Formwork turnover frame body for ultrahigh chimney and construction method of formwork turnover frame body

By introducing a real-time monitoring system into the mold turning frame of the ultra-high chimney, the problem of unmonitored mold turning frame in traditional construction is solved, real-time monitoring of the mold turning frame status and construction progress is achieved, and construction efficiency is improved. Security.

CN119021459APending Publication Date: 2024-11-26CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411134350.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the traditional chimney hydraulic sliding mold construction method, the mold turning frame is not monitored in use, resulting in the inability to understand the working state and changes of the mold turning, resulting in adverse effects.

Method used

A mold turning frame for ultra-high chimney and its construction method are designed, including upper derrick, main platform, lower scaffolding, unloading structure and real-time monitoring system, through structural health analysis module, construction progress monitoring module and structure The status monitoring module conducts real-time monitoring, and uses multi-physical field coupling analysis, material corrosion status monitoring, structural damage monitoring and construction efficiency analysis to understand the status and construction progress of the mold turning frame in real time.

Benefits of technology

Through multi-dimensional monitoring and analysis, we can timely understand the status and construction progress of the mold turning frame, avoid construction problems, improve work efficiency, optimize construction processes, reduce construction difficulties and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021459A_ABST
    Figure CN119021459A_ABST
Patent Text Reader

Abstract

The invention provides a formwork rollover frame body for an ultrahigh chimney and a construction method of the formwork rollover frame body, and belongs to the technical field of chimney construction, the formwork rollover frame body comprises an upper derrick, a main platform, a lower hanging scaffold, an unloading structure and a formwork, and a real-time monitoring system applied to the formwork rollover frame body comprises a structure health analysis module, a construction progress monitoring module and a structure state monitoring module. The structural health analysis module performs data analysis in different directions according to the collected data, judges the structural health condition of the rollover frame body by using the data, and comprises a material corrosion state monitoring unit, an environment monitoring unit, a structural damage monitoring unit and a multi-physics coupling analysis unit; the construction progress monitoring module comprises a construction stage monitoring unit and a construction efficiency analysis unit, and the problems that the use monitoring of a traditional formwork turnover frame body is not carried out, the state and change of formwork turnover work cannot be known during formwork turnover work, and adverse effects are generated are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of chimney construction, and in particular relates to a mold turning frame for an ultra-high chimney and a construction method thereof. Background Art

[0003] The problem of scaffolding required for chimney structure construction avoids the common concrete surface quality problems that are prone to occur in slipforms during the construction of high-rise structures, laying the foundation for ensuring the quality of the project from a technical perspective. In the traditional chimney hydraulic slipform construction method, there is no monitoring of the use of the frame, resulting in the inability to know the status and changes of the flipping work during the flipping work, which has an adverse effect. For this reason, a flipping frame for super-high chimneys that can monitor the use of the flipping frame and a construction method thereof are designed. Summary of the invention

[0004] The embodiment of the present invention provides a mold turning frame for an ultra-high chimney and a construction method thereof, which solves the problem that the traditional mold turning frame has no use monitoring of the frame, resulting in the inability to know the status and changes of the mold turning work during the mold turning work, resulting in adverse effects.

[0005] In view of the above problems, the technical solution proposed by the present invention is:

[0006] The present invention provides a mold turning frame for an ultra-high chimney and a construction method thereof, comprising an upper derrick, a main platform, a lower hanging scaffolding, a unloading structure and a template, wherein the upper derrick is fixed to the upper surface of the main platform, the lower hanging scaffolding is bolted to the bottom of the main platform, and the unloading structure and the inner side of the lower hanging scaffolding are provided with a material hanging cage;

[0007] The upper derrick comprises a material lifting frame, a steel bar lifting lever, a connecting ear plate, a cable wind rope and a material lifting frame base, wherein the connecting ear plate is arranged between the steel bar lifting lever and the material lifting frame, and the cable wind rope is arranged between the material lifting frame and the main platform;

[0008] The main platform includes a double-channel steel lower main beam, a double-channel steel upper main beam, a secondary beam group and a hydraulic jack. The double-channel steel lower main beam and the double-channel steel upper main beam are bolted together. The secondary beam group is respectively arranged on the sides of the double-channel steel lower main beam and the double-channel steel upper main beam. The hydraulic jack is arranged on the upper surface of the base of the material lifting frame.

[0009] The hanging scaffolding includes a blue galvanized climbing frame steel plate mesh, a white safety net, a hanging frame, a steel guardrail and a flap;

[0010] The unloading structure includes a plurality of channel steels, O-shaped hooks, turnbuckles, shackles and square lugs;

[0011] The real-time monitoring system applied to the above-mentioned mold turning frame includes a structural health analysis module, a construction progress monitoring module and a structural status monitoring module. The structural health analysis module performs data analysis in different directions according to the collected data, and uses the data to judge the structural health of the mold turning frame. The structural health analysis module includes a material corrosion status monitoring unit, an environmental monitoring unit, a structural damage monitoring unit and a multi-physical field coupling analysis unit;

[0012] The material corrosion status monitoring unit is used to monitor the material corrosion degree of the mold frame;

[0013] The environmental monitoring unit is used to monitor the environment outside the mold frame and evaluate the impact of wind load on the mold frame;

[0014] The structural damage monitoring unit is used to monitor the structural damage and crack conditions of the mold frame;

[0015] The multi-physics field coupling analysis unit combines the monitoring data of multiple physical fields including mechanics, thermal and electrical to perform coupling analysis;

[0016] The construction progress monitoring module is used to monitor the progress of the mold turning work, and the construction progress monitoring module includes a construction stage monitoring unit and a construction efficiency analysis unit;

[0017] The construction phase monitoring unit is used to record and monitor the number of times the template is lifted during the construction process;

[0018] The construction efficiency analysis unit analyzes the construction time and evaluates the construction efficiency based on the data of the construction phase monitoring unit;

[0019] The structural status monitoring module is used to monitor the displacement, settlement and deformation status of the mold frame.

