Method for evaluating influence of dam body operation environment on crack resistance of asphalt concrete core wall
By constructing an evaluation index system and risk assessment matrix, the crack resistance performance of the dam operating environment for asphalt concrete heart wall is systematically evaluated, which solves the problem of lack of comprehensive evaluation in the existing technology, and realizes the scientific evaluation of the crack resistance performance of the heart wall and Risk control.
Patent Information
- Application Number
- CN202410942986.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-22
AI Technical Summary
The prior art lacks systematic evaluation methods to evaluate the impact of the dam operating environment on the crack resistance of asphalt concrete core walls, resulting in the inability to fully and accurately ensure the safe operation of core walls.
The evaluation method of constructing an impact of the dam operating environment on crack resistance performance of asphalt concrete heart walls, establish an evaluation index system by analyzing the engineering characteristics and operation environment, calculate the total value of the cracking risk, and determine the cracking risk level based on the risk assessment matrix. Corresponding control measures.
A systematic evaluation of the crack resistance performance of asphalt concrete core walls in the dam operating environment is achieved, providing scientific basis to ensure the long-term and stable operation of the core walls, able to quickly evaluate crack safety performance and propose targeted rectification measures to effectively prevent and reduce safety risks. .
Smart Images

Figure CN119004761A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of asphalt concrete investigation and relates to an evaluation method for the influence of a dam body operation environment on the anti-cracking performance of an asphalt concrete core wall. Background Art
[0002] As the key anti-seepage component of asphalt concrete core rockfill dam, the anti-cracking and anti-seepage performance of asphalt concrete core wall during the water storage operation in the reservoir area plays a decisive role in ensuring the safety of the entire dam body and downstream areas. Faced with the continuous growth of water resource regulation and hydropower energy demand, the construction and operation environment of asphalt concrete core rockfill dams has become increasingly complex, especially the diversity of hydrological meteorological and geological activities, which poses a more severe challenge to the stability of the dam body and core wall. During the operation stage, the environmental conditions faced by asphalt concrete core wall dams are changeable and complex, and these environmental factors directly affect the stress state and deformation degree of the core wall.
[0003] Although the existing literature has conducted extensive research on the factors affecting the crack resistance of asphalt concrete, these studies mostly focus on a single or a few simple factors, and lack a systematic evaluation of the comprehensive impact of the dam operating environment. At present, there is no comprehensive and systematic evaluation method to evaluate the impact of the operating environment on the crack resistance of the asphalt concrete core wall. In view of this, the present invention aims to propose a systematic and comprehensive evaluation method to accurately evaluate the impact of the dam operating environment on the safety of the crack resistance of the asphalt concrete core wall, thereby providing a strong guarantee for the safe operation of asphalt concrete core wall rockfill dams in my country. Summary of the invention
[0004] In view of this, the object of the present invention is to provide a method for evaluating the influence of the dam operation environment on the anti-cracking performance of the asphalt concrete core wall.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] The method for evaluating the influence of the dam operation environment on the anti-cracking performance of the asphalt concrete core wall comprises the following steps:
[0007] S1: An evaluation index system is constructed based on the engineering characteristics and operating environment of asphalt concrete dams. The indicators are scored and weight coefficients are assigned to each evaluation index in descending order of importance. The sum of the weight coefficients is 1. The weight coefficient calculation formula is as follows:
[0008]
[0009] In the formula, γ ij is the weight coefficient, i=1,2,…; j=1,2,…; n is the number of evaluation indicators; m is the importance ranking number, m≤n;
[0010] S2: Calculate the total risk of core wall cracking based on the weight coefficient of each evaluation index:
[0011] S ij =R ij γ ij
[0012] F=ΣS ij
