Voltage reactive hierarchical planning method for power distribution network of pumped storage construction power supply system
By adopting the reactive layered planning method of distribution network voltage in the pumped storage power station construction power supply system, combined with high-voltage construction access to substations and medium-voltage distribution network network units and other equipment, the investment and operation costs are optimized and the line failure is solved The problems of power loss and terminal voltage instability improve the power quality and economical of the system.
Patent Information
- Application Number
- CN202410967980.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-07-18
AI Technical Summary
There are problems of large reactive power loss in the line and unstable terminal voltage in the pumped storage power station construction power supply system, resulting in a decrease in the system power factor and a decrease in energy utilization.
A reactive layered planning method for distribution network voltage is adopted, including high-voltage construction access substations, medium-voltage distribution network network units, low-voltage distribution transformers, power devices (DGs), capacitor banks, static transformers (SVGs), automatic Transformer (OLTC) and reactive power compensation equipment optimize investment and operating costs through the dual-layer planning of the overall model and the lower layer model to achieve economic design and energy compensation of the system.
It effectively solved the problem of voltage reactive power optimization in the construction power supply system, improved the overall planning and operational economy of the distribution network, adapted to the demand for power equipment and load growth of the distribution network, improved the terminal voltage level and system power quality .
Smart Images

Figure CN119010104A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pumped storage power supply, and relates to a voltage and reactive layered planning method for a distribution network of a pumped storage construction power supply system. Background Art
[0002] In order to achieve normal operation of the power system and provide reliable electricity, a large number of adjustable power sources are often required. Pumped storage power stations, as a relatively mature, economical and large-scale green carpet, efficient and flexible adjustable power source, play an important role in peak and frequency regulation, accident response, local energy consumption, energy conservation and emission reduction, etc. However, the construction of pumped storage power stations generally has the characteristics of large scale, long construction period, relatively scattered layout of construction facilities, many load points during the construction period, large capacity, scattered layout, and long power supply distance.
[0003] Generally speaking, the construction power supply system of a pumped storage power station is mainly responsible for the construction electricity consumption of the upper reservoir, lower reservoir, camp area and gravel area system. The construction power supply system of a pumped storage power station is mainly responsible for the stable power supply of various types of loads at the end of each area, such as construction machinery, lighting, compressed air, water supply and drainage, gravel processing, concrete production, etc. The long power supply radius and complex fluctuating loads are prone to cause reactive power loss of the line and unstable terminal voltage. When special equipment such as rotating equipment and electric welding machines work normally, they need to absorb active and reactive power from the power system to generate the alternating magnetic field required by the equipment. However, when the system transmits a certain amount of active power, the increase in reactive power will reduce the system power factor and reduce energy utilization. Therefore, solving the above-mentioned terminal power quality support will provide a great development foundation for the development of key technologies for the construction power supply system of pumped storage power stations. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a voltage-reactive layered planning method for the distribution network of a pumped-storage construction power supply system, which mainly includes a high-voltage construction access substation, a medium-voltage distribution network network unit, a low-voltage distribution transformer corresponding to different power loads, an upper reservoir area, a camp area, a lower reservoir area, part of a sand and gravel area, and various types of power loads at the end of each area, and also includes DG, capacitor banks, SVG, OLTC, and multiple voltage and reactive compensation equipment, thereby realizing the economical design of the entire construction power supply system, and using a flexible and mobile diesel generator backup power supply in the construction power supply system to compensate for the energy of the entire power supply system.