Device suitable for strong permeable layer shield to penetrate through ultra-deep vertical shaft and construction method of device
By using reinforced concrete sleeves and steel sleeve structures when crossing the shaft in the shield tunnel, combined with waterproofing devices and grouting technology, the construction complexity and safety hazards in the existing technology are solved, and the construction process is simplified and safe. Improvement of sex.
Patent Information
- Application Number
- CN202411269902.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-26
AI Technical Summary
When crossing vertical shafts during shield tunnel construction, the existing technology has many construction processes, high costs and high risks. Especially under high water-rich and complex geological conditions, there are safety hazards such as water gushing and sand gushing, and the backfilling and chiseling of concrete projects are backfilling and chiseling. Large, increasing complexity and risk.
The reinforced concrete sleeve and steel sleeve structure are adopted, combined with waterproofing devices, and the soil and water are backfilled in the sleeve structure to maintain balance. When the shield machine passes through, the building gap is formed behind the shield pipe sheet, synchronous and secondary grouting filling are performed to reduce End reinforcement and backfill project volume to reduce construction complexity and risks.
The construction process is simplified, the construction time and cost are reduced, the construction progress is improved, the structure is compact and waterproof, the risk of water and sand gushing is avoided, the project volume and risk is reduced, and a more stable construction environment is provided.
Smart Images

Figure CN119021703A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, and in particular to a device suitable for a shield machine with a strong permeable layer to pass through an ultra-deep vertical shaft and a construction method thereof. Background Art
[0002] During the construction of shield tunnels, shield machines often need to pass through vertical shafts, especially under complex geological conditions with high water content. The difficulty and risk of such construction environments are greatly increased. In order to ensure the safety of construction, existing technologies usually adopt a variety of measures to control the water and soil pressure in the shaft to prevent dangerous accidents such as water and sand gushing during construction. The existing common practice is to set up a closed structure or a U-shaped plain ground wall waterproofing on the outside of the shaft structure, and to fully reinforce the area between the ground wall and the surrounding structure through processes such as mixing piles or rotary jet piles. In order to ensure the safety of the construction opening, temporary vertical freezing technology is usually used at the opening, and auxiliary precipitation measures are reserved to reduce the pressure of groundwater. The interior of the shaft structure is usually backfilled with plastic concrete. After the shield machine passes through, it is necessary to chisel out these plastic concrete and reinforced concrete segments, and to construct post-cast ring beams to ensure structural stability.
[0003] Although the above method has a certain effect in ensuring the safety of shaft crossing, it also has some obvious shortcomings. First, the construction process is numerous, involving multiple complex processes such as closed structure, water-stopping measures, reinforcement piles, and temporary freezing technology, resulting in long construction time and high cost. In addition, a large number of end reinforcement measures are usually adopted on the outside of the shaft, which increases the construction difficulty and investment cost. Secondly, after the shield machine passes through the shaft, the plastic concrete inside needs to be backfilled and chiseled out, which increases the engineering volume and construction complexity, especially the chiseling of the pipe segments is time-consuming and labor-intensive, and is prone to cause engineering risks. Therefore, the existing technology still has room for improvement in improving engineering efficiency, reducing risks and saving costs. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention proposes a device and a construction method suitable for a highly permeable layer shield tunneling through an ultra-deep shaft, aiming to simplify the construction process, reduce the end reinforcement measures on the outside of the shaft, reduce the amount of backfilling and removal of plastic concrete, and avoid the removal of a large number of shield segments.
[0005] To achieve the above object, the technical solution of the present invention is as follows:
[0006] A device suitable for a shield machine with a highly permeable layer to pass through an ultra-deep shaft comprises a sleeve structure, wherein the sleeve structure comprises a reinforced concrete sleeve, a steel sleeve and a waterproof device, wherein the reinforced concrete sleeve is arranged at two ends, respectively connected to the early ring beam of the ultra-deep shaft side wall and protrudes from the side wall by a certain length, the steel sleeve is arranged between the reinforced concrete sleeves on both sides, and the waterproof device is arranged between the reinforced concrete sleeve and the steel sleeve; water and soil are backfilled in the sleeve structure, so that the pressure of the water and soil is balanced with the water and soil pressure of the outer retaining structure of the ultra-deep shaft, and when the shield machine passes through, a building gap is formed behind the shield segment, and the building gap is filled by grouting.