[0013] Where, F is the total risk score of core wall cracking; S ij is the evaluation score of the indicator; R ij is the basic score of the evaluation indicator;
[0014] S3: Classification of casualties, economic losses and severity of asphalt concrete core dam breach accidents;
[0015] S4: Based on the total risk value F and the risk assessment matrix, a cracking risk assessment matrix is established to determine the cracking risk level;
[0016] S1: An evaluation index system is constructed based on the engineering characteristics and operating environment of asphalt concrete dams. The indicators are scored and weight coefficients are assigned to each evaluation index in descending order of importance. The sum of the weight coefficients is 1. The weight coefficient calculation formula is as follows:
[0017]
[0018] In the formula, γ ij is the weight coefficient, i=1,2,…; j=1,2,…; n is the number of evaluation indicators; m is the importance ranking number, m≤n;
[0019] S2: Calculate the total risk of core wall cracking based on the weight coefficient of each evaluation index:
[0020] S ij =R ij γ ij
[0021] F=∑S ij
[0022] Where, F is the total risk score of core wall cracking; S ij is the evaluation score of the indicator; R ij is the basic score of the evaluation indicator;
[0023] S3: Classification of casualties, economic losses and severity of asphalt concrete core dam breach accidents;
[0024] S4: Based on the total risk value F and the risk assessment matrix, a cracking risk assessment matrix is established to determine the cracking risk level;
[0025] In S1, the engineering characteristics and operation environment analysis of asphalt concrete dams include the operation environment X1 and sudden earthquake X2;
[0026] In the operating environment X1, the evaluation indicators include operating climate X 11 ;
[0027] Operational ClimateX 11 The corresponding basic score R ij The value is R 11 , weight coefficient γ ij The value is γ 11 , evaluation score S ij The value is S 11 =R 11 ×γ 11 ;
[0028] in:
[0029] If the operating climate is X 11 If the area is high altitude, cold, has large temperature differences, and is prone to floods, the basic score is R. 11 The score range is 75-100;
[0030] If the operating climate is X 11 If the sunshine time is long, the temperature difference is large, and there are frequent floods, the basic score is R 11 The score range is 50 to 74;
[0031] If the operating climate is X 11 If there is no extreme cold or hot weather, the temperature difference is small, the precipitation is uneven, and there are frequent floods, then the basic score is R 11 The score range is 25 to 49;
[0032] If the operating climate is X 11 If there is no extreme cold or hot weather, the temperature difference is small, and the precipitation is uniform, the basic score is R 11 The score range is 0 to 24;
[0033] In the case of sudden earthquake X2, the evaluation indicators include dam slope stability X 21 and the dam crest subsidence rate X 22 ;
[0034] Dam slope stabilityX 21 The corresponding basic score R ij The value is R 21 , weight coefficient γ ij The value is γ 21 , evaluation score S ij The value is S 21 =R 21 ×γ 21 ;
[0035] Dam crest subsidence rate X 22 The corresponding basic score R ij The value is R 22 , weight coefficient γ ij The value is γ 22 , evaluation score S ij The value is S 22 =R 22 ×γ 22 ;
[0036] in:
[0037] If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the sliding body reduces the dam crest width by more than 1 / 3, and the most dangerous sliding arc passes through the core wall, then the basic score R 21 The score range is 75-100;
[0038] If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the sliding body reduces the dam crest width by more than 1 / 3, and the most dangerous sliding arc does not pass through the core wall, but endangers the safety of the core wall, then the basic score R 21 The score range is 50 to 74;
[0039] If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the dam slope instability does not endanger the safety of the core wall, then the basic score R 21 The score range is 25 to 49;
[0040] If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s >1.0, the dam slope instability does not endanger the safety of the core wall, then the basic score R 21 The score range is 0 to 24;
[0041] If the dam top subsidence rate X 22 If the dam height H>150m and the dam top subsidence rate is greater than 0.8%, the basic score R 22 The score range is 75-100;
[0042] If the dam top subsidence rate X 22 If the dam height H is less than 150m and the dam top subsidence rate is greater than 1%, the basic score R 22 The score range is 50 to 74;
[0043] If the dam top subsidence rate X 22 If the dam height H>150m and the dam top subsidence rate is less than 0.8%, the basic score R22 The score range is 25 to 49;
[0044] If the dam top subsidence rate X 22 If the dam height H is less than 150m and the dam top subsidence rate is less than 1%, the basic score R 22 The score ranges from 0 to 24.
