Charging strategy optimization method based on charging load state correlation and influence analysis

By building a charging load-related network and grid operation status model, analyzing and optimizing charging strategies, the problem of impact of electric vehicle charging on the grid is solved, and the grid stability and charging efficiency are improved.

CN119010051APending Publication Date: 2024-11-22HONGHE POWER SUPPLY BUREAU OF YUNNAN POWER GRID +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411092397.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively analyze and manage the impact of large-scale electric vehicle charging load on the power grid, and the lack of charging strategy optimization that takes into account the operating status of the power grid, resulting in the limitation of the grid stability.

Method used

By collecting and processing historical charging load and grid operating status data, a charging load-related network and grid operating status model is built, the impact of different charging modes on grid operating status is analyzed, and the charging strategy is adjusted to ensure stable operation of the power grid through simulation and optimization strategies. .

Benefits of technology

It realizes an accurate correlation analysis of the charging load and the operating status of the power grid, optimizes the charging strategy, improves the stability and charging efficiency of the power grid, and supports the safe operation of large-scale electric vehicle charging needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119010051A_ABST
    Figure CN119010051A_ABST
Patent Text Reader

Abstract

The invention relates to a charging strategy optimization method based on charging load state correlation and influence analysis, and belongs to the technical field of coating. The method comprises seven steps of data acquisition and processing, data slicing, construction of a charging load association network, construction of a power grid operation state model, association analysis of a charging mode and a power grid operation state, simulation of different charging strategies and strategy optimization and correction. According to the invention, a new effective method is provided for the intelligent charging of the electric vehicle and the cooperative operation of the power grid by establishing the charging load association network and the power grid operation state model and simulating and optimizing the charging strategy. The method is of great significance to grasp the influence of the charging demand of the large-scale electric vehicle on the power flow of the power grid and prevent and avoid the overload operation of the power grid, so that the stable and safe operation of the power grid is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power grids, and in particular relates to a charging strategy optimization method based on charging load state association and impact analysis. Background Art

[0002] At present, with the widespread popularity of electric vehicles, the impact of charging load on the power grid is increasing. How to effectively analyze and manage charging load and optimize charging strategies to ensure the stable operation of the power grid is an important issue facing the current power system.

[0003] In existing research, statistical methods are generally used to analyze and predict charging loads, and then charging strategies are formulated based on the prediction results. However, this method has two main problems. First, the accuracy of statistical prediction methods is affected by the quality and quantity of data. If the historical data is not large enough or the data quality is not high, the accuracy of the prediction results will be reduced. Second, statistical methods usually assume that the data distribution is fixed, but in fact the changes in charging loads are very complex and are affected by many random factors, such as weather, time, user behavior, etc. Therefore, the use of statistical methods to predict charging loads and optimize charging strategies is often subject to great limitations.

[0004] In addition, most current research focuses on single charging stations or small-scale charging networks, and there is little research on charging load management and optimization of large-scale and complex charging networks. In addition, there is a lack of research that considers the correlation between the operating status of the power grid and the charging load, and the formulation of charging strategies often does not take into account its impact on the operating status of the power grid. These all limit the effectiveness of existing technologies in practical applications.

[0005] In this case, there is an urgent need for a method that can accurately describe the relationship between charging load and grid operating status to help grid operators better understand and manage charging load and optimize charging strategies to ensure stable operation of the grid. Summary of the invention

[0006] The purpose of the present invention is to solve the deficiencies of the prior art and to provide a charging strategy optimization method based on charging load state association and impact analysis.

[0007] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0008] A charging strategy optimization method based on charging load state association and impact analysis includes the following steps:

[0009] S1. Data collection and processing: Collect historical charging load and grid operation status data, perform preprocessing, and then perform feature extraction to obtain structured feature data;

[0010] S2, data slicing: Slice the structured feature data in chronological order;

[0011] S3. Constructing a charging load association network: using the data obtained after slicing, using a graph algorithm or a network algorithm, constructing a charging load association network;

[0012] S4. Constructing a grid operation status model: using the data obtained after slicing, based on the physical model and the statistical model, constructing a grid operation status model;

[0013] S5. Analysis of the correlation between charging mode and grid operation status: Combine the charging load correlation network with the grid operation status model to analyze the impact of different charging modes on the grid operation status;

[0014] S6. Simulate different charging strategies: for different charging modes, simulate their implementation methods and calculate their impact on the operation status of the power grid;

[0015] S7. Strategy optimization and correction: According to the results of the correlation analysis between the charging mode and the grid operation status, the simulated charging strategy is adjusted in reverse to optimize the charging strategy while ensuring the stable operation of the grid.

