposed on the first column 13 , and there may be multiple slots 32 and insert blocks 31 disposed on the first ring beam 12 .
[0057] Anchor holes 4 are also provided at the plug block 31 and the slot 32, and the axial direction of the anchor holes 4 is along the radial direction of the wind turbine foundation. The anchor holes 4 provided on the plug block 31 directly penetrate the two side surfaces of the plug block 31, and the plug block 31 provided on the second column 23 is provided with two columns and four rows of eight anchor holes 4, and the plug block 31 provided on the second ring beam 22 is provided with two columns and two rows of four anchor holes 4. The anchor holes 4 provided at the slot 32 on the second column 23 penetrate from the side of the second column 23 away from the center of the wind turbine foundation to the slot 32, and then extend from the side of the slot 32 close to the center of the wind turbine foundation to the second column 23. The anchor holes 4 provided at the slot 32 on the second ring beam 22 penetrate from the side of the second ring beam 22 away from the center of the wind turbine foundation to the slot 32, and then extend from the side of the slot 32 close to the center of the wind turbine foundation to the second ring beam 22. Similarly, the slots 32 disposed on the second column 23 are provided with two columns and four rows of eight anchor holes 4 , and the slots 32 disposed on the second ring beam 22 are provided with two columns and two rows of four anchor holes 4 .
[0058] One end of the second rib beam 24 is connected to the second column 23, and the other end is connected to the second ring beam 22. And the top surface of the second rib beam 24 is a slope that slopes downward from the second column 23 to the second ring beam 22, so that materials can be saved when prefabricating the second rib beam 24 part.
[0059] The wind turbine foundation formed by connecting a plurality of prefabricated components 1 and 2 is approximately circular in shape as a whole, and a plurality of first columns 13 and second columns 23 are connected near the center to form a truncated cone. The portion of the truncated cone corresponding to the first column 13 is solid, and the portion corresponding to the second column 23 is partially empty due to the empty groove between the second column 23 and the second bottom plate 21, which makes the truncated cone a cantilever structure and can improve the stability of the truncated cone portion. The center position of the truncated cone is a circular groove, and the bottom surface of the circular groove is the surface of the first bottom plate 11 and the second bottom plate 21.
[0060] In addition, a shockproof buffer is also provided in the slot 32, and the shockproof buffer is preferably a rubber pad. The provided shockproof buffer can convert the energy received by the fan foundation into heat energy dissipation, thereby avoiding the accumulation of damage to the fan foundation.
[0061] The present embodiment also provides a method for constructing an assembled mixed tower fan foundation, which is applied to an assembled mixed tower fan foundation. The assembled mixed tower fan foundation is the same as the assembled mixed tower fan foundation in the above embodiment, so it will not be described in detail.
[0062] The construction method of the assembled mixed tower fan foundation specifically includes the following steps:
[0063] (1) a plurality of prefabricated components 1 and a plurality of prefabricated components 2 are alternately arranged along the annular direction, and adjacent prefabricated components 1 and 2 are connected by a plug-in structure;
[0064] Prefabricated component 1 and prefabricated component 2 are both prefabricated in the factory and are formed by pouring concrete with the help of formwork. The number of prefabricated components 1 and 2 required for each wind turbine foundation is determined according to the size of prefabricated components 1 and 2. Prefabricated components 1 and 2 can be directly installed by delivering them from the factory to the construction site, which is convenient and quick.
[0065] During actual construction, before installing the wind turbine foundation, a foundation pit will be excavated first, then the cable buried pipe will be laid in the foundation pit, and then a cushion layer will be poured to form it, and only then can the wind turbine foundation be installed.
[0066] Prefabricated components 1 and prefabricated components are alternately arranged in a clockwise or counterclockwise direction, shock-proof buffers are installed in the slots 32, and the plug-in blocks 31 or slots 32 on each prefabricated component 1 are plugged and connected with the slots 32 or plug-in blocks 31 on the adjacent prefabricated component 2 2 in turn.
[0067] (2) Fasteners are arranged at the insertion positions of prefabricated component 1 and prefabricated component 2.
