By expanding the pile boot body, a modified pile boot with a larger bottom area is formed, which solves the problem of puncture of the drilling platform in the 'egg shell formation', and a safe and stable pile insertion process is achieved, improving structural stability and offshore Platform's operating efficiency.
Patent Information
- Application Number
- CN202411251046.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-26
AI Technical Summary
In drilling platforms, when the jack-up drilling platform is inserted into the 'egg shell formation', the pile boots are prone to piercing due to cracks in hard thin layer plates, resulting in the tilt and sinking of the platform. The existing technology solutions are costly and have poor results. , it is difficult to ensure structural safety.
By expanding the pile boot body, multiple expansion modules are added to form a modified pile boot with a larger bottom area, and a balanced design is carried out in combination with the safe bearing capacity range of the first formation and the maximum pre-ballasing force of the pile legs to ensure the transformation The pile boots are always within the safe bearing capacity during the insertion process to avoid puncture.
The safe and stable drilling process of the drilling platform in the ‘eggshell formation’ has been realized, which improves structural stability, reduces the dependence of complex geological parameters, and improves the operating efficiency and safety of offshore platforms.
Smart Images

Figure CN119021205A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of drilling platforms, and in particular to a pile shoe modification method and a modified pile shoe. Background Art
[0002] The description in this section merely provides background information related to the present disclosure and does not constitute prior art.
[0003] In the field of drilling platform technology, the shallow seabed where the drilling platform is piled often has a layered soil structure with a hard thin soil layer on the upper part and a soft thick soil layer on the lower part, which is also referred to as the "eggshell formation" in the technical field. When the jack-up drilling platform is setting the support shoe points in the "eggshell formation", the jack-up platform will insert its multiple pile shoes downward into the soil layer to fix itself; due to the characteristics of the "eggshell formation", with the progress of the pile shoe insertion and the change in the bearing capacity of the interlaced strata on the pile shoes, the hard thin layer is prone to cracking, causing the single pile shoe of the drilling platform to pass through the hard thin layer and enter the soft thick soil layer, and accelerate sinking in the soft thick soil layer. This type of accident is a puncture accident. The puncture of a single pile shoe will cause the drilling platform to tilt, and the uncontrolled sinking will also seriously affect the pile shoe structure and even the structural safety of the entire drilling platform.
[0004] In the prior art, a variety of technical solutions have been proposed, such as actively puncturing the upper hard layer of the "eggshell formation", drilling within the supporting range of the pile shoe, weakening the bearing capacity of the upper hard formation, so that the pile shoe can safely sit in the lower soft layer to avoid the problem of sudden puncture. However, the active puncture operation has a large operating area and is difficult to operate. It requires professional drilling vessels, which is extremely costly and ineffective. Therefore, a passive operation method is also proposed, that is, pouring cement into the lower soft layer where the pile is about to be piled to form a cement ring, and seating the pile shoe on the cement ring. This method has too high technical requirements for construction, which makes the construction time of the project longer and it is difficult to provide guarantees for the bearing capacity of the cement ring. In the past offshore platform puncture accidents, the cause of many accidents was that the bearing capacity of the cement ring changed due to environmental influences, causing the offshore platform to tilt. At the same time, when this method is used, the pile shoe body needs to be redesigned to cooperate with the cement ring. Therefore, the return time of the drilling platform to the factory is longer, and the utilization efficiency of the drilling platform is lower.
[0005] It should be noted that the above introduction to the technical background is only for the convenience of providing a clear and complete description of the technical solutions of the present invention and for the convenience of understanding by those skilled in the art. It cannot be considered that the above technical solutions are well known to those skilled in the art simply because these solutions are described in the background technology section of the present invention. Summary of the invention
[0006] The purpose of the present invention is to provide a pile shoe modification method and a modified pile shoe, which solves the problem that the pile shoe body is easily punctured when it is erected on a hard and thin stratum.
[0007] The above-mentioned implementation objectives of the present invention are mainly achieved by the following technical solutions:
[0008] The present invention provides a pile shoe modification method for modifying a pile shoe body erected on a stratum, wherein the stratum comprises a first stratum and a second stratum stacked up and down, wherein the puncture bearing capacity of the first stratum is greater than the puncture bearing capacity of the second stratum, and the pile shoe modification method comprises:
[0009] Step S1: performing an expansion design on the pile shoe body to form a modified pile shoe having a plurality of expansion modules, wherein the area of the modified pile shoe is the sum of the area of the pile shoe body and the areas of the plurality of expansion modules;
[0010] Step S2: obtaining the safe bearing capacity range of the first stratum to the modified pile shoe according to the maximum pre-compression force of the pile leg, and obtaining the area of the modified pile shoe based on the safe bearing capacity range;
[0011] Step S3: According to the area of the modified pile shoe and the area of the pile shoe body, the total area of the multiple expansion modules is obtained, and based on the total area of the multiple expansion modules, the area and shape of each expansion module are obtained, and the operation of expanding and modifying the pile shoe body is completed.
[0012] In a specific implementation, the step S2 includes:
[0013] Step S21: selecting a plurality of simulation pile shoes of different areas, and obtaining a plurality of simulation line diagrams of the pile insertion depth of the simulation pile shoe in the first stratum and the corresponding bearing capacity of the first stratum provided to the simulation pile shoe;
[0014] Step S22: selecting at least one simulation line diagram from the plurality of simulation line diagrams, wherein the minimum bearing capacity provided by the first stratum to the simulation pile shoe is within the safe bearing capacity range;
[0015] Step S23: setting the area of the simulated pile shoe corresponding to the simulation line graph as the area of the modified pile shoe.
