Urban operation management scheduling command method and system
By building the basic layer, support layer and data layer in the urban operation and service platform, the layout and data processing of urban equipment are optimized, and the problems of low scheduling and command efficiency, uneven resource allocation and information asymmetry are solved, and the incident response speed is improved. The accuracy of decision-making has improved the level of automation.
Patent Information
- Application Number
- CN202411212090.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-22
AI Technical Summary
The existing urban operation management and service platform has problems such as inefficiency, unreasonable resource allocation, information asymmetry and low automation level in terms of scheduling and command, which affects the speed of incident response and the accuracy of decision-making.
By building a basic layer composed of urban monitoring equipment, establishing data transmission flow, and data processing and analysis are carried out through the support layer, data layer and application layer, dividing the city into grid-like units to optimize equipment layout and data processing, and building urban management Scheduling and coordinating business models to improve resource utilization and automation levels.
It realizes the timeliness of information and processing effectiveness, improves the utilization rate of data resources and service resources, reduces the complexity and error rate of scheduling work, and improves the speed of incident response and the accuracy of decision-making.
Smart Images

Figure CN119005627A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of urban operation management, and in particular relates to an urban operation management dispatching command method and system. Background Art
[0002] The city operation management service platform is committed to integrating various information resources in urban management, and through the Internet of Things, big data analysis, artificial intelligence and other technical means, it realizes real-time monitoring, intelligent early warning and rapid response of the city's operation status, and achieves an efficient management mode of "one network management". This platform is usually divided into three levels: national, provincial and municipal (district) levels. Each level is equipped with specific functional modules, such as business guidance, supervision and inspection, operation monitoring, etc., to meet the management needs of different levels.
[0003] In recent years, with the acceleration of the construction of smart cities, many cities in China have begun to build urban operation and management service platforms with local characteristics, aiming to promote the transformation of urban management towards modernization through data resource integration and governance model innovation.
[0004] In the field of smart cities, several leading technology companies have occupied a considerable market share. One of the leading companies, relying on its leading position in the market, has developed an application system with nine basic subsystems as the core, supplemented by industry supervision and public welfare services, providing cities with comprehensive operation and management solutions. Another innovative company cooperated with a certain region to build an urban comprehensive management service platform, which won the Smart City Conference Award for its outstanding results. There are also companies that have significantly improved the service level and governance efficiency of urban operation management through unique architectural design.
[0005] Although the urban transportation management service platform has played a key role in the modernization of urban management, the following challenges still exist in dispatching and commanding:
[0006] Slow scheduling response: Due to the limitations of data processing capabilities and analysis technology, the scheduling decision-making process is relatively long, which affects the speed of event response.
[0007] Uneven resource allocation: The lack of a refined resource scheduling strategy means that in emergency situations, key resources cannot be quickly and effectively allocated to where they are most needed.
[0008] Information asymmetry: Poor information exchange between platforms at all levels leads to information lag or loss in the dispatch and command process, affecting the accuracy and timeliness of decision-making.
[0009] Low level of automation: The existing platform performs poorly in scheduling automation and relies too much on manual intervention, which increases the complexity and error rate of scheduling work. Summary of the invention
[0010] The technical problem solved by the present invention is to provide an intelligent method and system for urban operation management and dispatching, so as to solve the problems of low efficiency, unreasonable resource allocation, information asymmetry and low automation level in the dispatching and command of the existing urban operation management service platform.
[0011] The basic solution provided by the present invention: a method for dispatching and commanding urban operation management, comprising:
[0012] S1: Build a basic layer consisting of several urban monitoring devices, and obtain data transmission streams from the basic layer through the support layer;
[0013] S2: storing the city monitoring data transmitted in the data transmission stream to the data layer;
[0014] S3: Call the city monitoring data in the data layer, analyze it after preprocessing, and establish a city management scheduling and coordination business model based on the application layer and display layer requirements. Input the analysis results into the city management scheduling and coordination business model and output them to the application layer and display layer.