[0016] Furthermore, preferably, in S1, the preprocessing includes data cleaning and normalization processing; and the principal component analysis method is used for feature extraction.

[0017] Furthermore, preferably, the data cleaning includes removing noise and outliers in the data; and the normalization process adopts the minimum-maximum normalization method.

[0018] Furthermore, preferably, in S2, slicing is performed by a sliding window method.

[0019] Further, preferably, the specific method of S3 is:

[0020] S301, establishing a node: taking the charging load in each time period of the sliced ​​data as a node;

[0021] S302, determining the edge condition: setting an association threshold, if the correlation coefficient between the charging loads in two time periods exceeds the set threshold, then establishing an edge between the two nodes, thereby forming a network;

[0022] S303, determine the weight of the edge: the weight of the edge represents the strength of the association between two nodes, and is set as the correlation coefficient between the two nodes;

[0023] S304, optimizing the network structure: using the Kruskal algorithm to optimize the constructed network to obtain a charging load association network.

[0024] Further, preferably, in S302 and S303, the correlation coefficient adopts the Pearson correlation coefficient.

[0025] Further, preferably, the specific method of S4 is:

[0026] S401, constructing a physical model: establishing a physical model of the power grid state according to the physical operation law of the power grid; for an n-node power grid, the physical model established is a DC constant power flow model, and the expression is as follows:

[0027] F p (X) = BL

[0028] Among them, F p (X) is an n-dimensional vector, representing the power injection at the node; B is an n×n-dimensional admittance matrix; L is an n-dimensional vector, representing the power flow on the line;

[0029] S402, constructing a statistical model: using the characteristic data obtained after slicing, combined with the collected historical power grid operation data, and using the gradient boosting regression model, a statistical model of the power grid operation status is established; statistical model F s (X) is represented by:

[0030] F s (X) = argmin(Loss(Y,F(X)))

[0031] Among them, X is the input feature, which is the factor that affects the operation status of the power grid, such as weather conditions, holiday information, and load demand; Y is the power grid operation parameter, which is voltage and current; F is the mapping function, which maps the input feature to the power grid operation parameter; Loss is the loss function;

[0032] S403, model fusion: combining the physical model and the statistical model as a power grid operation status model;

[0033] For input feature X, the grid operation state model F c (X) is represented by:

[0034] F c (X) = w*F p (X)+(1-w)*F s (X)

[0035] Among them, F p (X) and F s (X) represents the prediction results of the physical model and the statistical model respectively; w is the weight parameter;

[0036] S404, model verification: Use the historical charging load and grid operation status data collected in S1 to perform regression testing to verify the accuracy and robustness of the model; use the cross-validation method to verify the model;

[0037] S405, model update: according to the charging load association network obtained in S3 and the result of model verification, adjust and optimize the power grid operation status model.

[0038] Further, preferably, the specific method of S5 is:

[0039] S501, constructing a charging mode: determining a charging mode for each time period through a charging load association network;

[0040] S502, mapping the charging mode to the grid model: using the established grid operation state model, mapping the charging mode of each time period to the grid operation state;

[0041] S503, comparing and analyzing main grid parameters: then comparing grid operation states corresponding to different charging modes, and analyzing the impact of charging modes on grid stability;

[0042] S504. Correlation analysis: Analyze the correlation between the charging mode and the grid operation status by using the Pearson correlation coefficient method.

[0043] Further, preferably, the specific method of S6 is:

[0044] First, representative indicators of the charging strategy are defined, and the value range of the representative indicators is given; the representative indicators include charging time and charging power;

[0045] Secondly, based on the charging load association network and the grid operation status model, the charging strategy is analyzed and analyzed by the association between the charging mode and the grid operation status to calculate its impact on the grid operation status;

[0046] Then, for each charging strategy, the implementation process is simulated; the simulation needs to calculate and record the impact of each operation or decision on the operation status of the power grid;

[0047] Finally, the simulation results of all charging strategies are compared, and the charging strategy with the least impact on the grid operation status is selected as the optimal charging strategy.