[0016] In a specific implementation, the step S22 includes:
[0017] Determine the minimum safe bearing capacity according to the maximum preload force of the pile legs and the safety factor of the stratum;
[0018] At least one simulation line diagram is selected in which the minimum bearing capacity provided by the first stratum to the simulation pile shoe is greater than the minimum safe bearing capacity.
[0019] In a specific embodiment, the formation safety factor is determined based on the undrained shear strength of the first formation, the undrained shear strength of the second formation, and the foundation width of the simulated pile shoe.
[0020] In a specific implementation, step S3 includes:
[0021] Arranging a plurality of areas to be expanded on the circumference of the pile shoe body while keeping the maximum width of the pile shoe body unchanged;
[0022] According to the total area of the plurality of expansion modules, the shape and area of the expansion modules in each of the to-be-expanded areas are set;
[0023] The expansion modules are connected in sequence along the circumference of the pile shoe body.
[0024] In a specific embodiment, the minimum bearing capacity provided by the first stratum to the simulated pile shoe is determined based on the bearing capacity coefficient of the first stratum, the shape coefficient of the simulated pile shoe, the foundation width of the simulated pile shoe, the cohesion of the soil, the effective buoyant density of the soil at the position of the simulated pile shoe, and the weight of the backfill soil on the upper part of the simulated pile shoe.
[0025] In a specific embodiment, the bearing capacity coefficient of the first formation includes a first bearing capacity coefficient, a second bearing capacity coefficient and a third bearing capacity coefficient;
[0026] The first bearing capacity coefficient is determined by the foundation width of the simulation pile shoe, the foundation length of the simulation pile shoe, and the pile insertion depth of the simulation pile shoe in the first stratum;
[0027] The second bearing capacity coefficient is determined by the internal friction angle of the soil;
[0028] The third bearing capacity coefficient is determined by the second bearing capacity coefficient and the internal friction angle of the soil.
[0029] In a specific embodiment, the shape coefficient is determined by the base width of the simulated pile shoe, the base length of the simulated pile shoe, the first bearing capacity coefficient, and the second bearing capacity coefficient.
[0030] In a specific embodiment, the weight of the backfill soil on the upper part of the simulated pile shoe is determined by the effective buoyancy density of the soil at the position of the simulated pile shoe and the pile insertion depth of the simulated pile shoe in the first stratum.
[0031] The present invention further provides a pile shoe modification method, which adopts any of the pile shoe modification methods described above, and the pile shoe modification method comprises:
[0032] A pile shoe body, and a plurality of expansion modules arranged on the periphery of the pile shoe body, wherein the plurality of expansion modules are arranged within the maximum width range of the pile shoe body, and the expansion modules are independent sealed cavities;
[0033] The expansion module is provided with a pile punching pipeline and an adjustment pipe, the pile punching pipeline is connected with the pile punching ring pipe of the pile shoe body through the adjustment pipe, and one end opening of the pile punching pipeline is arranged on the side wall of the expansion module.
[0034] Compared with the prior art, the technical solution of the present invention has the following characteristics and advantages:
[0035] The pile shoe modification method provided by the present invention is suitable for a formation environment in which the puncture bearing capacity of the first formation is greater than that of the second formation, which is commonly known as the "eggshell formation" in the field of drilling technology. In this formation environment, due to the difference in puncture bearing capacity between the first formation and the second formation, the existing platform pile shoes often experience the overall splitting of the first formation during the pile insertion process, causing the platform pile shoes to suddenly fall from the first formation to the second formation, which is a puncture phenomenon and is likely to cause casualties. The method expands and modifies the pile shoe body, combines the enlarged bottom area of the modified pile shoe with the The bearing capacity of the first stratum given to the modified pile shoe and the maximum pre-load force of the pile leg are balanced, so that the modified pile shoe can be safely erected on the first stratum, so that the safe bearing capacity range of the modified pile shoe given by the first stratum to the modified pile shoe after the modification is always greater than the maximum pre-load force of the pile leg, that is, during the pile insertion process of the pile shoe of the drilling platform, no matter how much working ballast force is applied to the first stratum by the drilling platform, the bearing capacity provided by the first stratum to the modified pile shoe is always within the safety range of the first stratum, that is, the drilling platform can effectively achieve a safe and stable pile insertion process. At the same time, the modified pile shoe also improves the structural stability of the first stratum during the pile insertion process of the pile shoe; it also effectively avoids the need to perform complex operations such as pre-construction of the "eggshell stratum" or erection of safety devices on the "eggshell stratum" according to the geological parameters of the "eggshell stratum" when the existing offshore platform performs the "eggshell stratum" task, thereby improving the operating efficiency and safety of the offshore platform. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 is a flow chart of the pile shoe transformation method of the present invention;
[0037] Figure 2 is a flow chart of step S2 of the pile shoe transformation method of the present invention;
[0038] Figure 3 is a flow chart of step S22 of the pile shoe transformation method of the present invention;
[0039] Figure 4 is a flow chart of step S3 of the pile shoe transformation method of the present invention;
[0040] Figure 5 It is a structural diagram of the modified pile shoe of the present invention;
[0041] Figure 6 It is a cross-sectional structural diagram of the modified pile shoe of the present invention;
[0042] Figure 7 is a sectional side view of the modified pile shoe of the present invention;
[0043] Figure 8 is a top view of the pile shoe body;
[0044] Fig. 9 is a side view of the pile shoe body;
[0045] Fig.10 It is a simulation line diagram of an embodiment of the pile shoe transformation method of the present invention.
