Large-pre-deviation assembly type suspension bridge lower bearing plate assembly

By designing the prefabricated suspension bridge lower bearing plate assembly, the installation groove and the clamp provide space to avoid contact between the main cable and the lower bearing plate, and the combination of split molding and locking bolts, the lower bearing plate of the suspension bridge is solved by solving the main bearing plate of the suspension bridge lower bearing plate by combining split molding and locking bolts. The interference problem of cable movement improves installation efficiency and adaptability.

CN119021094APending Publication Date: 2024-11-26WUHAN MARINE MACHINERY PLANT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411176066.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the under-bearing plate of the suspension bridge will interfere with the movement of the main cable under large pre-equivalence and affect normal installation.

Method used

A large pre-biased prefabricated under-cover plate assembly is designed, including a base plate, a first plate unit, a second plate unit and a guide device. Through the design of the installation groove and the clamp plate, sufficient installation space is provided to Avoid contact between the main cable and the lower bearing plate, and ensure the free movement of the main cable through the combination of split molding and locking bolts.

Benefits of technology

It effectively avoids contact between the main cable and the lower bearing plate, reduces the difficulty of on-site manufacturing, improves installation efficiency, and adapts to the construction needs of large pre-equivalent suspension bridges, achieving the smooth construction of the main cable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021094A_ABST
    Figure CN119021094A_ABST
Patent Text Reader

Abstract

A large-pre-deviation fabricated suspension bridge lower bearing plate assembly comprises a bottom plate, a first bearing plate unit, a second bearing plate unit and a guide device. A mounting groove is formed in the right side of the bottom plate, at least one first bearing plate unit and at least one second bearing plate unit are sequentially embedded in the mounting groove, the right end of the first bearing plate unit is connected with the left end of the second bearing plate unit, and the first bearing plate unit comprises a first plate body and two first insertion plates; first insertion plates are connected to the top and the bottom of the first plate body, first mounting gaps exist between the first plate body and the first insertion plates, and a plurality of first bolt holes used for fixing are formed in each first insertion plate; the second bearing plate unit comprises a second plate body and two second insertion plates, the top and the bottom of the second plate body are connected with the second insertion plates, and second installation gaps exist between the second plate body and the second insertion plates. The device does not interfere with the movement of the main cable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an improvement of a lower bearing plate technology, belongs to the field of suspension bridges, and in particular to a lower bearing plate assembly of an assembled suspension bridge with a large pre-biased amount. Background Art

[0002] The empty cable shape of the main cable of the suspension bridge is quite different from the completed bridge shape. When the main cable saddle is installed, its initial position is generally pre-biased to the side span by a certain distance. The cable saddle is moved on the grid reaction frame by pushing, and the main cable span is changed, thereby adjusting the main cable force on both sides of the tower and the horizontal inclination of the main cable, eliminating or reducing the imbalance of the horizontal force of the main cables on both sides, and ensuring that the main tower of the suspension bridge is always in a safe stress state during the stiffening beam hoisting process. When the cable saddle is initially installed, it needs to be pre-biased to the side span by a certain distance according to the design requirements. Normal installation When the main cable is located in the pushing direction of the lower bearing plate, no contact will occur. When the pre-bias is larger than normal, the height of the lower bearing plate becomes higher, and the relative position of the lower bearing plate and the main cable also becomes higher. The main cable is usually arranged in an inclined state, and its position during installation or adjustment will maintain a safe distance from the lower bearing plate. However, when the height of the lower bearing plate increases due to the increase in pre-bias, the two originally separated ones will come into contact, causing the edge of the lower bearing plate to rub against the main cable. The lower bearing plate will interfere with the movement of the main cable, affecting normal installation.

[0003] A Chinese patent application with application number CN202311361825.1 and application date July 31, 2023 discloses a suspension bridge catwalk rotating saddle structure assembly, which at least includes a main saddle grid reaction frame, a tower top portal frame, a second rotating saddle and a suspension bridge catwalk; the main saddle grid reaction frame is provided with two pairs on the left and right; the second rotating saddle is provided with four, and the four second rotating saddles are divided into two groups, and the two groups of second rotating saddles are symmetrically arranged on both sides of the suspension bridge catwalk, and connected to the gantry column foot of the tower top portal frame; the The second rotating cable saddle includes a second rotating cable saddle support seat and a second rotating cable saddle body, and the second rotating cable saddle body is connected to the column foot of the tower top portal frame through the second rotating cable saddle support seat; it also includes a first rotating cable saddle; two of the first rotating cable saddles are arranged; the two first rotating cable saddles are symmetrically arranged on both sides of the catwalk of the suspension bridge, and are respectively connected to the outer sides of the two main cable saddle grid reaction frames. The above scheme makes the linear shape of the catwalk consistent with the linear shape of the main cable, which is convenient for the construction of the main cable, but does not solve the problem that the integral lower support plate will interfere with the movement of the main cable.

