Underground assembly type prefabricated steel bar truss prestress double-T-plate structure and construction method thereof

By adopting prefabricated steel bar truss prestressed double T-plate structure in the underground garage, combining frame columns and overlapping beams, the problems of small size, difficulty in lifting and low load-bearing capacity in the prior art are solved, and the structure is efficient. Good construction effect with earthquake resistance.

CN119021416APending Publication Date: 2024-11-26QINGDAO TENGYUAN DESIGN ACCOUNTANTS CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411456115.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The construction method of existing underground garages is the problem of small size, large number, difficulty in lifting, small load-bearing capacity, low construction efficiency, easy cracking after reverse arching, poor integrity, and inability to meet seismic resistance needs.

Method used

Adopt underground prefabricated prefabricated steel bar truss prestressed double T-plate structure, including prefabricated steel bar truss prestressed double T-plate, frame column, support overlapping beam and longitudinal overlapping beam. The vertical load-bearing structure is formed through the frame column and longitudinal overlapping beam is formed. It forms a horizontal load-bearing structure with the support overlapping beams, and combines cast-in-place concrete to form an integral structure to improve integrity and load capacity.

Benefits of technology

Improves the integrity and reliability of the structure, improves construction efficiency and load capacity, is suitable for underground prefabricated buildings, meets the needs of large spans and earthquake resistance, simplifies the use of connecting structures and materials, and is suitable for large span structures such as underground garages and bridges. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021416A_ABST
    Figure CN119021416A_ABST
Patent Text Reader

Abstract

The invention discloses an underground assembly type prefabricated steel bar truss prestressed double-T plate structure and a construction method thereof.The double-T plate structure comprises a prefabricated steel bar truss prestressed double-T plate, a frame column, a supporting superposed beam and a longitudinal superposed beam, the double-T plate comprises two T-shaped ribs, and prestressed steel bars are arranged in the T-shaped ribs; the adjacent double-T plates are connected through additional steel bars at the abutted seam positions; the double-T plate is supported on the supporting superposed beam and is connected through the connecting steel plate; bottom ribs and waist ribs are arranged in the supporting superposed beams and the longitudinal superposed beams, and top ribs are located in the superposed layers. The vertical steel bars of the frame columns and the stirrups are bound into a whole; the superposed beam steel bars extend into and are anchored in the frame columns; the double-T plates, the supporting superposed beams, the longitudinal superposed beams and the columns are connected into a whole through the superposed layers, and concrete is poured at the positions of the frame columns and the superposed layers. The integrality and reliability of the structure body are improved, the construction efficiency and the loading capacity are improved, and the structure is suitable for underground fabricated buildings and large-span structures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of engineering technology, and in particular relates to an underground assembled prefabricated steel truss prestressed double T-plate structure and a construction method thereof. Background Art

[0002] With the large-scale development and construction of urban underground space, underground prefabricated buildings have also achieved rapid development. In order to improve the operating efficiency and benefits of underground land, for example, the horizontal space of underground garages is increasing.

[0003] At present, conventional underground garages mostly adopt a fully cast-in-place construction method, which has obvious shortcomings in terms of construction efficiency and environmental benefits. Prefabricated assembly technology is the main technical direction to solve the above problems, improve construction efficiency and improve environmental benefits.

[0004] However, in the existing technology, the mainstream prefabrication and assembly technology is mainly aimed at above-ground structures, and there are many shortcomings such as small size, large number and troublesome hoisting of prefabricated components, which leads to limited positive effects in improving construction efficiency and improving environmental benefits. There are also some prefabrication and assembly technologies that use large prefabricated double T-plates to better solve the problems of assembly efficiency and large loads. However, since the horizontal top plates of the double T-plates are mostly insufficiently rigid or require more prestressed steel bars, they are prone to cracking after the reverse arch. In addition, since the double T-plates without overlapping layers have poor integrity, they cannot meet various calculations under earthquake action. Summary of the invention

[0005] The purpose of the present invention is to provide an underground assembled prefabricated steel truss prestressed double T-plate structure and a construction method thereof, so as to solve the problems existing in the prior art, such as small size, large number, difficult hoisting, difficulty in applying to underground assembled buildings, small bearing capacity, low construction efficiency, easy cracking after arching, poor integrity, and inability to meet earthquake resistance requirements; so that the structure can improve the integrity and reliability of the main body, improve construction efficiency and load capacity, be suitable for underground assembled buildings, and be suitable for large-span structures.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions: In a first aspect, the present invention provides an underground assembled prefabricated steel truss prestressed double T-plate structure, comprising a prefabricated steel truss prestressed double T-plate, a frame column, a supporting composite beam and a longitudinal composite beam, wherein the prefabricated steel truss prestressed double T-plate comprises two T-shaped ribs and a horizontal top plate, wherein the interior of the T-shaped rib is provided with prestressed steel bars; the two T-shaped ribs are arranged side by side and connected to the horizontal top plate as a whole to form a double T-shaped structure; the prefabricated steel truss prestressed double T-plate is provided with at least two and arranged side by side; the adjacent prefabricated steel truss prestressed double T-plates are connected at the joint position by additional connecting steel bars, a top plate pad and a composite layer; The frame columns are configured as vertical components, and there are four of them; the four frame columns are respectively arranged at the four corner positions of a rectangle; the frame columns are provided with column vertical steel bars and column stirrups inside, and the column vertical steel bars are tied by the column stirrups; the supporting composite beams are configured as transverse components, and there are two of them; the prefabricated steel truss prestressed double T-plate is connected to the bottom of the supporting composite beam by a connecting steel plate, and the upper part is connected by an additional supporting composite beam connecting steel bars and a composite layer; the longitudinal composite beams are configured as transverse components, and there are two of them; the two longitudinal composite beams and the two supporting composite beams are sequentially spaced and connected to form a rectangular frame beam, the two longitudinal composite beams are arranged along the length direction of the frame beam, the two supporting composite beams are arranged along the width direction of the frame beam, and the four corner positions of the frame beam are respectively connected to the four frame The top of the column is connected; top reinforcement, bottom reinforcement and waist reinforcement are arranged inside the supporting composite beam and the longitudinal composite beam, the top reinforcement is arranged in the composite layer and placed on site, the bottom reinforcement and waist reinforcement are arranged in the prefabricated components of the supporting composite beam and the longitudinal composite beam, and the top reinforcement, the bottom reinforcement and the waist reinforcement extend into and are anchored inside the frame column; the supporting composite beam and the longitudinal composite beam are supported on the frame column, and the supporting composite beam and the longitudinal composite beam are connected to the frame column through the composite layer, the top reinforcement, the bottom reinforcement and the waist reinforcement; the prefabricated steel truss prestressed double T-plate is installed on the frame beam, and the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam are connected into a whole through the composite layer; concrete is poured at the position of the frame column and the composite layer.