[0045] Furthermore, after S4, there is S5: establishing corresponding accident risk control measures according to the cracking risk level.
[0046] Furthermore, in S3, the casualties of the asphalt concrete core wall dam failure accident are classified into four levels:
[0047] Level 1, qualitatively described as general, with the number of casualties satisfying 1≤death<3 or 1≤severe injury<10;
[0048] Level 2, qualitatively described as large, with casualties meeting 3 ≤ deaths < 10 or 10 ≤ serious injuries < 50;
[0049] Level 3, qualitatively described as serious, with casualties meeting the condition of 10 ≤ deaths < 30 or 50 ≤ serious injuries < 100;
[0050] Level 4, qualitatively described as extremely large, with casualties meeting the requirement of ≥30 deaths or ≥100 serious injuries;
[0051] The economic losses of asphalt concrete core dam failure accidents are classified into four levels:
[0052] Level 1, qualitatively described as general, economic loss E satisfies E < 10 million yuan;
[0053] The second level is qualitatively described as large, and the economic loss E satisfies RMB 10 million ≤ E < RMB 50 million;
[0054] Level 3: qualitatively described as significant, with economic losses E satisfying RMB 50 million ≤ E < RMB 100 million;
[0055] Level 4, qualitatively described as extremely large, economic loss E satisfies E ≥ 100 million yuan;
[0056] The severity of asphalt concrete core dam failure accidents is classified into four levels:
[0057] The first level is qualitatively described as general. Except for the important structure section and the mountainous section, the dam body has leakage, which may damage the dam body itself.
[0058] Level 2, qualitatively described as large, may cause dam failure and damage the dam body and auxiliary powerhouses except for important structures and mountainous areas;
[0059] Level 3, qualitatively described as major, may cause dam breach in mountainous areas, damaging the dam itself, auxiliary powerhouses and surrounding environment;
[0060] The fourth level is qualitatively described as extremely large, and important structures such as bridges, tunnels, and buildings may be destroyed due to dam failure.
[0061] Further, the S4 is specifically: taking the highest level of the three classifications of casualties, economic losses and accident severity of the asphalt concrete core wall dam, and combining it with the total risk value F, to establish a cracking risk assessment matrix;
[0062] When the highest level of the three classifications is level 1, general, the F value satisfies F>60, and the possibility level is level 4, very likely, the cracking risk level is high III;
[0063] When the highest level of the three classifications is the second large level, the F value satisfies F>60, and the possibility level is the fourth very likely level, the cracking risk level is high III;
[0064] When the highest level among the three levels is the third major level, the F value satisfies F>60, and the possibility level is the fourth very likely level, the cracking risk level is very high IV;
[0065] When the highest level among the three levels is the fourth level, the F value satisfies F>60, and the possibility level is the fourth level, the cracking risk level is very high IV;
[0066] When the highest level of the three classifications is the first level of general, the F value satisfies 45<F≤60, and the possibility level is the third level of possible, the cracking risk level is moderate II;
[0067] When the highest level of the three classifications is the second larger level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is high III;
[0068] When the highest level among the three levels is the third major level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is high III;
[0069] When the highest level among the three levels is the fourth major level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is very high IV;
[0070] When the highest level among the three levels is the first level general, the F value satisfies 30<F≤45, and the possibility level is the second level accidental, the cracking risk level is moderate II;
[0071] When the highest level among the three levels is the second level, the F value satisfies 30<F≤45, and the probability level is the second level, accidental, the cracking risk level is moderate II;
[0072] When the highest level among the three levels is the third major level, the F value satisfies 30<F≤45, and the possibility level is the second accidental level, the cracking risk level is high III;
[0073] When the highest level among the three levels is the fourth major level, the F value satisfies 30<F≤45, and the possibility level is the second accidental level, the cracking risk level is high III;
[0074] When the highest level of the three classifications is the first level of general, the F value satisfies F≤30, and the possibility level is the first level of unlikely, the cracking risk level is low I;
[0075] When the highest level of the three classifications is the second large level, the F value satisfies F≤30, and the possibility level is the first unlikely level, the cracking risk level is moderate II;
[0076] When the highest level among the three levels is the third major level, the F value satisfies F≤30, and the possibility level is the first unlikely level, the cracking risk level is moderate II;
[0077] When the highest level among the three classifications is Grade 4 Major, the F value satisfies F≤30, and the possibility level is Grade 1 Unlikely, the cracking risk level is High III.
