Cleaning system and method for scabs in carbonization tower in sodium carbonate production
The vacuum absorption tower generates a cleaning system that combines high-efficiency washing liquid and cleaning gas, which solves the problems of high energy consumption and low efficiency during the cleaning of the carbonization tower, and realizes efficient cleaning and environmentally friendly carbonization tower production.
Patent Information
- Application Number
- CN202411483890.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-10-23
AI Technical Summary
The prior art has problems in the cleaning process of carbonization towers with high energy consumption, low cleaning efficiency, large equipment investment and environmental protection, especially when the production load of carbonization towers is large, the cleaning effect is not ideal.
The cleaning system is adopted that combines a vacuum absorption tower with a washing tower water pump, a mother liquor storage barrel and a conveying pipeline. The ammonia steam and mother liquor are absorbed through the vacuum absorption tower for cooling and absorption, and a high-temperature and efficient washing mother liquor is generated, and carbonized with the cleaning gas is combined. The cleaning of the tower improves the flow rate and temperature of the cleaning medium and enhances the cleaning efficiency.
It improves the cleaning efficiency and alkali production efficiency of the carbonization tower, reduces energy consumption and equipment investment, reduces steam consumption and sewage generation, and improves product quality and output.
Smart Images

Figure CN119016455A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of soda ash production, and in particular relates to a cleaning system and method for scarring in a carbonizing tower in soda ash production. Background Art
[0002] In the production process of soda ash, the carbonization process is a combination of chemical reactions, energy conversion, material solute transmission and diffusion, supersaturated solution crystallization and other physical and chemical processes, and at the same time, solid, liquid and gas three states of matter coexist and react. The carbonization tower is the core equipment in the soda ash (sodium carbonate) manufacturing process. The main chemical reaction for preparing soda ash is carried out in the carbonization tower, and the ammonia-soda method is used to prepare soda ash.
[0003] In the process of preparing soda ash, sodium bicarbonate is prepared using ammoniacal brine and carbon dioxide in the carbonization tower. Since sodium bicarbonate accumulates and forms scars in the carbonization tower body, if it is not cleaned for a long time, the carbonization tower channel will be blocked, thereby reducing the carbonization effect. For this reason, the carbonization tower needs to be cleaned periodically. The first existing technical method is to use the AⅡ liquid (NH3, H2O, NaCl, NH4Cl, a small amount of carbonate) sent from the crystallization section and the low-pressure nitrogen sent from the air separation to clean the scars (NaHCO3, NH4HCO3, etc.) in the carbonization tower. The cleaning principle of this method is to use the NH3•H2O in the AⅡ liquid and the HCO3 in the crystallization component to form a carbonization tower. - The reaction produces NH4 + and CO3 2- , thereby converting low-solubility hydrocarbon salts into high-solubility carbonates, achieving the purpose of removing the scars; and the low-pressure nitrogen that enters uses the impact force of the gas to act on the surface of the scars, eroding the scars to form fine particles, increasing the contact with the AⅡ liquid and promoting the increase of the chemical reaction rate. The disadvantages of this method are: the amount of low-pressure nitrogen used is large, and the cleaning effect is not good when the gas volume is insufficient, especially when the production load and production intensity of the alkali tower are large, the cleaning effect of the carbonization tower is not ideal, and the scar cleaning is incomplete, leaving hidden dangers for the alkali production operation of the carbonization tower.
[0004] Prior art method 2: Utilize AⅡ liquid (NH3, H2O, NaCl, NH4Cl, a small amount of carbonate) and cleaning gas (low-pressure nitrogen and CO2 gas of appropriate concentration sent from air separation) sent from the crystallization section to clean the scars in the carbonization tower. This method is an improvement on cleaning method 1. Its purpose is to perform pre-carbonization operation of carbonization reaction while cleaning the carbonization tower. While ensuring the cleaning effect of the carbonization tower, the AⅡ liquid CO2 is absorbed, thereby reducing the production intensity of the upper part of the carbonization tower and increasing the growth time of heavy alkali crystallization, and producing heavy alkali with larger particles. The disadvantages of this method are: the increase in CO2 concentration has a certain inhibitory effect on the cleaning process. On the contrary, a lower CO2 concentration makes it difficult to achieve the purpose of pre-carbonization. Therefore, it is necessary to select a reasonable CO2 concentration to balance the needs of these two aspects.
[0005] Prior art method three: using hot ammonia I and cleaning gas sent from the crystallization process to clean the scars in the carbonization tower. The principle of this cleaning method is that hot ammonia I and the scars have a reverse reaction during the cleaning process, thereby accelerating the cleaning. The disadvantages of this method are: due to the large system circulation volume, the transportation energy consumption and equipment and pipeline investment are increased, which is not conducive to the implementation of energy conservation and consumption reduction in enterprises.