[0007] Preferably, the T-shaped rib is provided with a rib mounting groove, and an embedded screw is embedded inside, and the end of the embedded screw extends out of the rib mounting groove; the supporting composite beam is provided with a beam mounting groove, and a beam anchor screw is embedded inside, and the beam anchor screw extends out of the rib-beam mounting groove; the connecting steel plate is installed in the rib mounting groove and the beam mounting groove, and the connecting steel plate is respectively provided with long through-hole-shaped mounting sliding grooves at positions corresponding to the embedded screw and the beam anchor screw, and the embedded screw and the beam anchor screw are respectively movably arranged in the mounting sliding grooves; the embedded screw passes through the rib mounting hole on the rib pad and is screwed with the rib nut; the beam anchor screw passes through the beam mounting hole on the beam pad and is screwed with the beam nut.

[0008] Preferably, truss steel bars are arranged longitudinally along the upper edge of the horizontal top plate, and the truss steel bars are provided in at least two and are symmetrically arranged; a horizontal steel mesh is provided inside the horizontal top plate, and a top plate anchor screw is provided inside the edge; the truss steel bars are provided at the bottom of the horizontal top plate and the upper part of the horizontal steel mesh, and the truss steel bars are connected to the horizontal steel mesh by binding; the top plate anchor screw is movably provided in the elongated top plate mounting hole on the top plate pad, and is screwed with the top plate nut.

[0009] Preferably, the composite layer includes beam top reinforcement, slab negative reinforcement, additional longitudinal composite beam connecting steel bars, additional longitudinal composite beam structural steel bars, additional plate seam connecting steel bars, additional plate seam structural steel bars, the additional supporting composite beam connecting steel bars and additional supporting composite beam structural steel bars; the additional longitudinal composite beam connecting steel bars, the additional plate seam connecting steel bars and the additional supporting composite beam connecting steel bars are placed on the prefabricated steel truss prestressed double T-plate, the additional longitudinal composite beam structural steel bars are placed on the additional longitudinal composite beam connecting steel bars, the additional plate seam structural steel bars are placed on the additional plate seam connecting steel bars, the additional supporting composite beam structural steel bars are placed on the additional supporting composite beam connecting steel bars, and are respectively tied with the wire ties.

[0010] Preferably, the cross-section of the longitudinal composite beam is set to be rectangular, the cross-section of the supporting composite beam is set to be L-shaped, and is provided with a cantilever; the end of the prefabricated steel truss prestressed double T-plate is placed on the cantilever of the supporting composite beam; the connecting steel plate is set to be L-shaped, and the two side parts of the L-shaped bending structure of the connecting steel plate are respectively provided with the installation sliding grooves, and are respectively arranged in the rib installation groove and the beam installation groove; the connecting steel plates are respectively connected between the two sides of the T-shaped rib and the supporting composite beam; the inner walls of the rib installation groove and the beam installation groove are respectively provided with rough surfaces, and the side surfaces of the connecting steel plate in contact with the T-shaped rib and the supporting composite beam are respectively provided with rough surfaces; the top surface of the horizontal top plate is provided with a rough surface, and the upper surfaces of the supporting composite beam and the longitudinal composite beam are provided with a water-washed rough surface.

[0011] Preferably, a longitudinal steel mesh is arranged in the middle position of the T-shaped rib, and the prestressed steel bars are arranged in pairs and symmetrically distributed at the bottom of the T-shaped rib; the number of the top plate mounting holes on the top plate pad is set to two and they are symmetrically distributed; the top plate anchor head screws on the adjacent prefabricated steel truss prestressed double T-plates are respectively movably arranged in the two top plate mounting holes.

[0012] In a second aspect, the present invention provides a construction method for the underground assembled prefabricated steel truss prestressed double T-plate structure according to the first aspect, comprising the following steps: Prefabricated components: manufacturing the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam; Frame column production: tying the frame column with the column longitudinal reinforcement and the stirrups, and after tying, setting up the formwork; Installation components: installing the supporting composite beams, the longitudinal composite beams and the prefabricated steel truss prestressed double T-plates on the frame columns; Connecting the double T-plate and the supporting composite beam: connecting the prefabricated steel truss prestressed double T-plate and the supporting composite beam through the connecting steel plate; Splicing double T-plates: connecting the adjacent prefabricated steel truss prestressed double T-plates at the splicing position through the horizontal top plate; Connecting the double T-plate, the supporting composite beam and the longitudinal composite beam: installing the prefabricated steel truss prestressed double T-plate on the frame beam, and connecting the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam into a whole through the composite layer; Tie the steel bars: install the additional longitudinal composite beam connecting steel bars, additional longitudinal composite beam structural steel bars, additional plate seam connecting steel bars, additional plate seam structural steel bars, the additional supporting composite beam connecting steel bars and the additional supporting composite beam structural steel bars in place, place the top bars of the supporting composite beam and the longitudinal composite beam at the beam top bar position and anchor them into the frame column, tie and install the negative bars of the prefabricated steel truss prestressed double T plate in place; Pouring concrete: pouring concrete at the positions of the frame columns and the superimposed layers.