[0078] Further, the S5 is specifically:
[0079] When the cracking risk level is level I, i.e. low risk, the control criterion is negligible and the control countermeasure is to maintain routine management;
[0080] When the cracking risk level is level II, that is, moderate risk, the control criteria are acceptable, and the control countermeasures are to strengthen risk prevention and control work and strictly monitor and manage construction;
[0081] When the cracking risk level is level III, i.e. high risk, the control criterion is undesirable, and the control countermeasure is to strictly control the risk and ensure that the risk reduction cost does not exceed the accident loss;
[0082] When the cracking risk level is level IV, that is, extremely high risk, the control criterion is unacceptable, and the control countermeasure is to put risk prevention and control work in the first place and take measures to reduce the risk to level III regardless of cost.
[0083] The beneficial effects of the present invention are:
[0084] (1) The present invention has successfully constructed a set of evaluation index systems for the impact of the dam operation environment on the anti-cracking performance of the asphalt concrete core wall by deeply analyzing and integrating hydrological and meteorological data, geological conditions, and potential influencing factors that may occur during operation. The system can efficiently evaluate the safety of the operating environment on the anti-cracking performance of the asphalt concrete core wall, and provides a scientific basis for ensuring the long-term stable operation of the core wall.
[0085] (2) The present invention can systematically and comprehensively evaluate the anti-cracking safety of the core wall of the dam during operation based on the specific site selection of the dam body and the operating environment of the asphalt concrete core wall dam. This evaluation method helps to ensure the stability and safety of the dam body within its design life.
[0086] (3) The method of the present invention can quickly and accurately evaluate the anti-cracking safety performance of the core wall during operation, and can assess the severity of potential accidents. In addition, the method can also put forward targeted rectification measures to ensure the safety of the dam body and its downstream area, and effectively prevent and reduce potential safety risks.
[0087] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0088] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0089] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0090] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0091] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0092] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0093] like Figure 1 As shown, the present invention is based on the index system method, and the asphalt concrete core wall dam survey and design anti-cracking safety risk assessment method mainly includes the following contents:
[0094] S1: Based on the on-site investigation and combined with data analysis, the evaluation indicators are divided, and each evaluation indicator is subdivided, and each subdivided indicator is graded and the evaluation principles are determined.
[0095] S2: Score the key indicators, assign weight coefficients to each evaluation indicator and sort them in order of importance from high to low. The allocation of weight coefficients should focus on core indicators, reduce the weight of non-key indicators or ignore their impact, and ensure that the sum of their weight coefficients is 1. The weight coefficient calculation formula is as follows:
[0096]
[0097] S3: According to the weight of each indicator, the total risk of core wall cracking is calculated as follows:
[0098] S ij =R ij γ ij
[0099] F=∑S ij
[0100] In the formula, γ ij is the weight coefficient, where i = 1, 2, ...; j = 1, 2, ...; n is the number of evaluation indicators (important indicators); m is the importance ranking number, m ≤ n; F is the total score of the core wall cracking risk; S ijis the evaluation score of the indicator; R ij It is the basic score of the evaluation indicator.
[0101] S4: Divide the risk level according to the total risk value F.
[0102] S5: Determine the risk severity level, determine the overall risk level and risk control countermeasures for the crack resistance of asphalt concrete core wall dams, and propose risk control measures.
[0103] 1. An evaluation index system is constructed based on the engineering characteristics and operating environment analysis of asphalt concrete dams, and the corresponding evaluation indicators are scored according to the survey and design scheme to construct the anti-cracking safety risk assessment index system for survey and design as shown in Table 1.
