Calcium sand temporary plugging and unplugging method and system for low-pressure easy-leakage oil and gas well
Through the calcium sand temporary plugging and acid liquid blocking process, the problem of temporary plugging and blocking of the upper reservoir of the oil and gas well is solved in low-pressure leaks and the problem of temporary plugging and blocking of the upper reservoir in the oil and gas well is achieved, and the operation of the stationary column is reduced, cost and pollution is reduced, and construction efficiency and safety is improved.
Patent Information
- Application Number
- CN202310602758.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-26
- Publication Date
- 2024-11-26
AI Technical Summary
The prior art is difficult to effectively temporarily plug and plug the upper two-layer reservoirs of low-pressure easily leaked oil and gas wells. The liquid used in conventional temporary plugging agents is large and polluted the reservoir seriously and cannot be discharged normally.
By collecting well parameter data, selecting suitable calcium sand, designing temporary blocking and unblocking construction technology, using calcium sand and sand carrying liquid for temporary blocking, and then using acid liquid for deblocking to ensure construction safety and efficiency.
Real-moving column operation is achieved, reducing construction costs, improving construction efficiency, minimizing reservoir pollution, and avoiding working conditions that liquid gels and glue plugs cannot adapt to under high temperature and high pressure.
Smart Images

Figure CN119021629A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas field development and application, in particular to a calcium sand temporary plugging and unplugging method and system for low-pressure and easily leaking oil and gas wells. Background Art
[0002] At present, many completed low-pressure oil and gas wells have serious leakage, but according to the needs, one or more layers above the layer need to be repaired or tested for oil and gas, or fracturing to increase production and transformation. After the repair operation or testing for oil and gas, or fracturing to increase production and transformation is completed, the lower reservoir needs to be opened again to resume production. At present, the main method for such wells with only one layer on the top is to temporarily plug the wellbore without moving the tubing, and then lower the high-strength bridge plug. Specifically, the following methods are included: First, normal well pressure. Second, low-density well pressure hydraulic well. Third, temporary plugging with liquid rubber plug. Fourth, through-tubing expansion bridge plug. The above four types of process technologies all require temporary plugging before lowering other types of high-strength bridge plugs. These processes are greatly affected by reservoir temperature, pressure and the size of the pressure difference between layers.
[0003] For wells that have been fractured and have serious leakage, there is currently no suitable process technology to temporarily plug and unplug the upper two or more layers of leaking reservoirs without moving the tubing due to the pressure difference between the layers (including the injection pressure difference caused by physical property differences). In addition, the existing technology uses a large amount of liquid and conventional temporary plugging agents, which cause serious pollution to the reservoir and cannot be discharged normally (negative pressure drainage is required).
[0004] In view of the problems of the prior art, the present invention provides a method and system for temporary plugging and unplugging of calcium sand for low-pressure and easily leaking oil and gas wells. Summary of the invention
[0005] In order to solve the problems in the prior art, the present invention provides a calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells, the method comprising:
[0006] S1. Collect parameter data of construction wells;
[0007] S2. Selecting calcium sand based on the parameter data;
[0008] S3. Based on the parameter data, the design of the temporary plugging construction process is completed;
[0009] S4. Perform temporary plugging construction according to the temporary plugging construction process;
[0010] S5. Based on the parameter data, temporary plugging construction technology and actual situation of temporary plugging construction, complete the design of unblocking construction technology;
[0011] S6. Carry out unblocking construction according to the unblocking construction process.
[0012] According to one embodiment of the present invention, in step S1, the parameter data includes but is not limited to: casing lowering depth, casing inner diameter, artificial well bottom depth, upper and lower boundary depths of reservoir, lower boundary depth of upper reservoir, tubing size and lowering depth, reservoir temperature and pressure, leakage rate, wellbore structure, and wellhead specifications and models.
[0013] According to one embodiment of the present invention, in step S2, based on the reservoir protection principle that oil, gas and water cannot enter or exit the reservoir and the later development requirements of the construction well, the characteristics, particle size, crushing rate, effective content of calcium carbonate, ferric oxide content and silicon dioxide content of the calcium sand are determined.
[0014] According to one embodiment of the present invention, in step S3, the temporary plugging construction equipment and quantity, calcium sand amount, sand ratio, sand-carrying liquid, sand-carrying liquid volume, sand-carrying liquid displacement, continuous oil pipe and dragging speed are determined, and the temporary plugging construction pipe string structure and temporary plugging construction process are determined.