[0013] Preferably, the T-shaped rib is provided with a rib mounting groove, and a pre-embedded screw is embedded inside, and the end of the pre-embedded screw extends from the rib mounting groove; the supporting composite beam is provided with a beam mounting groove, and a beam anchor screw is embedded inside, and the beam anchor screw extends from the rib beam mounting groove; the connecting steel plate is installed in the rib mounting groove and the beam mounting groove, and the connecting steel plate is provided with long through-hole-shaped mounting sliding grooves at positions corresponding to the pre-embedded screw and the beam anchor screw, and the pre-embedded screw and the beam anchor screw are movably arranged in the mounting sliding grooves respectively; When connecting the double T-plate and the supporting composite beam, align the installation sliding groove on the connecting steel plate with the embedded screw, and install the connecting steel plate in the rib installation groove and the beam installation groove; pass the embedded screw through the rib installation hole on the rib pad, and tighten the rib nut on the embedded screw; pass the beam anchor head screw through the beam installation hole on the beam pad, and tighten the beam nut on the beam anchor head screw.

[0014] Preferably, top plate anchor screws are embedded in the edge of the horizontal top plate; When splicing double T-plates, the top plate anchor screw is arranged in the elongated top plate mounting hole on the top plate pad, and the top plate nut is tightened on the top plate anchor screw.

[0015] Preferably, the composite layer includes additional longitudinal composite beam connecting steel bars, additional longitudinal composite beam structural steel bars, additional plate seam connecting steel bars, additional plate seam structural steel bars, additional supporting composite beam connecting steel bars and additional supporting composite beam structural steel bars; When connecting double T-plates, supporting composite beams and longitudinal composite beams, the additional longitudinal composite beam connecting steel bars, the additional plate seam connecting steel bars and the additional supporting composite beam connecting steel bars are placed on the prefabricated steel truss prestressed double T-plates, the additional longitudinal composite beam structural steel bars are placed on the additional longitudinal composite beam connecting steel bars, the additional plate seam structural steel bars are placed on the additional plate seam connecting steel bars, the additional supporting composite beam structural steel bars are placed on the additional supporting composite beam connecting steel bars, and they are tied respectively with the wire ties.

[0016] The underground assembled prefabricated steel bar truss prestressed double T-plate structure and the construction method thereof provided by the present invention have the following beneficial effects: 1. The underground assembled prefabricated steel truss prestressed double T-plate structure and the construction method thereof of the present invention form a vertical load-bearing structure through frame columns, form a horizontal load-bearing structure through longitudinal composite beams and supporting composite beams, and adopt a mixed construction scheme in which the vertical load-bearing structure is cast in situ, the horizontal load-bearing structure is prefabricated and then assembled with the prefabricated steel truss prestressed double T-plate. This not only ensures the integrity and reliability of the main structure, but also ensures a relatively high overall prefabrication and assembly rate, can reduce the support and formwork engineering, can improve the construction efficiency and environmental efficiency, and can simplify the connection structure and the consumption of materials and working hours.

[0017] Compared with traditional composite slabs and double T-slabs, the present invention can solve the problems existing in the prior art, such as small size, large number, difficult hoisting, difficulty in application to underground prefabricated buildings, small bearing capacity, low construction efficiency, easy cracking after arching, poor integrity, and inability to meet earthquake resistance requirements; it can improve the integrity and reliability of the main structure, improve construction efficiency and load capacity, and is suitable for underground prefabricated buildings, which is conducive to meeting the utilization of underground space and project assembly rate requirements; the present invention also solves the problem that traditional composite floor slabs are not suitable for large spans, large loads and poor integrity. It has reasonable structure, convenient processing, high construction efficiency, strong applicability, good earthquake resistance, and good comprehensive economy. It can be widely used in large-span structures of public buildings such as underground garages, bridges, industrial plants, and parking buildings. For example, it is suitable for underground prefabricated frame garages.

[0018] 2. The underground assembled prefabricated steel truss prestressed double T-plate structure and the construction method thereof of the present invention can improve the application span of the prefabricated components by arranging prestressed steel in the T-shaped ribs of the prefabricated steel truss prestressed double T-plate.

[0019] 3. The underground assembled prefabricated steel truss prestressed double T-plate structure and the construction method thereof of the present invention can improve the overall stiffness of the prefabricated steel truss prestressed double T-plate by setting truss steel bars on the horizontal top plate, and enhance the shear resistance and torsion resistance in and out of the plane.

[0020] 4. The underground assembled prefabricated steel truss prestressed double T-plate structure and the construction method thereof of the present invention can first connect the prefabricated steel truss double T-plate into a whole through the top plate pad, and then connect the prefabricated steel truss double T-plate and the supporting composite beam together through the connecting steel plate through the dry connection, and then connect the prefabricated steel truss double T-plate, the supporting composite beam, and the longitudinal composite beam into a whole through the composite layer; finally, the supporting composite beam and the composite beam are connected into a whole through the core area of ​​the frame column and the cast-in-place composite layer, so that the seismic performance and integrity of the entire structure are better.

[0021] 5. The underground assembled prefabricated steel truss prestressed double T-plate structure and the construction method thereof of the present invention, through the embedded screws and the beam anchor head screws are respectively movably set in the installation sliding grooves, and the top plate anchor head screws are movably set in the long strip top plate installation holes on the top plate pad, to form a dry sliding connection structure, which solves the problems of traditional installation accuracy and installation inconvenience, can improve installation accuracy and installation convenience, and further avoid cracking and improve seismic performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a top view of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0023] Figure 2 It is a schematic diagram of the connection between adjacent prefabricated steel truss prestressed double T joints of an underground assembled prefabricated steel truss prestressed double T plate structure provided by an embodiment of the present invention through a horizontal top plate.

[0024] Figure 3 It is a schematic diagram of the horizontal top plate and overlapping layer of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by an embodiment of the present invention.