[0004] The information disclosed in this background technology section is only intended to increase the understanding of the overall background of this patent application, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art already known to ordinary technicians in this field. Summary of the invention

[0005] The purpose of the present invention is to overcome the problem in the prior art that a large pre-bias will interfere with the movement of the main cable, and to provide a prefabricated suspension bridge lower deck assembly with a large pre-bias that will not interfere with the movement of the main cable when the pre-bias is large.

[0006] To achieve the above objectives, the technical solution of the present invention is: a deck assembly under a pre-deflected assembled suspension bridge with a large pre-deflected amount, the deck assembly under a pre-deflected assembled suspension bridge with a large pre-deflected amount comprises a bottom plate, a first deck unit, a second deck unit and a guide device; The bottom plate is provided with a mounting groove on the right side, in which at least one first support plate unit and a second support plate unit are sequentially embedded, the right end of the first support plate unit is connected to the left end of the second support plate unit, and guide devices are respectively provided at the upper end and the lower end of the front side of the bottom plate, and the two guide devices are symmetrically arranged; The first plate unit comprises a first plate body and two first insertion plates, the top and bottom of the first plate body are connected to the first insertion plates, a first installation gap exists between the first plate body and the first insertion plates, and each first insertion plate is provided with a plurality of first bolt holes for fixing; The second supporting plate unit includes a second plate body and two second insertion plates. The top and bottom of the second plate body are connected to the second insertion plates. There is a second installation gap between the second plate body and the second insertion plates. Each second insertion plate is provided with a plurality of second bolt holes for fixing.

[0007] A clamping plate is installed at the top and bottom of the installation groove on the right side of the bottom plate, and the top of the clamping plate is connected to the bottom of the side of the first carrier unit; The top of the clamping plate is connected to the bottom of the side of the second support plate unit; A connecting plate is installed on the right side of the bottom plate and located on the left side of the installation groove. A connecting groove is opened on the top of the connecting plate, and the left end of the first support plate unit is embedded in the connecting groove.

[0008] The clamping plate is clamped with the installation gap, and the clamping plate and the installation gap are connected by a first bolt.

[0009] The left side of the first plate body is connected to the first support plate, a first clamping area exists between the first support plate and the first plate body, and the top of the connecting plate is embedded in the first clamping area; The right side of the first plate body is connected to the second support plate, a second clamping area exists between the second support plate and the first plate body, and the second clamping area is connected to the left end of the second plate body.

[0010] The left end of the second plate body is connected to the right end of the third support plate, a third clamping area is arranged between the second plate body and the third support plate, and the second support plate is embedded in the third clamping area.

[0011] The thickness of the first support plate is greater than the thickness of the second support plate.

[0012] A first positioning groove is provided on one side of the top of the second support plate close to the first plate body, and a first positioning block is installed at the left end of the bottom of the third support plate, and the first positioning block is engaged with the first positioning groove; A second fixing bolt is arranged on the top of the third support plate, and the bottom of the second fixing bolt passes through the third support plate and the second support plate in sequence and is fixed with the nut thread. The second fixing bolt is arranged on the right side of the first positioning block.

[0013] The second insert plate is provided with an arc surface at one end away from the first plate body; The length of the second insert plate is smaller than the length of the second plate body.

[0014] A second positioning block is installed at the left bottom of the first support plate, and the second positioning block is engaged with the connecting groove; The length of the second positioning block is the same as that of the first positioning groove, and the length of the connecting groove is the same as that of the first positioning groove; The size of the notch of the second engaging area matches the size of the second positioning block.

[0015] The sum of the lengths of the first insert plate and the second insert plate is the same as the length of the mounting slot.

