Tool system for replacing anode plate of electric dust remover and construction method
Through the combined tooling system of sliding base frame and positioning hanger, the problem of plane damage and precise positioning of the anode plate of the electro-dust collector during the lifting process is solved, efficient and accurate replacement of the anode plate is achieved, and the flatness of the anode plate is protected and Improve construction efficiency.
Patent Information
- Application Number
- CN202411314346.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-26
AI Technical Summary
During the lifting process, the span of the electro-dust collector anode plate is prone to damage to the plane and it is difficult to replace batch precise positioning.
Using a tooling system including sliding chassis, positioning chassis and hoisting machinery, the horizontal state of the sliding chassis is rotated to the vertical state, and the lock rope in the positioning chassis matches the anode plate with the electro-dust collector to realize the anode plate Accurate lifting.
It effectively protects the planarity of the anode plate, realizes batch accurate replacement, improves construction efficiency, and avoids damage caused by excessive span during lifting.
Smart Images

Figure CN119016197A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electrostatic precipitators, and in particular to a tooling system and a construction method for replacing an anode plate of an electrostatic precipitator. Background Art
[0002] As an environmental protection equipment, the anode system of the electrostatic precipitator uses anode plates to collect dust. The number of anode plates installed is large, generally more than one thousand; the individual specifications are large, generally about 15 meters in length; and the flatness requirements are high.
[0003] A set of lifting brackets is usually used to replace the anode plates in the electrostatic precipitator. During the lifting process, the anode plates are subjected to the external force of the lifting as a whole due to the long span between the lifting end and the non-lifting end of the anode plates, which can easily lead to the destruction of the flatness of the anode plates. In addition, the requirements for batch replacement with precise positioning cannot be met. Summary of the invention
[0004] In order to solve the above problems, the present application provides a tooling system and a construction method for replacing an electrostatic precipitator anode plate.
[0005] The present application provides a tooling system for replacing anode plates of an electrostatic precipitator, comprising a sliding base, a positioning hanger, a first lifting machine and a second lifting machine, the sliding base being provided with a first lifting point located at one end of the length, the sliding base being provided with wheels located at the other end of the length, the sliding base being provided with a bracket located at one side of the thickness, close to the first lifting point and extending in the thickness direction, the positioning hanger being provided with a second lifting point, the positioning hanger being provided with a plurality of locking ropes spaced in sequence according to the installation spacing of the anode plates in the electrostatic precipitator, the positioning hanger being provided with a plurality of locking buckles respectively connected to the plurality of locking ropes, the locking buckles being used to connect the anode plates, the first lifting machine being detachably connected to the first lifting point, the second lifting machine being detachably connected to the second lifting point, wherein the first lifting machine can rotate the positioning hanger from a horizontal state to a vertical state along with the sliding base.
[0006] In some embodiments, the spacing distance between the bracket and the end of the length of the sliding chassis provided with the wheels is not less than the sum of the length of the anode plate and the length of the locking rope.
[0007] In some embodiments, the positioning hanger is provided with n locking ropes, where n is a positive integer, and the width of the sliding chassis is not less than n times the spacing between the anode plates.
[0008] In some embodiments, the length of the locking cord is 200 mm-350 mm.
[0009] In some embodiments, the bracket includes at least two support rods, one end of which is connected to one side of the thickness of the sliding base, the support rods extend along the thickness direction, and all the support rods are sequentially spaced along the width direction of the sliding base.
[0010] In some embodiments, the dimension of the bracket along the thickness direction of the sliding chassis is 30 mm-50 mm greater than the width of the frame body of the positioning hanger.
[0011] In some embodiments, the sliding chassis is provided with two first suspension points, and the two first suspension points are symmetrical along the central axis in the length direction of the sliding chassis;
[0012] The positioning hanger is provided with two second hanging points, and the two second hanging points are symmetrical along the central axis of the positioning hanger in the width direction.
[0013] A construction method for replacing an anode plate of an electrostatic precipitator, using the above-mentioned tooling system, the replacement method comprises:
[0014] Lay the sliding chassis flat, and place the positioning hanger flat on the sliding chassis and on the side of the pallet close to the first hanging point;
[0015] After the positioning hanger is laid flat, multiple anode plates are placed on the positioning hanger in parallel, and multiple anode plates are buckled with multiple locks respectively;
[0016] After the lock buckle is buckled to the anode plate, the first lifting machine is used to drive the sliding frame to rotate until the sliding frame rotates to an inclined state of 80°-90° with the horizontal plane;
[0017] After the sliding base frame rotates, the second lifting machinery is used to lift the positioning hanger until the anode plate on the positioning hanger is installed on the electrostatic precipitator.