[0025] Figure 4 It is a schematic diagram of the connection between the prefabricated steel truss prestressed double T-plate and the supporting composite beam of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0026] Figure 5 It is a schematic diagram of the connection between the supporting composite beam and the T-shaped rib of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0027] Figure 6 It is a front view of a prefabricated steel truss prestressed double T-plate of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0028] Figure 7 It is a schematic cross-sectional view of a prefabricated steel truss prestressed double T-plate of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0029] Figure 8 It is an elevation view of a prefabricated steel truss prestressed double T-plate of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0030] Fig. 9 It is a schematic diagram of the supporting composite beams of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0031] Fig.10It is a top view of the supporting composite beam of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0032] Fig.11 It is a front view of the connecting steel plates of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0033] Fig.12 It is a side view of the connecting steel plates of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0034] Fig.13 It is a top view of the top plate pad of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0035] Fig.14 It is a side view of the top plate pad of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0036] Fig.15 It is a schematic diagram of the top plate anchor head screw and the beam anchor head screw of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0037] Fig.16 It is a top view of the beam pad of the underground assembled prefabricated steel truss prestressed double T-plate structure provided by one embodiment of the present invention.

[0038] Fig.17 It is a side view of a beam pad of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by an embodiment of the present invention.

[0039] Fig.18 It is a flow chart of a construction method of an underground assembled prefabricated steel truss prestressed double T-plate structure provided by an embodiment of the present invention.

[0040] Reference numerals in the figures: 1 is a prefabricated steel truss prestressed double T plate, 2 is a T-shaped rib, 21 is a rib mounting groove, 22 is a pre-buried screw, 23 is a rib pad, 231 is a rib mounting hole, 24 is a rib nut, 25 is a longitudinal steel mesh, 26 is a prestressed steel bar, 3 is a horizontal top plate, 31 is a truss steel bar, 32 is a horizontal steel mesh, 33 is a top plate anchor bolt, 34 is a top plate pad, 341 is a top plate mounting hole, 35 is a top plate nut, 4 is a supporting composite beam, 41 is a beam mounting groove, 42 is a beam anchor screw, 43 is a beam pad, 431 is a beam mounting hole, 44 is a beam nut, 45 is a lug for supporting the composite beam, 5 is a frame column, 6 is a longitudinal composite beam, 7 is a connecting steel plate, 71 is an installation sliding groove, 8 is the composite layer, 81 is the additional longitudinal composite beam connecting steel bar, 82 is the additional longitudinal composite beam structural steel bar, 83 is the additional plate seam connecting steel bar, 84 is the additional plate seam structural steel bar, 85 is the additional supporting composite beam connecting steel bar, and 86 is the additional supporting composite beam structural steel bar. DETAILED DESCRIPTION

[0041] The present invention is further described in detail below through the accompanying drawings and specific embodiments. Example

[0042] Please refer to Figures 1 to 12 The present embodiment provides an underground assembled prefabricated steel truss prestressed double T-plate structure, including a prefabricated steel truss prestressed double T-plate 1, a frame column 5, a supporting composite beam 4 and a longitudinal composite beam 6; the prefabricated steel truss prestressed double T-plate 1 includes two T-shaped ribs 2 and a horizontal top plate 3, and the interior of the T-shaped rib 2 is provided with prestressed steel bars 26; the two T-shaped ribs 2 are arranged side by side and connected to the horizontal top plate 3 as a whole to form a double T-shaped structure; the prefabricated steel truss prestressed double T-plate 1 is provided with at least two and arranged side by side; the adjacent prefabricated steel truss prestressed The prestressed double T-plate 1 is connected at the joint position by additional connecting steel bars 83, the top plate pad 34 and the laminated layer 8; the frame column 5 is set as a vertical member, and there are four of them; the four frame columns 5 are arranged at the four corners of the rectangle respectively; the frame column 5 is provided with column vertical steel bars and column stirrups, and the column vertical steel bars are tied by column stirrups; the supporting laminated beam 4 is set as a horizontal member, and there are two of them; the prefabricated steel truss prestressed double T-plate 1 is connected to the bottom of the supporting laminated beam 4 by a connecting steel plate 7, and the upper part is connected by additional supporting laminated beam connecting steel bars 85 and laminated The composite layer 8 is connected; the longitudinal composite beam 6 is set as a transverse member, and there are two of them; the two longitudinal composite beams 6 and the two supporting composite beams 4 are sequentially spaced and connected to form a rectangular frame beam, the two longitudinal composite beams 6 are arranged along the length direction of the frame beam, and the two supporting composite beams 4 are arranged along the width direction of the frame beam. The four corners of the frame beam are respectively connected to the tops of the four frame columns 5; the top reinforcement, bottom reinforcement and waist reinforcement are arranged inside the supporting composite beam 4 and the longitudinal composite beam 6, the top reinforcement is arranged in the composite layer 8 and placed on site, and the bottom reinforcement and waist reinforcement of the beam are arranged on the supporting composite beam In the prefabricated components of the composite beam 4 and the longitudinal composite beam 6, the top reinforcement, bottom reinforcement and waist reinforcement extend into and are anchored inside the frame column 5; the supporting composite beam 4 and the longitudinal composite beam 6 are supported on the frame column 5, and the supporting composite beam 4 and the longitudinal composite beam 6 are connected to the frame column 5 through the composite layer 8, the top reinforcement, the bottom reinforcement and the waist reinforcement; the prefabricated steel truss prestressed double T-plate 1 is installed on the frame beam, and the prefabricated steel truss prestressed double T-plate 1, the supporting composite beam 4 and the longitudinal composite beam 6 are connected into a whole through the composite layer 8; concrete is poured at the position of the frame column 5 and the composite layer 8.

[0043] The underground assembled prefabricated steel truss prestressed double T-plate structure of this embodiment, the prestressed steel bars 26 are used to bear the large load on the prefabricated steel truss prestressed double T-plate 1, which can improve the integrity and reliability of the main structure, improve construction efficiency and load capacity, is suitable for underground assembled buildings, and is suitable for large-span structures. This embodiment is only described with a one-span frame structure.