[0046] Description of Figure Numbers:
[0047] 100. Modify the pile boot;
[0048] 110. Pile shoe body; 111. Pile ring pipe;
[0049] 120. Extension module; 121. Pile driving pipeline; 122. Adjustment pipe. DETAILED DESCRIPTION
[0050] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0051] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only embodiment.
[0052] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.
[0053] Implementation Method 1
[0054] like Figure 1 As shown, the present invention provides a pile shoe modification method for modifying a pile shoe body 110 erected on a stratum, wherein the stratum includes a first stratum and a second stratum stacked up and down, and the puncture bearing capacity of the first stratum is greater than the puncture bearing capacity of the second stratum, and the pile shoe modification method includes:
[0055] Step S1: extending and designing the pile shoe body 110 to form a modified pile shoe 100 having a plurality of extension modules 120, wherein the area of the modified pile shoe 100 is the sum of the area of the pile shoe body 110 and the area of the plurality of extension modules 120;
[0056] Step S2: according to the maximum pre-compression force of the pile leg, obtaining the safe bearing capacity range of the first stratum to the transformation pile shoe 100, and based on the safe bearing capacity range, obtaining the area of the transformation pile shoe 100;
[0057] Step S3: According to the area of the modified pile shoe 100 and the area of the pile shoe body 110, the total area of the multiple expansion modules 120 is obtained. Based on the total area of the multiple expansion modules 120, the area and shape of each expansion module 120 are obtained, and the operation of expanding and modifying the pile shoe body 110 is completed.
[0058] The pile shoe modification method provided by the present invention is suitable for a formation environment in which the puncture bearing capacity of the first formation is greater than that of the second formation, which is commonly known as the "eggshell formation" in the field of drilling technology. In this formation environment, due to the difference in puncture bearing capacity between the first formation and the second formation, the existing platform pile shoes often experience the overall splitting of the first formation during the pile insertion process, causing the platform pile shoes to suddenly fall from the first formation to the second formation, which is a puncture phenomenon and is likely to cause casualties. The method extends the design of the pile shoe body 110, and the designed modified pile shoe 100 is combined with the enlarged bottom area, the second formation The bearing capacity of the first stratum given to the modified pile shoe 100 and the maximum pre-load force of the pile leg are balanced, so that the modified pile shoe can be safely erected on the first stratum, so that the safe bearing capacity range of the first stratum given to the modified pile shoe 100 by the modified pile shoe 100 is always greater than the maximum pre-load force of the pile leg, that is, during the pile insertion process of the pile shoe of the drilling platform, no matter how much working ballast force is applied to the first stratum by the drilling platform, the bearing capacity provided by the first stratum to the modified pile shoe 100 is always within the safety range of the first stratum, that is, the drilling platform can effectively achieve a safe and stable pile insertion process. At the same time, the modified pile shoe 100 also improves the structural stability of the first stratum during the pile insertion process of the pile shoe; it also effectively avoids the need to perform complex operations such as pre-construction of the "eggshell stratum" or erecting safety devices on the "eggshell stratum" according to the geological parameters of the "eggshell stratum" when the existing offshore platform performs the "eggshell stratum" task, thereby improving the operating efficiency of the offshore platform and also improving the safety of the offshore platform.
[0059] The puncture bearing capacity in this method is the upward bearing capacity provided by the stratum per unit area to the puncture object. The puncture bearing capacity of the first stratum is greater than that of the second stratum, that is, per unit area, there is a difference between the puncture bearing capacity of the first stratum and the puncture bearing capacity of the second stratum. This phenomenon forms an "eggshell stratum" structure that is hard on the top and soft on the bottom. The stratum environment in which this method can be applied can be that the soil of the first stratum is sandy soil and the soil of the second stratum is clay soil. In other embodiments, the soil of the first stratum and the soil of the second stratum can also be other soils with a difference in puncture bearing capacity. There is no specific limitation on the soil of the first stratum and the soil of the second stratum.
[0060] In step S1, in order to increase the safe bearing capacity range of the first stratum for the pile shoe, so that the drilling platform can be safely erected on the first stratum and stable and smooth pile insertion is achieved, it is first necessary to increase the overall area of the pile shoe, that is, to increase the bottom area of the pile shoe during the vertical downward pile insertion process (hereinafter referred to as the bottom area of the pile shoe is referred to as the area), so that the bearing capacity of the first stratum for the pile shoe is increased; in this embodiment, the area of the pile shoe body 110 is increased by adding an expansion module 120 to the outer side of the pile shoe body 110, so that the area of the designed modified pile shoe 100 is equal to the sum of the area of the pile shoe body 110 and the area of the expansion module 120; in this embodiment, the bottom shape of the modified pile shoe 100 is designed with reference to the bottom shape of the pile shoe body 110.