[0018] In some embodiments, after the multiple locks are respectively fastened to the multiple anode plates and before the first hoisting machine drives the sliding chassis to rotate, a rope is used to bind the multiple anode plates at one side away from the locks;
[0019] The ropes are removed when the second lifting machinery lifts the positioning hanger to the anode plate installation position in the electrostatic precipitator.
[0020] In some embodiments, the tooling system used in the replacement method includes a sliding chassis and at least two positioning hangers;
[0021] In the replacement method, after the previous positioning hanger carries the anode plate away from the sliding base, the sliding base is rotated to a horizontal state, and the next positioning hanger is placed flat on the sliding base.
[0022] The beneficial effects of the present application are as follows: a tooling system for replacing the anode plates of an electrostatic precipitator is provided, the anode plates are installed to the electrostatic precipitator through the system, and the replacement of the anode plates of the electrostatic precipitator is completed, and multiple anode plates are connected to multiple locks of the positioning hanger on a horizontal sliding base, and a first lifting mechanism drives the sliding base to rotate from a horizontal state to a vertical state through a first lifting point, and the wheels slide on the ground to make the rotation process of the sliding base smooth. During the rotation, the positioning hanger is supported by a bracket, and multiple anode plates connected to the positioning hanger are rotated from a horizontal state to a vertical state together with the sliding base. When the anode plate is rotated to a nearly vertical state together with the sliding base, the positioning hanger and the anode plate are lifted to the anode plate installation position in the electrostatic precipitator by a second lifting mechanism and a second lifting point. The adjacent spacing of the multiple locking ropes is the same as the installation spacing of the anode plates in the electrostatic precipitator, so it is very convenient to hang the multiple anode plates at the installation position in the electrostatic precipitator; the tooling system of the present application is used to replace the anode plates of the electrostatic precipitator, which overcomes the problem that the flatness of the anode plates is easily damaged when the anode plates are subjected to the external force of the lifting during the lifting process due to the long span between the lifting end and the non-lifting end of the anode plates. The sliding base, the positioning hanger and the first lifting machinery are used to rotate the anode plates from a horizontal state to a nearly vertical state, and the integrity of the flatness of the anode plates is ensured during the rotation process. In addition, by limiting the adjacent spacing of the multiple locking ropes in the positioning hanger to be the same as the installation spacing of the anode plates in the electrostatic precipitator, the replacement requirements of batch precise positioning can be achieved, which has significant advantages in improving construction efficiency and protecting the flatness of the anode plates. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention.
[0024] Figure 1 A top view of a sliding chassis in a tooling system for replacing an electrostatic precipitator anode plate provided in the present application;
[0025] Figure 2 A front view of a sliding chassis in a tooling system for replacing an electrostatic precipitator anode plate provided in the present application;
[0026] Figure 3 A front view of a positioning hanger in a tooling system for replacing an electrostatic precipitator anode plate provided in the present application.
[0027] The attached drawings are marked with: 100 - sliding base, 110 - first hanging point, 120 - wheel, 130 - bracket, 200 - positioning hanger, 210 - second hanging point, 220 - locking rope, 230 - locking buckle. DETAILED DESCRIPTION
[0028] The present application provides a tooling system for replacing an anode plate of an electrostatic precipitator, comprising a sliding base frame 100, a positioning hanger 200, a first lifting machine and a second lifting machine. The first lifting machine is used in conjunction with the sliding base frame 100, and the second lifting machine is used in conjunction with the positioning hanger 200.
[0029] Please refer to Figure 1 and Figure 2 The sliding chassis 100 includes a first frame as the main structure. The first frame is provided with horizontal and vertical supports according to actual conditions. The materials used for the first frame include but are not limited to channel steel and angle iron. The first frame has a length direction, a width direction and a thickness direction. The sliding chassis 100 is provided with a first hanging point 110. The first lifting machinery is detachably connected to the first hanging point 110. The first hanging point 110 is used in conjunction with the first lifting machinery through the first hanging point 110. The first hanging point 110 is located at one end of the length of the first frame; the sliding chassis 100 is provided with a wheel 120. The wheel 120 is located at one end of the length of the first frame, and the first hanging point 110 and the wheel 120 are respectively provided at opposite ends of the first frame in the length direction. The sliding chassis 100 is provided with a bracket 130. The bracket 130 is connected to the first frame. The bracket 130 is close to the first hanging point 110 in the length direction of the first frame. The bracket 130 is located on the thickness side of the first frame, and the bracket 130 extends along the thickness direction.