[0015] Further, the S1 includes:
[0016] S1-1: Divide the target city into grids in the planning map; and build a basic layer consisting of computing storage devices, network security devices, sensing devices and computer rooms. The sensing devices are distributed according to the importance of the grids of the target city in the planning map;
[0017] S1-2: Establish a support layer for data transmission services based on the protocols of each city monitoring device in the basic layer, and transmit city monitoring data to the next data layer through the support layer.
[0018] Further, the S2 includes:
[0019] S2-1: Build a data aggregation system, data exchange system and comprehensive urban management database, and establish a data layer;
[0020] S2-2: Receive data resources of urban monitoring data through the data layer, and perform sharing and exchange operations according to the received data resources of urban monitoring data; the data resources include basic data and thematic data.
[0021] Further, the S3 includes:
[0022] S3-1: Establish thematic data processing models and basic data processing models, and pre-process the data resources of urban monitoring data;
[0023] S3-2: The pre-processed data resources of the urban monitoring data belonging to the thematic data are transmitted to the thematic data processing model, and the pre-processed data resources of the urban monitoring data belonging to the basic data are transmitted to the basic data processing model;
[0024] S3-3: Build the application layer and the display layer, and construct the city management dispatch coordination business model according to the application layer and the display layer requirements;
[0025] S3-4: The thematic data processing results output from the thematic data processing model and the basic data processing results output from the basic data processing model are input into the urban management dispatching and coordination business model, and transmitted in a targeted manner according to the application layer requirements and the presentation layer requirements.
[0026] Furthermore, it also includes:
[0027] S4: Build a user layer for full-process services in the target city, and push corresponding information according to the needs of each group in the user layer.
[0028] The city operation management dispatching and commanding system is applied to the above-mentioned city operation management dispatching and commanding method, including:
[0029] Basic layer: It is composed of several city monitoring devices and is used to obtain monitoring data of target cities;
[0030] Support layer: used to provide support services for the transmission of target city monitoring data in the basic layer;
[0031] Data layer: used to store and transmit the target city monitoring data;
[0032] Data processing and analysis module: used to retrieve the monitoring data of the target city and analyze it after preprocessing;
[0033] Dispatch and coordination business model building module: used to build a city management dispatch and coordination business model based on application layer requirements and presentation layer requirements;
[0034] The data processing and analysis module is also used to transmit the analysis results to the urban management dispatching and coordination business model for business dispatching and command output to the application layer and display layer.
[0035] The principles and advantages of the present invention are as follows: the city operation management and dispatching command in the present application, on the basis of a complete standard specification system and a network security protection system, has established a basic layer, a support layer, a data layer, an application layer, a display layer and a user layer, each layer is related to each other, and each layer is responsible for the process in the city management and dispatching link, realizing bottom-up construction; and in the process of data transmission, the city is divided into a number of grid-like units, firstly, the layout of the city monitoring equipment is reasonable, and secondly, the efficiency of data processing and dispatching of the city platform can be improved; furthermore, for the problems of unreasonable resource allocation, information asymmetry and low automation level, the bottom-up system constructed in the present application facilitates the complete process of information collection, case file establishment, task processing feedback, case verification and closure, comprehensive evaluation and target push when an incident occurs, greatly improving the utilization of data resources and service resources, the level of automation, and the timeliness and processing effectiveness of information. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 is a flowchart of an embodiment of the present invention;
[0037] Figure 2 The system structure of the embodiment of the present invention is shown in FIG. Figure 1 ;
[0038] Figure 3 The system structure of the embodiment of the present invention is shown in FIG. Figure 2 . DETAILED DESCRIPTION
[0039] The following is further described in detail through specific implementation methods:
[0040] The embodiment is basically as shown in the attached Figure 1 , Figure 2 and Figure 3 Shown: Urban operation management dispatching and command methods, including:
[0041] S1: Build a basic layer consisting of several urban monitoring devices, and obtain data transmission streams from the basic layer through the support layer;
[0042] Among them, S1 includes:
[0043] S1-1: Divide the target city into grids in the planning map; and build a basic layer consisting of computing storage devices, network security devices, sensing devices and computer rooms. The sensing devices are distributed according to the importance of the grids of the target city in the planning map;
[0044] S1-2: Establish a support layer for data transmission services based on the protocols of each city monitoring device in the basic layer, and transmit city monitoring data to the next data layer through the support layer.
