Power transmission line icing early warning method and device
By establishing the correspondence between the maximum arc sag of the transmission line and the temperature, it is possible to accurately determine whether the transmission line has ice covering, which solves the problem of low accuracy of ice covering warning in the prior art, and achieves a more accurate ice covering warning.
Patent Information
- Application Number
- CN202411193155.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-28
AI Technical Summary
In the prior art, the early warning method for ice-covered transmission lines relies on a multivariate physical quantities mathematical model, and the model parameters are not accurate enough, resulting in low accuracy of the prediction results of ice-covered disasters.
By obtaining the current temperature and maximum sag of the target transmission line, establish the correspondence between the maximum sag and temperature, predict the maximum sag, and judge whether ice cover occurs based on the sag difference value, and provide early warning.
It improves the accuracy of the early warning of ice covering of transmission lines, reduces the influence of artificial empirical factors, and enhances the theoretical rationality of the prediction results.
Smart Images

Figure CN119024101A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of transmission lines, and in particular to a method and device for early warning of icing of transmission lines. Background Art
[0002] With the rapid development of the power industry, the safety of transmission lines has received widespread attention. Transmission lines are prone to icing in winter, which can easily cause accidents such as ice flash tripping, tower collapse and line breakage, which seriously affect the safe and stable operation of the power grid. Therefore, early prediction and warning of the scope and degree of icing on transmission lines can effectively prevent icing disasters on transmission lines and strongly support the safe and stable operation of transmission lines.
[0003] At present, the existing methods for early warning of ice accumulation on transmission lines are mostly based on the prediction method of ice accumulation on transmission lines based on the mathematical model of multivariate physical quantities; however, the parameters of the model in the existing technology are not accurate enough, and the artificial experience factor occupies a major position. Therefore, it does not have strong theoretical rationality, resulting in low accuracy of the prediction results of ice accumulation disasters on transmission lines. Summary of the invention
[0004] Based on this, it is necessary to provide a transmission line icing warning method and device that can accurately monitor and warn of icing on transmission lines in response to the above technical problems.
[0005] In a first aspect, the present application provides a transmission line icing warning method, comprising:
[0006] Obtain the current temperature and current maximum sag of the target transmission line;
[0007] Determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature;
[0008] Determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag;
[0009] When it is determined that ice is applied to the target transmission line, an ice application warning is issued to the target transmission line.
[0010] In one embodiment, the correspondence between the maximum sag and the temperature is determined by:
[0011] Obtaining historical monitoring data of the target transmission line by means of a monitoring instrument installed on the target transmission line; wherein the historical monitoring data includes historical temperatures and historical maximum sags at different historical moments;
[0012] From the historical monitoring data, extract the historical monitoring data of the target transmission line in an ideal environment as the target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment;
[0013] According to the target monitoring data, a corresponding relationship between the maximum sag and the temperature of the target transmission line is constructed.
[0014] In one embodiment, determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag includes:
[0015] Taking the difference between the current maximum sag and the predicted maximum sag as the sag difference;
[0016] If the sag difference is greater than a preset error threshold, it is determined that ice coating occurs on the target transmission line.
[0017] In one embodiment, the providing of ice warning for the target transmission line includes:
[0018] Acquiring characteristic data and current load parameters of the target transmission line;
[0019] Determining the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter;
[0020] According to the ice thickness, an ice cover warning is issued to the target transmission line.
[0021] In one embodiment, the characteristic data includes static characteristic data and dynamic characteristic data, and the step of obtaining the characteristic data and current load ratio parameters of the target transmission line includes:
[0022] Acquiring the dynamic characteristic data through a monitoring instrument installed on the target transmission line;
[0023] Determining the static characteristic data according to the attribute information of the target transmission line;
[0024] The current load ratio parameter of the target transmission line is determined according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0025] In one embodiment, the dynamic characteristic data includes the outer diameter, cross-sectional area, mass parameter, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data includes the horizontal span, height difference angle, wind deviation angle, first temperature under ideal environment and second temperature under abnormal environment of the target transmission line; the current specific load parameter includes the deadweight specific load under the ideal environment and the comprehensive specific load under the abnormal environment;
[0026] The ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-covered and windy environment.