[0068] After the prefabricated component 1 is plugged and connected with the prefabricated component 2 2 , a fastener (anchor bolt) is inserted into the anchor bolt hole 4 to connect the plug block 31 and the slot 32 together, and then grouting is poured into the anchor bolt hole 4 .
[0069] After the connection of each prefabricated component is completed, the wind turbine foundation is installed. After the foundation is installed, the soil layer is backfilled, and then the concrete tower section and the transition section are hoisted, and then the prestressed cable is inserted. The prestressed cable passes through the prestressed cable channel 25 on the prefabricated component 2, and the prestressed cable is tensioned at the bottom of the prestressed cable channel 25.
[0070] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. An assembled mixed tower fan foundation, It is characterized in that include: A plurality of prefabricated components one (1) and a plurality of prefabricated components two (2) are alternately arranged in a circumferential direction; The adjacent prefabricated component one (1) and the adjacent prefabricated component two (2) are plug-connected via a plug-in structure, and a fastener is provided at the plug-in connection position.
2. The assembled mixed tower fan foundation according to claim 1, It is characterized in that The plug-in structure comprises an insert block (31) formed on one of the adjacent prefabricated component one (1) and the adjacent prefabricated component two (2) and a slot (32) on the other, wherein the insert block (31) is plugged into the slot (32).
3. The assembled mixed tower fan foundation according to claim 2, It is characterized in that Anchor holes (4) are provided at the slot (32) and the insert block (31); the fastener is an anchor bolt, and the anchor bolt is provided in the anchor hole (4).
4. The assembled mixed tower fan foundation according to claim 2, It is characterized in that The prefabricated component one (1) comprises: a first base plate (11), a first ring beam (12), a first column (13) and a first rib beam (14); the first ring beam (12), the first column (13) and the first rib beam (14) are all arranged on the first base plate (11); the first ring beam (12) is located on a side of the first column (13) away from the center of the wind turbine foundation; one end of the first rib beam (14) is connected to the first column (13), and the other end is connected to the first ring beam (12).
5. The assembled mixed tower fan foundation according to claim 4, It is characterized in that The second prefabricated component (2) comprises: a second base plate (21), a second ring beam (22), a second pedestal (23) and a second rib beam (24); the second ring beam (22), the second pedestal (23) and the second rib beam (24) are all arranged on the second base plate (21); the second ring beam (22) is located on a side of the second pedestal (23) away from the center of the wind turbine foundation, and there is an empty groove between the second pedestal (23) and the second base plate (21); one end of the second rib beam (24) is connected to the second pedestal (23), and the other end is connected to the second ring beam (22).
6. The assembled mixed tower fan foundation according to claim 5, It is characterized in that The first column (13) and the first ring beam (12) are provided with the slot (32) on one side and the insert block (31) on the other side; The second column (23) and the second ring beam (22) are provided with the slot (32) on one side and the insert block (31) on the other side.
7. The assembled mixed tower fan foundation according to claim 5, It is characterized in that The height of the first column (13) is greater than the height of the first ring beam (12); The height of the second pedestal (23) is greater than the height of the second ring beam (22), and a prestressed cable channel (25) is provided on the surface of the second pedestal (23).
8. The assembled mixed tower fan foundation according to claim 5, It is characterized in that The top surface of the first rib beam (14) is a slope that slopes downward from the first pedestal (13) to the first ring beam (12); The top surface of the second rib beam (24) is an inclined surface that slopes downward from the second pedestal (23) to the second ring beam (22).
9. The assembled mixed tower fan foundation according to any one of claims 2 to 8, It is characterized in that A shock-proof buffer is arranged in the slot (32).
10. A method for constructing an assembled mixed-tower fan foundation, applied to the assembled mixed-tower fan foundation according to any one of claims 1 to 9, It is characterized in that The following steps are involved: A plurality of prefabricated components one (1) and a plurality of prefabricated components two (2) are alternately arranged along the annular direction, and adjacent prefabricated components one (1) and prefabricated components two (2) are connected by a plug-in structure; Fasteners are arranged at the plug-in positions of the prefabricated component one (1) and the prefabricated component two (2).