[0020] As a preferred technical solution of the present invention, a winch is arranged between the material hoist cage and the upper derrick for lifting work, the material lifting frame is welded by a plurality of angle steels, and the base of the material lifting frame is welded to the bottom of the material lifting frame;

[0021] The secondary beam group includes a primary beam, a secondary beam and a tertiary beam, wherein the primary beam and the tertiary beam are both bolted to the lower main beam of the double-channel steel, and the secondary beam is welded to the upper main beam of the double-channel steel;

[0022] The blue galvanized climbing frame steel plate mesh is connected to the lower bracket by bolts, the steel guardrail is connected to the lower bracket by perforations, and the flap is connected to the lower bracket by hinges;

[0023] The channel steel bolts are connected to form a unloading frame, the O-shaped hook bolts are connected to the main beam of the main platform, the basket bolts are arranged at the bottom of the O-shaped hooks, the shackles are arranged at both ends of the basket bolts, and the square ear plates are welded to the channel steels.

[0024] As a preferred technical solution of the present invention, the material corrosion status monitoring unit uses electrochemical detection technology to monitor the corrosion status of the material of the mold frame, specifically:

[0025] A. Install working electrode, reference electrode and auxiliary electrode on each layer of the mold frame;

[0026] B, connecting the electrodes to the structural health analysis module via cables;

[0027] C. Set the acquisition frequency and data interval parameters, use the software to analyze the data, and calculate the corrosion rate;

[0028] The working electrode in step A uses the same metal material as the mold frame, the reference electrode uses a saturated calomel electrode or a silver / silver chloride electrode, and the auxiliary electrode uses a platinum electrode.

[0029] As a preferred technical solution of the present invention, the structural damage monitoring unit installs acoustic emission sensors and ultrasonic probes at key positions of the mold frame, captures sound signals generated by stress changes in the mold frame through the acoustic emission sensors, determines the damage location through acoustic emission analysis software and acoustic emission source positioning technology, receives reflected waves in the structure through the ultrasonic probe, processes the sound signals according to the ultrasonic analysis software, determines the integrity of the structure according to the ultrasonic image, and finally uses data fusion analysis software to locate the damage of the mold frame.

[0030] As a preferred technical solution of the present invention, the multi-physical field coupling analysis unit is specifically:

[0031] (1),Data integration, which integrates the monitoring data of different physical fields into an analytical model;

[0032] (2) Model establishment: Use finite element analysis software to establish a three-dimensional model of the mold frame and input actual monitoring data;

[0033] (3), coupling analysis, simulating the interaction between different physical fields in simulation software;

[0034] (4) ,Result interpretation, use the solver to perform the calculation and solve the ,analysis software to output the results, analyze the results, and present the results in ,graphical form;

[0035] (5),Prediction and optimization, based on the coupling analysis results, predict the changes of the structure in complex environments.

[0036] As a preferred technical solution of the present invention, the construction phase monitoring unit is equipped with a sensor on the upper derrick or the lower hanging scaffolding. Each time the template is lifted, the sensor records once, and the lifting number data is collected through the construction progress monitoring module. The lifting number is counted and analyzed through the construction progress monitoring module to generate a construction progress report.

[0037] The specific analysis steps of the construction efficiency analysis unit are as follows:

[0038] a. Use a time recorder to record the time of each construction stage;

[0039] b. Analyze the time data of each stage using the construction progress monitoring module;

[0040] c. Adjust the construction plan based on the analysis results.

[0041] As a preferred technical solution of the present invention, the structural status monitoring module includes a displacement monitoring unit, a settlement monitoring unit and a deformation monitoring unit. The displacement monitoring unit, the settlement monitoring unit and the deformation monitoring unit monitor the displacement, settlement and deformation of the mold frame during use, and the inclination monitoring function of the high-support mold monitoring alarm on the operating platform monitors the horizontal displacement and inclination of the operating platform during the hydraulic jacking process in real time.