[0016] Compared with the prior art, the present invention has the following beneficial effects: 1. In a lower deck assembly of a prefabricated suspension bridge with a large pre-biased amount of the present invention, an installation groove is provided on the right side of the bottom plate, at least one first deck unit and a second deck unit are sequentially embedded in the installation groove, the right end of the first deck unit is connected to the left end of the second deck unit, and guide devices are respectively provided at the upper and lower ends of the front of the bottom plate, and the two guide devices are symmetrically arranged. When applied: after the main structure of the lower deck is installed, the cable saddle is installed in place according to the designed initial position, and the main cable is installed. During the installation of the main cable, even if the pre-biased amount between the main cable and the lower deck is large, due to the right side of the bottom plate The setting of the installation groove leaves enough installation space, so that the main cable will not contact the bottom plate in the direction of pushing when adjusting its position. After the main cable is installed, the first support plate unit and the second support plate unit are pushed into the corresponding positions in the installation groove along the card plate, and then the left end of the first support plate unit is embedded in the connection groove, and the left end of the second support plate unit is embedded in the first support plate unit, and then the bolt assembly is used to fix the joint surfaces, and the lower support plate structure is split and formed. After the main cable construction is completed, the split lower support plate is assembled and formed, so as not to interfere with the movement of the main cable. Therefore, the present invention will not interfere with the movement of the main cable.

[0017] 2. In the lower deck assembly of a pre-biased assembled suspension bridge of the present invention, the lower deck structure for installing the saddle of the suspension bridge with large pre-bias is split and molded, so that the molding structure of each lower deck split is small and can be independently manufactured, transported and installed; the adjacent lower deck splits are arranged according to the designed position and connected to form an integral assembly through locking bolts, etc., which effectively meets the technical requirements for on-site installation of the saddle of the suspension bridge, reduces the difficulty of on-site manufacturing, is conducive to improving the efficiency of on-site installation, and is more suitable for the construction requirements of the suspension bridge with large pre-bias. Therefore, the present invention improves the installation efficiency and is simple to manufacture.

[0018] 3. In the lower bearing plate assembly of a prefabricated suspension bridge with a large pre-biased amount of the present invention, a first positioning groove is provided on the side of the top of the second supporting plate close to the first plate body, a first positioning block is installed at the bottom left end of the third supporting plate, the first positioning block is clamped with the first positioning groove, a second positioning block is installed at the bottom left of the first supporting plate, and the second positioning block is clamped with the connecting groove. When used: the first positioning block is installed in the first positioning groove, and the two bearing plate units are fixed in the form of a falcon joint. At the same time, the length of the lower bearing plate can be increased according to the use requirements, and the number of superimposed bearing plate units is more convenient. Therefore, the present invention increases the actual use length according to the use requirements, and has strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the present invention.

[0020] Figure 2 It is a bottom view of the present invention.

[0021] Figure 3 The present invention Figure 2 Schematic diagram of the structure at A in the middle.

[0022] Figure 4 It is a right side view of the present invention.

[0023] Figure 5 The present invention Figure 4 Schematic diagram of the structure at B in the figure.

[0024] Figure 6 It is a structural schematic diagram of the installation slot in the present invention.

[0025] Figure 7 It is a structural schematic diagram of the first carrier plate unit in the present invention.

[0026] Figure 8 It is a side view of the first carrier plate unit in the present invention.

[0027] Fig. 9 It is a bottom view of the first carrier plate unit in the present invention.

[0028] Fig.10It is a structural schematic diagram of the second carrier plate unit in the present invention.

[0029] Fig.11 It is a side view of the second carrier plate unit in the present invention.

[0030] Fig.12 It is a bottom view of the second carrier plate unit in the present invention.

[0031] Fig.13 It is an installation schematic diagram of the present invention.

[0032] In the figure: base plate 1, mounting groove 11, clamping plate 12, connecting plate 13, connecting groove 14, first supporting plate unit 2, first plate body 21, first insert plate 22, mounting gap 23, first support plate 24, second positioning block 25, first clamping area 26, second clamping area 27, second support plate 28, second supporting plate unit 3, second plate body 31, second insert plate 32, second mounting gap 33, arc surface 34, third support plate 35, third clamping area 36, ​​first positioning block 37, first bolt hole 4, second bolt hole 41, guide device 5. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0034] See also Figures 1 to 13 , a deck assembly for a prefabricated suspension bridge with a large pre-deflection, the deck assembly for a prefabricated suspension bridge with a large pre-deflection comprises a bottom plate 1, a first deck unit 2, a second deck unit 3 and a guide device 5; The bottom plate 1 is provided with a mounting groove 11 on the right side, in which at least one first support plate unit 2 and one second support plate unit 3 are sequentially embedded, the right end of the first support plate unit 2 is connected to the left end of the second support plate unit 3, and guide devices 5 are respectively provided at the upper and lower ends of the front side of the bottom plate 1, and the two guide devices 5 are symmetrically arranged; The first plate unit 2 includes a first plate body 21 and two first insert plates 22. The top and bottom of the first plate body 21 are connected to the first insert plates 22. There is a first installation gap 23 between the first plate body 21 and the first insert plates 22. Each first insert plate 22 is provided with a plurality of first bolt holes 4 for fixing. The second supporting plate unit 3 includes a second plate body 31 and two second insertion plates 32. The top and bottom of the second plate body 31 are connected to the second insertion plates 32. There is a second installation gap 33 between the second plate body 31 and the second insertion plates 22. Each second insertion plate 32 is provided with a plurality of second bolt holes 41 for fixing.