[0015] According to one embodiment of the present invention, in step S3, the amount of calcium sand is determined according to the following formula:
[0016]
[0017] Where Q represents the amount of calcium sand, m 3 ; D represents the inner diameter of the casing, mm; H represents the sand filling thickness, m; K represents the sand filling coefficient.
[0018] According to one embodiment of the present invention, step S4 comprises the following steps:
[0019] Connecting the temporary plugging construction equipment, and connecting the temporary plugging construction equipment with the temporary plugging construction pipe string structure;
[0020] The coiled tubing is lowered into a preset position on the bottom of an artificial well, calcium sand is mixed with a sand-carrying liquid according to the sand ratio, and the mixed sand-carrying liquid is pumped into the bottom of the well through the coiled tubing;
[0021] When the casing pressure is greater than a preset value, the pumping of the mixed sand-carrying fluid is stopped, the coiled tubing is pulled out, and the connected pipelines are removed, and the temporary plugging construction is completed.
[0022] According to one embodiment of the present invention, in step S5, the acid liquid and its amount, the unblocking construction equipment and its quantity, the acid liquid displacement, and the unblocking construction pipe string structure and unblocking construction process are determined.
[0023] According to one embodiment of the present invention, in step S5, the amount of acid solution and the acid solution concentration need to satisfy the following relationship:
[0024] Vn=0.1825QρK s
[0025] Where V represents the amount of acid, m 3 ; n represents the acid concentration; Q represents the amount of calcium sand, m 3 ; ρ represents the bulk density of calcium sand, Kg / m 3 ; K s Represents an additional coefficient.
[0026] According to one embodiment of the present invention, step S6 comprises the following steps:
[0027] Connecting the unblocking construction equipment, and connecting the unblocking construction equipment with the unblocking construction pipe string structure;
[0028] The coiled tubing is lowered into the temporary plugging calcium sand layer, and the acid solution is pumped in. When the coiled tubing is lowered close to the bottom of the artificial well or the designed position, the acid solution is replaced by active water;
[0029] When the coiled tubing reaches the bottom of the artificial well or the designed position, the injection of active water is stopped, the coiled tubing is pulled out, the connected pipelines are removed, and the unblocking construction is completed.
[0030] According to another aspect of the present invention, there is also provided a calcium sand temporary plugging and unplugging system for low-pressure and easily lost oil and gas wells, which performs the method described in any one of the above items, and the system comprises:
[0031] Design a module that performs the following steps:
[0032] Collect parameter data of construction wells;
[0033] Based on the parameter data, calcium sand is selected;
[0034] Based on the parameter data, the design of temporary plugging construction technology is completed;
[0035] Based on the parameter data, temporary plugging construction technology and the actual situation of temporary plugging construction, the design of the unblocking construction technology is completed;
[0036] Equipment required for temporary plugging construction, which is used to carry out temporary plugging construction according to the temporary plugging construction process;
[0037] The equipment required for unblocking construction is used to carry out unblocking construction according to the unblocking construction process.
[0038] The present invention provides a method and system for temporary plugging and unblocking of calcium sand for low-pressure and easily leaking oil and gas wells, which can prevent the fluid in the reservoir from entering the wellbore, and can also prevent the fluid in the wellbore from entering the reservoir, solving the problem that the foam well-killing fluid, liquid gel and rubber plug cannot adapt to the working conditions caused by the serious leakage of such wells and the possible pressure difference between the upper and lower layers, and can realize pressure operation, thereby ensuring the safety of engineering construction. The present invention is not limited by the well temperature, pressure and interlayer pressure difference. The present invention can operate without moving the tubing string during temporary plugging and unblocking, thereby reducing construction costs and improving construction efficiency. The present invention uses low-damage well entry materials to perform temporary plugging and unblocking operations without moving the tubing string, thereby minimizing reservoir pollution.
[0039] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0041] Figure 1 A flow chart of a calcium sand temporary plugging and unplugging method for a low-pressure and easily leaking oil and gas well is shown according to an embodiment of the present invention;
[0042] Figure 2 It shows a schematic diagram of a temporary plugging construction wellbore structure and a construction pipe string according to an embodiment of the present invention;
[0043] Figure 3 A schematic diagram of a wellbore structure and a construction pipe string structure for unblocking construction according to an embodiment of the present invention is shown;
[0044] Figure 4 A schematic diagram of a temporary plugging construction process according to an embodiment of the present invention is shown;
[0045] Figure 5 A schematic diagram of a blockage removal construction process according to an embodiment of the present invention is shown.