[0042] On the other hand, a construction method for a turn-over formwork frame for a super-high chimney comprises the following steps:

[0043] S1, using finite element software to simulate the structural design of the mold frame, optimize the design scheme, and obtain the optimized scheme;

[0044] S2, according to the optimization plan, the mold turning frame is installed. The template adopts two layers of templates on the inner and outer sides of the combined steel template. The mold turning frame provides two rows of inner and outer hanging scaffolds and upper derricks for the template. The mold turning frame adopts a large-tonnage hydraulic jack as a lifting device, and the scaffolding steel pipe is used as a support rod. The lower part of the support rod that bears the load of the entire mold turning frame has been deeply buried in the simple wall with a holding force;

[0045] S3, when the main platform is raised, after the concrete strength reaches 2.5Mpa, the main platform and the lower hanging scaffolding are lifted by the hydraulic jack on the support rod to a template height. During the lifting process or after the lifting is in place, the operating platform is aligned with the center of the structure and fixed. The operator removes the bottom set of templates on the second row of lower hanging scaffolding, hoists them to the position of the first row of lower hanging scaffolding after cleaning, and brushes the template isolation agent on them. Then, the template is installed on the upper part of the second set of steel templates. By setting the lifting points on the main platform, each template is lifted by a fall chain in combination with manual lifting, and the upper concrete has formed a bond force on the support;

[0046] S4, while operating in step S2 and step S3, start the real-time monitoring system, use the structural health analysis module, construction progress monitoring module and structural status monitoring module to monitor the use of the formwork frame, and make construction adjustments when the real-time data exceeds the safety threshold.

[0047] Compared with the prior art, the beneficial effects of the present invention are:

[0048] (1) The present invention monitors the use status of the mold frame in multiple dimensions, monitors the use status changes and use environment of the mold frame in real time by combining multi-physical field coupling analysis. By comprehensively considering the effects between multiple physical fields through multi-physical field coupling analysis, the situation of the mold frame can be more deeply understood, and improvements can be made in time to avoid problems during construction that cannot be modified, thereby improving work efficiency;

[0049] (2) The present invention monitors the construction progress in real time, calculates the construction efficiency according to the construction progress, and adjusts the construction plan in a timely manner in combination with the construction plan, thereby effectively improving the construction efficiency and optimizing the construction process;

[0050] (3) The present invention is applied to the construction of super-high chimney structures. Through the hydraulic mold turning method, the template adopts two layers of templates on the inner and outer sides of the combined steel template. The main platform provides two rows of inner and outer hanging scaffolds for the template, so that the template installation, demoulding, cleaning, oiling, reinstallation and tube wall grinding and maintenance can be carried out on the inner and outer rows of the main platform. The purpose is to reduce the difficulty of construction and improve the construction efficiency.

[0051] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a structural schematic diagram of a mold turning frame for a super-high chimney disclosed in the present invention;

[0053] Figure 2 It is a structural schematic diagram of an upper derrick of a mold turning frame body for an ultra-high chimney disclosed in the present invention;

[0054] Figure 3 It is a schematic diagram of the plane structure of a main platform of a mold turning frame for a super-high chimney disclosed in the present invention;

[0055] Figure 4 It is a structural schematic diagram of a load-relief structure of a mold turning frame for a super-high chimney disclosed in the present invention;

[0056] Figure 5 It is a structural schematic diagram of a guy rope for a mold turning frame of a super-high chimney disclosed in the present invention;

[0057] Figure 6 It is a structural schematic diagram of a lower hanging scaffold for a mold turning frame body of a super-high chimney disclosed in the present invention;

[0058] Figure 7 It is a block diagram of a real-time monitoring system for a mold turning frame for an ultra-high chimney disclosed in the present invention;

[0059] Figure 8 It is a schematic diagram of a construction method for a mold turning frame body for a super-high chimney disclosed in the present invention;

[0060] Explanation of the reference numerals: 1. Upper derrick; 101. Upper derrick angle steel; 2. Main platform; 201. Double-channel steel lower main beam; 202. Double-channel steel upper main beam; 203. First beam; 204. Second beam; 205. Third beam; 206. Hydraulic jack; 3. Lower hanging scaffolding; 301. Blue galvanized climbing frame steel plate mesh; 302. White safety net; 303. Lower hanging frame; 304. Steel guardrail; 305. Flap; 4. Unloading structure; 401. O-shaped hook; 402. Basket bolt; 403. Shackle; 404. Square ear plate; 5. Material cage; 6. Formwork; 7. Steel lifting lever; 8. Connecting ear plate ; 9. Cable wind rope; 901. Round steel rigging ring; 10. Material lifting frame base; 11. Cage; 12. Real-time monitoring system; 1201. Structural health analysis module; 12011. Material corrosion status monitoring unit; 12012. Environmental monitoring unit; 12013. Structural damage monitoring unit; 12014. Multi-physics field coupling analysis unit; 1202. Construction progress monitoring module; 12021. Construction stage monitoring unit; 12022. Construction efficiency analysis unit; 1203. Structural status monitoring module; 12031. Displacement monitoring unit; 12032. Settlement monitoring unit; 12033. Deformation monitoring unit. DETAILED DESCRIPTION

[0061] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0064] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0065] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0066] Embodiment 1

[0067] Refer to the attached Figure 1-7 As shown, the present invention provides a technical solution: a mold turning frame for an ultra-high chimney and a construction method thereof, comprising an upper derrick 1, a main platform 2, a lower hanging scaffold 3, an unloading structure 4 and a template 6, wherein the upper derrick 1 is fixed to the upper surface of the main platform 2, the lower hanging scaffold 3 is bolted to the bottom of the main platform 2, and a material cage 5 is arranged inside the unloading structure 4 and the lower hanging scaffold 3;

[0068] The upper derrick 1 includes a material lifting frame, a steel bar lifting lever 7, a connecting ear plate 8, a cable wind rope 9 and a material lifting frame base 10. The connecting ear plate 8 is arranged between the steel bar lifting lever 7 and the material lifting frame, and the cable wind rope 9 is arranged between the material lifting frame and the main platform 2. The upper part of the cable wind rope 9 is connected to the main platform 2 using an A13 steel wire rope and a 20mm straight-drop round steel rigging ring 901 to catch the wind on the upper derrick 1.

