Method for counting fishing boat in-port duration and fishing boat number for specific fishing port by using Beidou navigation positioning

By using the BeiDou navigation and positioning system and grid coding method, the management problems of the length of time and number of fishing boats in the fishing port have been solved, realizing the automation and modernization of fishing port management and providing evaluation indicators for the operation of the fishing port.

CN119003587APending Publication Date: 2024-11-22EAST CHINA SEA FISHERIES RES INST CHINESE ACAD OF FISHERY SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411000399.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Existing technologies are insufficient for effectively managing and tracking the length of time fishing vessels remain in port and the number of vessels, resulting in an unsound management mechanism and extensive management methods.

Method used

Using the BeiDou Navigation Satellite System, a grid-based coding method is employed to perform spatial queries and code matching on fishing port and vessel location data, and to calculate the duration and number of fishing vessels in port. The specific steps include creating a grid-like vector format geospatial data file, assigning a unique code to each grid, obtaining and matching the grid codes of vessel location data, and calculating the time-series continuous duration and number of vessels in port.

Benefits of technology

It enables rapid and accurate statistics on the duration and number of fishing vessels in port, providing direct indicators for port management and enabling the assessment of port capacity and operational status.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119003587A_ABST
    Figure CN119003587A_ABST
Patent Text Reader

Abstract

The invention discloses a method for counting fishing boat in-port time and the number of fishing boats facing a specific fishing port by using Beidou navigation positioning. The method specifically comprises the following steps: (1) firstly, forming a grid in a longitude and latitude range with a span of 64 degrees; (2) acquiring a spatial range and central longitude and latitude of a specific fishing port; (3) obtaining the coding information in the step (1) through spatial query according to the specific fishing port, and marking the name of the specific fishing port; (4) encoding the acquired ship position data by adopting the same encoding rule, and extracting ship position records which are the same as the encoding information of the specific fishing port; (5) storing ship position data with continuous time sequence; (6) obtaining the time length of the ship in the port; (7) obtaining the total number of ships in the port in the time period; and (8) accumulating the in-port time lengths of all the in-port ships to obtain the total in-port time length of the ships of the specific fishing port. According to the method, the operation condition of the fishing port can be evaluated by directly utilizing the calculated indexes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical fields of fishery management such as fishing vessels and fishing ports, Beidou navigation satellite positioning application, geocoding and ship position data mining, and in particular to a method for counting the length of time fishing vessels stay in a specific fishing port and the number of fishing vessels using Beidou navigation positioning. Background Art

[0002] Fishing ports are important fishery infrastructure and are essential places for fishermen to live and work and for fishing boats to take shelter from wind and reduce disasters. Due to factors such as weak supporting capacity and extensive traditional fishing operations, my country's fishing ports generally have imperfect management mechanisms and relatively extensive management methods, resulting in problems such as inadequate environmental maintenance and prominent contradictions between production and management. In recent years, with the continuous development of industries such as marine fisheries and the continuous advancement of coastal urban construction, the important role of fishing ports has become increasingly prominent, and their comprehensive functions have gradually expanded. Research on the length of time fishing vessels stay in port and the number of fishing vessels is of great significance to the management and development of fishing ports.

[0003] Based on the precise positioning of navigation satellites, in my country, it mainly relies on the Beidou navigation satellite positioning system. Through the Vessel Monitoring System (VMS) and the ship-borne terminal relying on the Automatic Identification System (AIS), fishing vessels can be monitored, controlled and supervised, and can automatically and continuously broadcast the ship's latitude and longitude position, heading, speed, Maritime Mobile Service Identification Code (MMSI), ship name, call sign and other dynamic and static information as well as navigation-related information. This is not only of great significance for ship collision avoidance and maritime traffic safety, but also can use this information to manage fishing vessels in port and promote the automation and modernization level of fishing port management. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method for counting the time fishing vessels stay in port and the number of fishing vessels in a specific fishing port by using Beidou navigation positioning, which can obtain information on the time fishing vessels stay in port and the number of fishing vessels from the ship position data obtained by the fishing vessel VMS or AIS.