[0045] In this embodiment, the existing city operation management service platform has problems such as multiple city management entities, untimely problem discovery, and passive and delayed handling. It is necessary to improve and optimize the management method. In this regard, in this application, for the target city, grid division is performed according to its planning map to divide the city into a number of grid-like units, wherein the division standard is based on the characteristics of each monitoring point in the city. Specifically, a bird's-eye view map of the target city is obtained, and city information is marked on the bird's-eye view map, such as city population distribution, industrial park distribution, traffic flow trend and other characteristic information, and then the map is divided according to the weights preset by the user. The importance of the city characteristic information is calculated, and the grid size is divided according to the preset importance threshold. For example, if the importance threshold is above 90%, the grid is the smallest and the grid density is high, which means the importance is the highest and more dense sensing devices are needed for monitoring. When the importance threshold is below 20%, the grid is larger and the grid density is low, so the number of sensing devices required is relatively low. For the importance between 20% and 90%, the sensing devices can be distributed according to actual needs, so that the use and distribution of urban monitoring equipment in the front-end basic layer are in line with the actual situation of the city.
[0046] After the basic layer is arranged, various types of equipment and facilities often appear, which leads to different types of data transmission and different data interfaces. It is troublesome to receive device data every time. For this reason, this application establishes a support layer to play a key role in connecting the entire urban operation management service platform. It is between the basic layer and the subsequent application layer. Specifically, the support layer in this application includes basic support software and basic tool services. For the basic support software, a cloud platform + APP software approach is adopted. For example, all sensing devices, sensors and other urban monitoring equipment adopt wireless transmission communication. On the one hand, it is presented in the form of user-side APP software to receive real-time visual data such as video and data transmitted by urban monitoring equipment. On the other hand, it is stored on the cloud platform to facilitate the subsequent application layer to pull data streams.
[0047] As for basic tool services, they include GIS services, identity authentication services, SMS services, etc., to achieve one-to-one urban data transmission services.
[0048] S2: storing the urban monitoring data transmitted in the data transmission stream to the data layer; wherein S2 includes:
[0049] S2-1: Build a data aggregation system, data exchange system and comprehensive urban management database, and establish a data layer;
[0050] S2-2: Receive data resources of urban monitoring data through the data layer, and perform sharing and exchange operations according to the received data resources of urban monitoring data; the data resources include basic data and thematic data.
[0051] In this embodiment, the urban monitoring data generated from the basic layer is transmitted to the data layer through the supporting layer. In order to better handle the urban data transmission services, such as comprehensive data transmission services for cities, districts, towns, and villages, the data layer in this application includes a data aggregation system, a data exchange system, and a comprehensive urban management database. Specifically, for the data aggregation system, the aggregated data include business guidance data, urban management basic data, industry application data, and related industry data. For the data exchange system, the data exchanged include urban management department events, public service data, comprehensive evaluation data, and urban operation safety supervision data, etc., and this type of data resources are collectively referred to as basic data and thematic data in this application. Basic data include urban management basic data, urban component event data, etc. Thematic data include urban management industry application data, related industry data, public service data, comprehensive evaluation data, etc.
[0052] As for the comprehensive urban management database, it is the basic foundation for the realization of data aggregation system and data sharing and exchange system. To realize data aggregation or data sharing and exchange, the participation of the comprehensive urban management database is required.
[0053] S3: Call the city monitoring data in the data layer, analyze it after preprocessing, and establish a city management dispatch coordination business model based on the application layer and display layer requirements. Input the analysis results into the city management dispatch coordination business model and output them to the application layer and display layer. Among them, S3 includes:
[0054] S3-1: Establish thematic data processing models and basic data processing models, and pre-process the data resources of urban monitoring data;
[0055] S3-2: The pre-processed data resources of the urban monitoring data belonging to the thematic data are transmitted to the thematic data processing model, and the pre-processed data resources of the urban monitoring data belonging to the basic data are transmitted to the basic data processing model;
[0056] S3-3: Build the application layer and the display layer, and construct the city management dispatch coordination business model according to the application layer and the display layer requirements;
[0057] S3-4: The thematic data processing results output from the thematic data processing model and the basic data processing results output from the basic data processing model are input into the urban management dispatching and coordination business model, and transmitted in a targeted manner according to the application layer requirements and the presentation layer requirements.