[0046] In the accompanying drawings, the same reference numerals are used for the same components. In addition, the accompanying drawings are not drawn according to the actual scale.
[0047] The meanings of the reference numerals in the accompanying drawings are as follows: 1—coiled tubing injection head, 2—blowout preventer group, 3—blowout preventer, 4—casing, 5—tubing, 6—coiled tubing, 7—reservoir, 8—artificial well bottom, 9—temporary plugging calcium sand layer. DETAILED DESCRIPTION
[0048] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings.
[0049] At present, many completed low-pressure oil and gas wells have serious leakage, but according to the needs, one or more layers above the layer need to be repaired or tested for oil and gas, fracturing and production increase. After the repair operation or oil and gas testing, fracturing and production increase, the lower reservoir needs to be opened again to resume production. At present, the main method for this type of well with only one layer on the top is to temporarily plug the wellbore without moving the pipe string, and then insert a high-strength bridge plug. The specific methods include the following:
[0050] First, normal well killing. This will cause huge amount of fluid consumption and serious reservoir pollution (for example, in the Daqing Qingshen gas field, the average amount of conventional well killing fluid used was 500m 3 , the average daily gas production decreased by 26.5%).
[0051] Second, low-density well-killing hydraulic wells. Although oil-based well-killing fluid has low density and good oil layer protection effect, it is expensive and seriously pollutes the environment. Conventional foam well-killing fluid does not have sufficient stability underground to prevent liquid loss, and its liquid film repair ability is weak when the oil pipe moves. It will quickly lose water and shrink in high-temperature and high-mineralization water, and has poor temperature resistance. In addition, the foam well-killing process requires the use of foam generators and liquid nitrogen equipment to continuously replenish foam, which is expensive. This process is only applicable to wells where there is no interlayer pressure difference (which is almost impossible).
[0052] Third, temporary plugging with liquid rubber plugs. The main principle of the temporary plugging process of liquid rubber plugs is to inject delayed cross-linking chemical rubber plugs into the well with a cement truck or a fracturing truck without moving the pipe string. When the rubber plug reaches the reservoir, its strength reaches the maximum, thereby blocking the entire wellbore near the blasthole. During the process of rubber plug injection, if there is an equipment accident or the cross-linking is not well controlled, it may not be injected in advance or enter the reservoir. Especially when taking out the bridge plug, the friction resistance of the rubber plug through the bridge plug will be too high. Once it fails to pass, it will cause delays and repeated operations. In addition, in order to ensure the plugging effect of the liquid rubber plug in the wellbore, the rubber plug section formed in the wellbore should be maintained at 200m. In fact, many reservoir intervals are only about 10m, so this process is not suitable for wells with smaller reservoir intervals. In addition, after the rubber plug is broken, it contains a large amount of residue and needs to be washed out by negative pressure well washing, otherwise it will cause serious pollution to the reservoir.
[0053] Fourth, through-the-tubing expansion bridge plug. This is the "cable-sealed through-the-tubing expansion bridge plug technology" once launched by Baker Petroleum. However, according to its through-the-tubing expansion technical specifications, only the bridge plug with an outer diameter of Ф54.1mm can pass through the tubing, and its pressure difference is only 8.2-10.3MPa.
[0054] The above four types of process technologies all require temporary plugging before other types of high-strength bridge plugs are put in. These process technologies are greatly affected by reservoir temperature, pressure and interlayer pressure difference.
[0055] For wells that have been fractured and have serious leakage, there is currently no suitable process technology to temporarily plug and unblock the fixed tubing in the upper two or more layers of leakage reservoirs due to the pressure difference between the layers (including the injection pressure difference caused by the difference in physical properties); in addition, it is also necessary to solve the problem that the existing technology uses a large amount of liquid and the conventional temporary plugging agent pollutes the reservoir and cannot be discharged normally (negative pressure drainage is required). Therefore, a temporary plugging and unblocking process for the fixed tubing is needed, which can prevent the oil, gas and water in the reservoir from entering the wellbore, and prevent the external liquid from entering the reservoir, and at the same time withstand the liquid pressure of 20 to 90MPa in the later fracturing. The purpose of the present invention is to solve the problem that it is difficult to achieve safe and smooth operation and effectively protect the reservoir due to the pressure difference between multiple layers, including the injection pressure difference caused by the difference in physical properties, and the temporary plugging and unblocking process provided ensures that the production can be restored normally in the later stage.