[0006] Prior art method 4: After the carbonization tower materials that need to be cleaned are drained, hot water is used for water washing. This cleaning process uses the principle that scars are easily soluble in water at high temperatures to clean the scars, which is efficient and fast. The disadvantages of this method are: a large amount of steam is required to heat the washing water during the cleaning process, which increases energy consumption; the washing water after cleaning contains a large amount of alkali and cannot be discharged at will, making it difficult to recycle the system, and there are dual problems of environmental protection and mother liquor expansion. Summary of the invention
[0007] Technical problem to be solved: In view of the problems existing in the cleaning process of the carbonizing tower in the background technology, the present invention provides a cleaning system and method for scarring in the carbonizing tower in soda ash production, which reduces the energy consumption of the cleaning system and improves the cleaning efficiency.
[0008] Technical solution: The present invention discloses a cleaning system for cleaning scabs in a carbonizing tower in soda ash production, the cleaning system comprising a vacuum absorption tower, a tower washing water pump, a mother liquid storage tank, a plurality of conveying pipelines and control valves respectively connected to the conveying pipelines, which are arranged in coordination with a carbonizing tower to be cleaned; The vacuum absorption tower comprises at least one set of cooling sections and absorption sections connected in series, wherein the cooling section comprises a first cooler and a second cooler arranged along the height direction of the vacuum absorption tower, wherein the inlet end of the first cooler is connected to the tail gas pipe at the top of the ammonia evaporation tower, receives ammonia vapor from the ammonia evaporation tower and cools the ammonia vapor; the inlet end of the second cooler is connected to the washing mother I pump, receives the mother I clarified liquid and cools the ammonia vapor; the mother I clarified liquid and the ammonia vapor from the ammonia evaporation tower are absorbed in the absorption section of the vacuum absorption tower to produce ammonia absorbing washing mother I, and the ammonia absorbing washing mother I is discharged from the vacuum absorption tower to form the vacuum absorption tower washing mother I; The liquid outlet of the vacuum absorption tower is connected to the liquid inlet of the washing tower and the mother liquid storage tank through the washing mother I to washing tower pipeline and the washing mother I to mother liquid storage tank pipeline respectively, and the washing mother I to washing tower pipeline is connected to the washing tower water pump; The carbonization tower to be cleaned serves as a cleaning tower to receive cleaning gas and vacuum absorption tower washing mother I for tower cleaning operations; the liquid outlet end of the cleaning tower is connected to the mother liquid storage tank through the pipeline from the washing mother I to the mother liquid storage tank after the washing tower, and the mother liquid storage tank is connected to the crystallization process through the pipeline from the mother liquid I to the crystallization process; the exhaust end of the cleaning tower transports the cleaning tail gas to the comprehensive recovery tower for treatment through the tail gas transport pipeline.
[0009] Preferably, the vacuum absorption tower comprises a cooling section A, an absorption section A, a cooling section B and an absorption section B connected in series in sequence. The ammonia absorption washing mother I produced by the absorption section A enters the cooling section B for heat exchange to produce the heat exchange washing mother I. The heat exchange washing mother I enters the absorption section B for absorption with the ammonia vapor from the ammonia evaporation tower to produce the vacuum absorption tower washing mother I.
[0010] Preferably, the shell sides of the multiple coolers arranged in the cooling section A and the cooling section B are connected to the circulating water storage tank through the circulating water supply pipe and the circulating water return pipe respectively.
[0011] Preferably, the pipeline from the washing mother I after the washing tower to the mother liquor storage tank is connected to the washing tower water pump through a tee and a pipeline from the washing mother I to the washing tower water pump, and the residual washing mother I in the washing tower is pumped into the mother liquor storage tank through the washing tower water pump and the pipeline from the washing tower water pump to the mother liquor storage tank, and the washing tower is converted into a carbonization tower to resume the alkali production operation.
[0012] Preferably, the pipeline from the tower washing water pump to the cleaning tower is connected to other carbonizing towers in normal alkali production operation through a tee and a pipeline from the tower washing water pump to the carbonizing tower.
[0013] Preferably, the pipeline from the tower wash water pump to the cleaning tower is connected to the mother liquid storage tank through a tee and a pipeline from the tower wash water pump to the mother liquid storage tank.
