Butt-joint construction method for prefabricated pipe-jacking gallery and cast-in-place pipe gallery

Through the construction method of connecting the prefabricated top pipe corridor with cast-in-place pipe corridor, and the use of steel frames and sectional casting technology, the construction problems of pipe corridors under complex terrain are solved, the effect of adapting to bends in different angles is achieved, cost and manufacturing difficulty is reduced, and Improve structural stability.

CN118997219AActive Publication Date: 2024-11-22CSCEC STRAIT CONSTR & DEV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411273424.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-22
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

When facing complex terrain, existing pipeline construction methods are difficult to adapt to bends at different angles, resulting in increased manufacturing difficulty and manufacturing costs.

Method used

The construction method of the prefabricated top pipe gallery and cast-in-place pipe gallery is adopted. By setting up a steel frame in the construction tank and pouring concrete in sections, an arc structure is formed, and arc pipes that are suitable for straight sections are cast out to adapt to bends at different angles. .

Benefits of technology

It improves the adaptability of pipe gallery laying, reduces manufacturing difficulty and manufacturing cost, and enhances the structural stability of arc tubes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997219A_ABST
    Figure CN118997219A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pipe galleries, and provides a prefabricated top pipe gallery and cast-in-place pipe gallery butt joint construction method which comprises the following steps that S1, a construction groove is excavated; s2, laying of straight line sections: jacking straight pipes into soil section by section according to a designed route on the inner wall of the construction groove by utilizing jacking equipment to form two straight line sections; s3, a bottom plate is manufactured, specifically, a first steel bar frame is arranged on the bottom wall of the construction groove, concrete pouring is conducted, and the bottom plate is formed; s4, side plates are manufactured, specifically, second steel bar frames are arranged on the inner arc edge and the outer arc edge of the bottom plate correspondingly, concrete pouring is conducted, and the two side plates are formed; s5, a top plate is manufactured, specifically, a third steel bar frame is arranged between the two side plates, concrete pouring is conducted, and the top plate is formed; and S6, backfilling the construction groove. According to the butt joint construction method for the prefabricated pipe-jacking gallery and the cast-in-place pipe gallery, the pipe gallery can adapt to turning at different angles during laying.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe corridors, and in particular to a construction method for connecting a prefabricated top pipe corridor with a cast-in-place pipe corridor. Background Art

[0002] Pipe gallery, that is, corridor of pipelines, is usually built underground in cities and used for laying municipal pipelines such as electricity, communication, water supply, drainage and gas. Pipe gallery is an underground pipeline engineering technology, also known as pipe jacking or jacking method. This method is usually used to install new underground pipelines or repair existing pipelines in cities or other densely populated areas without large-scale excavation, greatly reducing the impact of construction on urban life and reducing construction costs and time.

[0003] Conventional pipe corridors are usually laid in a straight line. When facing complex terrain (such as encountering irremovable obstacles such as building basements), the pipe corridor needs to be laid at a certain angle to avoid obstacles. The usual practice is to prefabricate straight pipe-shaped prefabricated pipe sections (hereinafter defined as straight pipes) and prefabricated pipe sections with a certain curvature (hereinafter defined as arc pipes) in the factory. The straight pipes and arc pipes are transported to the construction site. According to the planning and design, a construction trench is excavated at the predetermined turning point of the pipe corridor. On the inner wall of the construction trench, professional jacking equipment is used to push the straight pipe into the soil section by section according to the designed route. Multiple straight pipes are combined to form a whole (hereinafter defined as a straight segment). According to the turning angle of the planned design of the pipe corridor, the straight pipes are pushed into different side walls of the construction trench to form two straight segments. Then the arc pipe is hoisted into the construction trench so that the two ends of the arc pipe are connected to the two straight segments respectively. The arc pipe and the two straight segments are finally combined to form a pipe corridor with a certain angle of turning, so as to avoid underground obstacles. This construction method has the advantages of fast construction speed, controllable quality and little impact on the surrounding environment. It has been widely used in urban underground pipeline construction.

[0004] However, such arc tubes are prefabricated in the factory in advance, and the curvature of the arc tubes prefabricated in the factory is usually fixed. For complex terrain, when different angles of turns are required during the laying of the pipeline corridor, the factory is required to perform additional modeling to manufacture arc tubes with different curvatures, which increases the manufacturing difficulty and cost, and therefore needs further improvement. Summary of the invention

[0005] In order to enable the pipeline corridor to adapt to bends of different angles during its laying, the present application provides a construction method for docking a prefabricated top pipeline corridor with a cast-in-place pipeline corridor.

[0006] The construction method for connecting the prefabricated top pipe gallery and the cast-in-place pipe gallery provided in this application adopts the following technical solution: The construction method for butt jointing a prefabricated roof pipe gallery with a cast-in-place pipe gallery comprises the following steps: S1, excavation of a construction trench: excavating a construction trench on the ground according to a planning design; S2, laying of the straight segments: laying the straight segments on the inner wall of the construction trench using a jacking device to install the straight pipes; S3, laying of the straight segments: laying the straight pipes on the inner wall of the construction trench using a jacking device to install the straight pipes; S4, laying of the straight segments: laying the straight pipes on the inner wall of the construction trench using a jacking device to install the straight pipes; S5, laying of the straight segments: laying the straight pipes on the inner wall of the construction trench using a jacking device to install the straight pipes; S6, laying of the straight pipes on the inner wall of the construction trench; S7, laying of the straight pipes on the inner wall of the construction trench; S8, laying of the straight pipes on the inner wall of the construction trench; S9, laying of the straight pipes on the inner wall of the construction trench using a jacking device to install the straight pipes; S10, laying of the straight pipes on the inner wall of the construction trench; S11, laying of the straight pipes on the inner wall of the construction trench; S12, laying of the straight pipes on the inner wall of the construction trench using a jacking device to install the straight pipes; According to the designed route, the pipes are pushed into the soil section by section. According to the turning angle of the planned pipe gallery, the straight pipes are pushed into different side walls of the construction trench to form two straight line segments; S3, making the bottom plate: laying out the first steel frame on the bottom wall of the construction trench, and pouring concrete, and forming the bottom plate after the concrete solidifies; S4, making the side plates: laying out the second steel frame at the inner arc edge and the outer arc edge of the bottom plate, and pouring concrete respectively, and forming the two side plates after the concrete solidifies; S5, making the top plate: laying out the third steel frame between the two side plates, and pouring concrete, and forming the top plate after the concrete solidifies; S6, backfilling the construction trench.