[0007] Preferably, the construction gap of the reinforced concrete sleeve is reinforced with back grouting by various measures.
[0008] Preferably, polyurethane is injected into the building gap.
[0009] Preferably, the cross-section of the reinforced concrete sleeve is circular, connected to the early ring beam at the end wall, and the wall thickness on the side close to the underground continuous wall is greater than the wall thickness on the side close to the steel sleeve.
[0010] Preferably, it also includes a plain concrete foundation, which is arranged at the bottom of the ultra-deep shaft to support the reinforced concrete sleeve and the steel sleeve.
[0011] Preferably, the waterproof device comprises a curtain rubber plate and a flap.
[0012] The present invention also discloses a construction method based on the above-mentioned device suitable for shield tunneling through a super-deep shaft through a strong permeable layer, comprising the following steps:
[0013] S1, reinforced concrete sleeves are set on both sides of the ultra-deep shaft so that they protrude a certain length from the side wall of the ultra-deep shaft;
[0014] S2, a steel sleeve is arranged between the reinforced concrete sleeves on both sides, and a waterproof device is arranged between the steel sleeve and the reinforced concrete sleeve;
[0015] S3, backfilling a plain concrete foundation at the bottom of the ultra-deep shaft to support and fix the reinforced concrete sleeve and the steel sleeve;
[0016] S4, backfilling water and soil in the sleeve structure to balance the water and soil pressure of the water and soil pressure of the outer retaining structure of the ultra-deep shaft;
[0017] S5, shield machine crossing construction, assembling shield segments, and the building gap behind the shield segments is initially filled by synchronous grouting;
[0018] S6, further densely filling the building gap at the reinforced concrete sleeve position by secondary grouting, and injecting polyurethane to enhance water seepage resistance.
[0019] Preferably, the method further comprises step S7, wherein the steel sleeve is removed after the shield machine has completed the crossing construction.
[0020] Preferably, during the shield tunneling construction and removal of the steel sleeve, the displacement and deformation monitoring of the reinforced concrete sleeve segment and the detection of groundwater and soil behind it are carried out.
[0021] Preferably, in step S7, before removing the steel sleeve, the grouting body of the building gap (4) at the reinforced concrete sleeve position is inspected to ensure the quality of filling the building gap.
[0022] The beneficial effects of the present invention are as follows:
[0023] First, through the design of reinforced concrete sleeves and steel sleeves, the present invention effectively simplifies the construction process of the shield machine crossing the ultra-deep shaft, avoids complicated end reinforcement measures, and reduces the need for a large number of structural reinforcements on the outside of the shaft. This simplification not only reduces the complexity of construction, but also reduces the occupation of construction resources and time, and significantly improves the construction progress. Secondly, the present invention ensures the compactness and waterproof performance of the structure by performing synchronous grouting and secondary grouting in the building gap between the shield segment and the reinforced concrete sleeve, avoiding the safety hazard of water and sand gushing. The design of the device reduces the need for backfilling plastic concrete in the shaft, avoids the subsequent large-scale chiseling of concrete and segments, reduces engineering risks, and simplifies the post-construction processing work. In addition, the present invention can backfill water and soil inside the sleeve, maintain the balance of water and soil pressure inside and outside under high water-rich complex geological conditions, avoid geological problems such as water and sand gushing that may be caused when the shield machine passes through, and ensure the safety and stability of the shield during the crossing process, which not only reduces the risk of geological disasters caused by unbalanced pressure, but also provides a more stable working environment for subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of a device suitable for a shield tunnel in a highly permeable layer to pass through an ultra-deep vertical shaft according to an embodiment of the present invention;
[0025] Figure 2 This is a cross-sectional view of a device suitable for a shield tunnel in a highly permeable layer to pass through an ultra-deep shaft according to an embodiment of the present invention;
[0026] Figure 3 This is a flow chart of a construction method for a shield tunneling machine suitable for a strong permeable layer to pass through an ultra-deep vertical shaft according to an embodiment of the present invention;
[0027] Figure numerals: 1—reinforced concrete sleeve, 2—steel sleeve, 3—waterproof device, 4—building gap, 5—shield segment, 6—plain concrete base. DETAILED DESCRIPTION
[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the present invention.