[0048] Further, preferably, the specific method of S7 is:

[0049] Let the charging strategy set be P = {p 1 ,p 2 ,...,p n}, where p i represents the i-th charging strategy; the goal is to find the charging strategy that optimizes the grid operation state;

[0050] The specific steps are as follows:

[0051] First, a greedy algorithm is used to select the best option at each step, and then based on this option, the next local optimal solution is selected, that is:

[0052] p*=argmin{p i ∈P}{f(ΔS(p i ))}

[0053] Where f() represents the objective function, ΔS(p i ) indicates the application of charging strategy p i Changes in the post-grid operating status;

[0054] Then, the new charging strategy p* is applied to the grid operation status model to observe whether the grid operation status is improved under the new charging strategy p*;

[0055] By calculating the new state change ΔSnew and comparing it with the original state change ΔS, that is:

[0056] f(ΔSnew)<f(ΔS)

[0057] If the new strategy improves the operation status of the power grid, the charging strategy will be updated; otherwise, other charging strategies will be adopted, or the parameters of the optimization algorithm will be adjusted, and then the above steps will be repeated for iteration.

[0058] In S1 of the present invention, the principal component analysis method is used to extract features, and the extracted features include the peak value, valley value, and average value of the historical charging load data.

[0059] In S402 of the present invention, Loss is a loss function, and preferably a mean square error (MSE) function is used.

[0060] In S403 of the present invention, the weight parameter w is determined by a gradient descent algorithm, and the specific steps are described as follows:

[0061] (1) Initialize the value of the weight parameter w to 0 or a decimal close to 0;

[0062] (2) Calculate the error of the model under the current weight w by defining a loss function, which uses a square loss function;

[0063] (3) Calculate the gradient of the loss function with respect to the weight w. The gradient expresses the local slope of the function at the current position, that is, the speed and direction of the error change;

[0064] (4) Update the value of weight w, and the update rule is w new =w old-α, where α is a positive number, called the learning rate, which is responsible for controlling the step size of the weight update, w new The new weight parameter, w old The weight of the previous iteration;

[0065] (5) Continue iterating from (2) to (4) until the loss function value reaches the preset number of iterations.

[0066] In S404 of the present invention, the main steps of cross-validation are as follows:

[0067] (1) First, divide the historical data set D into k subsets of equal size; each subset should maintain the original distribution of the data as much as possible;

[0068] (2) Then, each time from these k subsets, select a subset as the test set T, and the remaining k-1 subsets as the training set R;

[0069] (3) Next, use the training set R to train the model and verify the prediction effect of the model on the test set T;

[0070] (4) Repeat (2) and (3) k times so that each subset is used as a test set;

[0071] (5) Finally, calculate the mean of the k test results as the evaluation index of the model;

[0072] The evaluation indicators used are mean square error (MSE) and R-squared (R 2 ) is calculated. The calculation formula of mean square error MSE is as follows:

[0073]

[0074] Among them, Pi is the model prediction value, Yi is the true value, and n is the number of samples.

[0075] R-squared(R 2 ) is also called the coefficient of determination, which measures the correlation between the model's predicted value and the actual value. The closer the value is to 1, the better the model's predictive ability. 2 The calculation formula is as follows:

[0076]

[0077] Among them, mean(Y) is the mean value of the true value Y. Pi is the model prediction value, and Yi is the true value.

[0078] The model evaluation indicators obtained through cross-validation comprehensively evaluate the prediction accuracy and robustness of the model and more accurately reflect the performance of the model on new data sets.

[0079] In the present invention, the grid operation state model is established based on the physical and statistical rules of the grid, and the charging load association network reveals the correlation of the charging load in different time periods. The model update is performed based on new data. This includes using the newly acquired historical charging load data, grid operation state data, and the charging load association network obtained through S3 to adjust the relevant parameters of the model and the operation results of the optimization algorithm. For example, if the charging load increases in a certain period of time, we can update the relevant parameters of the model to enable the model to reflect this new change, so as to better predict the operation state of the grid under the corresponding circumstances.

[0080] In step S504 of the present invention, the Pearson correlation coefficient method can be used to quantitatively measure the degree of correlation between the charging mode and the operating state of the power grid. This achievement will play a vital role in subsequent decision-making. Specifically, if a certain charging mode is strongly correlated with the operating state of the power grid, then we may need to focus on this charging mode when formulating the charging strategy. For example, if the charging mode during peak hours has a greater impact on the operating state of the power grid, then we may consider controlling the charging behavior during peak hours to ensure the stable operation of the power grid. At the same time, this correlation analysis can also be used to monitor the state of the power grid. According to the real-time changes in the charging mode, we can predict possible changes in the operating state of the power grid and make timely adjustments and responses. In addition, the analysis results can also be provided to decision makers as a reference for optimizing the charging strategy. If the implemented charging strategy causes a significant change in the operating state of the power grid, it may be necessary to adjust or optimize the strategy. Conversely, if the charging strategy has a small impact on the operating state of the power grid, it can be regarded as a relatively optimal strategy. )

[0081] In S6 of the present invention, the simulation needs to calculate and record the impact of each operation or decision on the operating state of the power grid; that is, record the changes in the operating state of the power grid after each operation or decision is changed, including the power consumption and power supply stability of the power grid.