[0007] By adopting the above technical scheme, through the arrangement of the first steel frame, the second steel frame and the third steel frame, after the two straight segments are pushed in, steps S3, S4 and S5 are sequentially performed in the construction trench to respectively form a bottom plate, two side plates and a top plate, and an arc tube is formed by segmented casting, so that the two ends of the arc tube are butted with the two straight segments; by the cast-in-place method, an arc tube adapted to the two straight segments can be cast in-situ according to the turning angle between the two straight segments, so that the pipeline corridor can adapt to turning angles of different angles during laying, thereby improving the adaptability of the overall structure and reducing the manufacturing difficulty and manufacturing cost.

[0008] 14. The repairing kit for automotive dents, according to claim 13, wherein the foot stand comprises a first, a second, and a second , wherein the foot stand comprises a first and a second , and the foot stand comprises a plurality of said first and second , wherein the foot stand comprises a first and a second , and the foot stand comprises a second , and the foot stand comprises a second , and the foot stand comprises a second , and the foot stand comprises a second , and the foot stand comprises a second , and the foot stand comprises a second , and the foot stand comprises a second

[0009] By adopting the above technical scheme, through the arrangement of the first vertical rod, the second vertical rod, the first horizontal bar and the second horizontal bar, the first vertical rod, the first horizontal bar and the second horizontal bar are combined to form a second steel bar frame that is staggered horizontally and vertically, the second steel bar frame is located in the side casting area, concrete is poured into the side casting area, and after the concrete solidifies, the concrete and the second steel bar frame are combined to form a side plate, the first horizontal bar and the corresponding second horizontal bar are cross-arranged, have good structural stability, can improve the structural stability of the side plate, and then improve the structural stability of the arc tube.

[0010] Optionally, multiple first horizontal bars and second horizontal bars are arranged along the length direction of the first vertical bar, and both ends of the first horizontal bar and both ends of the second horizontal bar are provided with penetration grooves, and the penetration grooves are used for the first vertical bar or the second vertical bar to pass through. The outer peripheral walls of the first vertical bar and the outer peripheral walls of the second vertical bar are both sleeved with multiple support rings, and the support rings are used to support the first horizontal bar or the second horizontal bar. The support rings are provided with connecting pieces, and the support rings are installed on the first vertical bar or the second vertical bar through the connecting pieces.

[0011] By adopting the above technical scheme, through the setting of the through groove and the support ring, the support ring is sleeved on the first vertical rod or the second vertical rod and fixed by the connecting piece, so that the support ring can support the first horizontal bar or the second horizontal bar; when the first horizontal bar and the second horizontal bar are installed, the through grooves at both ends of the first horizontal bar are respectively aligned with the first vertical rod and the second vertical rod and pushed downward, and the through grooves at both ends of the second horizontal bar are respectively aligned with the first vertical rod and the second vertical rod and pushed downward, so that a cross is formed between the first horizontal bar and the second horizontal bar. After multiple first horizontal bars and multiple second horizontal bars are installed, the first vertical rod, the second vertical rod, the first horizontal bar and the second horizontal bar are combined to form a second steel bar frame that is staggered horizontally and vertically, thereby improving the production efficiency of the second steel bar frame; and through the setting of the through groove, the first horizontal bar and the second horizontal bar can be turned around the first vertical rod or the second vertical rod through the through groove to adapt to the arc of the bottom plate, so that arc tubes with different curvatures can be made, thereby improving the adaptability of the overall structure.

[0012] Optionally, after the first steel bar frame is laid out in step S3, support bars are installed on the first steel bar frame, and a plurality of support bars are arranged at intervals along the arc of the bottom plate, and the number of the support bars, the first vertical rods and the second vertical rods are arranged correspondingly; the first vertical rod and the corresponding second vertical rod are both slidably installed on the corresponding support bars, and a driving assembly is provided between the first vertical rod and the second vertical rod, and the driving assembly is used to drive the first vertical rod and the second vertical rod to approach or move away from each other.

[0013] By adopting the above-mentioned technical scheme, through the setting of the support bar and the driving component, the support bar provides an installation carrier for the first vertical rod and the second vertical rod. After the second steel frame is built, concrete is poured into the side pouring area. During the concrete pouring process, the first vertical rod and the corresponding second vertical rod are driven to slide to approach or move away from each other. During the sliding process of the first vertical rod and the second vertical rod, the first horizontal bar and the second horizontal bar are driven to swing. The second steel frame in the active state can stir the concrete to discharge the bubbles mixed in the concrete, improve the pouring effect of the concrete, and then improve the cast-in-place quality of the side panel.