[0056] Figure 1 A flow chart of a calcium sand temporary plugging and unplugging method for a low-pressure easily leaking oil and gas well according to an embodiment of the present invention is shown.
[0057] In one embodiment, the reservoir pressure coefficient of the low-pressure and easily lost oil and gas well is ≤0.9.
[0058] like Figure 1 As shown, in step S1, parameter data of the construction well are collected. Specifically, the parameter data include but are not limited to: casing 4 insertion depth, casing 4 inner diameter, artificial well bottom 8 depth, reservoir 7 upper and lower boundary depth, upper reservoir 7 lower boundary depth, oil pipe 5 size and insertion depth, reservoir 7 temperature and pressure, leakage rate, wellbore structure, wellhead specifications and models.
[0059] like Figure 1As shown, in step S2, calcium sand is selected based on parameter data. In one embodiment, in step S2, the characteristics, particle size, crushing rate, effective content of calcium carbonate, content of ferric oxide, and content of silicon dioxide of calcium sand are determined according to the reservoir protection principle that oil, gas and water cannot enter or exit the reservoir and the later development requirements of the construction well. Further, the calcium sand is natural calcium carbonate sand, that is, the calcium carbonate sand uses natural calcium sand whose surface has not been modified, and the composition requires that the effective content of calcium carbonate is not less than 98%, the content of ferric oxide is not higher than 0.02%, and the content of silicon dioxide is not higher than 0.1%. According to the proppant detection standard, the crushing rate at 40MPa is less than 35%. Further, the calcium sand particle size is selected according to the Stokes free sedimentation formula, and the sedimentation rate in the stationary clean water is required to be not less than 0.03m / s. Combined with the indoor test results, the reaction with 5% hydrochloric acid at 90°C does not exceed 90s. Therefore, the final selected calcium sand particle size is φ300~1500μm.
[0060] like Figure 1 As shown, in step S3, the design of the temporary plugging construction process is completed based on the parameter data. In one embodiment, in step S3, the temporary plugging construction equipment and quantity, calcium sand amount, sand ratio, sand-carrying liquid, sand-carrying liquid volume, sand-carrying liquid displacement, coiled tubing 6 and dragging speed are determined, and the temporary plugging construction pipe string structure and temporary plugging construction process are determined.
[0061] In one embodiment, Figure 4 As shown in the figure, the temporary plugging construction equipment includes: 1 sand-carrying liquid storage tank and 1 active water storage tank, 1 cement truck, 1 sand mixer, 1 1' or 2' coiled tubing device, 1 coiled tubing injection head, 1 blowout preventer group, 1 blowout preventer pipe, and several meters of high and low pressure pipelines. Among them, the coiled tubing model is 1' or 2', and the corresponding construction displacement Q is 0.16m 3 / min and 0.24m 3 / min, and the corresponding speeds v are 6.4m / min and 4.8m / min respectively.
[0062] In one embodiment, the amount of calcium sand is determined according to the following formula:
[0063]
[0064] Where Q represents the amount of calcium sand, m 3 ; D represents the inner diameter of the casing, mm; H represents the sand filling thickness, m; K represents the sand filling coefficient, 1.05~1.20, and the sand filling thickness refers to the distance from the bottom of the artificial well 8 to about 10m above the reservoir to be buried by sand.
[0065] In one embodiment, the displacement of the sand-carrying fluid is determined according to the inner diameter of the coiled tubing 6 and the displacement of the cement truck. The displacement of the 1' coiled tubing is 0.16m 3 / min, 2' coiled tubing displacement is 0.24m 3 / min. In order to prevent sand jam and reduce the amount of liquid entering the well, the ratio of sand-carrying liquid to calcium sand in sand filling construction is 16%. Sand-carrying liquid is a liquid with a certain viscosity that can carry calcium sand into the bottom of the well. The sand-carrying liquid is composed of active water and drag reducer. The active water is composed of clean water, foaming agent (gas well) / emulsifier (oil well) and drainage agent. Foaming agent, demulsifier and drainage agent are additives used in oil fields. The amount of sand-carrying liquid is determined according to the amount of calcium sand that needs to be added, that is, 100Q / 15, and then add 2m 3 The active water is determined according to the size of the coiled tubing 6 and the well depth, which is 5 to 10 m 3 .
