Prefabricated laminated slab and construction method thereof
Patent Information
- Application Number
- CN202411409308.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-26
AI Technical Summary
Traditional prefabricated plates are inefficient in bundling steel bars during production, resulting in a long production cycle and the inability to ensure the safety and stability of the building structure.
Using a staggered vertically arranged transverse reinforced cage frame and a longitudinal reinforced cage frame, the integral reinforced cage frame is formed through the triangular structure of the first support member and the second support member, and the reinforced bars are bundled at the intersection to simplify the steel bar connection process.
It reduces manual operation of steel bar bundling, improves construction efficiency and bending resistance, shortens construction cycles, and reduces transportation and labor costs.
Smart Images

Figure CN119021406A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a prefabricated composite board and a construction method thereof. Background Art
[0002] Composite floor slabs are assembled integral floor slabs made of precast panels and cast-in-place reinforced concrete layers. Precast panels are not only one of the components of the floor structure, but also the permanent formwork of the cast-in-place reinforced concrete superimposed layer. Horizontal equipment pipelines can be laid in the cast-in-place superimposed layer. Composite floor slabs have good integrity and high rigidity, which can save formwork. In addition, the upper and lower surfaces of the panels are flat, which is convenient for finishing layer decoration. They are suitable for high-rise buildings and large-span buildings with high requirements for overall rigidity. When making traditional precast panels, it is necessary to first tie up steel bars, build formwork, and then pour concrete. After forming, the formwork is removed. However, manual tying of steel bars is inefficient and takes a long time. In addition, it is difficult to control the overlap method, length, position and tying method when tying steel bars manually, and the safety and stability of the building structure cannot be ensured.
[0003] At present, the authorization announcement number CN213766357U discloses a prefabricated fixed mold composite plate, in which the steel mesh is connected into a mesh by a plurality of transverse steel bars and a plurality of longitudinal steel bars arranged perpendicular to each other, and the intersections of the transverse steel bars and the longitudinal steel bars are welded and fixed; by welding the transverse and longitudinal steel bars instead of steel bar bundling, this structure can improve the connection speed and load-bearing capacity to a certain extent, but multi-point welding also requires manual point-by-point operation, and welding also requires cleaning of the steel bar surface in advance, and the overall production cycle of the pre-supported plate is relatively long. Summary of the invention
[0004] The purpose of the present invention is to solve the problem of slow steel bar bundling in existing prefabricated panels, which leads to a long prefabricated panel production cycle, and to provide a construction method for prefabricated composite panels, which can shorten the construction period, reduce transportation costs and formwork support losses.
[0005] To achieve the above object, the present invention adopts the following technical scheme: a prefabricated composite slab, comprising concrete, a plurality of transverse steel cages and a plurality of longitudinal steel cages, the transverse steel cages and the longitudinal steel cages are arranged vertically and staggered, and steel bars are used for tying at the intersection of the transverse steel cages and the longitudinal steel cages;
[0006] The transverse steel bar cage comprises a first fixing rib, a second fixing rib, a force-bearing rib and a first supporting member arranged in the transverse direction, wherein the first fixing rib and the second fixing rib are parallelly arranged at the bottom, and form a triangular structure with the force-bearing rib located at the upper ends of the first fixing rib and the second fixing rib, the first supporting member is triangular, and the top of the triangular member is respectively connected to the first fixing rib, the second fixing rib and the force-bearing rib, and the first supporting member is multiple and evenly spaced on the first fixing rib, the second fixing rib and the force-bearing rib;
[0007] The longitudinal steel bar cage includes a first supporting rib, a second supporting rib, a connecting rib and a second supporting member arranged along the longitudinal direction, wherein the first supporting rib and the second supporting rib are laid in parallel on the first fixing rib and the second fixing rib, and form an inverted triangle structure with the connecting rib located at the lower ends of the first supporting rib and the second supporting rib, the second supporting member is triangular, and its triangular top end is respectively connected to the first supporting rib, the second supporting rib and the connecting rib, and there are multiple second supporting members, which are evenly distributed on the first supporting rib, the second supporting rib and the connecting rib.
[0008] Furthermore, the first supporting member or the second supporting member includes three annular sleeves and two connecting rods connected between the annular sleeves, and the two connecting rods are symmetrically distributed.
[0009] Furthermore, at least one of the three annular sleeves is provided with a bearing ring, which is mounted on the inner wall of the annular sleeve and is concentrically arranged with the annular sleeve, and the bearing ring is installed in the annular sleeve at the top or bottom end.
[0010] Furthermore, the first supporting member and the second supporting member are arranged opposite to each other, and the spacing between them is distributed in the concrete.
[0011] Furthermore, the first supporting member is located between the first supporting rib and the second supporting rib, and the second supporting member is located between the first fixing rib and the second fixing rib.