[0104] Table 1
[0105]
[0106]
[0107] 2. Assign weight coefficients to each evaluation indicator and sort them in order of importance from high to low. The sum of the weight coefficients is 1. The weight coefficient calculation formula is as follows:
[0108]
[0109] In the formula, γ ij is the weight coefficient, i=1,2,…; j=1,2,…; n is the number of evaluation indicators; m is the importance ranking number, m≤n; according to the weight coefficient of each evaluation indicator, the total value of core wall cracking risk is calculated:
[0110] S ij =R ij γ ij
[0111] F=∑S ij
[0112] Where, F is the total risk score of core wall cracking; S ij is the evaluation score of the indicator; R ij is the basic score of the evaluation indicator;
[0113] 3. Different risk levels are divided according to the actual situation of the project and the total risk value F. The key basis for determining the severity level of an accident is the maximum level of casualties and economic losses that may be caused after the accident. Regarding the assessment of casualties, we conduct detailed classification according to the differences in their different categories and severity. The specific casualty classification standards are shown in Table 2.
[0114] Table 2
[0115] grade Qualitative description Casualties (persons) 1 generally 1≤death (including missing)<3 or 1≤serious injury<10 2 Larger 3≤death (including missing)<10 or 10≤serious injury<50 3 major 10≤death (including missing)<30 or 50≤severe injury<100 4 Extra Large Death (including missing) ≥30 or serious injury ≥100
[0116] Direct economic losses refer to the sum of all costs incurred by an accident, including direct costs and various expenses for handling the accident. The economic loss classification standards are shown in Table 3.
[0117] Table 3
[0118] grade Qualitative description Economic losses (million yuan) 1 generally E<1 2 Larger 1≤E<5 3 major 5≤E<10 4 Extra Large E≥10
[0119] Table 4 Accident severity classification
[0120]
[0121] Note: Important structures also include residential buildings, industrial plants, high-voltage towers, railways, roads and pipelines.
[0122] The consequences of dam break accidents of asphalt concrete core wall dams are difficult to predict accurately. The highest levels in Tables 2, 3 and 4 are used as references in the assessment. A cracking risk assessment matrix is established based on the classification of casualties, economic losses and accident severity of dam break accidents of asphalt concrete core wall dams.
[0123] 4. The total risk value F is compared with the worst level in Table 2, Table 3 and Table 4 to determine the cracking risk assessment matrix, as shown in Table 5, to determine the cracking risk level of the design solution.
[0124] Table 5
[0125]
[0126] 5. According to the cracking risk level, refer to Table 6 to determine the accident risk control measures to ensure the crack resistance of the asphalt concrete core wall.
[0127] Table 6
[0128]
[0129]
[0130] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. The evaluation method of the influence of the dam operation environment on the anti-cracking performance of the asphalt concrete core wall is characterized by: The method comprises the following steps: S1: An evaluation index system is constructed based on the engineering characteristics and operating environment of asphalt concrete dams. The indicators are scored and weight coefficients are assigned to each evaluation index in descending order of importance. The sum of the weight coefficients is 1. The weight coefficient calculation formula is as follows: In the formula, γ ij is the weight coefficient, i=1,2,…; j=1,2,…; n is the number of evaluation indicators; m is the importance ranking number, m≤n; S2: Calculate the total risk of core wall cracking based on the weight coefficient of each evaluation index: S ij =R ij c ij F=ΣS ij Where, F is the total risk score of core wall cracking; S ij is the evaluation score of the indicator; R ij is the basic score of the evaluation indicator; S3: Classification of casualties, economic losses and severity of asphalt concrete core dam breach accidents; S4: Based on the total risk value F and the risk assessment matrix, a cracking risk assessment matrix is established to determine the cracking risk level; In S1, the engineering characteristics and operation environment analysis of asphalt concrete dams include the operation environment X1 and sudden earthquake X2; In the operating environment X1, the evaluation indicators include operating climate X 11 ; Operational ClimateX 11 The corresponding basic score R ij The value is R 11 , weight coefficient γ ij The value is γ 11 , evaluation score S ij The value is S 11 =R 11 ×γ 11 ; in: If the operating climate is X 11 If the area is high altitude, cold, has large temperature differences, and is prone to floods, the basic score is R. 11 The score range is 75-100; If the operating climate is X 11 If the sunshine time is long, the temperature difference is large, and there are frequent