[0005] The present invention is achieved through the following technical solutions:

[0006] A method for counting the time and number of fishing vessels in a specific fishing port using Beidou navigation positioning specifically comprises the following steps:

[0007] (1) First, a grid-shaped surface type vector format geospatial data file is created for a longitude and latitude range spanning 64° to form a grid, and a grid stacking encoding method is used to give each grid a unique code;

[0008] (2) Obtain the spatial scope and central longitude and latitude of a specific fishing port;

[0009] (3) performing spatial query on the grid-shaped surface type vector format geographic spatial data in step (1) and the spatial range of the specific fishing port, extracting the grids that spatially overlap with the spatial range of the specific fishing port as representatives of the specific fishing port, marking them as dockable grids, obtaining the coding information of step (1) and marking the name of the specific fishing port;

[0010] (4) The longitude and latitude of the acquired ship position data are also grid-coded according to the coding rule of step (1), and the grid-coded result of the ship position is added to the ship position data set and saved;

[0011] (5) Compare the result of step (4) with the result of step (3), and by determining the correspondence between the grid coding result of the ship position record and the coding information of the specific fishing port in step (3), extract the ship position record with the same coding information as the specific fishing port, and save its time-series continuous ship position data; when the last ship position record transmitted before the shipborne equipment is turned off has the same code as the first ship position record after it is turned on and belongs to the specific fishing port code, it is assumed to be time-series continuous.

[0012] (6) The length of time that the ship is in port is obtained by calculating the length of the first and last time intervals of the coded ship position data that are continuous in time sequence and belong to a specific fishing port;

[0013] (7) Filter out the coded ship position data of all ships that are continuous in time sequence and belong to a specific fishing port and save them, select a time period, count the number of different ship names belonging to the time period, and obtain the total number of ships in the port in the time period;

[0014] (8) The total port time of ships in a specific fishing port can be obtained by adding up the port time of all ships in the port.

[0015] Preferably, the longitude and latitude range in step (1) is 105°~169°E, 0°~64°N.

[0016] Preferably, in step (1), a grid-shaped surface type vector format geospatial data file is created to form 7680×7680 grids, and the grid size, i.e., the spatial resolution, is 0.5′×0.5′.

[0017] Preferably, in step (1), a division rule combining binary division and multi-division and a grid stacking encoding method are adopted to give each grid a unique code.

[0018] Preferably, in the step (1), the grid code to the east of the longitude bisecting line is 1, and the grid code to the west is 0, the grid code to the north of the latitude bisecting line is 1, and the grid code to the south of the bisecting line is 0, and the longitude and latitude binary codes are converted into one-dimensional binary codes by cross-combining the digits of the longitude and latitude binary codes in the order of longitude first and latitude later, and the division is performed 7 times in total. For the cross-combined longitude and latitude binary codes, the 2-dimensional binary codes are repeated. 2 The binary 00, 01, 10, 11 correspond to the character codes 'A', 'B', 'C', 'D' respectively. After conversion, the character code is added to the encoding result, that is, a binary character conversion is performed. The grid size after 7 divisions is 0.5°×0.5°, that is, 30′×30′; it is further divided into a 3×3 grid, that is, the grid size is 10′×10′, and the encoding uses column-row encoding from left to right and from top to bottom. In the order of columns first and rows later, the column and row numbers start from 1, and the column and row numbers are added to the encoding result; it is binary again, the grid size is 5′×5′, and the binary character conversion is used, which is added to the encoding result; it is again divided into a 5×5 grid, the spatial scale is 1′×1′, the encoding uses the same column-row encoding, which is added to the encoding result; then it is binary again, the spatial scale is 0.5′×0.5′, and the binary character conversion is performed, and the character is added to the encoding result.

[0019] Preferably, in step (4), the grid coding result of the ship position is added to the ship position data set and saved, which means at the end of each position record.

[0020] Preferably, in step (5), if there is only a single coded and discontinuous ship position record belonging to a specific fishing port, the data will not be saved.