[0012] Furthermore, the spacing between the first supporting mechanisms is the same as the spacing between the first fixing ribs and the second fixing ribs.
[0013] The present invention also discloses a construction method of a prefabricated composite board, comprising the following steps:
[0014] S1. Use multiple first supporting mechanisms to sleeve the first fixed ribs, the second fixed ribs and the force-bearing ribs into a whole, and keep the spacing of each first supporting mechanism the same as the spacing between the first fixed ribs and the second fixed ribs, to make multiple parallel horizontal steel bar cages;
[0015] S2, using a plurality of second supporting mechanisms to sleeve the first supporting rib and the first connecting rib, placing the sleeved whole on the first fixing rib and the second fixing rib, and then passing the second supporting rib through the plurality of second supporting mechanisms in sequence to form a longitudinal steel bar cage, wherein the second supporting rib is also located on the first fixing rib and the second fixing rib, and the first supporting member is located between the first supporting rib and the second supporting rib, and a plurality of longitudinal steel bar cages are made in parallel;
[0016] S3, tie the cross points of the transverse steel cage and the longitudinal steel cage with steel bars, and hoist and place them in the mold;
[0017] S4. Clean the base of the construction site, measure and lay out the lines, and lay out the lifting equipment and supporting formwork;
[0018] S5. Hoist the frame consisting of the transverse steel cage and the longitudinal steel cage and place it in the formwork, clean the surface and then pour the concrete;
[0019] S6. Concrete curing and formwork removal: water the concrete in time within 12 hours after pouring to keep the surface moist, and cover it with cotton felt or quilt. Remove the formwork for acceptance after forming.
[0020] The beneficial effects of the present invention are:
[0021] 1) The present invention uses the first supporting member to form a triangular whole with the first fixing rib, the second fixing rib and the force-bearing rib, so that a steel cage can be formed without steel bar bundling. Similarly, the second member and the first supporting rib, the second supporting rib and the connecting rib form a steel cage as a whole, which not only provides the prefabricated beam with anti-bending performance, but also reduces steel bar bundling, reduces labor costs and improves construction efficiency.
[0022] 2) The present invention designs at least one bearing ring in the annular sleeve, so that the two connecting rods can rotate freely relative to the annular sleeve, and the spacing between the steel bars sleeved therewith can be adjusted. At the same time, it is also convenient for storage and transportation, thereby improving transportation efficiency and reducing transportation costs.
[0023] 3) Compared with traditional steel bar bundling, the present invention adopts a large number of first supporting members and second supporting members for connection, which improves the connection efficiency of the steel cage frame. Steel bar bundling reinforcement is only performed at the intersection of the horizontal and vertical cage frames, which can effectively shorten the construction period and save labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention.
[0025] Figure 2 It is a top view of the present invention.
[0026] Figure 3 It is a side view of the present invention.
[0027] Figure 4 This is a schematic diagram of the structure of the steel cage.
[0028] Figure 5 for Figure 4 Enlarged view of part A in .
[0029] Figure 6 It is a process flow chart of the construction method of the present invention.
[0030] In the figure: 1. concrete; 2. transverse steel cage; 3. longitudinal steel cage; 4. first fixing rib; 5. second fixing rib; 6. force-bearing rib; 7. first supporting member; 8. first supporting rib; 9. second supporting rib; 10. connecting rib; 11. second supporting member; 12. annular sleeve; 13. connecting rod; 14. bearing ring. DETAILED DESCRIPTION
[0031] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments.
[0032] Example: Figure 1-5 As shown, a prefabricated composite slab according to the present invention comprises concrete 1, a plurality of transverse steel cages 2 and a plurality of longitudinal steel cages 3, wherein the transverse steel cages 2 and the longitudinal steel cages 3 are arranged vertically and staggered, and steel bars are used for bundling at the intersections of the transverse steel cages 2 and the longitudinal steel cages 3;
[0033] The transverse reinforcement cage 2 includes a first fixing rib 4, a second fixing rib 5, a stress-bearing rib 6 and a first supporting member 7 arranged in the transverse direction, wherein the first fixing rib 4 and the second fixing rib 5 are parallelly located at the bottom, and form a triangular structure with the stress-bearing rib 6 located at the upper ends of the first fixing rib 4 and the second fixing rib 5, the first supporting member 7 is triangular, and the top of the triangle is respectively connected to the first fixing rib 4, the second fixing rib 5 and the stress-bearing rib 6, and there are multiple first supporting members 7, which are evenly spaced and distributed on the first fixing rib 4, the second fixing rib 5 and the stress-bearing rib 6;
[0034] The longitudinal steel bar cage 3 includes a first supporting rib 8, a second supporting rib 9, a connecting rib 10 and a second supporting member 11 arranged along the longitudinal direction, wherein the first supporting rib 8 and the second supporting rib 9 are laid in parallel on the first fixing rib 4 and the second fixing rib 5, and form an inverted triangle structure with the connecting rib 10 located at the lower ends of the first supporting rib 8 and the second supporting rib 9, the second supporting member 11 is triangular, and its triangular top end is respectively connected to the first supporting rib 8, the second supporting rib 9 and the connecting rib 10, and there are multiple second supporting members 11, which are evenly spaced and distributed on the first supporting rib 8, the second supporting rib 9 and the connecting rib 10.