[0030] Please refer to Figure 3 The positioning hanger 200 includes a second frame as the main structure, the second frame is in the shape of a strip, and the second frame has a length direction. The positioning hanger 200 is provided with a second hanging point 210, and the second lifting machine is detachably connected to the second hanging point 210, and is used in conjunction with the second lifting machine through the second hanging point 210. The positioning hanger 200 is provided with a plurality of lock ropes 220, one end of the lock rope 220 is connected to the second frame, and the plurality of lock ropes 220 are sequentially spaced along the length direction of the second frame, and the spacing between two adjacent lock ropes 220 is the spacing between the anode plates in the electrostatic precipitator. The anode plates are arranged in multiple rows in the electrostatic precipitator, and each row includes a plurality of anode plates sequentially arranged along the width direction of the anode plates. The spacing between the anode plates in the present application refers to the center spacing distance between two adjacent anode plates in each row. The positioning hanger 200 is provided with a plurality of lock buckles 230, and the plurality of lock buckles 230 are respectively connected to the plurality of lock ropes 220, and the anode plates are buckled by the lock buckles 230.
[0031] In this system, the first hoisting machine can rotate the positioning hanger 200 along with the sliding base 100 from a horizontal state to a vertical state, and the anode plate is installed to the electrostatic precipitator through this system to complete the replacement of the anode plate of the electrostatic precipitator.
[0032] During the installation process of installing the anode plates on the electrostatic precipitator, the sliding frame 100 is first adjusted to a horizontal state, for example, the sliding frame 100 is placed on the ground, and then the positioning hanger 200 is placed flat on the sliding frame 100 and placed on the side of the tray close to the first hanging point 110, and multiple anode plates are placed in parallel on the positioning hanger 200, and multiple anode plates are respectively buckled with multiple locks 230. The first lifting machinery drives the sliding frame 100 to rotate from a horizontal state to a vertical state through the first hanging point 110, and the wheels 120 slide on the ground to make the rotation process of the sliding frame 100 smooth. During the rotation process, the positioning hanger 200 is supported by the bracket 130, and the multiple anode plates connected to the positioning hanger 200 rotate from a horizontal state to a vertical state together with the sliding frame 100.
[0033] When the anode plate is rotated to a nearly vertical state together with the sliding base 100, the positioning hanger 200 and the anode plate are then lifted to the anode plate installation position in the electrostatic precipitator by the second lifting machinery and the second lifting point 210. Since the adjacent spacing of the multiple locking ropes 220 in the positioning hanger 200 is the same as the installation spacing of the anode plates in the electrostatic precipitator, it is very convenient to hang the multiple anode plates at the installation position in the electrostatic precipitator.
[0034] During the hoisting process, due to the long span between the hoisting end and the non-hoisting end of the anode plate, the flatness of the anode plate is easily damaged when the anode plate is subjected to the external force of hoisting as a whole. The anode plate of the electrostatic precipitator is replaced by the tooling system of the present application, and the anode plate is rotated from a horizontal state to a nearly vertical state by using the sliding base 100, the positioning hanger 200 and the first hoisting machinery. The integrity of the flatness of the anode plate is ensured during the rotation process, and the problem of the flatness of the anode plate being damaged due to the excessive length of the anode plate can be overcome. The tooling system of the present application has significant advantages in protecting the flatness of the anode plate.
[0035] In addition, the adjacent spacing of the multiple locking ropes 220 in the positioning hanger 200 is limited so that it is the same as the installation spacing of the anode plates in the electrostatic precipitator. The tooling system of the present application can achieve batch precise positioning replacement requirements, which has significant advantages in improving construction efficiency.
[0036] When the sliding frame 100 is adjusted to a state close to vertical, the wheels 120 of the sliding frame 100 are located on the ground, and the end of the sliding frame 100 where the wheels 120 are located is the bottom. Figure 1 , Figure 1The dimension L2 in the figure is the distance between the bracket 130 and the end of the length of the sliding chassis 100 where the wheels 120 are provided. In some embodiments, the distance between the bracket 130 and the end of the length of the sliding chassis 100 where the wheels 120 are provided is not less than the sum of the length of the anode plate and the length of the lock rope 220, where the length of the lock rope 220 is represented by Figure 3 The dimension L5, that is, the dimension L2 is not less than the sum of the length of the anode plate and the dimension L5. When the multiple anode plates connected to the positioning hanger 200 rotate together with the sliding base 100, the first frame of the sliding base 100 can support the entire range of the anode plate, ensuring that the anode plate will not touch the ground, thereby ensuring the integrity of the anode plate.