[0014] The present invention also discloses a method for cleaning scars in a carbonizing tower in soda ash production, the cleaning method comprising: Step 1: Before the cleaning operation, confirm that the pipeline from washing mother I to washing tower water pump, the pipeline from washing tower water pump to washing tower, the pipeline from washing mother I to mother liquid storage barrel after washing tower, the pipeline from washing tower water pump to mother liquid storage barrel, and the inlet pipeline of ammonia mother II are all in the off state; confirm that the pipeline from washing mother I to washing tower water pump and the pipeline from washing tower water pump to carbonizing tower are in the on state; start the washing tower water pump, and send the alkali-making liquid in the washing tower through the pipeline from washing mother I to washing tower water pump and the pipeline from washing tower water pump to carbonizing tower in turn into the normally operating alkali-making tower for alkali-making operation; after the residual alkali-making liquid in the washing tower is emptied, shut down the washing tower water pump; Step 2: During the cleaning operation, confirm that the pipeline from the tower washing pump to the carbonization tower, the tower washing mother I to the tower washing pump pipeline, and the tower washing pump to the mother liquid storage tank pipeline are in the off state; confirm that the washing mother I to the tower washing pump pipeline and the tower washing pump to the cleaning tower pipeline are in the connected state; open the vacuum absorption tower to receive the mother I clarified liquid and the ammonia vapor of the ammonia evaporation tower to absorb and produce the vacuum absorption tower washing mother I, and then start the tower washing pump to pump the vacuum absorption tower washing mother I; after the tower washing pump is started, close the opening of the control valve connected to the washing mother I to the mother liquid storage tank pipeline to 50~80%, and ensure that the flow rate of the vacuum absorption tower washing mother I delivered to the cleaning tower through the tower washing pump to the cleaning tower pipeline is 200~300m³ / h; and keep the washing mother I to the mother liquid storage tank pipeline after the tower washing in the connected state, and the cleaning tower starts the cleaning operation; Step 3: After the cleaning operation lasts for 18 to 24 hours, the cleaning operation is ready to end. The control valve connected to the pipeline from washing mother I to the mother liquid storage barrel is fully opened to ensure that after the cleaning stops, the washing mother I of the vacuum absorption tower enters the mother liquid storage barrel through the pipeline from washing mother I to the mother liquid storage barrel; then, the pipeline from washing mother I of the washing tower to the washing tower water pump is connected to allow the residual washing mother I after the washing tower in the washing tower to enter the washing tower water pump for transportation; after connecting the pipeline from washing mother I of the washing tower to the washing tower water pump, the pipeline from washing mother I to the washing tower water pump, the pipeline from washing mother I after the washing tower to the mother liquid storage barrel, and the pipeline from the washing tower water pump to the washing tower are shut off, and the pipeline from the washing tower water pump to the mother liquid storage barrel is connected to pump the residual washing mother I in the washing tower to the mother liquid storage barrel for storage, and then the washing tower water pump is shut off, and the pipeline from the washing mother I after the tower to the washing tower water pump and the pipeline from the washing tower water pump to the mother liquid storage barrel are shut off. The washing tower completes the cleaning and serves as a carbonization tower to resume the alkali production process.
[0015] Preferably, in step 2, the vacuum degree in the vacuum absorption tower is controlled at 25-35 kPa, the flow rate of the received mother I clarified liquid is controlled at 200-500 m³ / h, and the temperature of the mother I clarified liquid is controlled at 45-50°C by the cooler in the vacuum absorption tower; the temperature of the ammonia vapor in the receiving ammonia evaporation tower is controlled at 70-80°C, and the gas temperature is controlled at 55-65°C after cooling by the cooler.
[0016] Preferably, in step 1, cleaning gas is introduced into the cleaning tower during the cleaning process at the same time, the cleaning gas includes N2, O2, CO2, and the CO2 concentration is not higher than 5%, the cleaning gas flow rate is controlled at 1000~1500Nm³ / h, and the pressure is controlled at 0.32~0.4Mpa.
[0017] Preferably, during the cleaning process of step 2, the temperature of the vacuum absorption tower washing mother I is controlled to be 40-50° C. by adjusting the pipe opening of the circulating water supply pipe and the circulating water return pipe and the circulating water flow rate.
[0018] Compared with the prior art, the present invention has the following beneficial effects: 1. The cleaning system for cleaning scabs in a carbonizing tower of the present invention can be used for cleaning operations of at least one carbonizing tower in an existing alkali production process. On the one hand, the flow rate of the cleaning medium in the cleaning process of each carbonizing tower can be increased by about 20% compared with the original cleaning process, which is beneficial to the cleaning of scabs in the cleaning process; on the other hand, the temperature of the cleaning medium of the present invention is 3-8°C higher than the temperature of the original cleaning medium without external heating, and increasing the temperature is beneficial to the cleaning and reverse reaction, thereby improving the cleaning efficiency of the carbonizing tower; 2. The cleaning system improves the efficiency of the carbonization tower alkali production process and improves product quality and output. Since the carbonization tower alkali production is more efficient, the conversion rate of raw materials is improved, the mother liquor equivalent is reduced, and the energy consumption is reduced under the same output. It has the advantages of lower energy consumption and smaller equipment investment, and solves the scarring problem of the carbonization tower in the production of soda ash, so as to achieve the purpose of improving the production efficiency of the carbonization tower and reducing the energy consumption of the cleaning process; avoids the use of hot water boiling tower process, thereby reducing steam consumption and sewage generation. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of a cleaning process of a cleaning system for cleaning scars in a carbonization tower according to the present invention; Figure 2 It is a schematic diagram of the opening and closing states of each control valve of the cleaning system of the present invention before cleaning; Figure 3 It is a schematic diagram of the opening and closing states of each control valve of the cleaning system of the present invention during the cleaning process; Figure 4 It is a schematic diagram of the opening and closing states of each control valve of the cleaning system of the present invention after cleaning is completed.