[0027] In one embodiment, determining the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag includes:
[0028] The product of the mass parameter and the gravitational acceleration is used as the first intermediate parameter;
[0029] Determining the deadweight specific load according to the ratio between the first intermediate parameter and the cross-sectional area;
[0030] The comprehensive specific load is determined according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0031] In one embodiment, determining the comprehensive specific load of the target transmission line according to the deadweight specific load of the target transmission line, the predicted maximum sag, the current maximum sag, the inherent characteristic data and the measured characteristic data includes:
[0032] The ratio of the product of the current maximum sag and the deadweight specific load to the predicted maximum sag is used as a second intermediate parameter;
[0033] Determining a third intermediate parameter according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle;
[0034] determining a fourth intermediate parameter according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle, and the horizontal span;
[0035] The difference between the second intermediate parameter and the third intermediate parameter, and the difference between the fourth intermediate parameter, are used as the comprehensive ratio.
[0036] In one embodiment, determining the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter includes:
[0037] The difference between the product of the cosine value of the wind deflection angle and the comprehensive specific load and the deadweight specific load is taken as the fifth intermediate parameter;
[0038] The ice coating thickness of the target transmission line is determined according to the cross-sectional area, the outer diameter and the fifth intermediate parameter.
[0039] In a second aspect, the present application also provides a transmission line icing warning device, comprising:
[0040] A data acquisition module, used to obtain the current temperature and current maximum sag of the target transmission line;
[0041] A sag determination module, used to determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature;
[0042] An icing determination module, used to determine whether icing occurs on the target transmission line according to the current maximum sag and the predicted maximum sag;
[0043] The icing warning module is used to issue an icing warning to the target transmission line when it is determined that the target transmission line is iced.
[0044] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0045] Obtain the current temperature and current maximum sag of the target transmission line;
[0046] Determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature;
[0047] Determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag;
[0048] When it is determined that ice is applied to the target transmission line, an ice application warning is issued to the target transmission line.
[0049] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:
[0050] Obtain the current temperature and current maximum sag of the target transmission line;
[0051] Determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature;
[0052] Determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag;
[0053] When it is determined that ice is applied to the target transmission line, an ice application warning is issued to the target transmission line.
[0054] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0055] Obtain the current temperature and current maximum sag of the target transmission line;
[0056] Determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature;
[0057] Determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag;
[0058] When it is determined that ice is applied to the target transmission line, an ice application warning is issued to the target transmission line.
[0059] The above-mentioned transmission line icing warning method and device obtain the current temperature and current maximum sag of the target transmission line, and determine the predicted maximum sag of the target transmission line at the current temperature according to the corresponding relationship between the current temperature and the maximum sag and the temperature; further, determine whether the target transmission line is icing according to the current maximum sag and the predicted maximum sag, and in the case where it is determined that the target transmission line is icing, issue an icing warning to the target transmission line. The above-mentioned scheme, by introducing the corresponding relationship between the maximum sag and the temperature, can accurately reflect the maximum sag of the target transmission line at different temperatures. Therefore, based on the corresponding relationship between the maximum sag and the temperature, it can accurately determine the predicted maximum sag of the target transmission line at the current temperature, that is, the maximum sag when no icing occurs; further, according to the current maximum sag and the predicted maximum sag, it can reasonably and accurately determine whether the target transmission line is icing, so it can accurately issue an icing warning to the target transmission line. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0061] Figure 1 A diagram showing an application environment of a transmission line icing warning method in one embodiment;
[0062] Figure 2 It is a schematic diagram of a flow chart of a method for early warning of ice covering of a transmission line in one embodiment;
[0063] Figure 3A schematic diagram of a flow chart for determining a corresponding relationship between a maximum sag and a temperature in one embodiment;
[0064] Figure 4 A curve showing a maximum sag versus temperature variation of a target transmission line constructed in one embodiment;
[0065] Figure 5 A schematic diagram of a process for determining whether ice coating occurs on a target transmission line in one embodiment;
[0066] Figure 6 It is a schematic diagram of a process of providing ice cover warning for a target transmission line in one embodiment;
[0067] Figure 7 A schematic diagram of a process for obtaining characteristic data and current load parameters in one embodiment;
[0068] Figure 8 A schematic diagram of a flow chart of determining a current load ratio parameter of a target transmission line in one embodiment;
[0069] Fig. 9 A schematic diagram of a flow chart for determining a comprehensive load ratio of a target transmission line in one embodiment;
[0070] Fig.10 A schematic diagram of a process for determining ice thickness of a target transmission line in one embodiment;
[0071] Fig.11 It is a flow chart of a method for early warning of ice covering of a transmission line in another embodiment;
[0072] Fig.12 It is a structural block diagram of a transmission line ice warning device in one embodiment;
[0073] FIG. 13 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0074] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0075] The transmission line icing warning method provided in the embodiment of the present application can be applied to Figure 1In the application environment shown. Among them, the monitoring instrument 102 is a device installed on the target transmission line for monitoring the target transmission line and the environment in which the target transmission line is located; the information processing device 101 is a device for processing the data monitored by the monitoring instrument. Optionally, after obtaining the current temperature and the current maximum sag of the target transmission line monitored by the monitoring instrument 102, the information processing device 101 determines the predicted maximum sag of the target transmission line at the current temperature according to the corresponding relationship between the current temperature and the maximum sag and the temperature; and determines whether the target transmission line is covered with ice according to the current maximum sag and the predicted maximum sag; when it is determined that the target transmission line is covered with ice, an ice warning is issued for the target transmission line.