[0029] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.
[0030] See also Figure 1-2 This embodiment provides a device suitable for a shield machine with a strong permeable layer to pass through an ultra-deep shaft, including a sleeve structure, which is composed of a reinforced concrete sleeve 1, a steel sleeve 2 and a waterproof device 3. The sleeve structure not only provides a stable channel for the shield machine to pass through. The reinforced concrete sleeves are arranged at both ends, respectively connected to the early ring beams of the side walls of the ultra-deep shaft, and protrude from the side walls by a certain length. The steel sleeve 2 is arranged between the reinforced concrete sleeves 1 on both sides. The steel sleeve 2 is mainly used to provide a passing space when the shield machine passes through, ensuring that the water and soil pressure inside and outside the shaft remain balanced when the shield machine passes through, thereby preventing the risk of water and soil leakage. The waterproof device 3 is located between the reinforced concrete sleeve 1 and the steel sleeve 2, and includes a curtain rubber plate and a flap. The curtain rubber and the flap form a sealing effect to ensure that it still has good waterproof performance under high water pressure conditions.
[0031] The inside of the sleeve structure is filled with water and soil, and the pressure of these water and soil is balanced with the water and soil pressure of the outer retaining structure of the ultra-deep shaft. Through this pressure balance, the instability caused by the pressure difference during the crossing of the shield machine, such as water or sand gushing, can be avoided. When the shield machine crosses, building gaps 4 are formed behind the shield segments 5. These gaps need to be filled by grouting. Grouting not only plays a sealing role, but also further improves the stability of the structure by reinforcing the building gaps 4, avoiding water seepage or structural displacement problems in the later stage.
[0032] In this embodiment, the grouting method of the building gap 4 at the reinforced concrete sleeve 1 adopts multiple measures to strengthen the back grouting. Synchronous grouting can be performed during the shield machine crossing process. Synchronous grouting means grouting while the shield is excavating to ensure that the building gap 4 is filled in time to avoid the generation of gaps. The secondary grouting is to grout the building gap 4 at the reinforced concrete sleeve 1 again after the shield machine has passed through, so as to further compact the gap, increase the waterproof performance and ensure the long-term stability of the tunnel structure. In order to enhance the sealing effect of the building gap 4, polyurethane is also injected into it. The polyurethane material has excellent elasticity and waterproof performance, which can effectively prevent water seepage and improve the waterproof performance and durability of the tunnel structure.
[0033] Furthermore, the cross-section of the reinforced concrete sleeve 1 is designed to be circular, which is convenient for the shield machine to pass through, and the reinforced concrete sleeve 1 is connected to the pre-ring beam at the end wall, ensuring the continuity and stability of the entire structure. The pre-ring beam plays a role in reinforcing the side walls and ends of the shaft. After connecting with the reinforced concrete sleeve 1, the overall structure forms a complete annular support system, which effectively enhances the compressive strength and stability of the shaft. A thicker wall is designed on the side close to the underground continuous wall to provide greater strength and stability, while the wall on the side close to the steel sleeve 2 is thinner to provide space for the installation of the steel sleeve 2, while reducing the use of materials while ensuring the overall structural strength.
[0034] Furthermore, a plain concrete base 6 is installed at the bottom of the ultra-deep shaft to support the reinforced concrete sleeve 1 and the steel sleeve 2, ensuring that the bottom support is more stable, preventing the bottom of the shaft from sinking or other structural problems under long-term bearing pressure, and further improving the safety and stability of the shield when passing through the shaft.
[0035] See also Figure 3 Another embodiment of the present invention describes a construction method based on the above-mentioned device suitable for shield tunneling through a highly permeable layer through an ultra-deep shaft, comprising the following steps:
[0036] S1, firstly, reinforced concrete sleeves 1 are installed on both sides of the ultra-deep shaft. The reinforced concrete sleeves 1 are designed to protrude from the side walls of the ultra-deep shaft by a certain length.
[0037] Through the above steps, it is ensured that when the shield machine passes through, the reinforced concrete sleeve 1 can not only provide stable structural support, but also prevent the side wall of the shaft from being affected by the construction.
[0038] S2, installing a steel sleeve 2 between the reinforced concrete sleeves 1 on both sides, and installing a waterproof device 3 between the reinforced concrete sleeve 1 and the steel sleeve 2.