[0021] Beneficial effects:

[0022] The present invention performs geographic grid coding on a region, obtains coding information of a specific fishing port through spatial query, and performs geographic grid coding on ship position data at the same time, compares the coding result of the ship position data with the coding information of the specific fishing port, and screens out the ship position records belonging to the specific fishing port to form a corresponding data set; by calculating the first and last records of the ship position data that continuously belongs to the specific fishing port and is continuous in time sequence (i.e., subtracting the first and last time from each other), the port length of the ship can be conveniently, quickly and accurately calculated, the time sequence of the ship position data that is continuous and continuously belongs to the fishing port code is obtained for all fishing boats, a time period is selected, the number of fishing boats in the port within the time period is calculated, and the port length of all ships is accumulated to obtain the total port length of the fishing boats in the specific fishing port.

[0023] People can directly use the calculated indicators, such as the total number of ships in the port and the total length of time fishing boats are in port, as indicators of the carrying capacity of the fishing port. They can also use the calculated indicators, such as the ratio of the total number of ships in the port to the total berth data of the fishing port, to evaluate the turnover rate of the port and evaluate the operating conditions of the fishing port. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a flow chart of the method of the present invention;

[0025] Figure 2 It is the coding and name marking diagram of Shenjiamen Central Fishing Port in the embodiment;

[0026] Figure 3 It is a position trajectory diagram of the fishing vessel "Zhepu Yu 68901" in the embodiment. DETAILED DESCRIPTION

[0027] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings: This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

[0028] The present invention discloses a method for counting the time fishing vessels stay in a specific fishing port and the number of fishing vessels by using Beidou navigation positioning, which specifically comprises the following steps:

[0029] (1) First, for the longitude and latitude range of 64° (105°-169°E, 0°-64°N), a grid-shaped surface type vector format geospatial data file is created to form 7680×7680 grids with a grid size (i.e., spatial resolution) of 0.5′×0.5′. A combination of binary and multi-division coding rules is used to assign a unique code to each grid.

[0030] (2) Obtain the spatial scope and central longitude and latitude of a specific fishing port;

[0031] (3) performing spatial query on the grid-shaped surface type vector format geographic spatial data in step (1) and the spatial range of the specific fishing port, extracting the grids that spatially overlap with the spatial range of the specific fishing port as representatives of the specific fishing port, marking them as dockable grids, obtaining the coding information of step (1) and marking the name of the specific fishing port;

[0032] (4) The longitude and latitude of the acquired ship position data are also grid-coded according to the coding rules of step (1), and the grid coding result of the ship position is added to the ship position data set (at the end of each position record) and saved;

[0033] (5) Compare the result of step (4) with the result of step (3), and by determining the correspondence between the grid coding result of the ship position record and the coding information of the specific fishing port in step (3), extract the ship position record with the same coding information as the specific fishing port, and save its time-series continuous ship position data. Before and after the fishing moratorium, if the last ship position record transmitted before the shipborne equipment is turned off has the same coding as the first ship position record after it is turned on and belongs to the specific fishing port coding, then the time sequence is assumed to be continuous. If there is only a single ship position record with a coding belonging to a specific fishing port and is not continuous, the data will not be saved;

[0034] (6) The length of time that the ship is in port is obtained by calculating the length of the first and last time intervals of the coded ship position data that are continuous in time sequence and belong to a specific fishing port;

[0035] (7) Filter out the coded ship position data of all ships that are continuous in time sequence and belong to a specific fishing port and save them, select a time period, count the number of different ship names belonging to the time period, and obtain the total number of ships in the port in the time period;

[0036] (8) The total port time of ships in a specific fishing port can be obtained by adding up the port time of all ships in the port.