[0082] In S6 of the present invention, the simulation results of all charging strategies are compared, and the charging strategy with the least impact on the grid operation state is selected as the optimal charging strategy. The comparison is based on the changes in the grid operation state recorded above, such as the total power consumption or the change in power supply stability, and the charging strategy with the least impact on the grid operation state is selected as the optimal charging strategy.

[0083] In S7 of the present invention, the iteration process is stopped until a certain condition is met.

[0084] The conditions include the following:

[0085] 1) When the number of iterations reaches a preset number, such as 100 or 1000 times.

[0086] 2) When the degree of improvement in the grid operation status brought about by the new charging strategy is lower than a preset threshold, for example, if the degree of improvement in the grid operation status brought about by the new charging strategy is lower than a preset value such as 3% or 5%.

[0087] 3) When the rate of change of the grid operation state is less than a preset threshold, for example, after 5 or 10 consecutive iterations, the rate of change of the grid operation state is less than the preset threshold of 1% or 0.5%.

[0088] The main technical problem solved by the present invention is how to effectively analyze and predict the impact of charging mode on the operation status of the power grid, so as to formulate and optimize the charging strategy, and improve the charging efficiency and convenience under the premise of ensuring the stable operation of the power grid. The present invention provides a new and effective method for the coordinated operation of electric vehicle intelligent charging and power grid by establishing a charging load association network and a power grid operation status model, as well as simulating and optimizing the charging strategy.

[0089] Compared with the prior art, the present invention has the following beneficial effects:

[0090] 1. Accurate analysis: By collecting, cleaning and processing data on charging load and grid operation status, the correlation between charging load and grid operation status is analyzed, thus providing a basis for analyzing the impact of different charging modes on grid operation status.

[0091] 2. Effective prediction: By using the established grid operation status model, the impact of a certain charging mode on the grid operation status can be predicted in advance, which helps to avoid grid risks caused by charging behavior.

[0092] 3. Optimize decision-making: Based on the correlation analysis between charging mode and grid operation status, the charging strategy can be optimized to ensure stable operation of the grid while ensuring charging demand.

[0093] 4. Real-time adjustment: Through the feedback of historical data, the grid operation status model can be updated and optimized in real time to make it more adaptable to changes in the actual grid operation environment.

[0094] 5. Supporting safe operation of the power grid: This method is of great significance for grasping the impact of large-scale electric vehicle charging demand on the power grid trend, preventing and avoiding overload operation of the power grid, thereby ensuring the stable and safe operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0095] Figure 1 It is a flow chart of the charging strategy optimization method based on charging load state association and impact analysis of the present invention;

[0096] Figure 2 A flow chart for constructing a charging load association network;

[0097] Figure 3 Flowchart for constructing the grid operation status model;

[0098] Figure 4 Flowchart for the correlation analysis between charging mode and grid operation status. DETAILED DESCRIPTION

[0099] The present invention is further described in detail below in conjunction with embodiments.

[0100] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.

[0101] like Figure 1 to Figure 4 As shown, a charging strategy optimization method based on charging load state association and impact analysis includes the following steps:

[0102] S1. Data collection and processing: Collect historical charging load and grid operation status data, perform preprocessing, and then perform feature extraction to obtain structured feature data; the data source can be Smith chart, status report, hardware equipment (such as smart meter, charging station data, etc.) or data service provider;

[0103] S2, data slicing: Slice the structured feature data in chronological order to better reveal the relationship between charging load and grid operation status;

[0104] S3. Constructing a charging load association network: Using the data obtained after slicing, a graph algorithm or a network algorithm is used to construct a charging load association network to find the association characteristics between charging loads;

[0105] S4. Constructing a grid operation state model: Using the data obtained after slicing, based on the physical model and the statistical model, construct a grid operation state model to specifically analyze the impact of different charging modes on the grid operation state;

[0106] S5. Analysis of the correlation between charging mode and grid operation status: Combine the charging load correlation network with the grid operation status model to analyze the impact of different charging modes on the grid operation status;

[0107] S6. Simulate different charging strategies: for different charging modes, simulate their implementation methods and calculate their impact on the operation status of the power grid;

[0108] S7. Strategy optimization and correction: According to the results of the correlation analysis between the charging mode and the grid operation status, the simulated charging strategy is adjusted in reverse to optimize the charging strategy while ensuring the stable operation of the grid.