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a voltage and reactive layered planning method for a distribution network of a pumped storage construction power supply system, which comprises the following steps: S1, overall model, the objective function mainly includes the planning investment cost ( C INV) and planning operating costs ( C OPE ); the upper model is a planning scheme for the location and capacity determination of DG, capacitor banks, SVG, and OLTC equipment in the distribution network, with the investment cost minimized as the goal decision; the lower model is based on the upper decision results, and optimizes the distribution network operation variables with the goal of minimizing the planning operation cost. The distribution network hierarchical planning model is expressed as: (1) Where: , is the upper and lower layer objective function; , , and are the upper and lower constraints; x inv , x ope are investment decision variables and simulation operation variables respectively; from formula (1), it can be seen that the model is a one-way two-layer model, that is, the upper model transfers state variables to the lower model, and the lower model variable decision and influence on the upper model are reflected by adding the operating cost to the upper model constraint; S2, objective function, (2) Where: L ij For branch ij Length; l Identifies the device type; , , , , , is the set of candidate nodes corresponding to the investment equipment; , , , , , is a set of candidate types of corresponding investment equipment; , , , , , is the unit investment cost coefficient of the corresponding investment equipment; , , , , and Indicates whether the corresponding investment equipment is installed or the number of installations. This item is the decision variable corresponding to the investment layer, where is an integer variable, and the rest are 0-1 variables. Whether to invest in tapping transformers; S3, constraints, S3-1, Equipment selection constraints, (4) This constraint indicates that the selection of transformer capacity, line, BESS and SVG is unique, and each node can only choose one type from the set of candidate types for investment; S3-2, grouping capacitor installation node quantity limit bundle; (5) In the formula For CB j Number of nodes installed, M CB The installation quantity limit for each CB node; S4, operation constraints, including power flow constraints, safety constraints, transformer node power constraints, OLTC constraints, BESS operation constraints, CB operation constraints, static VAR compensator SVG operation constraints, DG related constraints and load loss constraints; S5, solution, S5-1, with the goal of minimizing the planned investment cost, IPSO is used to solve the equipment investment location selection and sizing model to obtain the results related to the investment planning cost and the distribution network decision-making plan; S5-2, based on the distribution network decision plan in S5-1, with the goal of minimizing the planned operating cost, uses IPSO to solve the equipment investment and operating cost, and obtains the lower-level optimization results, including the distribution network operation plan related results and investment and operating costs; S5-3, based on the relevant results of the distribution network operation plan in S5-2, solve the equipment investment location and capacity determination model considering the distribution network investment and operation, and obtain the planning cost, upper-level optimization results and total investment cost; S5-4, iterative optimization of the upper and lower layers until the termination condition is met.
[0006] In S2, the operating costs mainly include wind curtailment, solar curtailment and load loss costs, while considering the operating costs of each active management unit of the distribution network (OLTC, BESS, CB and SVG); (3) Where: ω is the conversion factor between operating cost and investment cost; E is a collection of lines; B TR , B WTG , B PVG , B LoadThey are the set of all transformer nodes, wind power node set, photovoltaic power generation node set and load node set in the system respectively; and are branch current and resistance respectively; ∆ t is the time interval; , For wind power and photovoltaic power generation data; , , , , , , , , They are the unit prices of network loss, main network power purchase, wind power abandonment, solar power abandonment, load loss penalty, OLTC regulation, CB switching, SVG operation, and BESS operation; , , and They represent the main grid output, wind power output, photovoltaic power output and load loss active power respectively, which are some decision variables corresponding to the operation layer. In addition, the decision variables also include control variables based on the distribution network’s own equipment such as OLTC, BESS, CB and SVC; , , , They are OLTC regulation, CB switching, SVG regulation and BESS regulation respectively.
[0007] In S4, the power flow constraint is (6) (7) (8) Where: x ij For branch ij Reactance; B is the set of all nodes in the system, B BESS , B OLTC , B CB and B SVC They are the node sets connected to BESS, OLTC, CB and SVG respectively; For j The branch end node set of the head end node; For j The set of branch headend nodes that are terminal nodes; For Node j No.t Time period voltage; , Branch ij No. t Active power and reactive power during the time period; , Node j Connected BESS t Charging power and discharging power during the time period; For Node i The connected OLTC t Period ratio, the ratio of the secondary side to the primary side; , , They are the reactive power values of wind turbine, CB and SVG respectively; , They are load predicted reactive power value and load-loss reactive power respectively.
[0008] In S4, the security constraint, (9) Where: , , They are the upper and lower limits of node voltage amplitude and the upper limit of current amplitude respectively.
[0009] In S4, the transformer node power constraint is (10) Where: , , and They are the upper and lower limits of transformer active power and reactive power respectively.
[0010] In S4, OLTC constraints, (11) Where: and They are the upper and lower limits of the adjustable ratio of OLTC, For OLTC t The ratio of time period.
[0011] In S4, BESS operation constraints include charge and discharge constraints, power constraints, and capacity constraints; Charge and discharge constraints; (12) Power constraints; (13) Capacity constraints; (14) Where: and They are the charging and discharging states of BESS respectively; , , and They are the upper and lower limits of BESS charging and discharging power respectively; BESS t The state of charge during the time period, and The upper and lower limits are taken into account for factors such as the life of the BESS; and are the charge and discharge efficiency respectively.