[0069] The main platform 2 includes a double-channel steel lower main beam 201, a double-channel steel upper main beam 202, a secondary beam group and a hydraulic jack 206. The double-channel steel lower main beam 201 and the double-channel steel upper main beam 202 are bolted together, and the secondary beam groups are respectively arranged on the sides of the double-channel steel lower main beam 201 and the double-channel steel upper main beam 202. The hydraulic jack 206 is arranged on the upper surface of the material lifting frame base 10 and is fixedly connected to the main beam by high-strength bolts. The jacking point is designed according to the actual construction plan;

[0070] The lower hanging scaffold 3 includes a blue galvanized climbing frame steel plate mesh 301, a white safety net 302, a lower hanging frame 303, a steel guard rail 304 and a flap 305;

[0071] The unloading structure 4 includes a plurality of channel steels, an O-shaped hook 401, a turnbuckle 402, a shackle 403 and a square ear plate 404;

[0072] The real-time monitoring system 12 applied to the above-mentioned mold turning frame includes a structural health analysis module 1201, a construction progress monitoring module 1202 and a structural state monitoring module 1203. The structural health analysis module 1201 performs data analysis in different directions according to the collected data, and uses the data to judge the structural health of the mold turning frame. The structural health analysis module 1201 includes a material corrosion state monitoring unit 12011, an environmental monitoring unit 12012, a structural damage monitoring unit 12013 and a multi-physical field coupling analysis unit 12014;

[0073] The material corrosion status monitoring unit 12011 is used to monitor the material corrosion degree of the mold frame to prevent structural failure;

[0074] The environmental monitoring unit 12012 is used to monitor the environment outside the formwork frame and evaluate the impact of wind load on the formwork frame. The biggest factor affecting the external environment of the formwork frame of the super-high chimney is wind force. The wind speed sensor and wind direction sensor are used to monitor the wind force in real time to adjust the construction structure and construction progress according to the wind force.

[0075] The structural damage monitoring unit 12013 is used to monitor the structural damage and crack conditions of the mold frame, and uses sensors to capture tiny sound signals inside the structure to analyze the damage and crack development of the structure;

[0076] The multi-physics coupling analysis unit 12014 combines the monitoring data of multiple physical fields such as mechanics, thermal and electrical to perform coupling analysis to gain a more comprehensive understanding of structural behavior;

[0077] The construction progress monitoring module 1202 is used to monitor the progress of the mold turning work. The construction progress monitoring module 1202 includes a construction stage monitoring unit 12021 and a construction efficiency analysis unit 12022;

[0078] The construction phase monitoring unit 12021 is used to record and monitor the number of times the template 6 is lifted during the construction process to track the construction progress and the use of the template 6;

[0079] The construction efficiency analysis unit 12022 analyzes the construction time, evaluates the construction efficiency, finds out the potential causes of delays, and optimizes the construction process based on the data of the construction phase monitoring unit 12021;

[0080] The structural status monitoring module 1203 is used to monitor the displacement, settlement and deformation status of the mold frame.

[0081] In addition, the template 6 is designed with two layers of inner and outer templates 6. The outer template 6 adopts a standardized steel template 6. According to the size of the outer wall, it is made into a 800*1800mm, 100*1800mm, 150*1800mm, 650*1800mm, and 750*1800mm combined steel template 6. The inner template refers to the outer template. The template 6 is processed with a 2.75mm thick steel plate and made of 2 50*4mm ribs. The inner and outer templates 6 are fixed with M14 tension screws and 2 48*3.0mm steel pipes for clamping. There are 2 layers in total. The vertical spacing of the screws is 400mm and 1000mm, and the horizontal spacing of the screws is 400mm.

[0082] The embodiment of the present invention is also implemented through the following technical solutions.

[0083] In the embodiment of the present invention, a winch is arranged between the material cage 5 and the upper derrick 1 for lifting work. The material lifting frame is welded by a number of angle steels. The base 10 of the material lifting frame is welded to the bottom of the material lifting frame. The winch is an integral cast-in-place foundation. A 25mm steel bar pull ring is pre-embedded according to the installation position of the winch and welded to the winch as a whole to prevent the winch from moving. The winch is connected to the main platform 2 in an articulated manner. The steel bar lifting lever 7 adopts a 110mmx5mm steel pipe for the transportation of steel bars. The steel bar lifting lever 7 is controlled by two winches and installed on the upper derrick 1 to control the arm retraction and arm release of the pull rod. One is a lifting winch to control the up and down of the hook. The wire rope adopts A17.5mm wire rope. The winch models are JK-3 and JK-0.5.