[0037] The above description shows that the positioning hanger 200 is provided with a plurality of locking ropes 220, the number of the locking ropes 220 is n, n is a positive integer, n is greater than or equal to 3, and in the existing solution of the electrostatic precipitator, each row is provided with about 9 anode plates. Figure 1 As shown in the dimension L1, the anode plates are installed at a spacing of Figure 3 As shown in the dimension L4 in FIG. 1 , in some embodiments, the width of the sliding chassis 100 is not less than n times the spacing between the anode plates, L1 ≥ nL4.
[0038] In some embodiments, the length of the locking rope 220 is 200 mm-350 mm. During actual construction and installation, the locking rope 220 within this length range can ensure the swing amount required during the lifting process.
[0039] The bracket 130 must not obstruct the locking rope 220. In some embodiments, the bracket 130 includes at least two supporting rods, one end of which is connected to one side of the thickness of the sliding chassis 100. The supporting rods extend along the thickness direction, and all the supporting rods are sequentially spaced along the width direction of the sliding chassis 100. When the positioning hanger 200 is placed flat on the sliding chassis 100, the locking rope 220 is passed through the spaced area between two adjacent supporting rods.
[0040] Please refer to Figure 2 , Figure 2 The dimension L3 is the dimension of the bracket 130 along the thickness direction of the sliding base 100. In some embodiments, L3 is 30mm-50mm larger than the width of the frame of the positioning hanger 200, ensuring that the bracket 130 can support the positioning hanger 200 when the positioning hanger 200 rotates with the sliding base 100.
[0041] In some embodiments, see Figure 1 The sliding frame 100 is provided with two first lifting points 110, and the two first lifting points 110 are symmetrical along the central axis of the length direction of the sliding frame 100. When the first lifting machinery lifts the sliding frame 100 and rotates it, the movement stability of the lifting process is guaranteed.
[0042] Please refer to Figure 3 The positioning hanger 200 is provided with two second lifting points 210, and the two second lifting points 210 are symmetrical along the central axis of the width direction of the positioning hanger 200. When the second lifting machinery lifts the positioning hanger 200, the movement stability of the lifting process is guaranteed.
[0043] Based on the above-mentioned tooling system, the present application also provides a construction method for replacing the anode plate of an electrostatic precipitator, comprising: laying the sliding base frame 100 flat, laying the positioning hanger 200 flat on the sliding base frame 100 and placing it on the side of the tray close to the first hanging point 110; after laying the positioning hanger 200 flat, placing a plurality of anode plates in parallel on the positioning hanger 200, and respectively buckling the plurality of anode plates with a plurality of locks 230; after buckling the anode plates with the locks 230, using the first lifting machinery to drive the sliding base frame 100 is rotated until the sliding base 100 is rotated to an inclined state of 80°-90° with the horizontal plane. It should be noted that the turning angle does not exceed 90°, and the positioning hanger 200 must not fall off the sliding base 100; after the sliding base 100 is rotated, the positioning hanger 200 is hoisted by a second hoisting machinery, and the positioning hanger 200 and the anode plate connected to the positioning hanger 200 are hoisted to the anode plate installation position in the electrostatic precipitator until the anode plate on the positioning hanger 200 is installed in the electrostatic precipitator.
[0044] In some embodiments, after the multiple lock buckles 230 are respectively buckled with the multiple anode plates, and before the first lifting machinery drives the sliding base frame 100 to rotate, a rope is used to bind the side of the multiple anode plates away from the lock buckle 230; the rope is removed when the second lifting machinery lifts the positioning hanger 200 to the anode plate installation position in the electrostatic precipitator. The rope is generally made of steel wire rope, and a soft rope can also be used. The side of the anode plate close to the lock buckle 230 is the lifting side, and the side of the anode plate away from the lock buckle 230 is the non-lifting side. The anode plate has holes on the non-lifting side. The rope is passed through the holes on the non-lifting sides of the multiple anode plates in turn, and the non-lifting sides of the multiple anode plates are tied together, thereby improving the mutual collision and injury phenomenon caused by the excessive number of anode plates lifted in batches during the lifting process.