[0012] In S4, CB runs constraints, (15) Where: For Node j Connect CB in t Number of groups put into operation during a period; For Node j The upper limit of the number of connected CB groups; is the compensation capacity of each group of CB; The upper limit of the number of operations.
[0013] In S4, the static VAR compensator SVG operation constraints, (16) Where: and They are the upper and lower limits of SVC compensation power respectively.
[0014] In S4, DG related constraints and load loss constraints; DG related constraints, (17) Considering the reactive power compensation capability of DG, its reactive power compensation capability and According to the maximum capacity of DG converter and Connect to the current node j DG in t Output during period and Sure; and They are the upper limits of PV and WT output respectively; Loss of load restraint, (18) , are the reactive power when the load is lost, It is the upper limit of the active power ratio when the load is lost.
[0015] The main beneficial effects of the present invention are: The voltage and reactive power optimization of the distribution network of the power supply system for the construction of a pumped-storage power station is taken into consideration to achieve the optimal economic planning of the distribution network control equipment, effectively adapt to the needs of distribution network access to DG and load growth, improve the economy of the overall planning and operation of the distribution network, and promote orderly and economic construction investment in the distribution network.
[0016] The problem of large reactive power loss in the distribution network and unstable terminal voltage in the construction power supply system of the pumped storage power station is solved; by considering the characteristics of the construction power supply load, the reactive power and voltage optimization design of the construction power supply system is carried out, thereby improving the terminal voltage level and the system power quality.
[0017] It mainly includes high-voltage construction access substation, medium-voltage distribution network unit, low-voltage distribution transformers corresponding to different power loads, upper storage area, camp area, lower storage area, part of the sand and gravel area and various types of power loads at the end of each area.
[0018] It also includes DG, capacitor bank, SVG, OLTC and multiple voltage and reactive power compensation equipment, thus realizing the economical design of the entire construction power supply system. In the construction power supply system, a flexible mobile diesel generator backup power supply is used to provide energy compensation for the entire power supply system. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0020] Figure 1 This is a structural diagram of the power supply system for the pumped storage power station of the present invention.
[0021] Figure 2 This is a diagram of the solution architecture of the voltage and reactive power hierarchical planning method of the distribution network of the present invention.
[0022] Figure 3 This is the flow chart of the improved particle swarm algorithm solution of the present invention. DETAILED DESCRIPTION
[0023] like Figure 1~Figure 3 A method for voltage and reactive power hierarchical planning of a distribution network of a pumped storage power supply system is provided, which comprises the following steps: S1, overall model, the objective function mainly includes the planning investment cost ( C INV ) and planning operating costs ( C OPE); the upper model is a planning scheme for the location and capacity determination of DG, capacitor banks, SVG, and OLTC equipment in the distribution network, with the investment cost minimized as the goal decision; the lower model is based on the upper decision results, and optimizes the distribution network operation variables with the goal of minimizing the planning operation cost. The distribution network hierarchical planning model is expressed as: (1) Where: , is the upper and lower layer objective function; , , and are the upper and lower constraints; x inv , x ope are investment decision variables and simulation operation variables respectively; from formula (1), it can be seen that the model is a one-way two-layer model, that is, the upper model transfers state variables to the lower model, and the lower model variable decision and influence on the upper model are reflected by adding the operating cost to the upper model constraint; S2, objective function, (2) Where: L ij For branch ij Length; l Identifies the device type; , , , , , is the set of candidate nodes corresponding to the investment equipment; , , , , , is a set of candidate types of corresponding investment equipment; , , , , , is the unit investment cost coefficient of the corresponding investment equipment; , , , , and Indicates whether the corresponding investment equipment is installed or the number of installations. This item is the decision variable corresponding to the investment layer, where is an integer variable, and the rest are 0-1 variables. Whether to invest in tapping transformers; S3, constraints, S3-1, Equipment selection constraints, (4) This constraint indicates that the selection of transformer capacity, line, BESS and SVG is unique, and each node can only choose one type from the set of candidate types for investment; S3-2, grouping capacitor installation node quantity limit bundle; (5) In the formula For CB j Number of nodes installed, M CB The installation quantity limit for each CB node; S4, operation constraints, including power flow constraints, safety constraints, transformer node power constraints, OLTC constraints, BESS operation constraints, CB operation constraints, static VAR compensator SVG operation constraints, DG related constraints and load loss constraints; S5, solution, S5-1, with the goal of minimizing the planned investment cost, IPSO is used to solve the equipment investment location selection and sizing model to obtain the results related to the investment planning cost and the distribution network decision-making plan; S5-2, based on the distribution network decision plan in S5-1, with the goal of minimizing the planned operating cost, uses IPSO to solve the equipment investment and operating cost, and obtains the lower-level optimization results, including the distribution network operation plan related results and investment and operating costs; S5-3, based on the relevant results of the distribution network operation plan in S5-2, solve the equipment investment location and capacity determination model considering the distribution network investment and operation, and obtain the planning cost, upper-level optimization results and total investment cost; S5-4, iterative optimization of the upper and lower layers until the termination condition is met.