[0066] In one embodiment, the temporary plugging construction pipe string structure is as follows: Figure 2 As shown, the coiled tubing injection head 1, the blowout preventer group 2, and the blowout preventer 3 are respectively connected above the construction wellhead, as shown in FIG. Figure 2 The temporary plugging construction pipe string structure shown also includes an oil pipe 5 and a continuous oil pipe 6.
[0067] like Figure 1 As shown, in step S4, temporary plugging construction is performed according to the temporary plugging construction process.
[0068] In one embodiment, step S4 comprises the following steps:
[0069] S41. Connect the temporary plugging construction equipment and connect the temporary plugging construction equipment to the temporary plugging construction pipe string structure. Specifically, connect the pipeline, sand-carrying liquid storage tank, active water storage tank and sand mixer, sand mixer and cement truck with low-pressure pipelines, cement truck and coiled tubing device with high-pressure pipelines, coiled tubing injection head 1, blowout preventer group 2, blowout preventer 3 are connected above the construction wellhead respectively.
[0070] S42, lower the coiled tubing to a preset position on the bottom of the artificial well, mix the calcium sand with the sand-carrying liquid according to the sand ratio, and pump the mixed sand-carrying liquid into the bottom of the well through the coiled tubing. Specifically, start the coiled tubing device to lower the 1' coiled tubing 6 to a preset position (e.g., 5 to 10 meters) above the bottom of the artificial well 8, start the sand mixing truck and cement truck to supply liquid, and after the pressure stabilizes, the sand mixing truck starts to add calcium sand and sand-carrying liquid at a sand ratio (e.g., 16% to 22%), and the cement truck uses a construction displacement (e.g., 0.16m 3 / min) to pump the mixed sand-carrying fluid into the well bottom through the 1' coiled tubing 6, and when the calcium sand and the sand-carrying fluid reach the artificial well bottom 8, the 1' coiled tubing 6 is pulled up at a preset speed (for example, 6.4 m / min).
[0071] S43, when the casing pressure is greater than the preset value, stop pumping the mixed sand-carrying liquid, pull out the coiled tubing, and remove the connected pipelines, and the temporary plugging construction is completed. Specifically, when the casing 4 pressure rises to exceed the preset value (e.g. 1MPa), open the casing 4 gate to release the pressure until the calcium sand and sand-carrying liquid are all released from the coiled tubing 6, shut down the sand mixing truck and cement truck, close the casing 4 gate, pull out the coiled tubing 6, remove the coiled tubing injection head 1, the blowout preventer group 2, the blowout preventer 3 and the connected pipelines to complete the construction.
[0072] like Figure 1 As shown, in step S5, based on the parameter data, temporary plugging construction process and the actual situation of temporary plugging construction, the design of the unblocking construction process is completed. In one embodiment, in step S5, the acid and acid amount, unblocking construction equipment and quantity, acid displacement, and unblocking construction pipe string structure and unblocking construction process are determined.
[0073] In one embodiment, Figure 5 As shown, the main equipment for unblocking construction includes: one acid storage tank and one active water storage tank, one cement truck, one 1' or 2' continuous tubing device, one continuous tubing injection head, one blowout preventer group, one blowout preventer pipe, and several meters of high and low pressure pipelines.
[0074] In one embodiment, the acid solution is 5-20% hydrochloric acid or low-harm UB biological acid and active water.
[0075] In one embodiment, the acid volume V and concentration n need to conform to the initial temporary plugging sand addition reaction relationship:
[0076] Vn=0.1825QρK s
[0077] Where V represents the amount of acid, m 3 ; n represents the acid concentration; Q represents the amount of calcium sand, m 3 ; ρ represents the bulk density of calcium sand, Kg / m 3 ; K s Represents the additional coefficient, and its value is 1.15.
[0078] In one embodiment, the construction displacement is determined by the reaction rate of acid solution with different concentrations and calcium sand with different particle sizes at the temperature of the reservoir 7, and the active water is determined by the size of the coiled tubing 6 and the well depth, which is 5-10m 3 .
[0079] In one embodiment, the pipe string structure for unblocking construction is as follows: Figure 3 As shown, the coiled tubing injection head 1, the blowout preventer group 2, and the blowout preventer 3 are respectively connected above the construction wellhead, as shown in FIG. Figure 3 The temporary plugging construction pipe string structure shown also includes an oil pipe 5 and a continuous oil pipe 6.