[0109] Among them, in S1, preprocessing includes data cleaning and normalization; principal component analysis is used for feature extraction, that is, reducing the dimensionality of correlated multidimensional data into representative new features.

[0110] The data cleaning includes cleaning the noise and outliers in the data; for example, data without charging behavior in a continuous period of time or charging load data with a sudden surge can be regarded as outliers and removed. The normalization process uses the minimum-maximum normalization method.

[0111] In S2, slicing is performed using a sliding window. The purpose of data slicing is to divide long time series data into smaller blocks or fragments to facilitate more convenient data processing and analysis. First, the length of the slice needs to be determined. This length can be fixed or dynamic, depending on the specific characteristics of the data and the requirements of the analysis task. The size of the sliding window is the slice length, and the step size of each window slide also needs to be determined in advance, which can generally be set to 1. Specifically, if there is a series of time series data X = {x1, x2, ..., xn}, and the window size is set to m, and the window sliding step size is k, then the data of the i-th time window Wi is {xi, xi+1, ..., xi+m-1}, and i increases by k each time.

[0112] When constructing a charging load association network, we can use some basic concepts and methods in graph theory. A graph is composed of nodes (Vertex) and edges (Edge). Nodes can be regarded as independent individuals with certain attributes, and edges represent the relationship between these individuals. In the present invention, the charging load in each time period can be regarded as a node. If there is a certain association relationship between two nodes (i.e., the charging load in two time periods) (for example, the size of the former has an impact on the latter), an edge is drawn between the two nodes. Based on this, the specific method of S3 is:

[0113] S301, establishing a node: taking the charging load in each time period of the sliced ​​data as a node;

[0114] S302, determining the edge condition: setting an association threshold, if the correlation coefficient between the charging loads in two time periods exceeds the set threshold, then establishing an edge between the two nodes, thereby forming a network;

[0115] S303, determine the weight of the edge: the weight of the edge represents the strength of the association between two nodes, and is set as the correlation coefficient between the two nodes;

[0116] S304, optimizing the network structure: using the Kruskal algorithm to optimize the constructed network to obtain a charging load association network.

[0117] In S302 and S303, the correlation coefficient adopts the Pearson correlation coefficient.

[0118] Assuming there are two data sets X and Y, their Pearson correlation coefficient r can be calculated by the following formula:

[0119]

[0120] Among them, xi and yi are data points in the data sets X and Y, and u x and u y is the average of the data sets X and Y. The symbol Σ represents the sum.

[0121] For the minimum spanning tree problem of a graph, the mathematical description of Kruskal's algorithm can be referred to the following form.

[0122] Let G = (V, E) be an undirected connected graph, where V is the set of nodes and E is the set of edges. Define the function c: E->R as a mapping from edges to weights. Let A be a subset of E, and E forms a spanning tree in the graph G = (V, A). We call the weight (or length) c(A) = Σc(e) where the sum of all e belonging to A is the weight (or length) of the spanning tree. Among all possible spanning trees T, the minimum spanning tree is the spanning tree with the smallest weight.

[0123] Kruskal algorithm is used to solve the minimum spanning tree problem of undirected graphs. The basic steps are as follows:

[0124] Sorting: Sort all the edges of the graph by weight from small to large.

[0125] Initialize the forest: Initialize each node of the graph as a single-node tree to form a forest.

[0126] Add edges: Select edges in sequence according to the sorting results. If the two nodes connected by this edge are in different trees, merge the two trees into one tree, that is, add this edge to the minimum spanning tree.

[0127] Repeat step 3: until all nodes are in the same tree, that is, the minimum spanning tree.

[0128] This algorithm can be formalized as the following mathematical formula:

[0129] Let G = (V, E) be a graph, V is a set of nodes, E is a set of edges, |V| = n, |E| = m. Define c:E->R as a mapping from edge to weight. Sort the edges in E in ascending order according to weight c:

[0130] e_1,e_2,...,e_m satisfies c(e_1)≤c(e_2)≤...≤c(e_m)

[0131] Let forest F = (V, F), where F is the empty set.

[0132] For i=1,2,...,m, if the graph after F and {e_i} does not form a cycle, let F=F and {e_i}.

[0133] After m cycles, the edges in F form the minimum spanning tree of graph G.