[0044] Among them, the length direction of the prefabricated steel truss prestressed double T plate 1, the longitudinal composite beam 6 and the frame beam is the same, all along the longitudinal direction, that is, Figure 1 The left-right direction shown in the figure; the width direction of the frame beam is the direction perpendicular to the longitudinal direction in the horizontal plane, that is, Figure 1 The up and down directions shown in .

[0045] The supporting composite beam 4 and the longitudinal composite beam 6 are prefabricated components. Both are cast-in-place within the horizontal top plate 3 of the prefabricated steel truss prestressed double T-plate 1, and top reinforcement is arranged inside this position. The top reinforcement is generally arranged as a part of the composite layer 8, and the bottom reinforcement and waist reinforcement are arranged in the prefabricated components of the two.

[0046] The frame column 5 is a cast-in-place column. Generally, the part of the frame column 5 within the height range of the frame beam forms a core area. The vertical reinforcement of the column in the core area is arranged continuously along the length direction, and the column stirrups are arranged according to the actual needs. The vertical reinforcement, column stirrups and top reinforcement are all processed and manufactured by workers on site and installed in corresponding positions respectively.

[0047] The top reinforcement, waist reinforcement and bottom reinforcement can be extended into and anchored in the core area of ​​the frame column 5 , and concrete is cast in situ at the core area of ​​the frame column 5 and the position of the superimposed layer 8 .

[0048] The prefabricated steel truss prestressed double T-plate 1 is composed of two T-shaped ribs 2 arranged side by side and integrally connected on the top surface, and its cross section is a double T-shape.

[0049] The horizontal top plate 3 is arranged on the top of the prefabricated steel truss prestressed double T plate 1 , and the bottom surface of the horizontal top plate 3 contacts the bottom surface of the prefabricated steel truss prestressed double T plate 1 .

[0050] The column vertical reinforcement is arranged inside the frame column 5 , and the top of the column vertical reinforcement extends upward to the outside of the top of the frame column 5 .

[0051] The two supporting composite beams 4 are parallel to each other, and the two longitudinal composite beams 6 are parallel to each other. The supporting composite beams 4 and the longitudinal composite beams 6 are perpendicular to each other and are sequentially connected to form a frame beam, and the frame beam is connected to the frame column 5 to form a supporting structure for supporting the prefabricated steel truss prestressed double T-slab 1.

[0052] The length direction of the prefabricated steel bar truss prestressed double T-plate 1 is along the longitudinal direction, and both ends of the prefabricated steel bar truss prestressed double T-plate 1 are overlapped and installed on two supporting composite beams 4 respectively.

[0053] Please refer to Figures 1 to 17 Specifically, the T-shaped rib 2 is provided with a rib mounting groove 21, and an embedded screw 22 is pre-embedded inside, and the end of the embedded screw 22 extends out from the rib mounting groove 21; the supporting composite beam 4 is provided with a beam mounting groove 41, and a beam anchor head screw 42 is pre-embedded inside, and the beam anchor head screw 42 extends out from the rib beam mounting groove 41; the connecting steel plate 7 is installed in the rib mounting groove 21 and the beam mounting groove 41, and the connecting steel plate 7 is respectively provided with long strip through-hole-shaped mounting sliding grooves 71 at positions corresponding to the embedded screw 22 and the beam anchor head screw 42, and the embedded screw 22 and the beam anchor head screw 42 are respectively movably arranged in the mounting sliding grooves 71; the embedded screw 22 passes through the rib mounting hole 231 on the rib pad 23 and is screwed with the rib nut 24; the beam anchor head screw 42 passes through the beam mounting hole 431 on the beam pad 43 and is screwed with the beam nut 44.

[0054] The embedded screw rod 22 avoids the prestressed steel bar 26. The beam anchor screw rod 42 is set as a screw rod with an anchor head. The two end sides of the installation sliding groove 71 are respectively set as arc-shaped edges protruding outward. The two installation sliding grooves 71 are symmetrically arranged. The length direction of the installation sliding groove 71 is along the longitudinal direction.

[0055] Specifically, truss steel bars 31 are arranged longitudinally on the horizontal top plate 3, and at least two truss steel bars 31 are arranged symmetrically; a horizontal steel mesh 32 is arranged inside the horizontal top plate 3, and a top plate anchor screw 33 is arranged inside the edge; the truss steel bars 31 are arranged at the bottom of the horizontal top plate 3 and the upper part of the horizontal steel mesh 32, and the truss steel bars 31 and the horizontal steel mesh 32 are connected by binding; the top plate anchor screw 33 is movably arranged in the long strip top plate mounting hole 341 on the top plate pad 34, and is screwed with the top plate nut 35.

[0056] The truss steel bar 31 is used to bear the shear load in the new and old concrete surfaces. The top plate pad 34 is used to strengthen the connection firmness of the horizontal top plate 3.

[0057] The top plate anchor screw 33 is provided as a screw with an anchor head. The end of the top plate anchor screw 33 extends outward from the horizontal top plate 3, and is used to connect the top plate pad 34 and the top plate nut 35. The side edges at both ends of the top plate mounting hole 341 are respectively provided as arc-shaped edges protruding outward. The length direction of the top plate mounting hole 341 is along the longitudinal direction.

[0058] Specifically, the composite layer 8 includes beam top reinforcement, slab negative reinforcement, additional longitudinal composite beam connecting steel bars 81, additional longitudinal composite beam structural steel bars 82, additional plate seam connecting steel bars 83, additional plate seam structural steel bars 84, additional supporting composite beam connecting steel bars 85 and additional supporting composite beam structural steel bars 86; the additional longitudinal composite beam connecting steel bars 81, additional plate seam connecting steel bars 83 and additional supporting composite beam connecting steel bars 85 are placed on the prefabricated steel truss prestressed double T-slab 1, the additional longitudinal composite beam structural steel bars 82 are placed on the additional longitudinal composite beam connecting steel bars 81, the additional plate seam structural steel bars 84 are placed on the additional plate seam connecting steel bars 83, and the additional supporting composite beam structural steel bars 86 are placed on the additional supporting composite beam connecting steel bars 85, and are respectively tied with wire.