[0020] Figure numerals: 1, ammonia steam from ammonia evaporation tower; 2, heat exchange ammonia steam; 3, mother I clarified liquid; 4, ammonia absorption washing mother I; 5, heat exchange washing mother I; 6, vacuum absorption tower washing mother I; 7, washing mother I to washing tower pipeline; 8, washing mother I after washing tower to mother liquid storage tank pipeline; 9, washing mother I to washing tower water pump pipeline; 10, circulating water supply pipeline; 11, circulating water return pipeline; 12, washing gas; 13, washing tail gas; 14, washing ammonia tail gas; 15, mother liquid I to crystallization process pipeline; 16, first control valve; 17, second control valve Valve; 18, third control valve; 19, fourth control valve; 20, fifth control valve; 21, sixth control valve; 22, seventh control valve; 23, ammonia mother II inlet valve; 24, vacuum absorption tower; 25, tower washing water pump; 26, mother liquor storage barrel; 27, cleaning tower; 28, alkali tower; 29, pipeline from mother washing I to mother liquor storage barrel; 30, pipeline from tower washing water pump to mother liquor storage barrel; 31, ammonia mother II inlet pipeline; 32, tower washing water pump to carbonization tower pipeline; 33, tower washing water pump to cleaning tower pipeline; 34, washing mother I to tower washing water pump pipeline. DETAILED DESCRIPTION
[0021] To make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the following will be combined with the attached Figures 1 to 4 The technical scheme of the embodiment of the present invention is clearly and completely described as shown. Obviously, the described embodiment is a part of the embodiment of the present invention, not all the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0022] Example 1: Figure 1 As shown, the present invention is a cleaning system for scarring in a carbonizing tower in soda ash production, the cleaning system comprising a vacuum absorption tower 24 arranged in conjunction with a carbonizing tower to be cleaned, a tower washing water pump 25, a mother liquid storage tank 26, a plurality of conveying pipelines and control valves respectively connected to the conveying pipelines.
[0023] The vacuum absorption tower 24 includes at least one set of cooling sections and absorption sections connected in series. The cooling section includes a first cooler and a second cooler arranged along the height direction of the vacuum absorption tower 24. The inlet end of the first cooler is connected to the tail gas pipe at the top of the ammonia evaporation tower, and receives the ammonia vapor 1 of the ammonia evaporation tower and cools it. The inlet end of the second cooler is connected to the washing mother I pump, and receives the mother I clarified liquid 3 and cools it. The mother I clarified liquid 3 and the ammonia vapor 1 of the ammonia evaporation tower are absorbed in the absorption section of the vacuum absorption tower 24 to produce ammonia absorption washing mother I 4, and the ammonia absorption washing mother I 4 is discharged from the vacuum absorption tower 24 to form a vacuum absorption tower washing mother I 6. In a preferred embodiment, the vacuum absorption tower 24 includes a cooling section A, an absorption section A, a cooling section B and an absorption section B connected in series in sequence. The shell sides of the multiple coolers arranged in the cooling section A and the cooling section B are connected to the circulating water storage tank through the circulating water supply pipe 10 and the circulating water return pipe 11 respectively, and the circulating water is used to exchange heat with the cooling section A and the cooling section B to achieve cooling or heating of the circulating medium therein. Ammonia vapor 1 from the ammonia evaporation tower flows through the cooling section A to form heat exchange ammonia vapor 2. The mother I clarified liquid 3 flows through the cooling section A and undergoes absorption reaction with the heat exchange ammonia vapor 2 to form an ammonia absorption washing mother I 4. The ammonia absorption washing mother I 4 undergoes heat exchange in the cooling section B to produce a heat exchange washing mother I 5 and ammonia washing tail gas 14. The heat exchange washing mother I 5 flows through the absorption section B and undergoes further absorption reaction with the heat exchange ammonia vapor 2 to produce a vacuum absorption tower washing mother I 6, which meets the subsequent cleaning operation of the carbonization tower.
[0024] The liquid outlet of the vacuum absorption tower 24 is connected to the liquid inlet of the washing tower 27 and the mother liquid storage tank 26 through the washing mother I to the washing tower pipeline 7 and the washing mother I to the mother liquid storage tank pipeline 29. The washing mother I to the washing tower pipeline 7 is connected to the washing tower water pump 25 to form the washing mother I to the washing tower water pump pipeline 34 and the washing tower water pump to the washing tower pipeline 33. The first control valve 16 is connected to the washing mother I to the washing tower water pump pipeline 34, the second control valve 17 is connected to the washing mother I to the mother liquid storage tank pipeline 29, and the third control valve 18 is connected to the washing tower water pump to the washing tower pipeline 33.