[0084] The secondary beam group includes a first beam 203, a second beam 204 and a third beam 205. The first beam 203 and the third beam 205 are both bolted to the lower main beam 201 of the double-channel steel, and the second beam 204 is welded to the upper main beam 202 of the double-channel steel;

[0085] The blue galvanized climbing frame steel plate mesh 301 is bolted to the lower bracket 303, the steel guardrail 304 is connected to the lower bracket 303 through holes, the flap 305 is connected to the lower bracket 303 through hinges, the lower bracket 303 plays the role of template 6 installation and wall concrete repair, the lower hanging scaffolding 3 is made of L60*6 angle steel welding, 5mm thick blue galvanized climbing frame steel plate mesh 301, the top is bolted and fixed to the main platform 2, and the outer periphery of the lower hanging scaffolding 3 is installed with an external dense mesh safety pocket The net is tied with the lower bracket 303 with wire, with a horizontal spacing of 200mm. A wooden springboard is laid on each layer and connected with the lower bracket 303 with steel wire. A steel guardrail 304 to A12 is set every 600m inside and outside each layer. A 1.4m high guardrail is set on the top, which is welded with medium A20 round steel. The bottom of the round steel is fully welded with the secondary beam. The vertical pole spacing is 1000mm. Two horizontal bars are set in the horizontal direction. A steel guardrail 304 to A12 is set every 600m in the middle.

[0086] The channel steels are connected by bolts to form a unloading frame, which is connected to the main platform 2 by round steel with a medium diameter of 20 mm and basket screws for unloading. The O-shaped hook 401 is bolted to the main beam of the main platform 2, and the basket bolt 402 is arranged at the bottom of the O-shaped hook 401. Both ends of the basket bolt 402 are provided with shackles 403, and the square ear plate 404 is welded to the channel steel.

[0087] In an embodiment of the present invention, the material corrosion status monitoring unit 12011 uses electrochemical detection technology to monitor the corrosion status of the material of the mold frame, specifically:

[0088] A. Install working electrode, reference electrode and auxiliary electrode on each layer of the mold frame;

[0089] B, connecting the electrodes to the structural health analysis module 1201 via cables;

[0090] C. Set the acquisition frequency and data interval parameters, use the software to analyze the data, and calculate the corrosion rate;

[0091] The working electrode in step A is made of the same metal material as the mold frame, the reference electrode is a saturated calomel electrode or a silver / silver chloride electrode to provide a stable potential reference point, the auxiliary electrode is a platinum electrode, and the monitoring data is processed and analyzed using corrosion monitoring software, such as CorrosionPRO, CORR-o-CHEM, etc.

[0092] In an embodiment of the present invention, the structural damage monitoring unit 12013 installs acoustic emission sensors and ultrasonic probes at key positions of the mold frame, captures sound signals generated by stress changes in the mold frame through the acoustic emission sensors, determines the damage location through acoustic emission analysis software and acoustic emission source positioning technology, receives reflected waves in the structure through the ultrasonic probe, processes the sound signals according to the ultrasonic analysis software, determines the integrity of the structure according to the ultrasonic image, and finally uses data fusion analysis software, such as MATLAB, SPSS Modeler, etc., to locate the damage of the mold frame.

[0093] In an embodiment of the present invention, the multi-physics field coupling analysis unit 12014 is specifically:

[0094] (1) Data integration: installing various types of sensors, such as strain gauges, temperature sensors, electrical sensors, etc., to collect data from different physical fields and integrating the monitoring data of different physical fields, such as stress, temperature, humidity, etc., into an analysis model;

[0095] (2) Model establishment: Use finite element analysis software to establish a three-dimensional model of the mold frame and input actual monitoring data;

[0096] (3) ,Coupled analysis, selects appropriate physical fields in the simulation software, simulates the interaction between different physical fields, and provides a comprehensive evaluation of structural behavior, such as the effect of thermal expansion on structural stress;

[0097] (4) Result interpretation: use the solver to calculate and solve, analyze the output results of the software, analyze the results, including error analysis and sensitivity analysis, present the results in a graphical way, and explain the comprehensive influence of different physical fields on the structural performance;

[0098] (5) Prediction and optimization: Based on the coupling analysis results, predict the changes of the structure in a complex environment and optimize and improve the structural design and construction process in a timely manner.

[0099] In an embodiment of the present invention, the construction phase monitoring unit 12021 installs a sensor on the upper derrick 1 or the lower hanging scaffold 3. Each time the template 6 is lifted, the sensor records once, and the lifting number data is collected through the construction progress monitoring module 1202. The lifting number is counted and analyzed through the construction progress monitoring module 1202, and a construction progress report is generated to track the construction progress and the use of the template 6, ensure the pouring quality of each layer of concrete, and track the construction height of the entire chimney;

[0100] The specific analysis steps of construction efficiency analysis unit 12022 are as follows:

[0101] a. Use a time recorder to record the time of each construction stage, such as the time of template 6 lifting, concrete pouring, etc.;

[0102] b. Analyze the time data of each stage using the construction progress monitoring module 1202 to check the time-consuming links, and compare the monitored data with the indicators by defining efficiency indicators such as template installation time, concrete pouring time, template removal time, etc.;

[0103] c. According to the analysis results, adjust the construction plan, optimize resource allocation and improve construction efficiency.

[0104] In an embodiment of the present invention, the structural status monitoring module 1203 includes a displacement monitoring unit 12031, a settlement monitoring unit 12032 and a deformation monitoring unit 12033. The displacement monitoring unit 12031, the settlement monitoring unit 12032 and the deformation monitoring unit 12033 monitor the displacement, settlement and deformation of the mold frame during use, and the inclination monitoring function of the high-support mold monitoring alarm on the operating platform is used to monitor the horizontal displacement and inclination of the operating platform during the jacking process of the hydraulic jack 206 in real time. When the jack fails and the inclination monitoring parameter of the operating platform exceeds the allowable value during the jacking process, the real-time monitoring system 12 is connected to the controller of the hydraulic jack 206, and the hydraulic jack 206 will stop jacking immediately. The real-time monitoring system 12 automatically alarms and notifies the on-site operators to stop working, view the monitoring data through the computer terminal, find the hydraulic jack 206 with problems, repair or replace the hydraulic jack 206, and ensure safe jacking.