[0059] Among them, the additional longitudinal composite beam structural reinforcement 82 and the additional longitudinal composite beam connecting reinforcement 81, and the additional supporting composite beam structural reinforcement 86 and the additional supporting composite beam connecting reinforcement 85 are respectively tied together by tying wire.

[0060] The additional plate seam connecting steel bars 83 are placed on the prefabricated steel truss prestressed double T plate 1, and the additional plate seam structural steel bars 84 are placed on the additional plate seam connecting steel bars 83, and the additional plate seam connecting steel bars 83 and the additional plate seam structural steel bars 84 are tied together by tying wire.

[0061] After the prefabricated steel truss prestressed double T-plate 1 is installed, the supporting composite beam 4, the longitudinal composite beam 6 and the top reinforcement of the composite layer 8 are installed and tied, and then the concrete is poured.

[0062] Specifically, the cross-section of the longitudinal composite beam 6 is set to be rectangular, the cross-section of the supporting composite beam 4 is set to be L-shaped, and is provided with a cantilever 45; the end of the prefabricated steel truss prestressed double T-plate 1 is placed on the cantilever 45 of the supporting composite beam 4; the connecting steel plate 7 is set to be L-shaped, and the two side parts of the L-shaped bending structure of the connecting steel plate 7 are respectively provided with installation sliding grooves 71, and are respectively arranged in the rib installation groove 21 and the beam installation groove 41; the two sides of the T-shaped rib 2 and the supporting composite beam 4 are respectively connected with connecting steel plates 7; the inner walls of the rib installation groove 21 and the beam installation groove 41 are respectively provided with rough surfaces, and the sides of the connecting steel plate 7 in contact with the T-shaped rib 2 and the supporting composite beam 4 are respectively provided with rough surfaces; the top surface of the horizontal top plate 3 is provided with a rough surface, and the upper surfaces of the supporting composite beam 4 and the longitudinal composite beam 6 are provided with a water-washed rough surface.

[0063] Among them, a beam mounting groove 41 is opened on the upper surface of the ear 45 of the supporting composite beam 4, and the supporting composite beam 4 has beam mounting grooves 41 respectively opened on both sides of the vertical part of the T-shaped rib 2; rib mounting grooves 21 are respectively opened on both sides of the vertical part of the T-shaped rib 2, and L-shaped connecting steel plates 7 are respectively connected between the two sides of the vertical part of the T-shaped rib 2 and the supporting composite beam 4, and the bending directions of the connecting steel plates 7 on both sides of the T-shaped rib 2 are opposite to each other.

[0064] The upper surface of the horizontal top plate 3 can be set as a rough surface as a whole, and the side surface can be set as a water-washed rough surface. The upper surface of the supporting composite beam 4 can be set as a rough surface as a whole. The upper surface of the longitudinal composite beam 6 can be set as a rough surface as a whole.

[0065] Specifically, a longitudinal steel mesh 25 is provided in the middle of the T-shaped rib 2, and prestressed steel bars 26 are arranged in pairs and symmetrically distributed at the bottom of the T-shaped rib 2; There are two top plate mounting holes 341 on the top plate pad 34 and they are symmetrically distributed; the top plate anchor screws 33 on the adjacent prefabricated steel bar truss prestressed double T-plates 1 are movably arranged in the two top plate mounting holes 341 respectively. Example

[0066] Please refer to Fig.18 This embodiment provides a construction method for an underground assembled prefabricated steel truss prestressed double T-plate structure as in Embodiment 1, comprising the following steps: Step S1, prefabricated components: manufacturing prefabricated steel truss prestressed double T-plate 1, supporting composite beam 4 and longitudinal composite beam 6; Step S2, frame column production: tie the frame column 5 with the column longitudinal reinforcement and stirrups, and after the tying is completed, set up the formwork; Step S3, installing components: installing the supporting composite beam 4, the longitudinal composite beam 6 and the prefabricated steel truss prestressed double T-plate 1 on the frame column 5; Step S4, connecting the double T-plate and the supporting composite beam: connecting the prefabricated steel truss prestressed double T-plate 1 and the supporting composite beam 4 through the connecting steel plate 7; Step S5, splicing double T plates: connecting adjacent prefabricated steel truss prestressed double T plates 1 at the splicing position through the horizontal top plate 3; Step S6, connecting the double T-plate, the supporting composite beam and the longitudinal composite beam: installing the prefabricated steel truss prestressed double T-plate 1 on the frame beam, and connecting the prefabricated steel truss prestressed double T-plate 1, the supporting composite beam 4 and the longitudinal composite beam 6 into a whole through the composite layer 8; Step S7, tying steel bars: installing the additional longitudinal composite beam connecting steel bars 81, the additional longitudinal composite beam structural steel bars 82, the additional plate seam connecting steel bars 83, the additional plate seam structural steel bars 84, the additional supporting composite beam connecting steel bars 85 and the additional supporting composite beam structural steel bars 86 in place, placing the top bars of the supporting composite beam 4 and the longitudinal composite beam 6 at the beam top bar position and anchoring them into the frame column 5, and tying and installing the negative bars of the prefabricated steel truss prestressed double T plate 1 in place; Step S8, pouring concrete: pouring concrete at the positions of the frame columns 5 and the superimposed layers 8.

[0067] Among them, in step S1, when prefabricating components, prefabricated steel truss prestressed double T-plate 1, supporting composite beam 4 and longitudinal composite beam 6 can be manufactured in a prefabricated component factory.

[0068] In step S3, when installing the components, the supporting composite beams 4, the longitudinal composite beams 6 and the prefabricated steel truss prestressed double T-plates 1 are installed on the frame columns 5 in sequence on site.

[0069] Specifically, when connecting the double T-plate and the supporting composite beam, align the installation sliding groove 71 on the connecting steel plate 7 with the embedded screw 22, and install the connecting steel plate 7 in the rib mounting groove 21 and the beam mounting groove 41; pass the embedded screw 22 through the rib mounting hole 231 on the rib pad 23, and tighten the rib nut 24 on the embedded screw 22; pass the beam anchor head screw 42 through the beam mounting hole 431 on the beam pad 43, and tighten the beam nut 44 on the beam anchor head screw 42.