[0061] In step S2, the size of the modified pile shoe 100 is related to whether the offshore platform can safely complete the shoeing on the "eggshell formation". Therefore, in order to determine the size of the modified pile shoe 100 after adding the expansion module 120, this method determines the safe bearing capacity range of the first formation for the modified pile shoe 100 according to the maximum pre-compression force of the pile leg. The maximum pre-compression force of the pile leg is the maximum downward pressure force or the maximum structural support force that the pile leg can withstand. If it is higher than the maximum pre-compression force, the pile leg will be damaged. Therefore, the maximum pre-compression force of the pile leg of the existing offshore platform is fixed. The working value can be obtained by consulting the engineering documents of each offshore platform; in a specific embodiment, the maximum pre-compression force of the pile leg can be multiplied by a safety factor to obtain a bearing capacity, that is, a bearing capacity greater than the maximum pre-compression force of the pile leg is set as the safe bearing capacity, and a range greater than the safe bearing capacity value is set as the safe bearing capacity range, that is, when the bearing capacity of the first stratum given to the modified pile shoe 100 is greater than the safe bearing capacity, since the maximum pre-compression force of the pile leg on the first stratum is much smaller than the bearing capacity of the pile shoe given by the first stratum, the probability of the risk of puncture of the pile shoe is reduced. Specifically in this method, under the condition of satisfying the safe bearing capacity, the area of the modified pile shoe 100 can be determined by combining the safe bearing capacity range of the first stratum given to the pile shoe and the bearing capacity of the first stratum on the pile shoe.
[0062] In step S3, according to the area of the modified pile shoe 100 determined in step S2 and the area of the pile shoe body 110, the total area of the multiple extension modules 120, that is, the total bottom area of the multiple extension modules 120, can be obtained. At this time, according to the shape of the pile shoe body 110, the shape and area of each extension module 120 can be designed around the pile shoe body 110 according to the filling principle or other design principles in the design method, and finally each extension module 120 is installed on the periphery of the pile shoe body 110 to complete the modification operation of the pile shoe body 110; the modified pile shoe 100 after modification can achieve a smooth and safe pile insertion process because the pile shoe area is expanded while taking into account the safety bearing factor.
[0063] like Figure 2 As shown, in a specific implementation, step S2 includes:
[0064] Step S21: selecting a plurality of simulated pile shoes of different areas, and obtaining a plurality of simulated line diagrams of the pile insertion depth of the simulated pile shoe in the first stratum and the bearing capacity of the first stratum corresponding to the simulated pile shoe;
[0065] Step S22: selecting at least one simulation line diagram from a plurality of simulation line diagrams, wherein the minimum bearing capacity provided by the first stratum to the simulation pile shoe is within a safe bearing capacity range;
[0066] Step S23: setting the area of the simulated pile shoe corresponding to the simulation line diagram as the area of the modified pile shoe 100 .
[0067] Specifically, in this embodiment, before determining the area of the modified pile shoe 100, it is necessary to determine that the bearing capacity of the first stratum for the modified pile shoe 100 is within the safe bearing capacity range. Therefore, in step S21, by setting up a plurality of simulation pile shoes of different areas, the simulation pile shoes are simulated and measured respectively during the pile insertion process. As the depth of the simulation pile shoe into the mud increases, the change line diagram of the support force given to each simulation pile shoe by the first stratum, that is, the simulation line diagram, is obtained; Fig.10 As shown, the simulation line graph can be used as a reference for selecting the area of the modified pile shoe 100 .
[0068] In step S22, in this embodiment, the safe bearing capacity ranges corresponding to the simulated pile shoes of different areas can be calculated according to the different safety factors corresponding to the areas of different simulated pile shoes. In other embodiments, the safety factors corresponding to the areas of different simulated pile shoes are the same, that is, the safe bearing capacity ranges corresponding to the simulated pile shoes of different areas are also the same. In this embodiment, in the simulation line graph, according to the bearing capacity given by the first stratum to each simulated pile shoe and the safe bearing capacity range corresponding to the simulated pile shoe, at least one simulation line graph in which the bearing capacity of the simulated pile shoe given by the first stratum is always within the safe bearing capacity range is selected. In other embodiments, the simulation line graph with the smallest area of the simulated pile shoe can also be selected among the multiple simulated pile shoes in which the bearing capacity of the simulated pile shoe given by the first stratum is always within the safe bearing capacity range.
[0069] In step S23, the area of the simulated pile shoe can be set as the area of the modified pile shoe 100 according to the selected simulation line graph and the area of the corresponding simulated pile shoe. The first stratum corresponding to the area of the modified pile shoe 100 provides a supporting force to the modified pile shoe 100, which is always within the safe bearing capacity range, thereby enabling stable piling of the modified pile shoe 100.
[0070] like Figure 3 As shown, in a specific implementation, step S22 includes:
[0071] Step S221: determining the minimum safe bearing capacity according to the maximum preload force of the pile legs and the safety factor of the stratum;
[0072] Step S222: selecting at least one simulation line diagram in which the minimum bearing capacity provided by the first stratum to the simulated pile shoe is greater than the minimum safe bearing capacity.
[0073] In step S221, the minimum safe bearing capacity of the first stratum for the pile shoe is determined by the maximum pre-load force of the pile leg, that is, under the condition of the maximum pre-load force that the pile leg can withstand, as long as the bearing capacity of the first stratum for the pile shoe is greater than the minimum safe bearing capacity, the pile shoe can achieve stable pile insertion operation during the pile insertion process; in this method, the minimum safe bearing capacity needs to be calculated in combination with the formation safety factor, and the formation safety factor is a coefficient greater than "1" in this embodiment; in another embodiment, the formation safety factor can also be dynamically adjusted according to the size parameters of the pile shoe; in yet another embodiment, the coefficient obtained after multiple simulations can also be used as the formation safety factor. In a specific embodiment, the formation safety factor obtained by this method can be "1.5", and there is no limitation on the specific value of the formation safety factor obtained by this method.