[0024] In the preferred solution, in S2, the operating cost mainly includes the cost of wind abandonment, solar abandonment and load loss, while considering the operating cost of each active management unit of the distribution network (OLTC, BESS, CB and SVG); (3) Where: ω is the conversion factor between operating cost and investment cost; E is a collection of lines; B TR , B WTG , B PVG , B LoadThey are the set of all transformer nodes, wind power node set, photovoltaic power generation node set and load node set in the system respectively; and are branch current and resistance respectively; ∆ t is the time interval; , For wind power and photovoltaic power generation data; , , , , , , , , They are the unit prices of network loss, main network power purchase, wind power abandonment, solar power abandonment, load loss penalty, OLTC regulation, CB switching, SVG operation, and BESS operation; , , and They represent the main grid output, wind power output, photovoltaic power output and load loss active power respectively, which are some decision variables corresponding to the operation layer. In addition, the decision variables also include control variables based on the distribution network’s own equipment such as OLTC, BESS, CB and SVC; , , , They are OLTC regulation, CB switching, SVG regulation and BESS regulation respectively.
[0025] In the preferred solution, in S4, the power flow constraint is (6) (7) (8) Where: x ij For branch ij Reactance; B is the set of all nodes in the system, B BESS , B OLTC , B CB and B SVC They are the node sets connected to BESS, OLTC, CB and SVG respectively; For j The branch end node set of the head end node; For j The set of branch headend nodes that are terminal nodes; For Nodej No. t Time period voltage; , Branch ij No. t Active power and reactive power during the time period; , Node j Connected BESS t Charging power and discharging power during the time period; For Node i The connected OLTC t Period ratio, the ratio of the secondary side to the primary side; , , They are the reactive power values of wind turbine, CB and SVG respectively; , They are load predicted reactive power value and load-loss reactive power respectively.
[0026] In the preferred solution, in S4, the security constraint is (9) Where: , , They are the upper and lower limits of node voltage amplitude and the upper limit of current amplitude respectively.
[0027] In the preferred solution, in S4, the transformer node power constraint is: (10) Where: , , and They are the upper and lower limits of transformer active power and reactive power respectively.
[0028] In the preferred solution, in S4, the OLTC constraint is, (11) Where: and They are the upper and lower limits of the adjustable ratio of OLTC, For OLTC t The ratio of time period.
[0029] In the preferred solution, in S4, the BESS operation constraints include charge and discharge constraints, power constraints, and capacity constraints; Charge and discharge constraints; (12) Power constraints; (13) Capacity constraints; (14) Where: and They are the charging and discharging states of BESS respectively; , , and They are the upper and lower limits of BESS charging and discharging power respectively; BESS t The state of charge during the time period, and The upper and lower limits are taken into account for factors such as the life of the BESS; and are the charge and discharge efficiency respectively.
[0030] In the preferred solution, in S4, the CB runs the constraint, (15) Where: For Node j Connect CB in t Number of groups put into operation during a period; For Node j The upper limit of the number of connected CB groups; is the compensation capacity of each group of CB; The upper limit of the number of operations.
[0031] In the preferred solution, in S4, the static VAR compensator SVG operation constraints are: (16) Where: and They are the upper and lower limits of SVC compensation power respectively.
[0032] In the preferred solution, in S4, DG related constraints and load loss constraints; DG related constraints, (17) Considering the reactive power compensation capability of DG, its reactive power compensation capability and According to the maximum capacity of DG converter and Connect to the current node j DG in t Output during period and Sure; and They are the upper limits of PV and WT output respectively; Loss of load restraint, (18) , are the reactive power when the load is lost, It is the upper limit of the active power ratio when the load is lost.