floods, the basic score is R 11 The score range is 50-74; If the operating climate is X 11 If there is no extreme cold or hot weather, the temperature difference is small, the precipitation is uneven, and there are frequent floods, then the basic score is R 11 The score range is 25 to 49; If the operating climate is X 11 If there is no extreme cold or hot weather, the temperature difference is small, and the precipitation is uniform, the basic score is R 11 The score range is 0 to 24; In the case of sudden earthquake X2, the evaluation indicators include dam slope stability X 21 and the dam crest subsidence rate X 22 ; Dam slope stabilityX 21 The corresponding basic score R ij The value is R 21 , weight coefficient γ ij The value is γ 21 , evaluation score S ij The value is S 21 =R 21 ×γ 21 ; Dam crest subsidence rate X 22 The corresponding basic score R ij The value is R 22 , weight coefficient γ ij The value is γ 22 , evaluation score S ij The value is S 22 =R 22 ×γ 22 ; in: If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the sliding body reduces the dam crest width by more than 1 / 3, and the most dangerous sliding arc passes through the core wall, then the basic score R 21 The score range is 75-100; If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the sliding body reduces the dam crest width by more than 1 / 3, and the most dangerous sliding arc does not pass through the core wall, but endangers the safety of the core wall, then the basic score R 21 The score range is 50-74; If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s <1.0, the dam slope instability does not endanger the safety of the core wall, then the basic score R 21 The score range is 25 to 49; If the dam slope is stable X 21 The dam slope stability safety factor F calculated by the pseudo-static method is satisfied s >1.0, the dam slope instability does not endanger the safety of the core wall, then the basic score R 21 The score range is 0 to 24; If the dam top subsidence rate X 22 If the dam height H>150m and the dam top subsidence rate is greater than 0.8%, the basic score R 22 The score range is 75-100; If the dam top subsidence rate X 22 If the dam height H is less than 150m and the dam top subsidence rate is greater than 1%, the basic score R 22 The score range is 50-74; If the dam top subsidence rate X 22 If the dam height H>150m and the dam top subsidence rate is less than 0.8%, the basic score R 22 The score range is 25 to 49; If the dam top subsidence rate X 22 If the dam height H is less than 150m and the dam top subsidence rate is less than 1%, the basic score R 22 The score ranges from 0 to 24.
2. The evaluation method for the influence of the dam operation environment on the anti-cracking performance of asphalt concrete core wall according to claim 1 is characterized by: After S4, there is S5: establishing corresponding accident risk control measures according to the cracking risk level.
3. The method for evaluating the influence of the dam operation environment on the anti-cracking performance of asphalt concrete core wall according to claim 1 is characterized by: In S3, the casualties of asphalt concrete core wall dam failure accidents are classified into four levels: Level 1, qualitatively described as general, with the number of casualties satisfying 1≤death<3 or 1≤severe injury<10; Level 2, qualitatively described as large, with casualties meeting 3 ≤ deaths < 10 or 10 ≤ serious injuries < 50; Level 3, qualitatively described as serious, with casualties meeting the condition of 10 ≤ death < 30 or 50 ≤ serious injury < 100; Level 4, qualitatively described as extremely large, with casualties meeting the requirement of ≥30 deaths or ≥100 serious injuries; The economic losses of asphalt concrete core dam failure accidents are classified into four levels: Level 1, qualitatively described as general, economic loss E satisfies E < 10 million yuan; The second level is qualitatively described as large, and the economic loss E satisfies RMB 10 million ≤ E < RMB 50 million; Level 3: qualitatively described as significant, with economic losses E satisfying RMB 50 million ≤ E < RMB 100 million; Level 4, qualitatively described as extremely large, economic loss E satisfies E ≥ 100 million yuan; The severity of asphalt concrete core dam failure accidents is classified into four levels: The first level is qualitatively described as general. Except for the important structure section and the mountainous section, the dam body has leakage, which may damage the dam body itself. Level 2, qualitatively described as large, may cause dam failure and damage the dam body and auxiliary powerhouses except for important structures and mountainous areas; Level 3, qualitatively described as major, may cause dam breach in mountainous areas, damaging the dam itself, auxiliary powerhouses and surrounding environment; The fourth level is qualitatively described as extremely large, and important structures such as bridges, tunnels, and buildings may be destroyed due to dam failure.