[0025] The alkali-making system of the present invention includes six carbonization towers. The carbonization tower is used as an alkali-making tower 28, and scarring is easy to occur inside the carbonization tower during operation. Therefore, periodic cleaning is required to maintain the alkali-making efficiency of the carbonization tower. In the present invention, one of the carbonization towers uses the cleaning system and cleaning method of the present invention to complete the cleaning of the cleaning tower 27 during cleaning, and the remaining five carbonization towers can use AⅡ liquid (NH3, H2O, NaCl, NH4Cl, a small amount of carbonate) and cleaning gas 12 (low-pressure nitrogen sent by air separation and CO2 gas of appropriate concentration) to clean the scarring in the carbonization tower during cleaning. On the one hand, the cleaning method can increase the flow rate of the cleaning medium (AⅡ liquid, washing mother liquor) in the cleaning process of each carbonization tower by about 20% compared with the original cleaning process, which is conducive to the cleaning of scarring during the cleaning process; on the other hand, the temperature of the cleaning medium of the present invention is 3~8°C higher than the original cleaning medium temperature without external heating. Properly increasing the cleaning temperature is conducive to the cleaning and reverse reaction, and can improve the cleaning efficiency. Compared with hot A I liquid cleaning, the cleaning system of the present invention has lower energy consumption and smaller equipment investment, solves the problem of scarring of the carbonizing tower in soda ash production, and serves the purpose of improving the production efficiency of the carbonizing tower and reducing the energy consumption of the cleaning process.
[0026] The carbonization tower to be cleaned is used as a cleaning tower 27 to receive the cleaning gas 12 and the vacuum absorption tower washing mother Ⅰ 6 for the tower washing operation. The liquid outlet of the cleaning tower 27 is connected to the mother liquid storage tank 26 through the mother liquid storage tank pipeline 8 after the tower washing. The mother liquid storage tank 26 is connected to the crystallization process through the mother liquid Ⅰ to the crystallization process pipeline 15. The mother liquid storage tank pipeline 8 after the tower washing mother Ⅰ is connected to the fourth control valve 19; the exhaust end of the cleaning tower 27 transports the cleaning tail gas 13 to the comprehensive recovery tower for treatment through the tail gas delivery pipeline. The mother liquid storage tank pipeline 8 after the tower washing mother Ⅰ is located at the front end of the fourth control valve 19 and is connected to the tower washing water pump 25 through a tee and the tower washing mother Ⅰ to the tower washing water pump pipeline 9. The fifth control valve 20 is connected to the tower washing mother Ⅰ to the tower washing water pump pipeline 9, and the end access position of the tower washing mother Ⅰ to the tower washing water pump pipeline 9 is located at the rear end of the first control valve 16. The tower washing water pump to the washing tower pipeline 33 is located at the front end of the third control valve 18 and is connected to the mother liquid storage tank 26 through a tee and a tower washing water pump to the mother liquid storage tank pipeline 30. The residual washing mother I in the washing tower 27 is pumped into the mother liquid storage tank 26 through the tower washing water pump 25 and the tower washing water pump to the mother liquid storage tank pipeline 30. The tower washing water pump to the mother liquid storage tank pipeline 30 is connected to the sixth control valve 21, and the washing tower 27 is converted into a carbonization tower to resume the alkali production operation.
[0027] The tower washing water pump to the washing tower pipeline 33 is located at the front end of the third control valve 18 and is connected to other carbonization towers in normal alkali production operation through a tee and a tower washing water pump to the carbonization tower pipeline 32. The tower washing water pump to the carbonization tower pipeline 32 is connected to the seventh control valve 22. The washing tower 27 is also provided with an ammonia mother II liquid inlet valve 23. When the washing tower 27 is converted into an alkali production tower after the washing is completed, the alkali production operation can be started by controlling the ammonia mother II liquid inlet valve 23.
[0028] Embodiment 2: The present invention also discloses a method for cleaning scars in a carbonizing tower in soda ash production, the cleaning method comprising: (a) As Figure 2 As shown, before the cleaning operation, confirm that the pipeline 34 from the washing mother I to the washing tower water pump, the pipeline 33 from the washing tower water pump to the washing tower, the pipeline 8 from the washing tower washing mother I to the mother liquid storage barrel, the pipeline 30 from the washing tower water pump to the mother liquid storage barrel, and the ammonia mother II liquid inlet pipeline 31 are all in the off state; confirm that the washing tower washing mother I to the washing tower water pump pipeline 9 and the washing tower water pump to the carbonization tower pipeline 32 are in the on state; start the washing tower water pump 25, and send the alkali-making liquid in the washing tower 27 to the normally working alkali-making tower 28 through the washing tower washing mother I to the washing tower water pump pipeline 9 and the washing tower water pump to the carbonization tower pipeline 32 in sequence for alkali-making operation; after the residual alkali-making liquid in the washing tower 27 is evacuated, shut down the washing tower water pump 25. It should be noted that the shut-off or connection of the delivery pipeline is performed by the corresponding operation of the control valve connected thereto.