[0033] It mainly includes high-voltage construction access substation, medium-voltage distribution network unit, low-voltage distribution transformers corresponding to different power loads, upper storage area, camp area, lower storage area, part of the sand and gravel area and various types of power loads at the end of each area.
[0034] It also includes DG, capacitor bank, SVG, OLTC and multiple voltage and reactive power compensation equipment, thus realizing the economical design of the entire construction power supply system. In the construction power supply system, a flexible mobile diesel generator backup power supply is used to provide energy compensation for the entire power supply system.
[0035] The voltage and reactive power optimization of the distribution network of the power supply system for the construction of a pumped-storage power station is taken into consideration to achieve the optimal economic planning of the distribution network control equipment, effectively adapt to the needs of distribution network access to DG and load growth, improve the economy of the overall planning and operation of the distribution network, and promote orderly and economic construction investment in the distribution network.
[0036] The problem of large reactive power loss in the distribution network and unstable terminal voltage in the construction power supply system of the pumped storage power station is solved; by considering the characteristics of the construction power supply load, the reactive power and voltage optimization design of the construction power supply system is carried out, thereby improving the terminal voltage level and the system power quality.
[0037] The optimization problem of voltage and reactive power hierarchical planning in distribution network has complex objectives and many constraints. It is a multidimensional nonlinear optimization problem. It is solved by using improved particle swarm optimization (IPSO).
[0038] In order to adapt to the needs of distributed power access and load growth in the distribution network of the power supply system for the construction of pumped-storage power stations, the upper investment layer focuses on planning and construction equipment, with the goal of minimizing the total investment cost and operating cost. The lower layer is the voltage and reactive power optimization layer, which focuses on optimizing the optimal operation plan of the distribution network, considering the equipment and system operation constraints, with the goal of minimizing the distribution network operation cost. Finally, through repeated iterative solutions of IPSO, the optimal planning solution for the distribution network is obtained, thereby solving the problems of large reactive power loss of the distribution network line and unstable terminal voltage in the power supply system for the construction of pumped-storage power stations, improving the terminal voltage level, and improving the power quality of the system.
[0039] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A voltage and reactive power hierarchical planning method for distribution network of pumped storage power supply system. Its characteristics are: It includes the following steps: S1, overall model, the objective function mainly includes the planning investment cost ( C INV ) and planning operating costs ( C OPE ); the upper model is a planning scheme for the location and capacity determination of DG, capacitor banks, SVG, and OLTC equipment in the distribution network, with the investment cost minimized as the goal decision; the lower model is based on the upper decision results, and optimizes the distribution network operation variables with the goal of minimizing the planning operation cost. The distribution network hierarchical planning model is expressed as: (1) Where: , is the upper and lower layer objective function; , , and are the upper and lower constraints; x inv , x ope are investment decision variables and simulation operation variables respectively; from formula (1), it can be seen that the model is a one-way two-layer model, that is, the upper model transfers state variables to the lower model, and the lower model variable decision and influence on the upper model are reflected by adding the operating cost to the upper model constraint; S2, objective function, (2) Where: L ij For branch ij Length; l Identifies the device type; , , , , , is the set of candidate nodes corresponding to the investment equipment; , , , , , is a set of candidate types of corresponding investment equipment; , , , , , is the unit investment cost coefficient of the corresponding investment equipment; , , , , and Indicates whether the corresponding investment equipment is installed or the number of installations. This item is the decision variable corresponding to the investment layer, where is an integer variable, and the rest are 0-1 variables. Whether to invest in tapping transformers; S3, constraints, S3-1, equipment selection constraints, (4) This constraint indicates that the selection of transformer capacity, line, BESS and SVG is unique, and each node can only choose one type from the set of candidate types for investment; S3-2, grouping capacitor installation node quantity limit bundle; (5) In the formula For CB j Number of nodes installed, M CB The installation quantity limit for each CB node; S4, operation constraints, including power flow constraints, safety constraints, transformer node power constraints, OLTC constraints, BESS operation constraints, CB operation constraints, static VAR compensator SVG operation constraints, DG related constraints and load loss constraints; S5, solution, S5-1, with the goal of minimizing the planned investment cost, IPSO is used to solve the equipment investment location selection and sizing model to obtain the results related to the investment planning cost and the distribution network decision-making plan; S5-2, based on the distribution network decision plan in S5-1, with the goal of minimizing the planned operating cost, uses IPSO to solve the equipment investment and operating cost, and obtains the lower-level optimization results, including the distribution network operation plan related results and investment and operating costs; S5-3, based on the relevant results of the distribution network operation plan in S5-2, solve the equipment investment location and capacity determination model considering the distribution network investment and operation, and obtain the planning cost, upper-level optimization results and total investment cost; S5-4, iterative optimization of the upper and lower layers until the termination condition is met.
2. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S2, the operating costs mainly include wind curtailment, solar curtailment and load loss costs, while considering the operating costs of each active management unit of the distribution network (OLTC, BESS, CB and SVG); (3) Where: ω is the conversion factor between operating cost and investment cost; E is a collection of lines; B TR , B WTG , B PVG , B Load They are the set of all transformer nodes, wind power node set, photovoltaic power generation node set and load node set in the system respectively; and are branch current and resistance respectively; ∆ t is the time interval; , For wind power and photovoltaic power generation data; , , , , , , , , They are the unit prices of network loss, main network power purchase, wind power abandonment, solar power abandonment, load loss penalty, OLTC regulation, CB switching, SVG operation, and BESS operation; , , and They represent the main grid output, wind power output, photovoltaic power output and load loss active power respectively, which are some decision variables corresponding to the operation layer. In addition, the decision variables also include control variables based on the distribution network’s own equipment such as OLTC, BESS, CB and SVC; , , , They are OLTC regulation, CB switching, SVG regulation and BESS regulation respectively.
3. The voltage and reactive power hierarchical planning method for the pumped storage construction power supply system distribution network according to claim 1, Its characteristics are: In S4, the power flow constraint is (6) (7) (8) Where: x ij For branch ij Reactance; B is the set of all nodes in the system, B BESS , B OLTC , B CB and B SVC They are the node sets connected to BESS, OLTC, CB and SVG respectively; For j The set of branch end nodes of the head end node; For j The set of branch headend nodes that are terminal nodes; For Node j No. t Time period voltage; , Branch ij No. t Active power and reactive power during the time period; , Node j Connected BESS t Charging power and discharging power during the time period; For Node i The connected OLTC t Period ratio, the ratio of the secondary side to the primary side; , , They are the reactive power values of wind turbine, CB and SVG respectively; , They are load predicted reactive power value and load-loss reactive power respectively.
4. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, the security constraint, (9) Where: , , They are the upper and lower limits of node voltage amplitude and the upper limit of current amplitude respectively.
5. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, the transformer node power constraint is (10) Where: , , and They are the upper and lower limits of transformer active power and reactive power respectively.
6. The voltage and reactive power hierarchical planning method for the pumped storage construction power supply system distribution network according to claim 1, Its characteristics are: In S4, OLTC constraints, (11) Where: and They are the upper and lower limits of the adjustable ratio of OLTC, For OLTC t The ratio of time period.
7. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, BESS operation constraints include charge and discharge constraints, power constraints, and capacity constraints; Charge and discharge constraints; (12) Power constraints; (13) Capacity constraints; (14) Where: and They are the charging and discharging states of BESS respectively; , , and They are the upper and lower limits of BESS charging and discharging power respectively; For BESS t The state of charge during the time period, and The upper and lower limits are taken into account for factors such as the life of the BESS; and are the charge and discharge efficiency respectively.
8. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, CB runs constraints, (15) Where: For Node j Connect CB in t Number of groups put into operation during a period; For Node j The upper limit of the number of connected CB groups; is the compensation capacity of each group of CB; The upper limit of the number of operations.
9. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, the static VAR compensator SVG operation constraints, (16) Where: and They are the upper and lower limits of SVC compensation power respectively.
10. The voltage and reactive power hierarchical planning method for the distribution network of the pumped storage construction power supply system according to claim 1, Its characteristics are: In S4, DG related constraints and load loss constraints; DG related constraints, (17) Considering the reactive power compensation capability of DG, its reactive power compensation capability and According to the maximum capacity of DG converter and Connect to the current node j DG in t Output during period and Sure; and They are the upper limits of PV and WT output respectively; Loss of load restraint, (18) , are the reactive power when the load is lost, It is the upper limit of the active power ratio when the load is lost.
Citation Information
Patent Citations
Method for treating voltage and line loss problems of rural transformer area
CN114123219A
Multi-stage planning method for energy storage power station, computer equipment and storage medium
CN116316716A
AC / DC hybrid power distribution network planning method comprehensively considering source-network-load-storage
CN117094117A
Power main and distribution network efficient cooperation system and method based on multi-objective optimization strategy
CN117526412A