[0037] The present invention will be further described below by a specific embodiment:

[0038] 1. Grid-shaped surface type vector format geospatial data file and encoding:

[0039] In ArcGIS, a geographic information system software, a grid-shaped surface type vector format geospatial data file is created for a 64° longitude and latitude range (105°~169°E, 0°~64°N), forming 7680×7680 grids with a spatial scale of 0.5′×0.5′. In order to improve the computing speed, the grid-shaped surface type vector format geospatial data file and the China coastline vector layer are spatially queried to obtain the coastline grid layer covering the fishing port (such as Figure 1 ), open the attribute table to create the center longitude, center latitude, and coding fields, use computational geometry to obtain the center longitude and center latitude of the coastline grid, and encode according to the center longitude and longitude, using a combination of binary and multi-division rules and a grid stacking coding method, that is, the grid code to the east of the bisecting line in the longitude is 1, and the grid code to the west is 0. The grid code to the north of the bisecting line in the latitude is 1, and the grid code to the south of the bisecting line is 0. Binary code the longitude and longitude, in the order of longitude first and latitude later, and convert the binary codes of longitude and latitude into a one-dimensional binary code by cross-combining the digits. Divide 7 times in total, and for the binary codes of longitude and longitude after the cross-combination, perform 2 2The binary system 00, 01, 10, 11 correspond to the character codes 'A', 'B', 'C', 'D' respectively. After conversion, the character code is added to the encoding result, that is, binary character conversion is performed. The grid size after 7 divisions is 0.5°×0.5°, that is, 30′×30′; it is further divided into a 3×3 grid, that is, the grid size is 10′×10′. The encoding uses column-row encoding from left to right and from top to bottom, in the order of column first and row later, and the column and row numbers start from 1, and the column and row numbers are added to the encoding result; it is binary again, the spatial scale is 5′×5′, and the binary character conversion is used, which is added to the encoding result; it is divided into a 5×5 grid, the spatial scale is 1′×1′, and the encoding uses the same column-row encoding, which is added to the encoding result, and then it is binary again, the grid size is 0.5′×0.5′, and the binary character conversion is performed, and the character is added to the encoding result. The encoding rules are implemented in Python to encode the longitude and latitude data. The part of converting the two-dimensional longitude and latitude data into one-dimensional data is shown in Table 1. The coded field assigned to the coastline grid layer is implemented by the Python code of the calculation field function.

[0040] Table 1 Geographical grid coding

[0041] Sorting Center longitude Center Latitude coding 1 113.2289963 6.3208899 AACBBAA22B41C 2 113.2369995 6.3208899 AACBBAA22B51A 3 113.2289963 6.3291898 AACBBAA22B41D 4 113.2369995 6.3291898 AACBBAA22B51B 5 113.2460022 6.3374901 AACBBAA21A55C 6 113.2539978 6.3374901 AACBBAA21C15A 7 113.2460022 6.34589 AACBBAA21A55D 8 113.2539978 6.34589 AACBBAA21C15B 9 113.3619995 8.3042002 AADAAAA32B22C 10 113.7040024 8.97089 AADAAAD21B32A 11 113.711998 8.97089 AADAAAD21B32C 12 113.7040024 8.9791899 AADAAAD21B32B 13 113.711998 8.9791899 AADAAAD21B32D 14 114.3619995 10.3709002 AADABCA31A23C 15 114.3710022 10.3709002 AADABCA31A33A 16 114.3619995 10.3793001 AADABCA31A23D 17 114.3710022 10.3793001 AADABCA31A33B 18 114.2789993 11.0542002 AADABDA23C22C 19 114.288002 11.0542002 AADABDA23C32A 20 114.2789993 11.0625 AADABDA23C22D

[0042] 2. Taking the central fishing port Shenjiamen as an example, obtain the code belonging to the scope of Shenjiamen fishing port:

[0043] The central fishing port built by the state is determined from the National Coastal Fishing Port Construction (2018-2025) issued by the National Development and Reform Commission. The longitude and latitude data are obtained according to the address of the central fishing port using the API geocoding function of Amap. The central fishing port and the coastline grid are spatially queried, and the codes within the scope of the central fishing port are judged as the fishing port codes where fishing boats can dock and the names of the central fishing ports are marked, such as Figure 2 The codes involved in Shenjiamen Central Fishing Port are shown in Table 2. Since Shenjiamen Fishing Port is large in scope, it involves multiple codes.