[0105] In addition, the structural health analysis module 1201 uses the data monitored by the material corrosion status monitoring unit 12011, the environmental monitoring unit 12012, the structural damage monitoring unit 12013 and the multi-physics field coupling analysis unit 12014 to evaluate the structural health status of the mold frame. The calculation formula is as follows:

[0106]

[0107] in, is the overall health status, Z is the health evaluation value of the mold frame, and the health evaluation value of the mold frame is composed of the health evaluation factor set of the monitored parts. Determine, the formula is as follows:

[0108]

[0109] Among them, M i is the health evaluation value of the ith monitoring layer. The health evaluation value of each monitoring layer is composed of the health evaluation factor set composed of the monitoring parts of the lower layer. It is decided as follows:

[0110]

[0111] Among them, N ji Represents the health evaluation value of the jth part of the ith monitoring layer.

[0112] Table 1: Health level classification table

[0113] grade Health status A Safety B Minor damage C Moderate damage D Severe damage

[0114] After the health levels are divided, the evaluation criteria that affect the size of each indicator parameter are established, and the intervals and thresholds of each monitoring indicator in the index under different health conditions are determined. This can be determined comprehensively based on the existing relevant information on the warning level division, combined with actual working conditions and mechanical numerical calculations.

[0115] In addition, the above-mentioned monitoring components are installed according to the stress or key positions of the actual structure of the mold frame.

[0116] Embodiment 2

[0117] Refer to the attached Figure 8 As shown, an embodiment of the present invention further provides a construction method for a mold turning frame for an ultra-high chimney, comprising the following steps:

[0118] S1, using finite element software to simulate the structural design of the mold frame, optimize the design scheme, and obtain the optimized scheme;

[0119] S2, according to the optimization plan, the mold turning frame is installed, the template 6 is turned by two layers of templates 6 on the inner and outer sides of the combined steel template 6, and the mold turning frame provides two rows of inner and outer hanging scaffolds 3 and upper well frame 1 for the template 6, so that the template 6 can be installed, disassembled, cleaned, oiled, reinstalled, and the barrel wall polished and maintained on the inner and outer rows of hanging scaffolds 3 of the mold turning frame. The mold turning frame adopts a large-tonnage hydraulic jack 206 as a lifting device, and uses the scaffold steel pipe as a support rod. The hydraulic console supplies high-pressure oil each time to make the through-core The jack climbs up 25mm and drives the whole operating table to rise up 25mm. The through-type hydraulic jack 206 has a self-locking function in both the lifting and non-lifting states, so that the jack and the operating table can only be lifted upward and cannot fall. The lower part of the support rod that bears the load of the entire flip form frame has been deeply buried in the simple wall with a gripping force. When the flip form frame is lifted, the transverse steel bars are welded firmly to the support rods while it is rising, so that the transverse steel bars have an accurate position and the support rods are reinforced, so that the construction quality and safety are guaranteed;

[0120] S3, when the main platform 2 is raised, after the concrete strength reaches 2.5Mpa, the main platform 2 and the lower hanging scaffold 3 are lifted by the hydraulic jack 206 on the support rod to the height of a template 6. During the lifting process or after the lifting is in place, the operating table is aligned with the center of the structure and fixed. The operator removes the bottom set of templates 6 on the second row of lower hanging scaffolds 3, and uses the S-shaped hook made of A12 round steel to pass through the steel template hole and cooperate with the manual hoist for lifting. After cleaning, it is lifted to the position of the first row of lower hanging scaffolds 3, and the template is brushed with template isolation agent, and then the template is removed. 6 is installed on the upper part of the second set of steel formwork. This project uses combined steel formwork 6. Two sets of steel formworks are repeatedly turned over, and at the same time, the wall concrete is maintained with formwork. By setting a hanging point on the main platform 2, each formwork 6 is lifted by a chain with manual lifting. The upper concrete has formed a gripping force on the support, and the platform is lifted. After the operating table is lifted into place, the operating table is centered, leveled, and the next section of steel bars is tied. The bottom layer of formwork 6 is removed, cleaned, and the formwork isolation agent is applied, the formwork 6 is reinstalled, calibrated, inspected, poured with concrete, concrete maintained, and the concrete cylinder wall is modified, and then the next cycle begins;

[0121] S4, while operating step S2 and step S3, start the real-time monitoring system 12, and use the structural health analysis module 1201, the construction progress monitoring module 1202 and the structural status monitoring module 1203 to monitor the material corrosion status, external environment change monitoring, structural damage monitoring, multi-physical field coupling analysis, displacement monitoring, settlement monitoring and deformation monitoring of the mold frame, so as to timely understand the use of the mold replacement, perform maintenance in time, reduce the impact on the construction progress, and monitor the construction progress in real time. When the real-time data exceeds the preset safety threshold, make construction adjustments.