[0014] Optionally, the driving assembly includes a driving rod, a driving gear and a driving rack, the driving rod is vertically installed between the first vertical rod and the corresponding second vertical rod, and the upper end of the driving rod is provided with a rotating head for driving the driving rod to rotate; the driving gear is arranged on the outer peripheral wall of the driving rod, and two driving racks are provided, the two driving racks are respectively connected to the first vertical rod and the second vertical rod, and the two driving racks are meshed with the driving gear for transmission, and the driving rod is rotated, and the two driving racks approach or move away from each other.

[0015] By adopting the above technical solution, through the arrangement of the driving rod, the driving gear and the driving rack, the rotating head can be used to connect with tools such as a hand wheel or an electric drill to drive the driving rod to rotate around its own axis; in the process of pouring concrete into the side pouring area, the driving rod is driven to repeatedly rotate forward and reverse to drive the driving gear to repeatedly rotate forward and reverse, and the driving gear pulls the first vertical rod and the second vertical rod respectively through two driving teeth, so that the first vertical rod and the second vertical rod are moved closer to or away from each other, so as to stir the concrete and improve the effect of concrete pouring.

[0016] Optionally, the driving assembly includes a driving rod, a rotating disk and a docking column, the driving rod being vertically installed between the first vertical rod and the corresponding second vertical rod, and the upper end of the driving rod is provided with a rotating head for driving the driving rod to rotate; the rotating disk is arranged on the outer peripheral wall of the driving rod, and a docking ring groove is opened on the surface of the rotating disk, and the docking ring groove is elliptical in shape; there are two docking columns, the two docking columns are respectively connected to the first vertical rod and the second vertical rod, and the two docking columns are slidably inserted in the docking ring groove.

[0017] By adopting the above technical solution, through the arrangement of the driving rod, the rotating disk and the docking column, the rotating head can be used to connect with tools such as a hand wheel or an electric drill to drive the driving rod to rotate around its own axis; in the process of pouring concrete into the side pouring area, the driving rod is driven to rotate to drive the rotating disk to rotate, and the docking column is slidably inserted in the docking ring groove, so that during the rotation of the rotating disk, the rotating disk can drive the docking column through the docking ring groove, thereby driving the first vertical rod and the second vertical rod to move closer to or away from each other, so as to stir the concrete, improve the effect of concrete pouring, and improve the operation convenience of the overall structure.

[0018] Optionally, a docking sleeve is rotatably installed on the top wall of the support bar, and the lower end of the drive rod is matched and inserted into the docking sleeve and circumferentially linked with the docking sleeve; a flapping piece is provided between the docking sleeve and the support bar, and when the docking sleeve rotates, the flapping piece is used to make the support bar vibrate.

[0019] By adopting the above-mentioned technical scheme, through the arrangement of the docking sleeve and the flapping piece, the driving rod is rotatably installed on the support bar through the docking sleeve, and the driving rod and the docking sleeve are circumferentially linked so that during the rotation of the driving rod, the docking sleeve can be driven to rotate, and the support bar is driven to vibrate through the flapping piece to vibrate the poured concrete, thereby expelling bubbles in the concrete as much as possible, improving the effect of concrete pouring in the side pouring area, and improving the quality of the side panel.

[0020] Optionally, the flapping member includes a vibration plate and a cam, wherein the vibration plate is arranged on the top wall of the support bar and multiple vibration plates are arranged at axial intervals around the docking sleeve; the cam is fixed to the outer peripheral wall of the docking sleeve, and when the docking sleeve rotates, the outer peripheral wall of the cam flaps against the vibration plate.

[0021] By adopting the above-mentioned technical solution, through the setting of the vibration plate and the cam, when the driving rod drives the docking sleeve to rotate, the docking sleeve drives the cam to rotate, so that the cam can hit the vibration plate. As the docking sleeve continues to rotate, vibration is continuously generated to expel as many bubbles in the concrete as possible.

[0022] Optionally, a movable groove is provided on the top wall of the support bar, and the length direction of the movable groove coincides with the radial direction of the bottom plate; the movable groove is respectively slidably installed with a first movable sleeve and a second movable sleeve, the first movable sleeve is used for matching and plugging with the first vertical rod, and the first vertical rod is slidably installed on the support bar through the first movable sleeve, and the second movable sleeve is used for matching and plugging with the second vertical rod, and the second vertical rod is slidably installed on the support bar through the second movable sleeve.