[0045] In some embodiments, the tooling system used in the replacement method includes a sliding base frame 100 and at least two positioning hangers 200; in the replacement method, after the previous positioning hanger 200 leaves the sliding base frame 100 with the anode plate, the sliding base frame 100 is rotated to a horizontal state, and the next positioning hanger 200 is placed flat on the sliding base frame 100. At least two positioning hangers 200 are used in conjunction with one sliding base frame 100, and a closed loop connection is formed between the processes, thereby improving the construction efficiency.
[0046] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0047] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A tooling system for replacing anode plates of electrostatic precipitators, It is characterized in that include: A sliding chassis, provided with a first hanging point at one end of the length, provided with wheels at the other end of the length, and provided with a bracket located at one side of the thickness, close to the first hanging point and extending in the thickness direction; A positioning hanger is provided with a second hanging point, a plurality of locking ropes sequentially spaced according to the installation spacing of the anode plates in the electrostatic precipitator, and a plurality of locking buckles respectively connected to the plurality of locking ropes, wherein the locking buckles are used to connect the anode plates; a first lifting machine, detachably connected to the first lifting point; a second lifting machine, detachably connected to the second lifting point; Wherein, the first hoisting machinery can make the positioning hanger rotate from a horizontal state to a vertical state along with the sliding base.
2. The tooling system according to claim 1, It is characterized in that The spacing distance between the bracket and the end of the length of the sliding chassis where the wheels are provided is not less than the sum of the length of the anode plate and the length of the locking rope.
3. The tooling system according to claim 1, It is characterized in that The positioning hanger is provided with n locking ropes, where n is a positive integer, and the width of the sliding base frame is not less than n times the installation spacing of the anode plates.
4. The tooling system according to claim 1, It is characterized in that The length of the locking rope is 200mm-350mm.
5. The tooling system according to claim 1, It is characterized in that The bracket includes at least two support rods, one end of each support rod is connected to one side of the thickness of the sliding base, the support rod extends along the thickness direction, and all the support rods are spaced in sequence along the width direction of the sliding base.
6. The tooling system according to claim 1, It is characterized in that The dimension of the bracket along the thickness direction of the sliding base is 30mm-50mm larger than the width of the frame body of the positioning hanger.
7. The tooling system according to claim 1, It is characterized in that The sliding chassis is provided with two first hanging points, and the two first hanging points are symmetrical along the central axis in the length direction of the sliding chassis; The positioning hanger is provided with two second hanging points, and the two second hanging points are symmetrical along the central axis in the width direction of the positioning hanger.
8. A construction method for replacing an electrostatic precipitator anode plate, It is characterized in that Using the tooling system as described in any one of claims 1 to 7, the replacement method comprises: Lay the sliding chassis flat, and lay the positioning hanger flat on the sliding chassis and on a side of the pallet close to the first hanging point; After the positioning hanger is laid flat, a plurality of anode plates are placed in parallel on the positioning hanger, and a plurality of lock buckles are used to buckle the plurality of anode plates respectively; After the lock buckle is buckled with the anode plate, the first lifting machine is used to drive the sliding chassis to rotate until the sliding chassis rotates to an inclined state of 80°-90° with the horizontal plane; After the sliding base frame rotates, the second lifting machinery is used to lift the positioning hanger until the anode plate on the positioning hanger is installed on the electrostatic precipitator.
9. The construction method according to claim 8, It is characterized in that After the plurality of lock buckles are respectively buckled with the plurality of anode plates and before the first hoisting machine drives the sliding chassis to rotate, a rope is used to bind the sides of the plurality of anode plates away from the lock buckles; The rope is removed when the second lifting machinery lifts the positioning hanger to the anode plate installation position in the electrostatic precipitator.
10. The construction method according to claim 8, It is characterized in that The tooling system used in the replacement method includes a sliding chassis and at least two positioning hangers; In the replacement method, after the previous positioning hanger carries the anode plate and leaves the sliding base, the sliding base is rotated to a horizontal state, and the next positioning hanger is placed flat on the sliding base.
Citation Information
Patent Citations
Electric precipitation anode plate installing and lifting device for power plants
CN103991787A
Lifting method
CN105236258A
Movable hoisting device for electric precipitation anode plate
CN212425112U
new adjustable multi-purpose lifting beam and its lifting method
DE112022000099T5
Reinforcement unit lifting device
JP1997249377A