[0044] Table 2 Codes involved in Shenjiamen Central Fishing Port

[0045]

[0046]

[0047] 3. Encode the ship position data:

[0048] The acquired fishing boat location data is encoded using Python according to the binary and multi-division combined segmentation rules and the grid stacking encoding method. The longitude and latitude of each data in the ship location dataset are encoded, and the converted code is added to the end of each location data as shown in Table 3. The trajectory of the ship named "Zhepu Yu 68901" is as follows Figure 3 shown.

[0049] Table 3 Schematic diagram of ship position data coding (taking the ship named "Zhepuyu 68901" as an example)

[0050]

[0051]

[0052] 4. Extract the ship position records with the same coding information as the specific fishing port and save the time-series continuous ship position data:

[0053] By judging the correspondence between the grid coding result of the ship position record and the coding information of the specific fishing port, the ship position record with the same coding information as the specific fishing port is extracted, and its time-series continuous ship position data is saved. When the last ship position record transmitted before the shipborne equipment is turned off has the same code as the first ship position record after it is turned on and belongs to the specific fishing port code, the time sequence is continuous by default. If there is only a single ship position record that belongs to the specific fishing port code and is not continuous, the data will not be saved.

[0054] 5. Calculate the time a fishing vessel spends in port:

[0055] The length of time that a fishing vessel spends in port is obtained by calculating the time interval between the first and last coded data of the fishing vessel position that are continuous in time sequence and belong to the same central fishing port code. During the fishing moratorium (usually from May to August), fishing vessels have to return to their home ports and the equipment is shut down. Therefore, before and after the fishing moratorium, when the last ship position record emitted before the shipborne equipment is shut down has the same code as the first ship position record after it is turned on and belongs to a specific fishing port code, the time sequence is assumed to be continuous to calculate the length of time in port. Here, the fishing vessel named "Zhepu Yu 68901" is taken as an example to count its length of time in port at the Shenjiamen Central Fishing Port, as shown in Table 4.

[0056] Table 5 Calculation of time in port (taking the fishing boat named "Zhepuyu 68901" docked at Shenjiamen Central Fishing Port as an example)

[0057]

[0058]

[0059] 6. Calculate the number of fishing vessels in port:

[0060] Filter out all the ship position data with continuous time series and continuous code belonging to Shenjiamen Central Fishing Port and save them. Select a time period and count the number of different ship names within the time period. Count the number of fishing boats in Shenjiamen Central Fishing Port every 20 minutes as shown in Table 5.

[0061] Table 5: The number of fishing boats at Shenjiamen Central Fishing Port every 20 minutes (taking January 5 to 10, 2018 as an example)

[0062]

[0063]

[0064]

[0065] 7. Statistics on total time spent in port and number of fishing vessels:

[0066] The ship position data of all the screened fishing vessels that are continuous in time series and belong to the Shenjiamen Central Fishing Port code are saved monthly. For all the fishing vessels each month, the first and last time intervals of the ship position data that are continuous in time series and belong to the Shenjiamen Central Fishing Port code are calculated and added up to obtain the total length of time the fishing vessels are in port. The number of different ship names each month, that is, the total number of fishing vessels, is counted.

[0067] The Beidou-based ship position data for 2018 is statistically analyzed on a monthly basis, and the total time spent in port and the number of fishing boats at Shenjiamen Central Fishing Port are shown in Table 6.

[0068] Table 6 Total time spent in port and number of fishing vessels at Shenjiamen Central Fishing Port in 2018

[0069]

[0070]