[0134] This formula uses the set union (|) operation and uses "and" (&&) and "satisfies" (|) to express the steps of the algorithm. The main components of the mathematical model here are set theory and logic, which are mainly used to describe the process of the algorithm starting from an empty set and adding edges according to certain conditions (no loops can be formed) until a minimum spanning tree is formed;

[0135] The specific method of S4 is:

[0136] S401, constructing a physical model: establishing a physical model of the power grid state according to the physical operation law of the power grid;

[0137] The physical model of the power grid is constructed based on Ohm's law (V = IR) and Kirchhoff's law. For an n-node power grid, the physical model is a DC constant power flow model, and the expression is as follows:

[0138] F p (X) = BL

[0139] Among them, F p (X) is an n-dimensional vector, representing the power injection at the node; B is an n×n-dimensional admittance matrix; L is an n-dimensional vector, representing the power flow on the line;

[0140] S402, constructing a statistical model: using the characteristic data obtained after slicing, combined with the collected historical power grid operation data, and using the gradient boosting regression model, a statistical model of the power grid operation status is established; statistical model F s (X) is represented by:

[0141] F s (X) = argmin(Loss(Y,F(X)))

[0142] Among them, X is the input feature, which is the factor that affects the operation status of the power grid, such as weather conditions, holiday information, and load demand; Y is the power grid operation parameter, which is voltage and current; F is the mapping function, which maps the input feature to the power grid operation parameter; Loss is the loss function, which reflects the difference between the predicted value and the actual value;

[0143] S403, model fusion: combining the physical model and the statistical model as a power grid operation status model;

[0144] For input feature X, the grid operation state model F c (X) is represented by:

[0145] F c (X) = w*F p (X)+(1-w)*F s (X)

[0146] Among them, F p (X) and F s (X) represents the prediction results of the physical model and the statistical model respectively; w is the weight parameter, which can be optimized by the cross-validation method;

[0147] S404, model verification: Use the historical charging load and grid operation status data collected in S1 to perform regression testing to verify the accuracy and robustness of the model; use the cross-validation method to verify the model;

[0148] S405, model update: according to the charging load association network obtained in S3 and the result of model verification, adjust and optimize the power grid operation status model.

[0149] The specific method of S5 is:

[0150] S501, constructing a charging mode: determining the charging mode of each time period through a charging load association network; for example, if it is found that the charging load from 8 pm to 10 pm is strongly correlated with the grid operation status in the subsequent time period, we can assume that a specific charging mode is used in this time period;

[0151] S502, map the charging mode to the grid model: Use the established grid operation state model to map the charging mode of each time period to the grid operation state; specifically, we can use the charging mode as the input of the grid model to obtain the corresponding grid state prediction result. For example, let M be the charging mode, and M = {m1, m2, ..., mn}, then the grid state prediction is expressed as:

[0152] F c (M)=F c (m1,m2,...,mn)

[0153] Wherein, mi represents the charging mode in the i-th time period.

[0154] S503, comparing and analyzing main grid parameters: then comparing the grid operation states corresponding to different charging modes (covering the main grid parameters, such as voltage, current, and frequency), and analyzing the impact of the charging modes on grid stability;

[0155] S504. Correlation analysis: Analyze the correlation between the charging mode and the grid operation status by using the Pearson correlation coefficient method.

[0156] The purpose of the above steps is to find the possible relationship between charging mode and grid operation status through comparison and analysis, so as to guide the formulation and optimization of charging strategy.

[0157] In step S6, different charging modes, such as fast charging and slow charging, are simulated and their impact on the operation status of the power grid is calculated. The specific method of S6 is:

[0158] First, the representative indicators of the charging strategy are defined, and the value range of the representative indicators is given; the representative indicators include charging time and charging power; this involves the constraint problem, which can be expressed using the following mathematical formula:

[0159] C i ≤C≤C max

[0160] Where C represents the charging indicator, such as charging time or charging power, i and C max are the lower and upper limits of the indicator respectively.

[0161] Secondly, based on the charging load association network and the grid operation state model, the charging strategy is analyzed and calculated through the association between the charging mode and the grid operation state to calculate its impact on the grid operation state; the specific impact can be expressed by a linear or nonlinear function f(C), that is:

[0162] ΔS=f(C), where ΔS represents the change in the operating state of the power grid, and f(C) represents the influence function.

[0163] Then, for each charging strategy, the implementation process is simulated; the simulation needs to calculate and record the impact of each operation or decision on the operation status of the power grid;

[0164] Finally, the simulation results of all charging strategies are compared, and the charging strategy with the least impact on the grid operation status is selected as the optimal charging strategy.