[0074] In this embodiment, the maximum pre-compression force of the pile leg is multiplied by the safety factor of the formation to obtain a value greater than the maximum pre-compression force of the pile leg, and the value is converted into the minimum safe bearing capacity of the first formation on the pile shoe. Even in the case of the maximum pre-compression force applied by the pile leg to the formation, the bearing capacity that the first formation can provide to the pile shoe will not easily cause the pile shoe to puncture the first formation. In this embodiment, the calculation method of the minimum safe bearing capacity is as follows:
[0075] F1=A S ·q s
[0076] Among them, F1 is the minimum safe bearing capacity, kN; A S is the formation safety factor; q s is the maximum preload force of the pile leg, kN.
[0077] In step S222, each simulated pile shoe has a different size and area. Therefore, in the process of simulating the pile insertion of the simulated pile shoe into the first stratum, the bearing capacity of the first stratum on the simulated pile shoe is affected by the size and area of the simulated pile shoe. It is necessary to calculate the bearing capacity change line diagram of the first stratum on the simulated pile shoe according to the size parameters of the pile shoe and the depth of the pile shoe in the first stratum, that is, the simulation line diagram, and refer to Fig.10As shown, in this embodiment, among the simulation line graphs corresponding to multiple simulated pile shoes, at least one simulation line graph in which the minimum bearing capacity of the simulated pile shoe given by the first stratum is always greater than the minimum safe bearing capacity is selected. In other embodiments, a simulation line graph with the smallest simulated pile shoe area can also be selected.
[0078] In a specific embodiment, the formation safety factor is determined based on the undrained shear strength of the first formation, the undrained shear strength of the second formation, and the foundation width of the simulated pile shoe.
[0079] Specifically in this embodiment, the calculation method of the formation safety factor is as follows:
[0080]
[0081] Among them, A S is the formation safety factor; α is the first adjustment coefficient; B is the foundation width of the simulation pile shoe, m; S u1 is the undrained shear strength of the first stratum soil, t / m 2 ; S u2 is the undrained shear strength of the second stratum soil, t / m 2 .
[0082] In the present embodiment, the first adjustment coefficient is an adjustment parameter related to the size. In the present embodiment, the empirical parameter is determined through multiple simulation experiments. In other embodiments, the first adjustment coefficient can also be removed. After removal, the accuracy of the calculated structure is poor. In the present embodiment, the foundation width B of the simulation pile shoe is a size parameter of the simulation pile shoe. When the simulation pile shoe is a "circular" pile shoe, the foundation width B of the simulation pile shoe is the diameter. When the simulation pile shoe is a "rectangular" pile shoe, the foundation width B of the simulation pile shoe is the shortest side of the rectangle. In the present embodiment, the undrained shear strength is obtained by existing geological survey instruments.
[0083] In the calculation method of the formation safety factor of the present embodiment, the foundation width parameter of the simulated pile shoe is introduced. According to the design specifications of the pile shoe, the foundation width of the simulated pile shoe affects the area size of the simulated pile shoe. Therefore, in the calculation process of the simulated pile shoe, the foundation widths of simulated pile shoes of different areas are different, and the formation safety factors corresponding to the simulated pile shoes of different areas are also different, and thus the minimum safety bearing capacity corresponding to the simulated pile shoes of different areas is also different.
[0084] like Figure 4 As shown, in a specific implementation, step S3 includes:
[0085] Step S31: arranging a plurality of areas to be expanded on the circumference of the pile shoe body 110 while keeping the maximum width of the pile shoe body 110 unchanged;
[0086] Step S32: according to the total area of the plurality of expansion modules 120, setting the shape and area of the expansion modules 120 in each area to be expanded;
[0087] Step S33 : sequentially connecting the expansion modules 120 along the circumference of the pile shoe body 110 .
[0088] Specifically in this embodiment, the total area of the modified pile shoe 100 is obtained according to the total area of the simulated pile shoe determined in step S2. Therefore, the total area of the multiple extension modules 120 can be calculated according to the total area of the modified pile shoe 100 and the total area of the pile shoe body 110; and the pile shoe body 110 can be extended and designed according to the total area of the multiple extension modules 120.
[0089] In step S31, according to the feasibility design of the transformation, it is necessary to comprehensively consider the shape and effect of the pile shoe. In the present embodiment, the transformation of the pile shoe body 110 needs to ensure that the modified pile shoe 100 does not protrude from the hull in the port and starboard directions. Therefore, it is necessary to keep the maximum width of the modified pile shoe 100 the same as the maximum width of the pile shoe body 110 to avoid collision when entering and exiting the dock; at the same time, keeping the maximum width of the modified pile shoe 100 the same as the maximum width of the pile shoe body 110 is conducive to the folding of the pile shoe and avoids the mutual influence of adjacent pile shoes during the folding of the pile shoe. Keeping the maximum width of the modified pile shoe 100 the same as the maximum width of the pile shoe body 110 can improve the bearing capacity of the modified pile shoe 100 and reduce the risk of pile shoe puncture under the premise of the same diameter.
[0090] In this embodiment, for the modification scheme of the pile shoe body 110, it is preferred to determine the bottom surface of the modified pile shoe 100 as a rectangle. In other embodiments, the bottom surface of the modified pile shoe 100 can also be determined as a circle. The modification of the pile shoe body 110 can make full use of the shape of the pile shoe body 110, without reducing the strength of the pile shoe or increasing the height of the pile shoe. It is preferred to arrange the expansion module 120 on the peripheral side of the pile shoe body 110. In this embodiment, it is not necessary to strengthen the pile leg to reduce the design and modification risks. In this embodiment, multiple areas to be expanded are set on the peripheral side of the pile shoe body 110, and the shape and volume of the areas to be expanded correspond to the shape and volume of the expansion module 120. The bottom of the pile shoe body 110 cooperates with the bottom of the areas to be expanded to form a rectangular or circular bottom shape of the modified pile shoe 100. In a specific embodiment, the bottom of the pile shoe body 110 is hexagonal, and multiple areas to be expanded are arranged on the peripheral side of the pile shoe body 110 to fill the vacancy of the hexagon and form a rectangular bottom of the modified pile shoe 100.