[0029] (ii) Figure 3As shown, when the cleaning operation is carried out, it is confirmed that the pipeline 32 from the tower washing pump to the carbonization tower, the tower washing mother I to the tower washing pump pipeline 9, and the tower washing pump to the mother liquid storage barrel pipeline 30 are in the off state; it is confirmed that the washing mother I to the tower washing pump pipeline 34 and the tower washing pump to the cleaning tower pipeline 33 are in the connected state; the vacuum absorption tower 24 is opened to receive the mother I clarified liquid 3 and the ammonia vapor 1 of the ammonia evaporation tower to absorb and produce the vacuum absorption tower washing mother I 6, and then the tower washing pump 25 is started to pump the vacuum absorption tower washing mother I 6; after the tower washing pump 25 is started, the opening of the control valve connected to the washing mother I to the mother liquid storage barrel pipeline 29 is closed to 50~80%, ensuring that the flow rate of the vacuum absorption tower washing mother I 6 transported to the cleaning tower 27 through the tower washing pump to the cleaning tower pipeline 33 is 200~300m³ / h; and the pipeline 8 from the washing mother I to the mother liquid storage barrel after the tower washing is kept in the connected state, and the cleaning operation of the cleaning tower 27 begins.
[0030] During the cleaning process, the vacuum degree in the vacuum absorption tower 24 is controlled at 25~35kpa, the flow rate of the receiving mother I clarified liquid 3 is controlled at 200~500m³ / h, and the temperature of the mother I clarified liquid 3 is controlled at 45~50℃ through the cooler in the vacuum absorption tower 24; the temperature of the ammonia vapor 1 in the receiving ammonia evaporation tower is controlled at 70~80℃, and the gas temperature is controlled at 55~65℃ after cooling by the cooler. It should be noted that the cooling section A and the cooling section B control the cooling capacity of each cooler of the vacuum absorption tower 24 by adjusting the pipeline opening of the circulating water supply pipeline 10 and the circulating water return pipeline 11 and the circulating water flow rate to control the temperature of the output vacuum absorption tower washing mother I 6 at 40~50℃. During the cleaning process, the cleaning tower 27 simultaneously introduces the cleaning gas 12, which includes N2, O2, and CO2, and the CO2 concentration is not higher than 5%. The flow rate of the cleaning gas 12 is controlled at 1000~1500Nm³ / h and the pressure is controlled at 0.32~0.4Mpa. It should be noted that the process parameters of the present invention are all process control parameters, and the specific point values of the parameters have no practical significance in the actual production process, that is, any value of the process parameters controlled within the corresponding parameter range can meet the requirements.
[0031] (III) Figure 4As shown, after the cleaning operation lasts for 18 to 24 hours, the cleaning operation is ready to end, and the control valve connected to the pipe 29 from the washing mother I to the mother liquid storage barrel is fully opened to ensure that after the cleaning is stopped, the vacuum absorption tower washing mother I 6 enters the mother liquid storage barrel 26 through the pipe 29 from the washing mother I to the mother liquid storage barrel; then the pipe 9 from the washing mother I to the washing tower water pump is connected to allow the residual washing mother I in the washing tower 27 to enter the washing tower water pump 25 for transportation; the washing mother I to the washing tower water pump pipe is connected to allow the residual washing mother I in the washing tower 27 to enter the washing tower water pump 25 for transportation; After passing through channel 9, the pipeline 34 from the washing mother I to the washing tower water pump, the pipeline 8 from the washing mother I after the washing tower to the mother liquid storage tank, and the pipeline 33 from the washing tower water pump to the cleaning tower are shut off, and the pipeline 30 from the washing tower water pump to the mother liquid storage tank is connected, and the residual washing mother I in the cleaning tower 27 is pumped to the mother liquid storage tank 26 for storage, and then the cleaning tower water pump 25 is shut off, and the pipeline 34 from the washing mother I after the tower to the washing tower water pump, and the pipeline 30 from the washing tower water pump to the mother liquid storage tank are shut off. The cleaning of the cleaning tower 27 is completed as a carbonization tower to resume the alkali production process.
[0032] The cleaning method of the present invention improves the alkali production efficiency of the carbonizing tower alkali production process, and improves product quality and output; because the carbonizing tower alkali production is more efficient, the conversion rate of raw materials is improved, the mother liquor equivalent is reduced, and the energy consumption is reduced under the condition of the same output, and has the advantages of lower energy consumption and smaller equipment investment, and solves the scarring problem of the carbonizing tower in the production of soda ash, so as to achieve the purpose of improving the production efficiency of the carbonizing tower and reducing the energy consumption of the cleaning process; avoids the use of hot water boiling tower process, thereby reducing steam consumption and sewage generation.