[0035] The first supporting member 7 or the second supporting member 11 includes three annular sleeves 12 and two connecting rods 13 connected between the annular sleeves 12 , and the two connecting rods 13 are symmetrically distributed; the first supporting member 7 and the second supporting member 11 are arranged opposite to each other, and the spacing is distributed in the concrete 1 .
[0036] At least one of the three annular sleeves 12 is provided with a bearing ring 14 , which is mounted on the inner wall of the annular sleeve 12 and is concentrically arranged with the annular sleeve 12 . The bearing ring 14 is installed in the annular sleeve 12 at the top or bottom.
[0037] The first supporting member 7 is located between the first supporting rib 8 and the second supporting rib 9 , and the second supporting member 11 is located between the first fixing rib 4 and the second fixing rib 5 ; the spacing of the first supporting mechanism is the same as the spacing of the first fixing rib 4 and the second fixing rib 5 .
[0038] like Figure 6 As shown, the present invention discloses a construction method of a prefabricated composite panel, comprising the following steps:
[0039] S1, using a plurality of first supporting mechanisms to sleeve the first fixing rib 4, the second fixing rib 5 and the force-bearing rib 6 into a whole, and keeping the spacing of each first supporting mechanism the same as the spacing of the first fixing rib 4 and the second fixing rib 5, to make a plurality of parallel horizontal reinforcement cages 2;
[0040] S2, using a plurality of second supporting mechanisms to sleeve the first supporting rib 8 and the first connecting rib 10, placing the sleeved whole on the first fixing rib 4 and the second fixing rib 5, and then passing through the plurality of second supporting mechanisms in sequence through the second supporting rib 9 to form a longitudinal steel bar cage 3, wherein the second supporting rib 9 is also located on the first fixing rib 4 and the second fixing rib 5, and the first supporting member 7 is located between the first supporting rib 8 and the second supporting rib 9, and a plurality of longitudinal steel bar cages 3 are made in parallel;
[0041] S3, the intersection of the transverse steel cage 2 and the longitudinal steel cage 3 is tied with steel bars, and hoisted and placed in the mold;
[0042] S4. Clean the base of the construction site, measure and lay out the lines, and lay out the lifting equipment and supporting formwork;
[0043] S5, hoisting the frame consisting of the transverse steel cage 2 and the longitudinal steel cage 3 and placing it in the formwork, and pouring concrete 1 after cleaning the surface;
[0044] S6. Concrete 1 curing and formwork removal: water the concrete 1 in time within 12 hours after pouring to keep the surface moist, and cover it with cotton felt or quilt. Remove the formwork for acceptance after forming.
[0045] Working principle:
[0046] like Figure 4 and Figure 5 As shown, the first fixing rib 4, the second fixing rib 5 and the force-bearing rib 6 are combined into a triangular whole by the first supporting member 7, and a steel cage can be formed without steel bar bundling. Similarly, the second member and the first supporting rib 8, the second supporting rib 9 and the connecting rib 10 form a steel cage as a whole, which not only provides the precast beam with anti-bending performance, but also reduces steel bar bundling, reduces labor costs, and improves construction efficiency.
[0047] At least one bearing ring 14 is designed in the annular sleeve 12, so that the two connecting rods 13 can rotate freely relative to the annular sleeve 12, and the distance between the steel bars connected thereto can be adjusted. At the same time, it is also convenient for storage and transportation, thereby improving transportation efficiency and reducing transportation costs.
[0048] Compared with the traditional steel bar bundling, a large number of first support members 7 and second support members 11 are used for connection, which improves the connection efficiency of the steel cage frame. The steel bar bundling reinforcement is only performed at the intersection of the horizontal and vertical cage frames, which can effectively shorten the construction period and save labor costs. The present invention improves the bending and shear resistance of the prefabricated composite plate by bundling a triangular horizontal steel bar cage frame and a longitudinal steel bar cage frame. A single steel bar cage frame uses the first support member and the second support member for quick socketing, and manual bundling is required point by point, which not only shortens the construction period and improves the construction efficiency, but also reduces the transportation cost and support loss.