[0091] In step S32, according to the total area of the plurality of expansion modules 120 and the location of each area to be expanded, the shape and area of each expansion module 120 to be expanded can be allocated to form the modified pile shoe 100 into a rectangle or a circle. In a specific embodiment, referring to Figure 5 As shown, the bottom of the pile shoe body 110 is hexagonal, and at least two areas to be expanded are arranged on the peripheral side of the pile shoe body 110. According to the total area of multiple expansion modules 120 and the determination that the modified pile shoe 100 is a rectangle with chamfered corners, an "inwardly concave" expansion module 120 is set on the outer side of the pile shoe body 110.
[0092] In step S33, refer to Figure 6 As shown, according to the determined shape and area of the expansion module 120 , after the production is completed, each expansion module 120 is sequentially connected to the peripheral side of the pile shoe body 110 along the circumference of the pile shoe body 110 to form a “rectangular” modified pile shoe 100 .
[0093] In a specific embodiment, the minimum bearing capacity q1 provided by the first stratum to the simulated pile shoe is calculated based on the bearing capacity coefficient N1 of the first stratum and the shape coefficient s of the simulated pile shoe. c , the foundation width B of the simulated pile shoe, the cohesion c of the soil, the effective buoyant density γ of the soil at the position of the simulated pile shoe, and the weight q0 of the backfill soil on the upper part of the simulated pile shoe.
[0094] In this embodiment, the parameters obtained from the previous geological survey can be directly used to calculate the bearing capacity of the first stratum to the simulated pile shoe. The specific formula is as follows:
[0095]
[0096] Among them, β is the second adjustment coefficient; is the third adjustment coefficient; σ is the fourth adjustment coefficient; N1 is the bearing capacity coefficient of the first formation; s c is the shape coefficient of the simulated pile shoe; γ is the effective buoyant density of the soil at the location of the simulated pile shoe, t / m 3 ; B is the foundation width of the simulation pile shoe, m; c is the cohesion of the soil, kPa; q0 is the weight of the backfill soil on the upper part of the simulation pile shoe, kPa; q1 is the bearing capacity of the first stratum on the simulation pile shoe, kN.
[0097] In this embodiment, the effective buoyancy density γ of the soil and the cohesion c of the soil are determined by existing geological survey instruments; in this embodiment, the weight q0 of the backfill soil on the upper part of the simulated pile shoe can be determined by referring to the characteristics of the first stratum; in this embodiment, the second adjustment coefficient β and the third adjustment coefficient is an adjustment parameter related to the first formation characteristic. In this embodiment, it is an empirical parameter determined through multiple simulation experiments. In other embodiments, the second adjustment coefficient β and the third adjustment coefficient may also be removed. After the calculation result is removed, the accuracy is poor. In a specific embodiment, the second adjustment coefficient β can be The third adjustment factor Can be In order to achieve a more accurate calculation of the bearing capacity q1 of the first stratum to the simulated pile shoe; in this embodiment, the fourth adjustment coefficient σ is an empirical parameter for adjusting the bearing capacity coefficient N1 of the first stratum, wherein, in this formula, the fourth adjustment coefficient σ needs to be empirically adjusted according to a specific calculation method.
[0098] In a specific embodiment, the bearing capacity coefficient of the first formation includes a first bearing capacity coefficient, a second bearing capacity coefficient and a third bearing capacity coefficient;
[0099] The first bearing capacity factor N c Determined by the foundation width B of the simulation pile shoe, the foundation length L of the simulation pile shoe, and the pile insertion depth d of the simulation pile shoe in the first stratum;
[0100] The second bearing capacity factor N q Determined by the internal friction angle of the soil;
[0101] The third bearing capacity factor N γ The second bearing capacity factor N q The internal friction angle of the soil is determined.
[0102] The pile shoe reconstruction method provided by the present invention converts the bearing capacity coefficient of the first stratum into a first bearing capacity coefficient, a second bearing capacity coefficient and a third bearing capacity coefficient. Compared with the table lookup method, the calculation is more accurate and the obtained value is more precise.
[0103] In this embodiment, the first bearing capacity coefficient N c It is related to the shape of the simulated pile shoe. In the embodiment where the simulated pile shoe is a "circular" pile shoe, the first bearing capacity coefficient N c The calculation of is as follows:
[0104]
[0105] Wherein, σ1 is the fifth adjustment coefficient; d is the insertion depth of the simulation pile shoe in the first stratum, m; B is the foundation width of the simulation pile shoe, m; N c is the first bearing capacity coefficient. In this embodiment, the fifth adjustment coefficient is determined according to calculation experience.
[0106] In the embodiment where the simulated pile shoe is a "rectangular" pile shoe, the first bearing capacity coefficient N cThe calculation of is as follows:
[0107]
[0108] Wherein, σ1 is the fifth adjustment coefficient; d is the insertion depth of the simulation pile shoe in the first stratum, m; B is the foundation width of the simulation pile shoe, m; L is the foundation length of the "rectangular" simulation pile shoe, m; N c is the first bearing capacity coefficient.