[0033] The above are preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A cleaning system for scarring in a carbonizing tower in soda ash production, characterized in that: The cleaning system comprises a vacuum absorption tower (24) arranged in cooperation with a carbonization tower to be cleaned, a tower-cleaning water pump (25), a mother liquid storage tank (26), a plurality of conveying pipelines, and control valves respectively connected to the conveying pipelines; The vacuum absorption tower (24) comprises at least one group of cooling sections and absorption sections connected in series, the cooling section comprising a first cooler and a second cooler arranged along the height direction of the vacuum absorption tower (24), the inlet end of the first cooler being connected to the tail gas pipe at the top of the ammonia evaporation tower, receiving ammonia vapor (1) from the ammonia evaporation tower and cooling it; the inlet end of the second cooler being connected to the washing mother I pump, receiving mother I clarified liquid (3) and cooling it; the mother I clarified liquid (3) and the ammonia vapor (1) from the ammonia evaporation tower are absorbed in the absorption section of the vacuum absorption tower (24) to produce ammonia absorbing washing mother I (4), and the ammonia absorbing washing mother I (4) is discharged from the vacuum absorption tower (24) to form a vacuum absorption tower washing mother I (6); The liquid outlet of the vacuum absorption tower (24) is connected to the liquid inlet of the cleaning tower (27) and the mother liquid storage tank (26) through a cleaning mother I to cleaning tower pipeline (7) and a cleaning mother I to mother liquid storage tank pipeline (29), and the cleaning mother I to cleaning tower pipeline (7) is connected to a cleaning tower water pump (25); The carbonization tower to be cleaned serves as a cleaning tower (27) to receive cleaning gas (12) and vacuum absorption tower cleaning mother I (6) to perform a cleaning operation; the liquid outlet of the cleaning tower (27) is connected to a mother liquid storage tank (26) through a post-cleaning mother I to mother liquid storage tank pipeline (8), and the mother liquid storage tank (26) is connected to the crystallization process through a mother liquid I to crystallization process pipeline (15); the exhaust end of the cleaning tower (27) transports the cleaning tail gas (13) to a comprehensive recovery tower for treatment through a tail gas transport pipeline.
2. The cleaning system for scarring in a carbonizing tower in soda ash production according to claim 1, characterized in that: The vacuum absorption tower (24) comprises a cooling section A, an absorption section A, a cooling section B and an absorption section B which are connected in series in sequence. The ammonia absorption washing mother I (4) produced by the absorption section A enters the cooling section B for heat exchange to produce a heat exchange washing mother I (5). The heat exchange washing mother I (5) enters the absorption section B for absorption with ammonia vapor (1) from an ammonia evaporation tower to produce a vacuum absorption tower washing mother I (6).
3. The cleaning system for scarring in a carbonizing tower in soda ash production according to claim 2, characterized in that: The shell sides of the multiple coolers arranged in the cooling section A and the cooling section B are connected to the circulating water storage tank through the circulating water supply pipe (10) and the circulating water return pipe (11) respectively.
4. The cleaning system for scarring in a carbonizing tower in soda ash production according to any one of claims 1 to 3, characterized in that: The pipeline (8) from the washing mother I after the washing tower to the mother liquid storage tank is connected to the washing tower water pump (25) through a tee and a pipeline (9) from the washing mother I to the washing tower water pump. The residual washing mother I in the washing tower (27) is pumped into the mother liquid storage tank (26) through the washing tower water pump (25) and the pipeline (30) from the washing tower water pump to the mother liquid storage tank, and the washing tower (27) is converted into a carbonization tower to resume the alkali production operation.
5. The cleaning system for scarring in a carbonizing tower in soda ash production according to claim 4, characterized in that: The pipeline (33) from the tower washing water pump to the cleaning tower is connected to other carbonizing towers in normal alkali production operation through a tee and the pipeline (32) from the tower washing water pump to the carbonizing tower.
6. The cleaning system for scarring in a carbonizing tower in soda ash production according to claim 5, characterized in that: The tower wash water pump to cleaning tower pipeline (33) is connected to the mother liquid storage tank (26) through a tee and the tower wash water pump to mother liquid storage tank pipeline (30).