[0122] In addition, the step S2 mold turning construction method also includes that after the steel bar binding of the simplified section is completed and the concrete joint treatment is qualified, the template 6 can be installed, first the hand winch hook hung on the radiation beam is placed on the lower template 6 lifting ring and hooked, the fall chain is tightened, tightened and then loosened a little, the inner and outer templates 6 of one wall are hung at the same time, the nuts of the tension bolts are removed, the tension bolts are pulled out, and the template 6 is opened from the bottom with a small crowbar to separate the template 6 from the wall concrete, the lower template 6 is manually lifted to the top of the upper template 6 with the fall chain, the surface of the template 6 is cleaned, and then it is reinforced in place. When turning the mold, the east facade and the west facade should be constructed at the same time, and the south facade and the north facade should be constructed at the same time.

[0123] In addition, in step S4, the monitoring points of the structural status monitoring module 1203 are set to set a balance alarm device on the short and long sides of the platform. The balance instrument alarm is used to determine whether the platform is balanced. If the height difference between the left and right platforms or the upper and lower platforms exceeds 20 mm, the system will send an alarm signal. The monitoring system is connected to the control system of the hydraulic jack 206. If the height difference between the left and right platforms or the upper and lower platforms of the main platform 2 exceeds 20 mm, the platform jacking will be automatically stopped. At the same time, the jacking system monitors the jacking rate and height of the 18 jacking points to ensure the smooth jacking of the platform.

[0124] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0125] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of protection of the present disclosure. The attached method claims present the elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.

[0126] The above description includes examples of one or more embodiments. Of course, it is impossible to describe all possible combinations of components or methods for the purpose of describing the above embodiments, but it should be recognized by those skilled in the art that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications and variations that fall within the scope of protection of the appended claims. In addition, with respect to the term "comprising" used in the specification or claims, the word is covered in a manner similar to the term "including", just as "including," is explained as a transitional word in the claims. In addition, any term "or" used in the specification of the claims is intended to mean "non-exclusive or".

Claims

1. A mold frame for an ultra-high chimney and a construction method thereof, characterized in that: The utility model comprises an upper derrick (1), a main platform (2), a lower hanging scaffold (3), a load-removing structure (4) and a template (6); the upper derrick (1) is fixed on the upper surface of the main platform (2); the lower hanging scaffold (3) is bolted to the bottom of the main platform (2); and a material hanging cage (5) is arranged inside the load-removing structure (4) and the lower hanging scaffold (3); The upper derrick (1) comprises a material lifting frame, a steel bar lifting lever (7), a connecting ear plate (8), a cable wind rope (9) and a material lifting frame base (10), wherein the connecting ear plate (8) is arranged between the steel bar lifting lever (7) and the material lifting frame, and the cable wind rope (9) is arranged between the material lifting frame and the main platform (2); The main platform (2) comprises a double-channel steel lower main beam (201), a double-channel steel upper main beam (202), a secondary beam group and a hydraulic jack (206); the double-channel steel lower main beam (201) and the double-channel steel upper main beam (202) are bolted together; the secondary beam group is respectively arranged on the side of the double-channel steel lower main beam (201) and the double-channel steel upper main beam (202); and the hydraulic jack (206) is arranged on the upper surface of the material lifting frame base (10); The lower hanging scaffold (3) comprises a blue galvanized climbing frame steel plate mesh (301), a white safety net (302), a lower hanging frame (303), a steel guard rail (304) and a flap (305); The unloading structure (4) comprises a plurality of channel steels, an O-shaped hook (401), a turnbuckle (402), a shackle (403) and a square ear plate (404); The real-time monitoring system (12) applied to the above-mentioned mold turning frame comprises a structural health analysis module (1201), a construction progress monitoring module (1202) and a structural status monitoring module (1203), wherein the structural health analysis module (1201) performs data analysis in different directions according to the collected data and uses the data to judge the structural health status of the mold turning frame, and the structural health analysis module (1201) comprises a material corrosion status monitoring unit (12011), an environmental monitoring unit (12012), a structural damage monitoring unit (12013) and a multi-physical field coupling analysis unit (12014); The material corrosion status monitoring unit (12011) is used to monitor the material corrosion degree of the mold frame; The environmental monitoring unit (12012) is used to monitor the environment outside the mold frame and evaluate the impact of wind load on the mold frame; The structural damage monitoring unit (12013) is used to monitor the structural damage and crack conditions of the mold frame; The multi-physics field coupling analysis unit (12014) combines monitoring data of multiple physical fields including mechanics, heat and electricity to perform coupling analysis; The construction progress monitoring module (1202) is used to monitor the progress of the mold turning work, and the construction progress monitoring module (1202) includes a construction stage monitoring unit (12021) and a construction efficiency analysis unit (12022); The construction phase monitoring unit (12021) is used to record and monitor the number of times the template (6) is lifted during the construction process; The construction efficiency analysis unit (12022) analyzes the construction time and evaluates the construction efficiency based on the data of the construction stage monitoring unit (12021); The structural status monitoring module (1203) is used to monitor the displacement, settlement and deformation status of the mold frame.

2. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: A winch is arranged between the material hoist cage (5) and the upper derrick (1) for lifting work, the material lifting frame is welded by a plurality of angle steels, and the material lifting frame base (10) is welded to the bottom of the material lifting frame; The secondary beam group comprises a first beam (203), a second beam (204) and a third beam (205), wherein the first beam (203) and the third beam (205) are both bolted to the lower main beam (201) of the double-channel steel, and the second beam (204) is welded to the upper main beam (202) of the double-channel steel; The blue galvanized climbing frame steel plate mesh (301) is bolted to the lower bracket (303), the steel bar guardrail (304) is perforated and connected to the lower bracket (303), and the flap (305) is connected to the lower bracket (303) by hinges; The channel steels are connected by bolts to form a load-relief frame, the O-shaped hook (401) is bolted to the main beam of the main platform (2), the basket bolt (402) is arranged at the bottom of the O-shaped hook (401), the two ends of the basket bolt (402) are provided with the shackle (403), and the square ear plate (404) is welded to the channel steel.

3. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: The material corrosion status monitoring unit (12011) uses electrochemical detection technology to monitor the corrosion status of the material of the mold frame, specifically: A. Install working electrode, reference electrode and auxiliary electrode on each layer of the mold frame; B, connecting the electrodes to the structural health analysis module (1201) via cables; C. Set the acquisition frequency and data interval parameters, use the software to analyze the data, and calculate the corrosion rate; The working electrode in step A uses the same metal material as the mold frame, the reference electrode uses a saturated calomel electrode or a silver / silver chloride electrode, and the auxiliary electrode uses a platinum electrode.

4. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: The structural damage monitoring unit (12013) installs acoustic emission sensors and ultrasonic probes at key positions of the mold frame, captures sound signals generated by stress changes in the mold frame through the acoustic emission sensors, determines the damage location through acoustic emission analysis software and acoustic emission source positioning technology, receives reflected waves in the structure through the ultrasonic probe, processes the sound signals according to the ultrasonic analysis software, determines the integrity of the structure according to the ultrasonic image, and finally uses data fusion analysis software to locate the damage of the mold frame.

5. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: The multi-physics field coupling analysis unit (12014) is specifically: (1),Data integration, which integrates the monitoring data of different physical fields into an analytical model; (2) Model establishment: Use finite element analysis software to establish a three-dimensional model of the mold frame and input actual monitoring data; (3), coupling analysis, simulating the interaction between different physical fields in simulation software; (4) ,Result interpretation, use the solver to perform the calculation and solve the ,analysis software to output the results, analyze the results, and present the results in ,graphical form; (5) Prediction and optimization: Based on the coupling analysis results, predict the changes of the structure in complex environments.

6. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: The construction phase monitoring unit (12021) installs a sensor on the upper derrick (1) or the lower hanging scaffold (3), and each time the template (6) is lifted, the sensor records once, and the lifting frequency data is collected through the construction progress monitoring module (1202), and the lifting frequency is counted and analyzed through the construction progress monitoring module (1202) to generate a construction progress report; The specific analysis steps of the construction efficiency analysis unit (12022) are as follows: a. Use a time recorder to record the time of each construction stage; b. Analyze the time of each stage using the construction progress monitoring module (1202); c. Adjust the construction plan based on the analysis results.

7. A mold turning frame for a super high chimney and a construction method thereof according to claim 1, characterized in that: The structural status monitoring module (1203) includes a displacement monitoring unit (12031), a settlement monitoring unit (12032) and a deformation monitoring unit (12033). The displacement monitoring unit (12031), the settlement monitoring unit (12032) and the deformation monitoring unit (12033) monitor the displacement, settlement and deformation of the mold turning frame when in use, and the inclination monitoring function of the high formwork monitoring alarm on the operating platform monitors the horizontal displacement and inclination of the operating platform in real time during the lifting process of the hydraulic jack (206).

8. A construction method for a mold turning frame for a super-high chimney, applied to a mold turning frame for a super-high chimney according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1, using finite element software to simulate the structural design of the mold frame, optimize the design scheme, and obtain the optimized scheme; S2, according to the optimization scheme, the mold turning frame is installed, the mold (6) is turned by using a combination steel mold (6) with two layers of molds (6) on the inner and outer sides, the mold turning frame provides two rows of inner and outer hanging scaffolds (3) and an upper well frame (1) for the mold (6), the mold turning frame uses a large-tonnage hydraulic jack (206) as a lifting device, and uses scaffolding steel pipes as support rods. The lower part of the support rod that bears the load of the entire mold turning frame is deeply buried in the simple wall with a holding force; S3, when the main platform (2) is raised, after the concrete strength reaches 2.5Mpa, the main platform (2) and the lower hanging scaffold (3) are raised by climbing the hydraulic jack (206) on the support rod to the height of one template (6). During the lifting process or after the lifting is in place, the operating table is aligned with the center of the structure and fixed. Then, the operator removes the bottom set of templates (6) on the second row of lower hanging scaffolds (3), cleans them, and hoists them to the position of the first row of lower hanging scaffolds (3). After applying the template (6) isolation agent, the template (6) is installed on the upper part of the second set of steel molds. By setting the lifting points on the main platform (2), each template (6) is lifted by a fall chain in combination with manual lifting, and the upper concrete has formed a grip on the support; S4, while operating in step S2 and step S3, start the real-time monitoring system (12), use the structural health analysis module (1201), the construction progress monitoring module (1202) and the structural status monitoring module (1203) to monitor the use of the formwork frame, and make construction adjustments when the real-time data exceeds the safety threshold.