[0109] In this embodiment, the second bearing capacity coefficient N q Depending on the characteristics of the soil, the calculation of the second bearing capacity factor is as follows:
[0110]
[0111] Among them, N q is the second bearing capacity coefficient; is the internal friction angle of the first formation, °.
[0112] In this embodiment, the third bearing capacity coefficient N γ The characteristics of the soil and the second bearing capacity factor N q The third bearing capacity factor N γ The calculation of is as follows:
[0113]
[0114] Among them, N γ is the third bearing capacity coefficient; N q is the second bearing capacity coefficient; is the internal friction angle of the first formation, °.
[0115] In the above embodiment, the internal friction angle of the soil of the first stratum and the second bearing capacity coefficient N can be obtained by using existing geological survey instruments. q and the third bearing capacity factor N γ It can be obtained according to the above formula. In other embodiments, it can also be obtained by referring to the industry standard SY / T 10030. However, the accuracy of data obtained by looking up the industry standard table is poor.
[0116] In a specific embodiment, the shape coefficient is composed of the base width B of the simulated pile shoe, the base length L of the simulated pile shoe, the first bearing capacity coefficient N c , and the second bearing capacity factor N q Sure.
[0117] The pile shoe modification method provided by the present invention is to modify the shape coefficient s c Converted into the foundation width B of the simulation pile shoe, the foundation length L of the simulation pile shoe, and the first bearing capacity coefficient N c , and the second bearing capacity factor Nq Determined together, taking into account the shapes and sizes of different pile shoes, compared to the fixed shape factor s c , the calculation is more accurate and the obtained value is more precise.
[0118] In this embodiment, the shape coefficient s of the simulation pile shoe is c The shape coefficient s of the simulated pile shoe is determined by referring to the shape of the simulated pile shoe. c The calculation of is as follows:
[0119]
[0120] Among them, s c is the shape coefficient of the simulation pile shoe; N q is the second bearing capacity coefficient; N c is the first bearing capacity coefficient; L is the foundation length of the “rectangular” simulation pile shoe, m; B is the foundation width of the simulation pile shoe, m.
[0121] In a specific embodiment, the weight of the backfill soil on the upper part of the simulated pile shoe is determined by the effective buoyancy density γ of the soil at the position of the simulated pile shoe and the pile insertion depth d of the simulated pile shoe in the first stratum.
[0122] In this embodiment, the weight q0 of the backfill soil on the upper part of the simulated pile shoe is calculated as follows:
[0123] q0=γd
[0124] Where γ is the effective buoyancy density of the soil at the location of the simulated pile shoe, t / m 3 ; q0 is the weight of the backfill soil on the upper part of the simulation pile shoe, kPa; d is the pile insertion depth of the simulation pile shoe in the first stratum, m.
[0125] Implementation Method 2
[0126] like Figures 5 to 9 As shown, the present invention further provides a pile shoe modification 100, using any of the pile shoe modification methods described above, the pile shoe modification 100 comprises:
[0127] A pile shoe body 110, and a plurality of expansion modules 120 arranged on the periphery of the pile shoe body 110, wherein the plurality of expansion modules 120 are arranged within the maximum width range of the pile shoe body 110, and the expansion modules 120 are independent sealed cavities;
[0128] The expansion module 120 is provided with a pile driving pipeline 121 and an adjustment pipe 122 . The pile driving pipeline 121 is connected to the pile driving ring pipe 111 of the pile shoe body 110 through the adjustment pipe 122 . One end of the pile driving pipeline 121 is opened on the side wall of the expansion module 120 .
[0129] The modified pile shoe 100 provided in the present embodiment increases the bottom area of the modified pile shoe 100 by means of a plurality of expansion modules 120 arranged on the periphery of the pile shoe body 110, that is, increases the bearing capacity of the first stratum on the modified pile shoe 100, and avoids the problem of the modified pile shoe 100 puncturing the first stratum. At the same time, a plurality of expansion modules 120 are arranged within the maximum width range of the pile shoe body 110, that is, the plurality of expansion modules 120 do not exceed the maximum width setting of the pile shoe body 110, which can avoid collision of the pile shoe when entering and exiting the dock, and is beneficial to avoid mutual influence of adjacent pile shoes when the pile shoe is folded. At the same time, the bearing capacity of the first stratum on the modified pile shoe 100 can be increased without increasing the width size of the modified pile shoe 100, and the risk of puncture can also be effectively reduced.
[0130] A pile driving pipeline 121 is provided in the expansion module 120 of the present embodiment. By setting the opening of the pile driving pipeline 121 on the side wall of the expansion module 120, the pile driving pipeline 121 is facilitated to spray the soil on the outer peripheral side of the modified pile shoe 100, thereby effectively reducing the friction of the soil of the first formation on the modified pile shoe 100, and facilitating the removal of the modified pile shoe 100 from the seabed.
[0131] Specifically, in this embodiment, refer to Figure 6 As shown, an adjustment tube 122 is provided in the expansion module 120, one end of the adjustment tube 122 is used to connect the pile driving ring tube 111 in the pile shoe body 110, and the other end of the adjustment tube 122 is used to connect the pile driving pipeline 121 in the expansion module 120. In this embodiment, one end of the pile driving pipeline 121 is opened on the side wall of the expansion module 120, and is used to spray the pile driving fluid outward from the side of the modified pile shoe 100. In this embodiment, the pile driving pipeline 121 is arranged around the circumference of the modified pile shoe 100. In other embodiments, the pile driving pipeline 121 can also be arranged along the radial direction of the modified pile shoe 100. In this embodiment, the expansion module 120 is an independent sealed cavity, and multiple expansion modules 120 are independently arranged to reduce the overall weight of the modified pile shoe 100 and avoid excessive maximum pre-load force on the pile leg. At the same time, during the pile insertion process, seawater can be poured into the expansion module 120 to control the ballast force while reducing the center of gravity of the modified pile shoe 100 to ensure stability.