[0071] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for counting the length of time fishing vessels are in port and the number of fishing vessels at a specific fishing port using Beidou navigation positioning, characterized in that: The specific steps include: (1) First, a grid-shaped surface type vector format geospatial data file is created for a longitude and latitude range spanning 64° to form a grid. A combination of binary and multi-division subdivision rules is used to assign a unique code to each grid; (2) Obtain the spatial scope and central longitude and latitude of a specific fishing port; (3) performing spatial query on the grid-shaped surface type vector format geographic spatial data in step (1) and the spatial range of the specific fishing port, extracting the grids that spatially overlap with the spatial range of the specific fishing port as representatives of the specific fishing port, marking them as dockable grids, obtaining the coding information of step (1) and marking the name of the specific fishing port; (4) The longitude and latitude of the acquired ship position data are also grid-coded according to the coding rule of step (1), and the grid-coded result of the ship position is added to the ship position data set and saved; (5) comparing the result of step (4) with the result of step (3), extracting the ship position record having the same coding information as the specific fishing port by determining the correspondence between the grid coding result of the ship position record and the coding information of the specific fishing port in step (3), and saving the time-series continuous ship position data; (6) The length of time that the ship is in port is obtained by calculating the length of the first and last time intervals of the coded ship position data that are continuous in time sequence and belong to a specific fishing port; (7) Filter out the coded ship position data of all ships that are continuous in time sequence and belong to a specific fishing port and save them, select a time period, count the number of different ship names belonging to the time period, and obtain the total number of ships in the port in the time period; (8) The total port time of ships in a specific fishing port can be obtained by adding up the port time of all ships in the port.

2. According to claim 1, a method for counting the length of time fishing vessels are in port and the number of fishing vessels in a specific fishing port using Beidou navigation positioning, characterized in that: The longitude and latitude range in step (1) is 105° to 169°E, 0° to 64°N.

3. The method for counting the time and number of fishing vessels in a specific fishing port using Beidou navigation positioning according to claim 1 is characterized in that: In the step (1), a grid-shaped surface type vector format geospatial data file is created to form 7680×7680 grids, and the grid size, i.e., the spatial resolution, is 0.5′×0.5′.

4. The method for counting the duration of fishing vessels in port and the number of fishing vessels in a specific fishing port using Beidou navigation positioning according to claim 1 is characterized in that: In the step (1), a grid stacking encoding method is used to give each grid a unique code.

5. The method of using Beidou navigation positioning to count the length of time fishing vessels are in port and the number of fishing vessels in a specific fishing port according to claim 1, characterized in that: In the step (1), the grid code to the east of the longitude bisecting line is 1, and the grid code to the west is 0. The grid code to the north of the bisecting line is 1, and the grid code to the south of the bisecting line is 0. The longitude and latitude binary codes are first longitude and then latitude, and the digits of the longitude and latitude binary codes are cross-combined to convert into one-dimensional binary codes. The division is performed 7 times in total. For the cross-combined longitude and latitude binary codes, the 2-dimensional binary codes are repeated. 2 Bit character encoding, binary 00, 01, 10, 11 correspond to the character codes 'A', 'B', 'C', 'D' respectively. After conversion, the character code is added to the encoding result, that is, binary character conversion is performed. The grid size after 7 divisions is 0.5°×0.5°, that is, 30′×30′; it is further divided into 3×3 grids, that is, the grid size is 10′×10′. The encoding uses column and row encoding from left to right and from top to bottom, in the order of column first and row later, and the column and row numbers start from 1, and the column and row numbers are added to the end of the encoding result; Divide it into two again, the grid size is 5′×5′, use binary character conversion, and add it to the end of the encoding result; divide it into a 5×5 grid again, the spatial scale is 1′×1′, the encoding uses the same column and row encoding, and add it to the end of the encoding result; Then it is divided into two parts again, with a spatial scale of 0.5′×0.5′, and a binary character conversion is performed, and the characters are added to the end of the encoding result.

6. The method of using Beidou navigation positioning to count the length of time fishing vessels are in port and the number of fishing vessels in a specific fishing port according to claim 1, characterized in that: In the step (4), the grid coding result of the ship position is added to the ship position data set and saved, which means at the end of each position record.

7. The method of using Beidou navigation positioning to count the length of time fishing vessels are in port and the number of fishing vessels in a specific fishing port according to claim 1, characterized in that: In step (5), if there is only a single coded and discontinuous ship position record belonging to a specific fishing port, the data will not be saved.

8. The method of using Beidou navigation positioning to count the length of time fishing vessels are in port and the number of fishing vessels in a specific fishing port according to claim 1, characterized in that: In the step (5), when the last ship position record transmitted before the shipborne equipment is turned off has the same code as the first ship position record transmitted after the equipment is turned on and belongs to a specific fishing port code, the timing sequence is assumed to be continuous.