7. A method for cleaning scars in a carbonizing tower in soda ash production, characterized in that: Utilizing the cleaning system of claim 6, the cleaning method comprises: Step 1: Before the cleaning operation, confirm that the pipeline from the washing mother I to the washing tower water pump (34), the washing tower water pump to the washing tower pipeline (33), the washing mother I after the washing tower to the mother liquid storage barrel pipeline (8), the washing tower water pump to the mother liquid storage barrel pipeline (30), and the ammonia mother II liquid inlet pipeline (31) are all in the off state; confirm that the pipeline from the washing mother I to the washing tower water pump (9) and the washing tower water pump to the carbonization tower pipeline (32) are in the on state; start the washing tower water pump (25) to send the alkali-making liquid in the washing tower (27) to the normally operating alkali-making tower (28) through the washing mother I to the washing tower water pump pipeline (9) and the washing tower water pump to the carbonization tower pipeline (32) in turn for alkali-making operation; after the residual alkali-making liquid in the washing tower (27) is evacuated, shut down the washing tower water pump (25); Step 2: During the cleaning operation, confirm that the pipeline from the tower washing pump to the carbonization tower (32), the tower washing mother I to the tower washing pump pipeline (9), and the tower washing pump to the mother liquid storage tank pipeline (30) are in the off state; confirm that the washing mother I to the tower washing pump pipeline (34) and the tower washing pump to the cleaning tower pipeline (33) are in the on state; open the vacuum absorption tower (24) to receive the mother I clarified liquid (3) and the ammonia vapor (1) from the ammonia evaporation tower for absorption to produce the vacuum absorption tower washing mother I (6), and then start the cleaning operation. The tower water pump (25) pumps the vacuum absorption tower washing mother I (6); after the tower washing water pump (25) is started, the opening of the control valve connected to the washing mother I to the mother liquid storage tank pipeline (29) is closed to 50-80%, so as to ensure that the flow rate of the vacuum absorption tower washing mother I (6) transported to the washing tower (27) through the tower washing water pump to the washing tower pipeline (33) is 200-300m³ / h; and the washing mother I to the mother liquid storage tank pipeline (8) after the washing tower is kept in an open state, and the washing tower (27) starts the cleaning operation; Step 3: After the cleaning operation lasts for 18 to 24 hours, the cleaning operation is ready to end. The control valve connected to the pipe (29) from the washing mother I to the mother liquid storage tank is fully opened to ensure that after the cleaning is stopped, the washing mother I (6) of the vacuum absorption tower enters the mother liquid storage tank (26) through the pipe (29) from the washing mother I to the mother liquid storage tank; then the pipe (9) from the washing mother I to the washing water pump of the washing tower is connected to allow the residual washing mother I in the washing tower (27) to enter the washing water pump (25) for transportation; the pipe (9) from the washing mother I to the washing water pump of the washing tower is connected to allow the residual washing mother I in the washing tower (27) to enter the washing water pump (25) for transportation; After that, the pipeline (34) from the washing mother I to the washing tower water pump, the pipeline (8) from the washing mother I after the washing tower to the mother liquid storage tank, and the pipeline (33) from the washing tower water pump to the cleaning tower are shut off, and the pipeline (30) from the washing tower water pump to the mother liquid storage tank is connected, and the residual washing mother I in the cleaning tower (27) is pumped to the mother liquid storage tank (26) for storage, and then the cleaning tower water pump (25) is shut off, and the pipeline (34) from the washing mother I after the tower to the washing tower water pump, and the pipeline (30) from the washing tower water pump to the mother liquid storage tank are shut off. The cleaning of the cleaning tower (27) is completed and used as a carbonization tower to resume the alkali production process.
8. The method for cleaning scars in a carbonizing tower used in soda ash production according to claim 7, characterized in that: In step 2, the vacuum degree in the vacuum absorption tower (24) is controlled at 25-35 kPa, the flow rate of the received mother I clarified liquid (3) is controlled at 200-500 m³ / h, and the temperature of the mother I clarified liquid (3) is controlled at 45-50° C. by the cooler in the vacuum absorption tower (24); the temperature of the ammonia vapor (1) in the receiving ammonia evaporation tower is controlled at 70-80° C., and the gas temperature is controlled at 55-65° C. after being cooled by the cooler.
9. The cleaning method for scarring in a carbonizing tower used in soda ash production according to claim 7, characterized in that: In step 1, a cleaning gas (12) is introduced into the cleaning tower (27) during the cleaning process. The cleaning gas (12) includes N2, O2, and CO2, and the CO2 concentration is not higher than 5%. The flow rate of the cleaning gas (12) is controlled at 1000-1500 Nm³ / h and the pressure is controlled at 0.32-0.4 MPa.
10. The method for cleaning scars in a carbonizing tower in soda ash production according to claim 7, characterized in that: During the cleaning process of step 2, the temperature of the vacuum absorption tower washing mother I (6) is controlled to be 40-50° C. by adjusting the pipe opening of the circulating water supply pipe (10) and the circulating water return pipe (11) and the circulating water flow rate.
Citation Information
Patent Citations
Cleaning process for outer cooling shift gas alkali preparation
CN101157462A
Carbonization cleaning process of carbonizer for producing heavy soda ash
CN102432041A
Cleaning system and method for alkali-associated carbonation tower
CN102935438A
Alkali-making carbonizer with efficient cleaning function
CN220056378U
Method of carbonization of ammoniated brine in production of soda ash ammonial method and carbonization column for method embodiment
RU2209181C2