[0023] By adopting the above technical solution and by providing the first movable sleeve and the second movable sleeve, the first vertical rod and the second vertical rod are slidably installed on the support bar.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. After the two straight segments are pushed in by setting the first steel frame, the second steel frame and the third steel frame, steps S3, S4 and S5 are sequentially performed in the construction trench to respectively form a bottom plate, two side plates and a top plate, and an arc tube is formed by segmented casting, so that the two ends of the arc tube are butted with the two straight segments; by cast-in-place, an arc tube adapted to the two straight segments can be cast in-place according to the turning angle between the two straight segments, so that the pipe gallery can adapt to turnings of different angles during laying, thereby improving the adaptability of the overall structure and reducing the manufacturing difficulty and manufacturing cost; 2. By setting the through groove and the support ring, the support ring is sleeved on the first vertical rod or the second vertical rod and fixed by the connecting piece, so that the support ring can support the first horizontal bar or the second horizontal bar; when the first horizontal bar and the second horizontal bar are installed, the through grooves at both ends of the first horizontal bar are respectively aligned with the first vertical rod and the second vertical rod and pushed downward, and the through grooves at both ends of the second horizontal bar are respectively aligned with the first vertical rod and the second vertical rod and pushed downward, so that a cross is formed between the first horizontal bar and the second horizontal bar. After multiple first horizontal bars and multiple second horizontal bars are installed, the first vertical rod, the second vertical rod, the first horizontal bar and the second horizontal bar are combined to form a second steel bar frame that is staggered horizontally and vertically, thereby improving the production efficiency of the second steel bar frame; and by setting the through groove, the first horizontal bar and the second horizontal bar can be turned around the first vertical rod or the second vertical rod through the through groove to adapt to the arc of the bottom plate, so that arc tubes with different curvatures can be made, thereby improving the adaptability of the overall structure; 3. Through the arrangement of the driving rod, the rotating disk and the docking column, the rotating head can be used to dock with tools such as a hand wheel or an electric drill to drive the driving rod to rotate around its own axis; in the process of pouring concrete into the side pouring area, the driving rod is driven to rotate to drive the rotating disk to rotate, and the docking column is slidably inserted in the docking ring groove, so that during the rotation of the rotating disk, the rotating disk can drive the docking column through the docking ring groove, thereby driving the first vertical rod and the second vertical rod to move closer to or away from each other, so as to stir the concrete, improve the effect of concrete pouring, and improve the operation convenience of the overall structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 is a schematic diagram of the overall structure of Example 1; Figure 2 is a schematic structural diagram of an embedding portion and an embedding groove in Embodiment 1; Figure 3 is a schematic diagram of the structure of the arc tube embodied in Example 1; Figure 4 is an exploded schematic diagram of the second steel reinforcement frame according to Embodiment 1; Figure 5 is a partial cross-sectional view of a side baffle according to Embodiment 1; Figure 6 is a schematic structural diagram of a first steel bar frame in accordance with Embodiment 1; Figure 7 is a schematic diagram of the structure of the support ring embodied in Example 1; Figure 8 is a schematic diagram of the structure of the drive assembly embodied in Example 2; Fig. 9 is a schematic diagram of the structure of the drive assembly embodied in Example 3; Fig.10 It is a schematic diagram of the structure of the beating member according to the fourth embodiment.

[0026] Description of reference numerals: 1, arc tube, 11, bottom plate, 12, top plate, 13, side plate, 14, first steel bar frame, 141, straight bar steel bar, 142, arc bar steel bar, 16, side baffle, 161, side casting area, 17, concrete, 2, straight tube, 21, embedded part, 22, embedded groove, 3, construction groove, 4, second steel bar frame, 41, first vertical rod, 42, second vertical rod, 43, first horizontal bar, 44, second horizontal bar, 45, through groove, 46, support ring, 46 1. Limiting hole; 47. Connecting bolt; 5. Support bar; 51. Docking sleeve; 52. Moving groove; 53. First moving sleeve; 54. Second moving sleeve; 55. Connecting column; 56. First fixed sleeve; 57. Second fixed sleeve; 6. Driving assembly; 61. Driving rod; 611. Rotating head; 62. Driving gear; 63. Driving rack; 64. Rotating disk; 641. Docking ring groove; 65. Docking column; 7. Beating piece; 71. Vibrating plate; 72. Cam. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-10 This application is described in further detail.

[0028] Embodiment 1: The embodiment of the present application discloses a construction method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery.

[0029] Reference Figure 1 , Figure 2 The pipe gallery includes an arc tube 1 and two straight segments. The straight segment includes a plurality of straight tubes 2. The plurality of straight tubes 2 are connected to each other to form a straight segment. In this embodiment, an embedding portion 21 is integrally formed at one end of the straight tube 2, and an embedding groove 22 is provided at the other end of the straight tube 2. The embedding groove 22 is used for matching and embedding the embedding portions 21 of adjacent straight tubes 2 to improve the sealing between the two adjacent straight tubes 2.

[0030] Reference Figure 3 , Figure 4 The arc tube 1 includes a bottom plate 11, a top plate 12 and two side plates 13. In this embodiment, the bottom plate 11, the top plate 12 and the two side plates 13 are all in an arc shape. The two side plates 13 are fixedly installed on the upper surface of the bottom plate 11, and the two side plates 13 are respectively arranged at the inner arc edge and the outer arc edge of the upper surface of the bottom plate 11; the top plate 12 is fixedly installed on the top walls of the two side plates 13, and the bottom plate 11, the top plate 12 and the two side plates 13 are combined to form the above-mentioned arc tube 1.

[0031] Reference Figure 1 , Figure 5 The construction method for connecting the prefabricated top pipe gallery with the cast-in-place pipe gallery includes the following steps: S1. Excavation of the construction trench 3: a. Clean the construction ground and remove obstacles on the ground according to the planning and design; b. Use excavators and other equipment to excavate the construction trench 3 on the ground.

[0032] S2. Laying of straight segments: using a jacking device (the jacking device is a prior art structure, its structure will not be elaborated here, and it is not shown in the figure), the straight pipe 2 is pushed into the soil section by section along the designed route on the inner wall of the construction trench 3. According to the turning angle of the planned corridor, the straight pipe 2 is pushed into different side walls of the construction trench 3 to form two straight segments.

[0033] S3. Production of the bottom plate 11: a. Arrange the first steel frame 14 on the bottom wall of the construction trench 3; b. Build a bottom baffle (not shown in the figure) on the periphery of the first steel frame 14, the bottom baffle is used to enclose the first steel frame 14 to form a bottom pouring area for pouring concrete 17; c. Pour concrete 17 into the bottom pouring area, and after the concrete 17 solidifies, remove the bottom baffle to form a bottom plate 11 between the first steel frame 14 and the concrete 17.