[0132] It should be understood that in the various embodiments of this document, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this document.
[0133] It should also be understood that in the embodiments of this article, the term "and / or" is only a description of the association relationship of the associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0134] Specific embodiments are used in this article to illustrate the principles and implementation methods of this article. The description of the above embodiments is only used to help understand the methods and core ideas of this article. At the same time, for general technicians in this field, according to the ideas of this article, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on this article.
Claims
1. A pile shoe modification method, characterized in that: The method for modifying a pile shoe body erected on a stratum includes a first stratum and a second stratum stacked up and down, the puncture bearing capacity of the first stratum is greater than the puncture bearing capacity of the second stratum, and the pile shoe modification method includes: Step S1: performing an expansion design on the pile shoe body to form a modified pile shoe having a plurality of expansion modules, wherein the area of the modified pile shoe is the sum of the area of the pile shoe body and the areas of the plurality of expansion modules; Step S2: obtaining the safe bearing capacity range of the first stratum to the modified pile shoe according to the maximum pre-compression force of the pile leg, and obtaining the area of the modified pile shoe based on the safe bearing capacity range; Step S3: According to the area of the modified pile shoe and the area of the pile shoe body, the total area of the multiple expansion modules is obtained, and based on the total area of the multiple expansion modules, the area and shape of each expansion module are obtained, and the operation of expanding and modifying the pile shoe body is completed.
2. The pile shoe modification method according to claim 1, characterized in that: The step S2 comprises: Step S21: selecting a plurality of simulation pile shoes of different areas, and obtaining a plurality of simulation line diagrams of the pile insertion depth of the simulation pile shoe in the first stratum and the corresponding bearing capacity of the first stratum provided to the simulation pile shoe; Step S22: selecting at least one simulation line diagram from the plurality of simulation line diagrams, wherein the minimum bearing capacity provided by the first stratum to the simulation pile shoe is within the safe bearing capacity range; Step S23: setting the area of the simulated pile shoe corresponding to the simulation line graph as the area of the modified pile shoe.
3. The pile shoe modification method according to claim 2, characterized in that: The step S22 comprises: Determine the minimum safe bearing capacity according to the maximum preload force of the pile legs and the safety factor of the stratum; At least one simulation line diagram is selected in which the minimum bearing capacity provided by the first stratum to the simulation pile shoe is greater than the minimum safe bearing capacity.
4. The pile shoe modification method according to claim 3, characterized in that: The formation safety factor is determined according to the undrained shear strength of the first formation, the undrained shear strength of the second formation, and the foundation width of the simulated pile shoe.
5. The pile shoe modification method according to claim 1, characterized in that: The step S3 comprises: Under the condition that the maximum width of the pile shoe body remains unchanged, a plurality of areas to be expanded are arranged on the circumference of the pile shoe body; According to the total area of the plurality of expansion modules, the shape and area of the expansion modules in each of the to-be-expanded areas are set; The expansion modules are connected in sequence along the circumference of the pile shoe body.
6. The pile shoe modification method according to claim 2, characterized in that: The minimum bearing capacity provided by the first stratum to the simulated pile shoe is determined based on the bearing capacity coefficient of the first stratum, the shape coefficient of the simulated pile shoe, the foundation width of the simulated pile shoe, the cohesion of the soil, the effective buoyant density of the soil at the position of the simulated pile shoe, and the weight of the backfill soil on the upper part of the simulated pile shoe.
7. The pile shoe modification method according to claim 6, characterized in that: The bearing capacity coefficient of the first formation includes a first bearing capacity coefficient, a second bearing capacity coefficient and a third bearing capacity coefficient; The first bearing capacity coefficient is determined by the foundation width of the simulation pile shoe, the foundation length of the simulation pile shoe, and the pile insertion depth of the simulation pile shoe in the first stratum; The second bearing capacity coefficient is determined by the internal friction angle of the soil; The third bearing capacity coefficient is determined by the second bearing capacity coefficient and the internal friction angle of the soil.
8. The pile shoe modification method according to claim 7, characterized in that: The shape coefficient is determined by the base width of the simulated pile shoe, the base length of the simulated pile shoe, the first bearing capacity coefficient, and the second bearing capacity coefficient.
9. The pile shoe modification method according to claim 6, characterized in that: The weight of the backfill soil on the upper part of the simulation pile shoe is determined by the effective buoyancy density of the soil at the position of the simulation pile shoe and the insertion depth of the simulation pile shoe in the first stratum.
10. A modified pile shoe, characterized in that: The pile shoe is formed by the pile shoe modification method according to any one of claims 1 to 9, wherein the modified pile shoe comprises: A pile shoe body, and a plurality of expansion modules arranged on the periphery of the pile shoe body, wherein the plurality of expansion modules are arranged within the maximum width range of the pile shoe body, and the expansion modules are independent sealed cavities; The expansion module is provided with a pile punching pipeline and an adjustment pipe, the pile punching pipeline is connected with the pile punching ring pipe of the pile shoe body through the adjustment pipe, and one end opening of the pile punching pipeline is arranged on the side wall of the expansion module.