[0070] When tightening the rib nut 24 , do not tighten it until the rib nut 24 cannot be rotated; when tightening the beam nut 44 , do not tighten it until the beam nut 44 cannot be rotated.

[0071] Specifically, when splicing the double T-plates, the top plate anchor screw 33 is set in the elongated top plate mounting hole 341 on the top plate pad 34 , and the top plate nut 35 is tightened on the top plate anchor screw 33 .

[0072] The top plate nut 35 is tightened until the top plate nut 35 cannot be rotated.

[0073] In step S7, when tying the steel bars, the vertical steel bars of the frame column 5 are tied by the column stirrups, and the top bars, waist bars and bottom bars of the frame beam are extended into and anchored in the core area of ​​the frame column 5; The negative reinforcement of the slab surface refers to the reinforcement of the slab top, which is arranged on the top of the prefabricated steel truss prestressed double T slab 1 and is used to bear the slab surface force of the prefabricated steel truss prestressed double T slab 1.

[0074] The negative reinforcement of the plate surface is arranged outside the prefabricated steel bar truss prestressed double T plate 1 and on the top of the truss steel bar 31.

[0075] Specifically, when connecting the double T-plate, the supporting composite beam and the longitudinal composite beam, the additional longitudinal composite beam connecting steel bars 81, the additional plate seam connecting steel bars 83 and the additional supporting composite beam connecting steel bars 85 are placed on the prefabricated steel truss prestressed double T-plate 1, the additional longitudinal composite beam structural steel bars 82 are placed on the additional longitudinal composite beam connecting steel bars 81, the additional plate seam structural steel bars 84 are placed on the additional plate seam connecting steel bars 83, and the additional supporting composite beam structural steel bars 86 are placed on the additional supporting composite beam connecting steel bars 85, and are tied with wire respectively.

[0076] In step S8 , when pouring concrete, the core area concrete of the frame column 5 is poured, and the concrete of the superimposed layer 8 is poured.

[0077] The above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

[0078] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0079] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to has a specific orientation, is constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0080] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

Claims

1. Underground prefabricated steel truss prestressed double T-plate structure, characterized by: include: The prefabricated steel truss prestressed double T-plate comprises two T-shaped ribs and a horizontal top plate, wherein the T-shaped ribs are provided with prestressed steel bars inside; the two T-shaped ribs are arranged side by side and connected with the horizontal top plate as a whole to form a double T-shaped structure; the prefabricated steel truss prestressed double T-plates are provided with at least two and arranged side by side; the adjacent prefabricated steel truss prestressed double T-plates are connected at the joint position by additional connecting steel bars, a top plate pad and a superimposed layer; The frame column is set as a vertical member, and is set in four pieces; the four frame columns are respectively arranged at the four corners of the rectangle; the frame column is provided with column vertical steel bars and column stirrups inside, and the column vertical steel bars are tied by the column stirrups; The supporting composite beam is set as a transverse member, and is set in two; the prefabricated steel truss prestressed double T plate is connected to the bottom of the supporting composite beam through a connecting steel plate, and the upper part is connected by an additional supporting composite beam connecting steel bars and a composite layer; A longitudinal composite beam is provided as a transverse member, and is provided in two; the two longitudinal composite beams and the two supporting composite beams are sequentially connected at intervals to form a rectangular frame beam, the two longitudinal composite beams are arranged along the length direction of the frame beam, the two supporting composite beams are arranged along the width direction of the frame beam, and the four corner positions of the frame beam are respectively connected to the tops of the four frame columns; Top reinforcement, bottom reinforcement and waist reinforcement are arranged inside the supporting composite beam and the longitudinal composite beam, the top reinforcement is arranged inside the composite layer and placed on site, the bottom reinforcement and waist reinforcement are arranged inside the prefabricated components of the supporting composite beam and the longitudinal composite beam, the supporting composite beam and the longitudinal composite beam are supported on the frame column, and the top reinforcement, the bottom reinforcement and waist reinforcement extend into and are anchored inside the frame column; The prefabricated steel truss prestressed double T-plate is installed on the frame beam, and the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam are connected into a whole through a composite layer; Concrete is poured at the positions of the frame columns and the superimposed layers.

2. The underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 1 is characterized in that: The T-shaped rib is provided with a rib mounting groove, and a pre-embedded screw is embedded inside, and the end of the pre-embedded screw extends from the rib mounting groove; the supporting composite beam is provided with a beam mounting groove, and a beam anchor screw is embedded inside, and the beam anchor screw extends from the rib beam mounting groove; The connecting steel plate is installed in the rib installation groove and the beam installation groove, and the connecting steel plate is provided with long through-hole-shaped installation sliding grooves at positions corresponding to the embedded screws and the beam anchor screws, and the embedded screws and the beam anchor screws are movably arranged in the installation sliding grooves; The embedded screw rod passes through the rib mounting hole on the rib pad and is screwed with the rib nut; the beam anchor head screw rod passes through the beam mounting hole on the beam pad and is screwed with the beam nut.

3. The underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 2 is characterized in that: The horizontal top plate is provided with truss steel bars in the longitudinal direction, and the truss steel bars are provided with at least two and are arranged symmetrically; a horizontal steel mesh is provided inside the horizontal top plate, and top plate anchor screws are provided inside the edge; the truss steel bars are provided at the bottom of the horizontal top plate and the top of the horizontal steel mesh, and the truss steel bars are connected to the horizontal steel mesh by binding; The top plate anchor head screw rod is movably arranged in the elongated top plate mounting hole on the top plate pad and is screwed with the top plate nut.