[0035] A clamping plate 12 is installed at the top and bottom of the mounting groove 11 on the right side of the bottom plate 1, and the top of the clamping plate 12 is connected to the bottom of the side of the first carrier unit 2; The top of the clamping plate 12 is connected to the bottom of the side of the second support plate unit 3; A connecting plate 13 is installed on the right side of the bottom plate 1 and located on the left side of the installation groove 11 . A connecting groove 14 is formed on the top of the connecting plate 13 . The left end of the first carrier plate unit 2 is embedded in the connecting groove 14 .

[0036] The clamping plate 12 is clamped with the installation gap 23 , and the clamping plate 12 and the installation gap 23 are connected by a first bolt 6 .

[0037] The left side of the first plate body 21 is connected to the first support plate 24. There is a first clamping area 26 between the first support plate 24 and the first plate body 21. The top of the connecting plate 13 is embedded in the first clamping area 26. The right side of the first plate body 21 is connected to the second support plate 28 . A second engaging area 27 exists between the second support plate 28 and the first plate body 21 . The second engaging area 27 is connected to the left end of the second plate body 31 .

[0038] The left end of the second plate body 31 is connected to the right end of the third support plate 35 . A third engaging area 36 is provided between the second plate body 31 and the third support plate 35 . The second support plate 28 is embedded in the third engaging area 36 .

[0039] The thickness of the first support plate 24 is greater than the thickness of the second support plate 28 .

[0040] A first positioning groove 27 is formed on one side of the top of the second support plate 28 close to the first plate body 21, and a first positioning block 37 is installed at the left end of the bottom of the third support plate 35, and the first positioning block 37 is engaged with the first positioning groove 27; A second fixing bolt 7 is disposed on the top of the third support plate 35 , and the bottom of the second fixing bolt 7 passes through the third support plate 35 and the second support plate 28 in sequence and is fixed with a nut thread. The second fixing bolt 7 is disposed on the right side of the first positioning block 37 .

[0041] The second insert plate 32 is provided with an arc surface 34 at one end away from the first plate body 21; The length of the second insert plate 32 is smaller than the length of the second plate body 31 .

[0042] A second positioning block 25 is installed at the left bottom of the first support plate 24, and the second positioning block 25 is engaged with the connecting groove 14; The length of the second positioning block 25 is the same as that of the first positioning groove 27 , and the length of the connecting groove 14 is the same as that of the first positioning groove 27 ; The size of the notch of the second engaging area 27 matches the size of the second positioning block 25 .

[0043] The sum of the lengths of the first insert plate 22 and the second insert plate 32 is the same as the length of the mounting groove 11 .

[0044] The supplementary description of the present invention is as follows: Large pre-bias refers to the situation when the pre-bias is greater than two meters. The main structure of the lower support plate is a supporting member welded from steel plates, mainly composed of a base plate 1 and a guide device 5. The upper and lower planes of the base plate 1 are both finely machined surfaces. The guide device 5 is welded from steel plates and welded on both sides of the base plate 1. The surface perpendicular to the plane of the base plate 1 is the machined surface, which plays a guiding role in the jacking process; a rope notch is set near the middle position of the tail, which is a channel for the main cable to be installed during the installation of the main cable. Bolt connection holes are set around the notch for fixing the first support plate unit 2 and the second support plate unit 3. The lower support plate assembly has at least two split-formed support plate units; each support plate unit has a joint surface connected to the adjacent support plate unit according to the horizontal arrangement position; each adjacent support plate unit is assembled and connected into an integral structure through a plurality of locating pins and a plurality of locking bolts that are arranged through the joint surface.