[0058] In this embodiment, the processing methods are different according to the types of data resources in the data layer. In this regard, the present application establishes a thematic data processing model and a basic data processing model according to the data resource type. For the basic data and thematic data, the formats are different due to their different sources, or there are problems such as data missing, which makes the model unable to recognize them. The basic data and thematic data are preprocessed, including data cleaning, data supplementation, data unification, normalization, etc., so that the received data resources are complete, valid, and can be received and processed by the model.
[0059] Subsequently, the application layer and the display layer are established according to the needs of the target city. In this embodiment, the application layer includes eight systems, namely, the business guidance system, the public service system, the supervision and monitoring subsystem, the command and coordination system, the comprehensive evaluation system, the industry application system, the urban operation safety supervision system and the application maintenance system. Among them, the business guidance system is a municipal construction, which is used for users to fill in policies and regulations, industry trends and experience exchanges, etc. The public service system is also a municipal construction, but the basic public service data at the district and county level is completed, and finally aggregated into the basic public service data of the whole city, such as the census and storage of service items and basic service data; the supervision and inspection subsystem is also a municipal construction, and the district and county level is responsible for feedback on the progress and implementation of work tasks, and synchronously displays it on the command screen for visual display; the command and coordination system is based on the "Urban Municipal Comprehensive Supervision Information System Technical Specifications", to achieve the command and coordination of urban issues, including closed-loop management of information collection - case establishment - task dispatch - task processing - processing feedback - case verification and closure - performance appraisal; the comprehensive evaluation system is designed in accordance with the requirements of the operation management service platform, and its functions include evaluation database management, evaluation result management, etc.; the industry application system builds a unified system access point for urban sanitation, municipal facilities, landscaping and urban management work in accordance with the needs of districts and counties; the urban operation safety supervision system includes urban operation safety early warning management, emergency response, emergency plan management, and emergency resource management; the application maintenance system is an administrator's backend management system to achieve rapid business establishment, customized business workflow, and organizational structure, and can easily and quickly complete daily maintenance work such as work form content style adjustment, business process modification, personnel authority change, and system data backup.
[0060] Therefore, based on the functions that need to be completed by each system in the above-mentioned application layer, a large number of data types are required. If processed through a data processing model, its efficiency will not be high, and improving efficiency will inevitably result in high costs. Therefore, this application divides the urban monitoring data into basic data and thematic data, and establishes corresponding basic data processing models and thematic data processing models, so that the urban monitoring data is processed in two ways, the data processing type is unified, and the processing results are transmitted to the urban management scheduling and coordination business model.
[0061] As for the display layer, this application includes the high-definition large screen of the digital city management command center, the command seat computer, office computers and various mobile terminals.
[0062] The urban management dispatching and coordination business model in this application is established based on the requirements of the application layer and the display layer. That is, based on the binary processing of the processing models of basic data and thematic data, the processing results are dispatched and directed and transmitted through the urban management dispatching and coordination business model, the application layer and the display layer. Each system in the application layer establishes a direct data transmission link from the urban management dispatching and coordination business model to capture the data results after real-time processing. The display layer captures the data processing results in real time and displays them in real time, as well as captures the target data for display according to user instructions.
[0063] In addition, it also includes S4: Building a user layer for the entire process of the target city, and pushing corresponding information according to the needs of each group in the user layer. Specifically, the user layer in this application includes the district government and commissions, the district digital city management command center and business departments, various township and street communities, command centers, market-oriented service companies and citizens, etc. Therefore, the user layer in this application covers all user groups in the target city, which can effectively ensure the timeliness of data dissemination.