[0034] S4. Production of side panels 13: a. Arrange the second steel bars 4 at the inner arc edge and the outer arc edge of the upper surface of the bottom plate 11 respectively; b. Install side baffles 16 on the upper surface of the bottom plate 11. Two groups of side baffles 16 are installed. The two groups of side baffles 16 are respectively arranged at the inner arc edge and the outer arc edge of the upper surface of the bottom plate 11. The two groups of side baffles 16 are arranged corresponding to the two groups of second steel bars 4. The side baffles 16 are used to enclose the second steel bars 4 to form a side pouring area 161 for pouring concrete 17; c. Pour concrete 17 into the side pouring area 161. After the concrete 17 solidifies, the side baffles 16 are disassembled to form a side panel 13 between the second steel bars 4 and the concrete 17.

[0035] S5. Production of the top plate 12: a. Arrange a third steel frame between the two side plates 13, with the two sides of the third steel frame overlapped on the top walls of the two side plates 13 respectively; b. Build a top baffle (not shown in the figure) on the periphery of the third steel frame, the top baffle is used to enclose the third steel frame to form a top pouring area for pouring concrete 17; c. Pour concrete 17 into the top pouring area, and after the concrete 17 solidifies, remove the top baffle, form a top plate 12 between the third steel frame and the concrete 17, and combine the bottom plate 11, the top plate 12 and the two side plates 13 to form the above-mentioned arc tube 1, and the two ends of the arc tube 1 are respectively connected to two straight line segments.

[0036] S6. Backfill the construction trench 3. Use soil, stone and other materials that meet the requirements to backfill the construction trench 3.

[0037] Reference Figure 6 The structure of the first steel bar frame 14 is the same as that of the third steel bar frame. The structure of the first steel bar frame 14 is used as an example for explanation below. The structure of the third steel bar frame can be obtained similarly (the third steel bar frame is not shown in the figure). The first steel bar frame 14 includes straight rod steel bars 141 and arc rod steel bars 142. The straight rod steel bars 141 are arranged at intervals along the arc line of the bottom plate 11, and both ends of each straight rod steel bar 141 are extended along the radial direction of the bottom plate 11. The arc rod steel bars 142 are formed into an arc shape by bending, and the arc line of the arc rod steel bars 142 is consistent with the arc line of the bottom plate 11. A plurality of arc rod steel bars 142 are arranged at intervals along the radial direction of the bottom plate 11, and all the straight rod steel bars 141 and all the arc rod steel bars 142 are connected as a whole by binding to form the first steel bar frame 14.

[0038] Reference Figure 4 , Figure 7 It should be noted that when the first steel frame 14 is laid out and the concrete 17 has not been poured, the support bar 5 is installed on the first steel frame 14, and the bottom wall of the support bar 5 is fixedly installed with a connecting column 55, and the connecting column 55 is fixedly installed on the first steel frame 14 by welding. When the concrete 17 is poured on the first steel frame 14 and solidified, the support bar 5 is located on the upper surface of the base plate 11; in this embodiment, two groups of support bars 5 are provided, and the two groups of support bars 5 are respectively arranged at the inner arc edge and the outer arc edge of the upper surface of the base plate 11, and the number of each group of support bars 5 is provided. A plurality of support bars 5 are arranged at intervals along the arc of the base plate 11.

[0039] Reference Figure 4 , Figure 5 , Figure 7 The support bar 5 is used to connect with the second steel bar frame 4. In this embodiment, the top wall of the support bar 5 is fixedly installed with a first fixed sleeve 56 and a second fixed sleeve 57. The first fixed sleeve 56 and the second fixed sleeve 57 are arranged at intervals along the radial direction of the bottom plate 11; the second steel bar frame 4 includes a first vertical rod 41, a second vertical rod 42, a first horizontal bar 43 and a second horizontal bar 44. The first vertical rod 41 and the second vertical rod 42 are both vertically arranged. The first vertical rod 41 and the second vertical rod 42 are both arranged at intervals along the arc of the bottom plate 11. The support bar 5, the first vertical rod 41 And the number of second vertical rods 42 is set accordingly; the lower end of the first vertical rod 41 is inserted into the first fixed sleeve 56 of the corresponding support bar 5, and the first vertical rod 41 is connected to the support bar 5 (i.e., the bottom plate 11) through the first fixed sleeve 56, and the lower end of the second vertical rod 42 is inserted into the second fixed sleeve 57 of the corresponding support bar 5, and the second vertical rod 42 is connected to the support bar 5 (i.e., the bottom plate 11) through the second fixed sleeve 57; it should be noted that the first vertical rod 41 and the first fixed sleeve 56, and the second vertical rod 42 and the second fixed sleeve 57 are welded and fixed.

[0040] Reference Figure 4 , Figure 5 , Figure 7 In this embodiment, a plurality of first horizontal bars 43 and a plurality of second horizontal bars 44 are arranged along the arc line of the bottom plate 11, and the plurality of first horizontal bars 43 and the plurality of second horizontal bars 44 are arranged correspondingly. One end of the first horizontal bar 43 is connected to the first vertical rod 41, and the other end is connected to the second vertical rod 42. One end of the second horizontal bar 44 is connected to the second vertical rod 42, and the other end is connected to the first vertical rod 41. The first horizontal bars 43 and the corresponding second horizontal bars 44 are arranged crosswise.

[0041] Reference Figure 4 , Figure 7It should be noted that the first horizontal bar 43 and the second horizontal bar 44 are both provided with a plurality of them along the length direction of the first vertical rod 41, and both ends of the first horizontal bar 43 and the second horizontal bar 44 are provided with a penetration groove 45, the penetration groove 45 is a strip groove, and both ends of the penetration groove 45 extend along the length direction of the first horizontal bar 43 or the length direction of the second horizontal bar 44, and the penetration groove 45 is used for the first vertical rod 41 or the second vertical rod 42 to penetrate.