[0049] The above description is only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in this field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.
Claims
1. A prefabricated composite panel, characterized in that: It comprises concrete (1), a plurality of transverse steel cages (2) and a plurality of longitudinal steel cages (3), wherein the transverse steel cages (2) and the longitudinal steel cages (3) are arranged vertically and staggered, and steel bars are used for bundling at the intersections of the transverse steel cages (2) and the longitudinal steel cages (3); The transverse steel bar cage (2) comprises a first fixing rib (4), a second fixing rib (5), a force-bearing rib (6) and a first supporting member (7) arranged in the transverse direction, wherein the first fixing rib (4) and the second fixing rib (5) are located parallel to each other at the bottom, and form a triangular structure with the force-bearing rib (6) located at the upper ends of the first fixing rib (4) and the second fixing rib (5), and the first supporting member (7) is triangular, and the top of the triangle is respectively connected to the first fixing rib (4), the second fixing rib (5) and the force-bearing rib (6), and the first supporting member (7) is a plurality of first supporting members (7) which are evenly spaced and distributed on the first fixing rib (4), the second fixing rib (5) and the force-bearing rib (6); The longitudinal steel bar cage (3) comprises a first supporting rib (8), a second supporting rib (9), a connecting rib (10) and a second supporting member (11) arranged in the longitudinal direction, wherein the first supporting rib (8) and the second supporting rib (9) are laid in parallel on the first fixing rib (4) and the second fixing rib (5), and form an inverted triangle structure with the connecting rib (10) located at the lower ends of the first supporting rib (8) and the second supporting rib (9); the second supporting member (11) is triangular, and its triangular top end is respectively connected to the first supporting rib (8), the second supporting rib (9) and the connecting rib (10); and the second supporting member (11) is a plurality of members, which are evenly spaced and distributed on the first supporting rib (8), the second supporting rib (9) and the connecting rib (10).
2. A prefabricated composite panel according to claim 1, characterized in that: The first supporting member (7) or the second supporting member (11) comprises three annular sleeves (12) and two connecting rods (13) connected between the annular sleeves (12), and the two connecting rods (13) are symmetrically distributed.
3. A prefabricated composite panel according to claim 2, characterized in that: At least one of the three annular sleeves (12) is provided with a bearing ring (14), which is mounted on the inner wall of the annular sleeve (12) and is arranged concentrically with the annular sleeve (12), and the bearing ring (14) is installed in the annular sleeve (12) at the top end or the bottom end.
4. The prefabricated composite panel according to claim 1, characterized in that: The first supporting member (7) and the second supporting member (11) are arranged opposite to each other and are spaced apart from each other in the concrete (1).
5. The prefabricated composite panel according to claim 1, characterized in that: The first supporting member (7) is located between the first supporting rib (8) and the second supporting rib (9), and the second supporting member (11) is located between the first fixing rib (4) and the second fixing rib (5).
6. The prefabricated composite panel according to claim 1, characterized in that: The spacing between the first supporting mechanisms is the same as the spacing between the first fixing ribs (4) and the second fixing ribs (5).
7. A construction method using a prefabricated composite panel as claimed in any one of claims 1 to 6, characterized in that: The following steps are involved: S1, using a plurality of first supporting mechanisms to sleeve the first fixing ribs (4), the second fixing ribs (5) and the force-bearing ribs (6) into a whole, and keeping the spacing of each first supporting mechanism the same as the spacing between the first fixing ribs (4) and the second fixing ribs (5), to make a plurality of parallel horizontal reinforcement cages (2); S2, using a plurality of second supporting mechanisms to sleeve the first supporting rib (8) and the first connecting rib (10), placing the sleeved whole on the first fixing rib (4) and the second fixing rib (5), and then passing the second supporting rib (9) through the plurality of second supporting mechanisms in sequence to form a longitudinal steel bar cage (3), wherein the second supporting rib (9) is also located on the first fixing rib (4) and the second fixing rib (5), and the first supporting member (7) is located between the first supporting rib (8) and the second supporting rib (9), so as to manufacture a plurality of longitudinal steel bar cages (3) arranged in parallel; S3, tying the cross points of the transverse steel cage (2) and the longitudinal steel cage (3) with steel bars, and hoisting and placing them in the mold; S4. Clean the base of the construction site, measure and lay out the lines, and lay out the lifting equipment and supporting formwork; S5, hoisting and placing the frame consisting of the transverse steel cage (2) and the longitudinal steel cage (3) in the formwork, cleaning the surface and pouring the concrete (1); S6. Concrete (1) curing and formwork removal. Within 12 hours after pouring concrete (1), water the surface to keep it moist and cover it with cotton felt or quilt. After forming, remove the formwork for acceptance.