[0165] The specific method of S7 is:

[0166] Let the charging strategy set be P = {p 1 ,p 2 ,...,pn}, where p i represents the i-th charging strategy; the goal is to find the charging strategy that optimizes the grid operation state. The “optimal” here is defined according to the actual problem, which may be a strategy that balances the load of the grid or minimizes the mismatch;

[0167] The specific steps are as follows:

[0168] First, a greedy algorithm is used to select the best option at each step, and then based on this option, the next local optimal solution is selected, that is:

[0169] p*=argmin{p i ∈P}{f(ΔS(p i ))}

[0170] Where f() represents the objective function, ΔS(p i ) indicates the application of charging strategy p i Changes in the post-grid operating status;

[0171] Then, the new charging strategy p* is applied to the grid operation status model to observe whether the grid operation status is improved under the new charging strategy p*;

[0172] By calculating the new state change ΔSnew and comparing it with the original state change ΔS, that is:

[0173] f(ΔSnew)<f(ΔS)

[0174] If the new strategy improves the operation status of the power grid, the charging strategy will be updated; otherwise, other charging strategies will be adopted, or the parameters of the optimization algorithm will be adjusted, and then the above steps will be repeated for iteration.

[0175] Application Examples

[0176] Assume that there is a power grid operation system with 100 charging stations. We collected data from the past year, where the historical charging load includes the charging power (in kilowatts) of each charging station at a recording point every 10 minutes, and the grid operation status data includes the total active load (in kilowatts) and total reactive load (in kvars) of the system at a recording point every 10 minutes, as well as the voltage (in kilovolts) of each charging station.

[0177] In the preprocessing stage, we removed the data with power less than 0 or voltage outside the valid range and normalized the remaining data.

[0178] In the slicing stage, we sliced ​​the data into one day, and each slice contained data for every charging station every 10 minutes on that day.

[0179] When constructing the charging load association network, we used the Pearson correlation coefficient as the network weight, and the threshold was set to 0.5. For example, the correlation coefficient of the load data of charging station A and charging station B in a certain period of time is 0.65, so in the association network, A and B form an edge with a weight of 0.65.

[0180] In the stage of building the grid operation status model, the grid topology is scanned and filled according to the grid line parameters during the calculation of the admittance matrix B of the grid physical model. Each element of the equivalent voltage transfer vector L is the voltage angle difference between two electrical nodes. The power P of each grid node can be derived from the voltage and current. In the stage of building the statistical model, we selected the total active load of the grid, the total reactive load, the active load of each charging station, and the grid frequency as the input feature X, and the grid voltage as the output feature Y, and used the gradient boosting regression model for training.

[0181] During the correlation analysis phase, we found that the power grid was overloaded during the morning and evening peak hours due to concentrated charging of electric vehicles, which affected the stability of the power grid. Therefore, when formulating charging strategies, we need to consider reasonable control of charging during these two time periods, such as promoting peak-shifting charging and shifting part of the load to the low-load period at night.

[0182] In the stage of simulating charging strategies, we assume that the morning peak is 8:00-10:00, the evening peak is 18:00-20:00, and the night low load period is 22:00-6:00. Three strategies are formulated: Strategy A prohibits charging during peak hours; Strategy B does not exceed 40% of the charging power during peak hours; Strategy C does not exceed 70% of the charging power during peak hours and transfers 10% of the charging demand to the night. By simulating the impact of each strategy on the power grid and calculating the power grid operation parameters, we found that Strategy C takes into account the charging needs of electric vehicle users while making the power grid stable.

[0183] In the strategy optimization phase, we further subdivided the C strategy and simulated the new strategy. We found that the strategy of controlling the charging power at 60% during peak hours and shifting 20% ​​of the charging demand to the nighttime made the grid operate most stably, so we set this strategy as the optimal charging strategy. At the same time, this strategy was also written into the electric vehicle charging rules to guide electric vehicle users to charge reasonably and ensure the stable operation of the power grid.

[0184] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A charging strategy optimization method based on charging load state correlation and impact analysis, It is characterized in that The steps include: S1. Data collection and processing: Collect historical charging load and grid operation status data, perform preprocessing, and then perform feature extraction to obtain structured feature data; S2, data slicing: slicing the structured feature data in chronological order; S3. Constructing a charging load association network: using the data obtained after slicing, using a graph algorithm or a network algorithm, constructing a charging load association network; S4. Constructing a grid operation status model: using the data obtained after slicing, based on the physical model and the statistical model, constructing a grid operation status model; S5. Analysis of the correlation between charging mode and grid operation status: Combine the charging load correlation network with the grid operation status model to analyze the impact of different charging modes on the grid operation status; S6. Simulate different charging strategies: for different charging modes, simulate their implementation methods and calculate their impact on the operation status of the power grid; S7. Strategy optimization and correction: According to the results of the correlation analysis between the charging mode and the grid operation status, the simulated charging strategy is adjusted in reverse to optimize the charging strategy while ensuring the stable operation of the grid.

2. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that In S1, preprocessing includes data cleaning and normalization; principal component analysis is used for feature extraction.

3. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The data cleaning includes removing noise and outliers in the data; the normalization process adopts the minimum-maximum normalization method.

4. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that In S2, a sliding window method is used for slicing.

5. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The specific methods of S3 are: S301, establishing a node: taking the charging load in each time period of the sliced ​​data as a node; S302, determining the edge condition: setting an association threshold, if the correlation coefficient between the charging loads in two time periods exceeds the set threshold, then establishing an edge between the two nodes, thereby forming a network; S303, determine the weight of the edge: the weight of the edge represents the strength of the association between two nodes, and is set as the correlation coefficient between the two nodes; S304, optimizing the network structure: using the Kruskal algorithm to optimize the constructed network to obtain a charging load association network.

6. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that In S302 and S303, the correlation coefficient adopts the Pearson correlation coefficient.

7. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The specific method of S4 is: S401, constructing a physical model: establishing a physical model of the power grid state according to the physical operation law of the power grid; for an n-node power grid, the physical model established is a DC constant power flow model, and the expression is as follows: F p (X)=BL Among them, F p (X) is an n-dimensional vector, representing the power injection at the node; B is an n×n-dimensional admittance matrix; L is an n-dimensional vector, representing the power flow on the line; S402, constructing a statistical model: using the characteristic data obtained after slicing, combined with the collected historical power grid operation data, and using the gradient boosting regression model, a statistical model of the power grid operation status is established; statistical model F s (X) is represented by: F s (X)=argmin(Loss(Y,F(X))) Among them, X is the input feature, which is the factor that affects the operation status of the power grid, such as weather conditions, holiday information, and load demand; Y is the power grid operation parameter, which is voltage and current; F is the mapping function, which maps the input feature to the power grid operation parameter; Loss is the loss function; S403, model fusion: combining the physical model and the statistical model as a power grid operation status model; For input feature X, the grid operation state model F c (X) is represented by: F c (X)=w*F p (X)+(1-w)*F s (X) Among them, F p (X) and F s (X) represents the prediction results of the physical model and the statistical model respectively; w is the weight parameter; S404, model verification: Use the historical charging load and grid operation status data collected in S1 to perform regression testing to verify the accuracy and robustness of the model; use the cross-validation method to verify the model; S405, model update: according to the charging load association network obtained in S3 and the result of model verification, adjust and optimize the power grid operation status model.

8. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The specific method of S5 is: S501, constructing a charging mode: determining a charging mode for each time period through a charging load association network; S502, mapping the charging mode to the grid model: using the established grid operation state model, mapping the charging mode of each time period to the grid operation state; S503, comparing and analyzing main grid parameters: then comparing grid operation states corresponding to different charging modes, and analyzing the impact of charging modes on grid stability; S504. Correlation analysis: Analyze the correlation between the charging mode and the grid operation status by using the Pearson correlation coefficient method.

9. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The specific method of S6 is: First, representative indicators of the charging strategy are defined, and the value range of the representative indicators is given; the representative indicators include charging time and charging power; Secondly, based on the charging load association network and the grid operation status model, the charging strategy is analyzed and analyzed by the association between the charging mode and the grid operation status to calculate its impact on the grid operation status; Then, for each charging strategy, the implementation process is simulated; the simulation needs to calculate and record the impact of each operation or decision on the operation status of the power grid; Finally, the simulation results of all charging strategies are compared, and the charging strategy with the least impact on the grid operation status is selected as the optimal charging strategy.

10. The charging strategy optimization method based on charging load state association and impact analysis according to claim 1, It is characterized in that The specific method of S7 is: Let the charging strategy set be P = {p 1 ,p 2 ,...,p n }, where p i represents the i-th charging strategy; the goal is to find the charging strategy that optimizes the grid operation state; The specific steps are as follows: First, a greedy algorithm is used to select the best option at each step, and then based on this option, the next local optimal solution is selected, that is: p*sargmin{p i ∈P}{f(ΔS(p i ))} Where f() represents the objective function, ΔS(p i ) indicates the application of charging strategy p i Changes in the post-grid operating status; Then, the new charging strategy p* is applied to the grid operation status model to observe whether the grid operation status is improved under the new charging strategy p*; By calculating the new state change ΔSnew and comparing it with the original state change ΔS, that is: f(ΔSnew)<f(ΔS) If the new strategy improves the operation status of the power grid, the charging strategy will be updated; otherwise, other charging strategies will be adopted, or the parameters of the optimization algorithm will be adjusted, and then the above steps will be repeated for iteration.