[0042] The outer peripheral wall of the first vertical rod 41 and the outer peripheral wall of the second vertical rod 42 are both sleeved with a plurality of support rings 46, and the support rings 46 are used to support the first horizontal bar 43 or the second horizontal bar 44. The support rings 46 are provided with connecting parts, and the support rings 46 are installed on the first vertical rod 41 or the second vertical rod 42 through the connecting parts; in this embodiment, the peripheral wall of the support ring 46 is provided with a limiting hole 461, and the connecting part includes a connecting bolt 47, and the connecting bolt 47 is passed through the limiting hole 461 and abuts against the outer peripheral wall of the first vertical rod 41 or the outer peripheral wall of the second vertical rod 42, and the connecting bolt 47 is threadedly connected to the limiting hole 461.

[0043] It should be noted that after the side plate 13 is formed, the upper end surfaces of the first vertical rod 41 and the second vertical rod 42 are both higher than the top wall of the side plate 13 so as to be used for welding the third steel bar frame.

[0044] The implementation principle of Example 1 of the present application is as follows: the arc tube 1 is made by cast-in-place, and can be cast in-place according to the turning angle between the two straight segments to match the two straight segments, so that the pipeline corridor can adapt to turning angles of different angles when laid, thereby improving the adaptability of the overall structure; the combination of the first vertical rod 41, the second vertical rod 42, the first horizontal bar 43 and the second horizontal bar 44 serves as the skeleton of the side panel 13, which greatly improves the structural strength of the side panel 13; the lower ends of the first vertical rod 41 and the second vertical rod 42 are connected to the support bar 5, and thus connected to the first steel bar frame 14, and the upper ends of the first vertical rod 41 and the second vertical rod 42 are both exposed on the side panel 13 and used to connect to the third steel bar frame, so that after the arc tube 1 is formed, the first steel bar frame 14, the second steel bar frame 4 and the third steel bar frame are connected as a whole, which greatly improves the structural strength of the arc tube 1.

[0045] Embodiment 2: The embodiment of the present application discloses a construction method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery.

[0046] Reference Figure 8 The difference between the construction method for connecting the prefabricated roof pipe gallery and the cast-in-place pipe gallery disclosed in the embodiment of the present application and embodiment 1 is that: In this embodiment, a movable groove 52 is opened on the top wall of each support bar 5, and the length direction of the movable groove 52 coincides with the radial direction of the bottom plate 11. The movable groove 52 is respectively slidably installed with a first movable sleeve 53 and a second movable sleeve 54. The first movable sleeve 53 is used for matching and plugging with the first vertical rod 41. The first vertical rod 41 is slidably installed on the support bar 5 through the first movable sleeve 53. The second movable sleeve 54 is used for matching and plugging with the second vertical rod 42. The second vertical rod 42 is slidably installed on the support bar 5 through the second movable sleeve 54.

[0047] Reference Figure 8 , a docking sleeve 51 is rotatably installed on the inner wall of the movable groove 52, and the docking sleeve 51 is located between the first movable sleeve 53 and the second movable sleeve 54; a driving assembly 6 is arranged between the first vertical rod 41 and the second vertical rod 42, and the driving assembly 6 is used to drive the first vertical rod 41 and the second vertical rod 42 to approach or move away from each other; in this embodiment, the driving assembly 6 includes a driving rod 61, a driving gear 62 and a driving rack 63, the driving rod 61 is vertically arranged, the driving rod 61 is located between the first vertical rod 41 and the corresponding second vertical rod 42, the lower end of the driving rod 61 is matched and inserted in the docking sleeve 51 and welded and fixed with the docking sleeve 51, so that the driving rod 61 and the docking sleeve 51 are circumferentially linked (that is, when the driving rod 61 rotates, the docking sleeve 51 can be driven to rotate), and a rotating head 611 is integrally formed on the upper end of the driving rod 61, and the cross-sectional shape of the rotating head 611 is polygonal, and the rotating head 611 is used to dock with tools such as a hand wheel or an electric drill to drive the driving rod 61 to rotate around its own axis.

[0048] Reference Figure 8 The driving gear 62 is coaxially fixed to the outer peripheral wall of the driving rod 61, and there are two driving racks 63, one end of which is fixedly connected to the support ring 46 of the first vertical rod 41, and one end of the other driving rack 63 is fixedly connected to the support ring 46 of the second vertical rod 42. In this embodiment, the driving gear 62 and the two driving racks 63 are meshed for transmission, and the two driving racks 63 can be moved closer to or away from each other by rotating the driving rod 61.

[0049] The implementation principle of Example 2 of the present application is as follows: after the second steel bar frame 4 is built, concrete 17 is poured into the side pouring area 161. During the pouring of concrete 17, a tool is used to drive the driving rod 61 to rotate, which can drive the first vertical rod 41 and the second vertical rod 42 to move closer to or away from each other. By controlling the driving rod 61 to repeatedly rotate forward and reverse, the first vertical rod 41 and the second vertical rod 42 can be driven to slide back and forth, so that the first vertical rod 41, the second vertical rod 42, the first horizontal bar 43 and the second horizontal bar 44 can stir the concrete 17 to discharge bubbles mixed in the concrete 17, thereby improving the pouring effect of the concrete 17.

[0050] Embodiment 3: The embodiment of the present application discloses a construction method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery.