[0039] Through the above steps, the steel sleeve 2 provides additional support during tunnel excavation, and the waterproof device 3 ensures sealing performance to avoid water infiltration during construction.
[0040] S3, backfilling a plain concrete foundation 6 at the bottom of the ultra-deep shaft to support and fix the reinforced concrete sleeve 1 and the steel sleeve 2.
[0041] Through the above steps, the plain concrete base 6 provides a stable basic support for the entire sleeve structure, preventing settlement or other structural problems at the bottom of the shaft, and further improving the overall structural stability.
[0042] S4, backfill water and soil inside the sleeve structure to balance the water and soil pressure with the water and soil pressure of the outer retaining structure of the ultra-deep shaft.
[0043] Through the above steps, water and soil are filled to balance the water and soil pressure of the external retaining structure, ensuring that the pressure inside and outside the shaft is consistent. This balance can effectively prevent water and sand gushing when the shield machine passes through, reducing risks during construction.
[0044] S5, the shield machine passes through the construction and assembles the shield segments 5. The building gap 4 behind the shield segments 5 is initially filled by synchronous grouting.
[0045] Through the above steps, as the shield machine advances, the shield segments 5 are laid. The shield segments 5 serve as the supporting structure of the tunnel to ensure the stability of the inner wall of the tunnel. A building gap 4 is formed on the back of the shield segment 5. At this time, the building gap 4 is preliminarily filled by synchronous grouting to ensure the density of the gap and provide a basis for subsequent construction.
[0046] S6, further densely filling the building gap 4 at the location of the reinforced concrete sleeve 1 by secondary grouting, and injecting polyurethane to enhance water seepage resistance.
[0047] Through the above steps, the building gap 4 at the reinforced concrete sleeve 1 is further densely filled by secondary grouting to ensure that the gap is completely sealed, and polyurethane is injected into the gap to enhance its water seepage resistance, thereby ensuring that the entire structure still has good waterproof performance under high water pressure conditions and avoiding subsequent leakage problems.
[0048] Furthermore, step S7 is also included, in which after the shield machine completes the crossing construction, the steel sleeve 2 is removed. By compacting the building gap and lengthening the distance of the seepage channel to increase the seepage resistance, it is ensured that no water or sand gushing accidents occur when the steel sleeve 2 is removed. In addition, during the shield machine crossing construction and the removal of the steel sleeve 2, the displacement and deformation of the pipe segments in the section where the reinforced concrete sleeve 1 is located must be monitored to ensure the stability of the tunnel structure when the shield machine crosses and removes the steel sleeve 2. In addition, the groundwater flow behind the reinforced concrete sleeve 1 and the stability of the soil must be monitored to prevent water and soil seepage or soil displacement due to pressure changes during the construction process. In step S7, before removing the steel sleeve 2, it is first necessary to inspect the grouting body in the building gap 4 at the reinforced concrete sleeve 1 to ensure that the grouting body in the building gap 4 has been completely filled and dense, so as to avoid leakage or structural instability due to insufficient filling after the steel sleeve 2 is removed. Only after the inspection confirms that the quality of the grouting body in the building gap 4 meets the requirements, the removal of the steel sleeve 2 can be continued, thereby ensuring that the stability and safety of the entire tunnel will not be affected during the removal process.
[0049] In summary, the present invention discloses a device and a construction method suitable for shield tunneling through ultra-deep shafts in highly permeable layers. By adopting the optimized design of reinforced concrete sleeves 1 and steel sleeves 2, the construction process of shield tunneling through ultra-deep shafts is effectively simplified, the traditional end reinforcement measures are omitted, the amount of backfilling and chiseling of plastic concrete is reduced, and the operation of chiseling a large number of shield segments 5 is avoided, which not only reduces the risk in the construction process, but also significantly improves the progress of the project. By reducing cumbersome processes and material consumption, the present invention saves a lot of project investment while ensuring the quality of the project. The method has strong applicability and convenient operation. It is particularly suitable for the construction of shield tunnels crossing ultra-deep shafts under highly permeable strata. It has high practical value and promotion significance. While reducing construction risks, the present invention significantly saves project investment and provides an efficient, safe and economical solution for shield tunneling projects.