4. The underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 3 is characterized in that: The composite layer includes beam top reinforcement, slab negative reinforcement, additional longitudinal composite beam connecting reinforcement, additional longitudinal composite beam structural reinforcement, additional plate seam connecting reinforcement, additional plate seam structural reinforcement, additional supporting composite beam connecting reinforcement and additional supporting composite beam structural reinforcement; The additional longitudinal composite beam connecting steel bars, the additional plate seam connecting steel bars and the additional supporting composite beam connecting steel bars are placed on the prefabricated steel truss prestressed double T-plate, the additional longitudinal composite beam structural steel bars are placed on the additional longitudinal composite beam connecting steel bars, the additional plate seam structural steel bars are placed on the additional plate seam connecting steel bars, the additional supporting composite beam structural steel bars are placed on the additional supporting composite beam connecting steel bars, and are respectively tied with the binding wire.

5. The underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 4 is characterized in that: The cross section of the longitudinal composite beam is set to be rectangular, the cross section of the supporting composite beam is set to be L-shaped, and is provided with a cantilever; the end of the prefabricated steel truss prestressed double T plate is laid on the cantilever of the supporting composite beam; the connecting steel plate is set to be L-shaped, and the two side parts of the L-shaped bending structure of the connecting steel plate are respectively provided with the installation sliding grooves, and are respectively arranged in the rib installation groove and the beam installation groove; The connecting steel plates are respectively connected between the two sides of the T-shaped rib and the supporting composite beam; The inner walls of the rib mounting groove and the beam mounting groove are respectively provided with rough surfaces, and the sides of the connecting steel plate in contact with the T-shaped rib and the supporting composite beam are respectively provided with rough surfaces; the top surface of the horizontal top plate is provided with a rough surface, and the upper surfaces of the supporting composite beam and the longitudinal composite beam are provided with water-washed rough surfaces.

6. The underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 5 is characterized in that: A longitudinal steel mesh is arranged in the middle of the T-shaped rib, and the prestressed steel bars are arranged in pairs and symmetrically distributed at the bottom of the T-shaped rib; The number of the top plate mounting holes on the top plate pad is two and they are symmetrically distributed; the top plate anchor screws on the adjacent prefabricated steel bar truss prestressed double T-plates are movably arranged in the two top plate mounting holes respectively.

7. The construction method of the underground assembled prefabricated steel truss prestressed double T-plate structure according to any one of claims 1 to 6, characterized in that: The following steps are involved: Prefabricated components: manufacturing the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam; Frame column production: tying the frame column with the column longitudinal reinforcement and the stirrups, and after tying, setting up the formwork; Installation components: installing the supporting composite beams, the longitudinal composite beams and the prefabricated steel truss prestressed double T-plates on the frame columns; Connecting the double T-plate and the supporting composite beam: connecting the prefabricated steel truss prestressed double T-plate and the supporting composite beam through the connecting steel plate; Splicing double T-plates: connecting the adjacent prefabricated steel truss prestressed double T-plates at the splicing position through the horizontal top plate; Connecting the double T-plate, the supporting composite beam and the longitudinal composite beam: installing the prefabricated steel truss prestressed double T-plate on the frame beam, and connecting the prefabricated steel truss prestressed double T-plate, the supporting composite beam and the longitudinal composite beam into a whole through the composite layer; Tie the steel bars: install the additional longitudinal composite beam connecting steel bars, additional longitudinal composite beam structural steel bars, additional plate seam connecting steel bars, additional plate seam structural steel bars, the additional supporting composite beam connecting steel bars and the additional supporting composite beam structural steel bars in place, place the top bars of the supporting composite beam and the longitudinal composite beam at the beam top bar position and anchor them into the frame column, tie and install the negative bars of the prefabricated steel truss prestressed double T plate in place; Pouring concrete: pouring concrete at the positions of the frame columns and the superimposed layers.

8. The construction method of the underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 7 is characterized in that: The T-shaped rib is provided with a rib mounting groove, and a pre-embedded screw is embedded inside, and the end of the pre-embedded screw extends from the rib mounting groove; the supporting composite beam is provided with a beam mounting groove, and a beam anchor screw is embedded inside, and the beam anchor screw extends from the rib beam mounting groove; The connecting steel plate is installed in the rib installation groove and the beam installation groove, and the connecting steel plate is provided with long through-hole-shaped installation sliding grooves at positions corresponding to the embedded screws and the beam anchor screws, and the embedded screws and the beam anchor screws are movably arranged in the installation sliding grooves; When connecting the double T-plate and the supporting composite beam, align the installation sliding groove on the connecting steel plate with the embedded screw, and install the connecting steel plate in the rib installation groove and the beam installation groove; pass the embedded screw through the rib installation hole on the rib pad, and tighten the rib nut on the embedded screw; pass the beam anchor head screw through the beam installation hole on the beam pad, and tighten the beam nut on the beam anchor head screw.

9. The construction method of the underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 8 is characterized in that: Top plate anchor screws are pre-buried inside the edge of the horizontal top plate; When splicing double T-plates, the top plate anchor screw is arranged in the elongated top plate mounting hole on the top plate pad, and the top plate nut is tightened on the top plate anchor screw.

10. The construction method of the underground assembled prefabricated steel truss prestressed double T-plate structure according to claim 9, characterized in that: The composite layer includes additional longitudinal composite beam connecting steel bars, additional longitudinal composite beam structural steel bars, additional plate seam connecting steel bars, additional plate seam structural steel bars, additional supporting composite beam connecting steel bars and additional supporting composite beam structural steel bars; When connecting double T-plates, supporting composite beams and longitudinal composite beams, the additional longitudinal composite beam connecting steel bars, the additional plate seam connecting steel bars and the additional supporting composite beam connecting steel bars are placed on the prefabricated steel truss prestressed double T-plates, the additional longitudinal composite beam structural steel bars are placed on the additional longitudinal composite beam connecting steel bars, the additional plate seam structural steel bars are placed on the additional plate seam connecting steel bars, the additional supporting composite beam structural steel bars are placed on the additional supporting composite beam connecting steel bars, and they are tied respectively with the wire ties.

Citation Information

Cited By

  • Method for design of seismic-damping partition wall with variable friction energy dissipation