[0080] like Figure 1 As shown, in step S6, unblocking construction is performed according to the unblocking construction process.
[0081] In one embodiment, step S6 comprises the following steps:
[0082] S61, connect the unblocking construction equipment, and connect the unblocking construction equipment to the unblocking construction pipe string structure. Specifically, connect the pipelines, the acid storage tank, the active water storage tank and the cement truck with low-pressure pipelines, the cement truck and the coiled tubing device with high-pressure pipelines, and the coiled tubing injection head 1, the blowout preventer group 2, and the blowout preventer 3 are respectively connected above the construction wellhead.
[0083] S62, lower the coiled tubing 6 into the temporary plugging calcium sand layer 9, pump in acid, and when the coiled tubing 6 is lowered close to the bottom of the artificial well or the designed position, start to replace the acid with active water. Specifically, when the 1' coiled tubing 6 is lowered into the sand surface, lift the tubing to a preset position (e.g., 5-10m), start the cement truck to supply liquid, and after the pressure is stable, pump in acid with a certain displacement. When the acid reaches the temporary plugging calcium sand layer 9 through the 1' coiled tubing 6, lower the 1' coiled tubing 6, and open the tubing 5 gate to drain the liquid. When the 1' coiled tubing 6 is lowered close to the bottom of the artificial well 8 or the designed position, start to replace it with active water.
[0084] S63, when the coiled tubing reaches the bottom of the artificial well or the designed position, stop injecting active water, pull out the coiled tubing, remove the connected pipelines, and complete the unblocking construction. Specifically, when the 1' coiled tubing 6 reaches the bottom of the artificial well 8 or the designed position, stop injecting active water, pull out the 1' coiled tubing 6, remove the coiled tubing injection head 1, the blowout preventer group 2, the blowout preventer 3 and the connected pipelines to complete the construction.
[0085] The present invention also provides a calcium sand temporary plugging and unblocking system for low-pressure and easily leaked oil and gas wells, and implements a calcium sand temporary plugging and unblocking method for low-pressure and easily leaked oil and gas wells. The system includes: a design module, equipment required for temporary plugging construction, and equipment required for unblocking construction.
[0086] Specifically, the design module is used to perform the following steps: collect parameter data of the construction well; select calcium sand based on the parameter data; complete the design of the temporary plugging construction process based on the parameter data; complete the design of the unblocking construction process based on the parameter data, the temporary plugging construction process and the actual situation of the temporary plugging construction; the equipment required for temporary plugging construction is used to perform temporary plugging construction according to the temporary plugging construction process; the equipment required for unblocking construction is used to perform unblocking construction according to the unblocking construction process.
[0087] The calcium sand temporary plugging and unplugging method and system for low-pressure and easily lost oil and gas wells provided by the present invention can also be used in conjunction with a computer-readable storage medium, on which a computer program is stored, and the computer program is executed to run a calcium sand temporary plugging and unplugging method for low-pressure and easily lost oil and gas wells. The computer program can run computer instructions, and the computer instructions include computer program code, which can be in source code form, object code form, executable file or some intermediate form, etc.
[0088] Computer-readable storage media may include: any entity or device that can carry computer program code, recording media, USB flash drives, mobile hard disks, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.
[0089] It should be noted that the content contained in computer-readable storage media can be appropriately increased or decreased based on the requirements of legislation and patent practices in the jurisdiction. For example, in some jurisdictions, based on legislation and patent practices, computer-readable storage media do not include electrical carrier signals and telecommunications signals.
[0090] In summary, the present invention provides a method and system for temporary plugging and unblocking of calcium sand for low-pressure and leak-prone oil and gas wells, which can prevent the fluid in the reservoir from entering the wellbore, and can also prevent the fluid in the wellbore from entering the reservoir, solving the problem that the foam well-killing fluid, liquid gel and rubber plug cannot adapt to the working conditions caused by the serious leakage of such wells and the possible pressure difference between the upper and lower layers, and can realize pressure operation, thereby ensuring the safety of engineering construction. The present invention is not limited by the well temperature, pressure and interlayer pressure difference. The present invention can operate without moving the tubing string during temporary plugging and unblocking, thereby reducing construction costs and improving construction efficiency. The present invention uses low-damage well entry materials to perform temporary plugging and unblocking operations without moving the tubing string, thereby minimizing reservoir pollution.
[0091] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.
[0092] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0093] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0094] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.