[0050] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may also be combined, the steps may be implemented in any order, and there are many other changes in different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity. Although the present invention has been described in detail with reference to the above embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the above embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A device suitable for shield tunneling through a highly permeable layer through an ultra-deep shaft, characterized in that: The invention comprises a sleeve structure, wherein the sleeve structure comprises a reinforced concrete sleeve (1), a steel sleeve (2) and a waterproof device (3); the reinforced concrete sleeve (1) is arranged at two ends, respectively connected to the early ring beam of the side wall of the ultra-deep shaft, and protrudes from the side wall by a certain length; the steel sleeve (2) is arranged between the reinforced concrete sleeves (1) on both sides; and the waterproof device (3) is arranged between the reinforced concrete sleeve (1) and the steel sleeve (2); water and soil are backfilled in the sleeve structure so that the pressure of the water and soil is balanced with the water and soil pressure of the outer enclosure structure of the ultra-deep shaft; when the shield machine passes through, a building gap (4) is formed behind the shield segment (5), and the building gap (4) is filled by grouting.
2. The device suitable for shield tunneling through a super-deep shaft in a highly permeable layer according to claim 1, characterized in that: The building gap (4) of the reinforced concrete sleeve (1) adopts multiple measures to strengthen the back grouting.
3. The device suitable for shield tunneling through a super-deep shaft in a highly permeable layer according to claim 2, characterized in that: Polyurethane is injected into the building gap (4).
4. The device suitable for a strong permeable layer shield tunneling through an ultra-deep shaft according to claim 1, characterized in that: The cross-section of the reinforced concrete sleeve (1) is circular and connected to the early ring beam at the end wall. The wall thickness on the side close to the underground continuous wall is greater than the wall thickness on the side close to the steel sleeve (2).
5. The device suitable for a strong permeable layer shield tunneling through an ultra-deep shaft according to claim 1, characterized in that: It also comprises a plain concrete base (6) which is arranged at the bottom of the ultra-deep shaft to support the reinforced concrete sleeve (1) and the steel sleeve (2).
6. The device suitable for a strong permeable layer shield tunneling through an ultra-deep shaft according to claim 1, characterized in that: The waterproof device (3) comprises a curtain rubber plate and a flap.
7. A construction method for a device suitable for a strong permeable layer shield tunneling through an ultra-deep shaft based on any one of claims 1 to 6, characterized in that: The following steps are involved: S1, a reinforced concrete sleeve (1) is arranged on both sides of the ultra-deep shaft so that it protrudes from the side wall of the ultra-deep shaft by a certain length; S2, a steel sleeve (2) is arranged between the reinforced concrete sleeves (1) on both sides, and a waterproof device (3) is arranged between the steel sleeve (2) and the reinforced concrete sleeve (1); S3, backfilling a plain concrete foundation (6) at the bottom of the ultra-deep shaft to support and fix the reinforced concrete sleeve (1) and the steel sleeve (2); S4, backfilling water and soil in the sleeve structure to balance the water and soil pressure of the water and soil pressure of the outer retaining structure of the ultra-deep shaft; S5, the shield machine crosses the construction, assembles the shield segments (5), and the building gap (4) behind the shield segments (5) is initially filled by synchronous grouting; S6, further compacting and filling the building gap (4) at the location of the reinforced concrete sleeve (1) by secondary grouting, and injecting polyurethane to enhance water seepage resistance.
8. The construction method according to claim 7, characterized in that: The invention also comprises step S7, wherein after the shield machine passes through the construction, the steel sleeve (2) is removed.
9. The construction method according to claim 8, characterized in that: During the shield tunneling construction and steel sleeve removal process, the displacement and deformation monitoring of the reinforced concrete sleeve segment and the detection of groundwater and soil behind it are carried out.
10. The construction method according to claim 9, characterized in that: In the step S7, before removing the steel sleeve (2), the grouting body of the building gap (4) at the reinforced concrete sleeve (1) is inspected to ensure the filling quality of the building gap (4).
Citation Information
Patent Citations
Shield portal sealing device capable of adjusting positions and off-center installation method thereof
CN107143339A
Shield tunneling machine air shaft passing method based on steel sleeve device
CN108625866A
Construction method for shield launching by short sleeve
CN108843337A
Construction system and construction method for shield to pass through air shaft
CN115949419A
Starting and receiving device for shield construction
CN217055188U