[0064] In another embodiment of the present embodiment, a city operation management dispatching command system is further included, which is applied to the above-mentioned city operation management dispatching command method, including:
[0065] Basic layer: It is composed of several city monitoring devices and is used to obtain monitoring data of target cities;
[0066] Support layer: used to provide support services for the transmission of target city monitoring data in the basic layer;
[0067] Data layer: used to store and transmit the target city monitoring data;
[0068] Data processing and analysis module: used to retrieve the monitoring data of the target city and analyze it after preprocessing;
[0069] Dispatch and coordination business model building module: used to build a city management dispatch and coordination business model based on application layer requirements and presentation layer requirements;
[0070] The data processing and analysis module is also used to transmit the analysis results to the urban management dispatching and coordination business model for business dispatching and command output to the application layer and display layer.
[0071] The above are only embodiments of the present invention. Common knowledge such as the known specific structures and characteristics in the scheme is not described in detail here. Ordinary technicians in the relevant field know all the common technical knowledge in the technical field to which the invention belongs before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply conventional experimental means before that date. Ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can be made, which should also be regarded as the scope of protection of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A method for dispatching and commanding urban operation management, characterized in that: include: S1: Build a basic layer consisting of several urban monitoring devices, and obtain data transmission streams from the basic layer through the support layer; S2: storing the city monitoring data transmitted in the data transmission stream to the data layer; S3: Call the city monitoring data in the data layer, analyze it after preprocessing, and establish a city management scheduling and coordination business model based on the application layer and display layer requirements. Input the analysis results into the city management scheduling and coordination business model and output them to the application layer and display layer.
2. The urban operation management dispatching and commanding method according to claim 1 is characterized by: The S1 includes: S1-1: Divide the target city into grids in the planning map; and build a basic layer consisting of computing storage devices, network security devices, sensing devices and computer rooms. The sensing devices are distributed according to the importance of the grids of the target city in the planning map; S1-2: Establish a support layer for data transmission services based on the protocols of each city monitoring device in the basic layer, and transmit city monitoring data to the next data layer through the support layer.
3. The urban operation management dispatching and commanding method according to claim 2 is characterized in that: The S2 includes: S2-1: Build a data aggregation system, data exchange system and comprehensive urban management database, and establish a data layer; S2-2: Receive data resources of urban monitoring data through the data layer, and perform sharing and exchange operations according to the received data resources of urban monitoring data; the data resources include basic data and thematic data.
4. The urban operation management dispatching and commanding method according to claim 3 is characterized by: The S3 includes: S3-1: Establish thematic data processing models and basic data processing models, and pre-process the data resources of urban monitoring data; S3-2: The pre-processed data resources of the urban monitoring data belonging to the thematic data are transmitted to the thematic data processing model, and the pre-processed data resources of the urban monitoring data belonging to the basic data are transmitted to the basic data processing model; S3-3: Build the application layer and the display layer, and construct the city management dispatch coordination business model according to the application layer and the display layer requirements; S3-4: The thematic data processing results output from the thematic data processing model and the basic data processing results output from the basic data processing model are input into the urban management dispatching and coordination business model, and transmitted in a targeted manner according to the application layer requirements and the presentation layer requirements.
5. The urban operation management dispatching and commanding method according to claim 4 is characterized in that: Also includes: S4: Build a user layer for full-process services in the target city, and push corresponding information according to the needs of each group in the user layer.
6. A city operation management dispatching and commanding system, applied to the city operation management dispatching and commanding method according to any one of claims 1 to 5, characterized in that: include: Basic layer: It is composed of several city monitoring devices and is used to obtain monitoring data of target cities; Support layer: used to provide support services for the transmission of target city monitoring data in the basic layer; Data layer: used to store and transmit the target city monitoring data; Data processing and analysis module: used to retrieve the monitoring data of the target city and analyze it after preprocessing; Dispatch and coordination business model building module: used to build a city management dispatch and coordination business model based on application layer requirements and presentation layer requirements; The data processing and analysis module is also used to transmit the analysis results to the urban management dispatching and coordination business model for business dispatching and command output to the application layer and display layer.