[0045] Embodiment 1: A deck assembly for an assembled suspension bridge with a large pre-biased amount, the deck assembly for an assembled suspension bridge with a large pre-biased amount comprising a bottom plate 1, a first deck unit 2, a second deck unit 3 and a guide device 5; a mounting groove 11 is provided on the right side of the bottom plate 1, at least one first deck unit 2 and a second deck unit 3 are sequentially embedded in the mounting groove 11, the right end of the first deck unit 2 is connected to the left end of the second deck unit 3, the upper and lower ends of the front side of the bottom plate 1 are respectively provided with guide devices 5, and the two guide devices 5 are symmetrically arranged; the first deck unit 2 comprises a first plate body 21 and two second deck units 3; An insertion plate 22, the top and bottom of the first plate body 21 are connected to the first insertion plate 22, there is a first installation gap 23 between the first plate body 21 and the first insertion plate 22, and each first insertion plate 22 is provided with a plurality of first bolt holes 4 for fixing; the second supporting plate unit 3 includes a second plate body 31 and two second insertion plates 32, the top and bottom of the second plate body 31 are connected to the second insertion plate 32, there is a second installation gap 33 between the second plate body 31 and the second insertion plate 22, and each second insertion plate 32 is provided with a plurality of second bolt holes 41 for fixing.

[0046] When applying: After the installation of the bottom plate 1 of the main structure of the lower bearing plate is completed, the cable saddle is installed in place according to the designed initial position, and the main cable is installed. During the construction process, the jacking is carried out in sequence to make the saddle body move relative to the tower top. After reaching the specified displacement, the grid split unit, the first bearing plate unit 2, and the second bearing plate unit 3 are assembled in sequence, and the bolt assemblies are used to fix the joint surfaces; when there are multiple bearing plate units, the assembly of subsequent bearing plate units is completed in sequence according to the above process based on the displacement of the designed jacking.

[0047] Embodiment 2: Embodiment 2 is substantially the same as Embodiment 1, except that: The left side of the first plate body 21 is connected to the first support plate 24, and there is a first clamping area 26 between the first support plate 24 and the first plate body 21, and the top of the connecting plate 13 is embedded in the first clamping area 26; the right side of the first plate body 21 is connected to the second support plate 28, and there is a second clamping area 27 between the second support plate 28 and the first plate body 21, and the second clamping area 27 is connected to the left end of the second plate body 31; the left end of the second plate body 31 is connected to the right end of the third support plate 35, and a third clamping area 36 is provided between the second plate body 31 and the third support plate 35, and the second support plate 28 is embedded in the third clamping area 36; the thickness of the first support plate 24 is greater than the thickness of the second support plate 28.

[0048] When applying: The first support plate unit 2 is a planar structure, which is used to fill the installation groove 11 position of the lower support plate main structure. The first support plate unit 2 and the lower support plate main structure are positioned by the clamping plate 12, the connecting plate 13 and the connecting groove 14, and are connected by a bolt assembly to form a lower support plate assembly. The lower support plate split structure is divided into one or more split structures according to the designed displacement of the top push and the linear requirements of the main cable, and each split structure is also connected by a bolt assembly.

[0049] Embodiment 3: Embodiment 3 is substantially the same as Embodiment 1, except that: A first positioning groove 27 is provided on the side of the top of the second support plate 28 close to the first plate body 21, and a first positioning block 37 is installed at the left end of the bottom of the third support plate 35, and the first positioning block 37 is clamped with the first positioning groove 27; a second fixing bolt 7 is provided on the top of the third support plate 35, and the bottom of the second fixing bolt 7 passes through the third support plate 35 and the second support plate 28 in sequence and is fixed with the nut thread, and the second fixing bolt 7 is arranged on the right side of the first positioning block 37; an arc surface 34 is provided at one end of the second insertion plate 32 away from the first plate body 21; the length of the second insertion plate 32 is less than the length of the second plate body 31; a second positioning block 25 is installed at the bottom of the left side of the first support plate 24, and the second positioning block 25 is clamped with the connecting groove 14; the length of the second positioning block 25 is the same as the length of the first positioning groove 27, and the length of the connecting groove 14 is the same as the length of the first positioning groove 27; the size of the notch of the second engaging area 27 is adapted to the size of the second positioning block 25.

[0050] When applying: Through assembly segmentation, the two support plate units are fixed in the form of falcon joints. At the same time, the length of the lower support plate can be increased according to usage requirements, and the number of support plate units can be stacked, which greatly reduces the difficulty of on-site manufacturing and installation and better ensures the flatness of the main plane of the lower support plate structure after it is formed.