4. The method for evaluating the influence of the dam operation environment on the anti-cracking performance of asphalt concrete core wall according to claim 1 is characterized by: Specifically, S4 is as follows: taking the highest level of the three classifications of casualties, economic losses and accident severity of the asphalt concrete core wall dam break accident, and combining it with the total risk value F, to establish a cracking risk assessment matrix; When the highest level of the three classifications is level 1, general, the F value satisfies F>60, and the possibility level is level 4, very likely, the cracking risk level is high III; When the highest level of the three classifications is the second large level, the F value satisfies F>60, and the possibility level is the fourth very likely level, the cracking risk level is high III; When the highest level among the three levels is the third major level, the F value satisfies F>60, and the possibility level is the fourth very likely level, the cracking risk level is very high IV; When the highest level among the three levels is the fourth level, the F value satisfies F>60, and the possibility level is the fourth level, the cracking risk level is very high IV; When the highest level of the three classifications is the first level of general, the F value satisfies 45<F≤60, and the possibility level is the third level of possible, the cracking risk level is moderate II; When the highest level of the three classifications is the second larger level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is high III; When the highest level among the three levels is the third major level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is high III; When the highest level among the three levels is the fourth major level, the F value satisfies 45<F≤60, and the possibility level is the third possible level, the cracking risk level is very high IV; When the highest level among the three levels is the first level general, the F value satisfies 30<F≤45, and the possibility level is the second level accidental, the cracking risk level is moderate II; When the highest level among the three levels is the second level, the F value satisfies 30<F≤45, and the probability level is the second level, accidental, the cracking risk level is moderate II; When the highest level among the three levels is the third major level, the F value satisfies 30<F≤45, and the possibility level is the second accidental level, the cracking risk level is high III; When the highest level among the three levels is the fourth major level, the F value satisfies 30<F≤45, and the possibility level is the second accidental level, the cracking risk level is high III; When the highest level of the three classifications is the first level of general, the F value satisfies F≤30, and the possibility level is the first level of unlikely, the cracking risk level is low I; When the highest level of the three classifications is the second large level, the F value satisfies F≤30, and the possibility level is the first unlikely level, the cracking risk level is moderate II; When the highest level among the three levels is the third major level, the F value satisfies F≤30, and the possibility level is the first unlikely level, the cracking risk level is moderate II; When the highest level among the three classifications is Grade 4 Major, the F value satisfies F≤30, and the possibility level is Grade 1 Unlikely, the cracking risk level is High III.
5. The method for evaluating the influence of the dam operation environment on the anti-cracking performance of asphalt concrete core wall according to claim 1 is characterized by: The S5 is specifically: When the cracking risk level is level I, i.e. low risk, the control criterion is negligible and the control countermeasure is to maintain routine management; When the cracking risk level is level II, that is, moderate risk, the control criteria are acceptable, and the control countermeasures are to strengthen risk prevention and control work and strictly monitor and manage construction; When the cracking risk level is level III, i.e. high risk, the control criterion is undesirable, and the control countermeasure is to strictly control the risk and ensure that the risk reduction cost does not exceed the accident loss; When the cracking risk level is level IV, that is, extremely high risk, the control criterion is unacceptable, and the control countermeasure is to put risk prevention and control work in the first place and take measures to reduce the risk to level III regardless of cost.
Citation Information
Patent Citations
Human reliability equilibrium method for deep water riser system risk maintenance decision optimization
CN108710946A
A comprehensive safety assessment method for an ocean platform
CN109784611A
Cited By
Asphalt core wall dam leakage safety online diagnosis method fusing multiple factors
CN121093100A