[0051] Reference Fig. 9 The difference between the construction method for connecting the prefabricated roof pipe gallery and the cast-in-place pipe gallery disclosed in the embodiment of the present application and that in embodiment 2 is that: In this embodiment, the driving assembly 6 includes a driving rod 61, a rotating disk 64 and a docking column 65. The structure of the driving rod 61 is the same as the structure of the driving rod 61 in Example 2, and will not be repeated here; the rotating disk 64 is coaxially fixed to the outer peripheral wall of the driving rod 61, and a docking ring groove 641 is provided on the upper surface of the rotating disk 64, and the shape of the docking ring groove 641 is elliptical; there are two docking columns 65, one end of which is fixedly connected to the support ring 46 of the first vertical rod 41, and one end of the other docking column 65 is fixedly connected to the support ring 46 of the second vertical rod 42, and the two docking columns 65 are both slidably inserted in the docking ring groove 641 of the rotating disk 64.

[0052] The implementation principle of Example 3 of the present application is as follows: after the second steel bar frame 4 is built, concrete 17 is poured into the side pouring area 161. During the pouring of concrete 17, the driving rod 61 is driven to rotate by a tool, and the rotating disk 64 can drive the two docking columns 65 to approach or move away from each other through the inner wall of the docking ring groove 641, thereby driving the first vertical rod 41 and the second vertical rod 42 to approach or move away from each other; by continuously driving the driving rod 61 to rotate, the docking ring groove 641 can drive the first vertical rod 41 and the second vertical rod 42 to continuously slide back and forth, so that the first vertical rod 41, the second vertical rod 42, the first horizontal bar 43 and the second horizontal bar 44 can stir the concrete 17 to discharge bubbles mixed in the concrete 17, improve the pouring effect of the concrete 17, and improve the convenience of operation of stirring the concrete 17.

[0053] Embodiment 4: The embodiment of the present application discloses a construction method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery.

[0054] Reference Fig.10 The difference between the construction method for connecting the prefabricated roof pipe gallery and the cast-in-place pipe gallery disclosed in the embodiment of the present application and embodiment 3 is that: In this embodiment, a beating piece 7 is arranged between the docking sleeve 51 and the support bar 5. When the docking sleeve 51 rotates, the beating piece 7 is used to make the support bar 5 vibrate; the beating piece 7 includes a vibration plate 71 and a cam 72. The vibration plate 71 is vertically arranged, and the lower side of the vibration plate 71 is fixedly connected to the inner wall of the movable groove 52 of the support bar 5. A plurality of vibration plates 71 are arranged at axial intervals around the docking sleeve 51; the cam 72 is fixedly installed on the outer peripheral wall of the docking sleeve 51. When the docking sleeve 51 rotates, the outer peripheral wall of the cam 72 beats on the vibration plate 71.

[0055] The implementation principle of Example 4 of the present application is: the driving rod 61 rotates, so that the second steel frame 4 stirs the concrete 17, and the driving rod 61 drives the docking sleeve 51 to rotate. The cam 72 on the docking sleeve 51 can tap the vibration plate 71 during the rotation process, thereby generating vibration, reducing the possibility of bubbles being mixed in the concrete 17, and thereby improving the quality of the pouring of the concrete 17.

[0056] The above are preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. The construction method for connecting the prefabricated top pipe gallery with the cast-in-place pipe gallery is characterized by: The pipe gallery comprises an arc pipe (1) and two straight sections, wherein the straight sections comprise a plurality of straight pipes (2) connected end to end; the arc pipe (1) comprises a bottom plate (11), a top plate (12) and two side plates (13), wherein the bottom plate (11), the top plate (12) and the two side plates (13) are all in an arc shape, wherein the two side plates (13) are respectively arranged at the inner arc edge and the outer arc edge of the upper surface of the bottom plate (11), wherein the top plate (12) is arranged between the two side plates (13), and wherein the bottom plate (11), the top plate (12) and the two side plates (13) are combined to form the arc pipe (1); the construction method for butting a prefabricated top pipe gallery with a cast-in-place pipe gallery comprises the following steps: S1, excavation of a construction trench (3): excavating a construction trench (3) on the ground according to a planning design; S2, laying of straight sections: using a jacking device to jack the straight pipes (2) section by section along a designed route on the inner wall of the construction trench (3); During burial, according to the turning angle of the pipe gallery planning and design, the straight pipe (2) is pushed into different side walls of the construction trench (3) to form two straight line segments; S3, production of the bottom plate (11): a first steel frame (14) is arranged on the bottom wall of the construction trench (3), and concrete (17) is poured. After the concrete (17) solidifies, the bottom plate (11) is formed; S4, production of the side plate (13): a second steel frame (4) is arranged at the inner arc edge and the outer arc edge of the bottom plate (11), and concrete (17) is poured. After the concrete (17) solidifies, the two side plates (13) are formed; S5, production of the top plate (12): a third steel frame is arranged between the two side plates (13), and concrete (17) is poured. After the concrete (17) solidifies, the top plate (12) is formed; S6, backfilling of the construction trench (3).

2. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 1 is characterized in that: In step S4, after the second steel frame (4) is arranged, a side baffle (16) is installed on the upper surface of the bottom plate (11), and the side baffle (16) is used to enclose the second steel frame (4) to form a side pouring area (161) for pouring concrete (17); the second steel frame (4) includes a first vertical rod (41), a second vertical rod (42), a first horizontal bar (43) and a second horizontal bar (44), the lower end of the first vertical rod (41) and the lower end of the second vertical rod (42) are both connected to the bottom plate (11), and the first vertical rod (41) and the second vertical rod (42) are both arranged at intervals along the arc of the bottom plate (11), and the plurality of first vertical rods (41) and the plurality of second vertical rods (42) are connected to each other. Two vertical rods (42) are arranged correspondingly, and each of the first vertical rods (41) and the corresponding second vertical rod (42) are arranged at intervals along the radial direction of the bottom plate (11); a plurality of the first horizontal bars (43) and the second horizontal bars (44) are arranged along the arc of the bottom plate (11), and a plurality of the first horizontal bars (43) and a plurality of the second horizontal bars (44) are arranged correspondingly, one end of the first horizontal bar (43) is connected to the first vertical rod (41), and the other end is connected to the second vertical rod (42), one end of the second horizontal bar (44) is connected to the second vertical rod (42), and the other end is connected to the first vertical rod (41), and the first horizontal bar (43) and the corresponding second horizontal bar (44) are arranged in a cross-shaped manner.

3. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 2 is characterized in that: The first horizontal bar (43) and the second horizontal bar (44) are both provided with a plurality of them along the length direction of the first vertical bar (41); both ends of the first horizontal bar (43) and both ends of the second horizontal bar (44) are provided with penetration grooves (45); the penetration grooves (45) are used for the first vertical bar (41) or the second vertical bar (42) to penetrate; the outer peripheral wall of the first vertical bar (41) and the outer peripheral wall of the second vertical bar (42) are both provided with a plurality of support rings (46); the support rings (46) are used for supporting the first horizontal bar (43) or the second horizontal bar (44); the support rings (46) are provided with connecting pieces; the support rings (46) are installed on the first vertical bar (41) or the second vertical bar (42) through the connecting pieces.

4. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 3 is characterized in that: After the first reinforcement frame (14) is arranged in step S3, a support bar (5) is installed on the first reinforcement frame (14), and a plurality of the support bars (5) are arranged at intervals along the arc of the bottom plate (11), and the number of the support bars (5), the first vertical rod (41) and the second vertical rod (42) are arranged correspondingly; the first vertical rod (41) and the corresponding second vertical rod (42) are both slidably installed on the corresponding support bars (5), and a driving component (6) is provided between the first vertical rod (41) and the second vertical rod (42), and the driving component (6) is used to drive the first vertical rod (41) and the second vertical rod (42) to move closer to or away from each other.

5. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 4 is characterized in that: The driving assembly (6) comprises a driving rod (61), a driving gear (62) and a driving rack (63); the driving rod (61) is vertically installed between a first vertical rod (41) and a corresponding second vertical rod (42); a rotating head (611) for driving the driving rod (61) to rotate is provided at the upper end of the driving rod (61); the driving gear (62) is arranged on the outer peripheral wall of the driving rod (61); two driving racks (63) are provided; the two driving racks (63) are respectively connected to the first vertical rod (41) and the second vertical rod (42); and the two driving racks (63) are meshed with the driving gear (62) for transmission; when the driving rod (61) is rotated, the two driving racks (63) are moved closer to or farther away from each other.

6. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 4 is characterized in that: The driving assembly (6) comprises a driving rod (61), a rotating disk (64) and a docking column (65); the driving rod (61) is vertically installed between a first vertical rod (41) and a corresponding second vertical rod (42); a rotating head (611) for driving the driving rod (61) to rotate is provided at the upper end of the driving rod (61); the rotating disk (64) is arranged on the outer peripheral wall of the driving rod (61); a docking ring groove (641) is provided on the surface of the rotating disk (64); and the docking ring groove (641) is elliptical in shape; two docking columns (65) are provided, and the two docking columns (65) are respectively connected to the first vertical rod (41) and the second vertical rod (42), and the two docking columns (65) are both slidably inserted in the docking ring groove (641).

7. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 6 is characterized in that: A docking sleeve (51) is rotatably mounted on the top wall of the support bar (5); the lower end of the driving rod (61) is matched and inserted into the docking sleeve (51) and is circumferentially linked with the docking sleeve (51); a beating member (7) is provided between the docking sleeve (51) and the support bar (5); when the docking sleeve (51) rotates, the beating member (7) is used to cause the support bar (5) to vibrate.

8. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 7 is characterized in that: The beating member (7) comprises a vibration plate (71) and a cam (72); the vibration plate (71) is arranged on the top wall of the support bar (5), and a plurality of the vibration plates (71) are arranged at intervals around the axial direction of the docking sleeve (51); the cam (72) is fixed to the outer peripheral wall of the docking sleeve (51); when the docking sleeve (51) rotates, the outer peripheral wall of the cam (72) beats against the vibration plate (71).

9. The method for connecting a prefabricated roof pipe gallery with a cast-in-place pipe gallery according to claim 4 is characterized in that: The top wall of the support bar (5) is provided with a movable groove (52), and the length direction of the movable groove (52) coincides with the radial direction of the bottom plate (11); the movable groove (52) is slidably mounted with a first movable sleeve (53) and a second movable sleeve (54), respectively; the first movable sleeve (53) is used for matching and plugging with the first vertical rod (41), and the first vertical rod (41) is slidably mounted on the support bar (5) through the first movable sleeve (53); the second movable sleeve (54) is used for matching and plugging with the second vertical rod (42), and the second vertical rod (42) is slidably mounted on the support bar (5) through the second movable sleeve (54).

Citation Information

Patent Citations

  • Underground excavation construction method for underground multi-cabin utility tunnel underpass buildings

    CN112482435A

  • Underground pipe gallery gas cabin structure

    CN215330026U

  • Constructing method for underground external wall using form with concrete placing inlet and vibrator inlet for preventing concrete counterflow

    KR1020110136987A

  • SECTION OF UNDERGROUND PEDESTRIAN CROSSING

    RU2011103079A