[0051] The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiment. Any equivalent modifications or changes made by ordinary technicians in this field based on the contents disclosed by the present invention should be included in the protection scope recorded in the claims.

Claims

1. A large pre-deflection assembled suspension bridge lower deck assembly, characterized in that: The lower deck assembly of the assembled suspension bridge with a large pre-deflection comprises a bottom plate (1), a first deck unit (2), a second deck unit (3) and a guide device (5); The bottom plate (1) is provided with a mounting groove (11) on the right side thereof, in which at least one first support plate unit (2) and one second support plate unit (3) are sequentially embedded, the right end of the first support plate unit (2) is connected to the left end of the second support plate unit (3), and guide devices (5) are respectively provided at the upper end and the lower end of the front side of the bottom plate (1), and the two guide devices (5) are symmetrically arranged; The first support plate unit (2) comprises a first plate body (21) and two first insertion plates (22); the top and bottom of the first plate body (21) are both connected to the first insertion plates (22); a first installation gap (23) exists between the first plate body (21) and the first insertion plates (22); and each first insertion plate (22) is provided with a plurality of first bolt holes (4) for fixing; The second support plate unit (3) comprises a second plate body (31) and two second insertion plates (32); the top and bottom of the second plate body (31) are both connected to the second insertion plates (32); a second installation gap (33) exists between the second plate body (31) and the second insertion plates (22); and each second insertion plate (32) is provided with a plurality of second bolt holes (41) for fixing.

2. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 1, characterized in that: A clamping plate (12) is installed at the top and bottom of the installation groove (11) on the right side of the bottom plate (1), and the top of the clamping plate (12) is connected to the bottom of the side surface of the first carrier plate unit (2); The top of the clamping plate (12) is connected to the bottom of the side surface of the second support plate unit (3); A connecting plate (13) is installed on the right side of the bottom plate (1) and located on the left side of the installation groove (11); a connecting groove (14) is provided on the top of the connecting plate (13); and the left end of the first support plate unit (2) is embedded in the connecting groove (14).

3. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 2, characterized in that: The clamping plate (12) is clamped with the installation gap (23), and the clamping plate (12) and the installation gap (23) are connected via a first bolt (6).

4. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 3, characterized in that: The left side of the first plate body (21) is connected to the first support plate (24), a first clamping area (26) exists between the first support plate (24) and the first plate body (21), and the top of the connecting plate (13) is embedded in the first clamping area (26); The right side of the first plate body (21) is connected to the second support plate (28), a second clamping area (27) is present between the second support plate (28) and the first plate body (21), and the second clamping area (27) is connected to the left end of the second plate body (31).

5. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 4, characterized in that: The left end of the second plate body (31) is connected to the right end of the third support plate (35); a third clamping area (36) is provided between the second plate body (31) and the third support plate (35); and the second support plate (28) is embedded in the third clamping area (36).

6. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 5, characterized in that: The thickness of the first support plate (24) is greater than the thickness of the second support plate (28).

7. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 4, characterized in that: A first positioning groove (27) is provided on one side of the top of the second support plate (28) close to the first plate body (21); a first positioning block (37) is installed at the left end of the bottom of the third support plate (35); the first positioning block (37) is engaged with the first positioning groove (27); A second fixing bolt (7) is arranged on the top of the third support plate (35), and the bottom of the second fixing bolt (7) passes through the third support plate (35) and the second support plate (28) in sequence and is fixed by means of a nut thread. The second fixing bolt (7) is arranged on the right side of the first positioning block (37).

8. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 7, characterized in that: An end of the second insertion plate (32) away from the first plate body (21) is provided with a curved surface (34); The length of the second insertion plate (32) is smaller than the length of the second plate body (31).

9. The large pre-deflection assembled suspension bridge lower deck assembly according to claim 8, characterized in that: A second positioning block (25) is installed at the left bottom of the first support plate (24), and the second positioning block (25) is snap-fitted with the connecting groove (14); The length of the second positioning block (25) is the same as the length of the first positioning groove (27), and the length of the connecting groove (14) is the same as the length of the first positioning groove (27); The size of the notch of the second engaging area (27) is adapted to the size of the second positioning block (25).

10. The large pre-deflection assembled suspension bridge lower deck assembly according to any one of claims 1 to 9, characterized in that: The sum of the lengths of the first insertion plate (22) and the second insertion plate (32) is the same as the length of the installation groove (11).