[0095] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0096] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.
Claims
1. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells, characterized in that: The method comprises: S1. Collect parameter data of construction wells; S2. Selecting calcium sand based on the parameter data; S3. Based on the parameter data, the design of the temporary plugging construction process is completed; S4. Perform temporary plugging construction according to the temporary plugging construction process; S5. Based on the parameter data, temporary plugging construction technology and actual situation of temporary plugging construction, complete the design of unblocking construction technology; S6. Carry out unblocking construction according to the unblocking construction process.
2. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in claim 1, characterized in that: In step S1, the parameter data include but are not limited to: casing depth, casing inner diameter, artificial well bottom depth, reservoir upper and lower boundary depths, upper reservoir lower boundary depth, tubing size and depth, reservoir temperature and pressure, leakage rate, wellbore structure, and wellhead specifications and models.
3. The calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells according to claim 1, characterized in that: In step S2, the characteristics, particle size, crushing rate, effective content of calcium carbonate, ferric oxide content, and silicon dioxide content of the calcium sand are determined based on the reservoir protection principle that oil, gas, and water cannot enter or exit the reservoir and the later development requirements of the construction well.
4. The calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells according to claim 1, characterized in that: In step S3, the temporary plugging construction equipment and quantity, calcium sand amount, sand ratio, sand-carrying liquid, sand-carrying liquid volume, sand-carrying liquid displacement, coiled tubing and dragging speed are determined, and the temporary plugging construction pipe string structure and temporary plugging construction process are determined.
5. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in claim 4, characterized in that: In step S3, the amount of calcium sand is determined according to the following formula: Where Q represents the amount of calcium sand, m 3 ; D represents the inner diameter of the casing, mm; H represents the sand filling thickness, m; K represents the sand filling coefficient.
6. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in any one of claims 4 to 5, characterized in that: Step S4 comprises the following steps: Connecting the temporary plugging construction equipment, and connecting the temporary plugging construction equipment with the temporary plugging construction pipe string structure; The coiled tubing is lowered into a preset position on the bottom of an artificial well, calcium sand is mixed with a sand-carrying liquid according to the sand ratio, and the mixed sand-carrying liquid is pumped into the bottom of the well through the coiled tubing; When the casing pressure is greater than a preset value, the pumping of the mixed sand-carrying fluid is stopped, the coiled tubing is pulled out, and the connected pipelines are removed, and the temporary plugging construction is completed.
7. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in any one of claims 4 to 6, characterized in that: In step S5, the acid liquid and its amount, the unblocking construction equipment and its quantity, the acid liquid displacement, and the unblocking construction pipe string structure and unblocking construction process are determined.
8. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in claim 7, characterized in that: In step S5, the amount of acid and the concentration of acid must satisfy the following relationship: Vn=0.1825QρK s Where V represents the amount of acid, m 3 ; n represents the acid concentration; Q represents the amount of calcium sand, m 3 ; ρ represents the bulk density of calcium sand, Kg / m 3 ; K s Represents an additional coefficient.
9. A calcium sand temporary plugging and unblocking method for low-pressure and easily leaking oil and gas wells as claimed in any one of claims 7 to 8, characterized in that: Step S6 comprises the following steps: Connecting the unblocking construction equipment, and connecting the unblocking construction equipment with the unblocking construction pipe string structure; The coiled tubing is lowered into the temporary plugging calcium sand layer, and the acid solution is pumped in. When the coiled tubing is lowered close to the bottom of the artificial well or the designed position, the acid solution is replaced by active water; When the coiled tubing reaches the bottom of the artificial well or the designed position, the injection of active water is stopped, the coiled tubing is pulled out, the connected pipelines are removed, and the unblocking construction is completed.
10. A calcium sand temporary plugging and unblocking system for low-pressure and easily leaking oil and gas wells, characterized in that: The method according to any one of claims 1 to 9 is performed, wherein the system comprises: Design a module that performs the following steps: Collect parameter data of construction wells; Based on the parameter data, calcium sand is selected; Based on the parameter data, the design of temporary plugging construction technology is completed; Based on the parameter data, temporary plugging construction technology and the actual situation of temporary plugging construction, the design of the unblocking construction technology is completed; Equipment required for temporary plugging construction, which is used to carry out temporary plugging construction according to the temporary plugging construction process; The equipment required for unblocking construction is used to carry out unblocking construction according to the unblocking construction process.