[0076] In one embodiment, Figure 2 As shown, a transmission line icing warning method is provided, and the method is applied to Figure 1 The information processing device 101 in the example is used as an example to illustrate, and specifically includes the following steps:
[0077] S201, obtaining the current temperature and current maximum sag of the target transmission line.
[0078] Among them, the target transmission line is the transmission line that needs to be monitored for ice coverage. Furthermore, the target transmission line can be the transmission line between any two adjacent base poles within the monitoring range; the current dimension is the temperature of the target transmission line in the current period; the sag is the vertical distance between the lowest point of the target transmission line and the line connecting the two hanging points when the hanging heights of the target transmission line on two adjacent base poles on which the target transmission line is hung are the same; the current maximum sag is the maximum sag reached by the target transmission line in the current period.
[0079] Optionally, in an embodiment of the present application, the condition of the target transmission line and the condition of the environment in which the target transmission line is located can be monitored in real time by a monitoring instrument installed on the target transmission line. Therefore, the current temperature and the current maximum sag of the target transmission line at the current moment can be obtained by the monitoring instrument. Exemplarily, the monitoring instrument can be an instrument integrating multiple sensors, such as an infrared sensor, an ultraviolet sensor, a sonar sensor, a meteorological sensor, a sag monitoring sensor, a temperature sensor, etc.
[0080] It is understandable that, through the monitoring instrument, not only the current temperature and the current maximum sag of the target transmission line can be obtained, but also the temperature, humidity, air pressure and other information of the environment in which the target transmission line is located can be obtained.
[0081] S202, determining the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature.
[0082] The corresponding relationship between the maximum sag and the temperature represents the maximum sag of the target transmission line at different temperatures, especially the maximum sag of the target transmission line at different temperatures under an ideal environment. In the embodiment of the present application, the corresponding relationship between the maximum sag and the temperature can be represented by a curve.
[0083] Optionally, the maximum sag corresponding to the current temperature can be determined based on the corresponding relationship between the maximum sag and the temperature, and the determined maximum sag can be used as the predicted maximum sag of the target transmission line at the current temperature.
[0084] S203: Determine whether the target transmission line is covered with ice based on the current maximum sag and the predicted maximum sag.
[0085] Optionally, the current maximum sag and predicted maximum sag may be input into an icing prediction model so that the icing prediction model outputs a prediction result of whether icing occurs on the target transmission line according to preset parameters, and determines whether icing occurs on the target transmission line according to the prediction result.
[0086] It should be noted that in order to ensure the accuracy of the prediction results, after obtaining the prediction results, the on-site images of the target transmission line collected by the monitoring instrument can also be identified by using image recognition technology, and the recognition results can be output to determine whether the target transmission line is covered with ice. If the prediction results are different from the recognition results, the ice prediction model needs to be adjusted and optimized to ensure the accuracy of the ice prediction model.
[0087] S204: When it is determined that ice is applied to the target transmission line, an ice application warning is issued for the target transmission line.
[0088] Optionally, when it is determined that the target transmission line is covered with ice, in order to avoid accidents such as ice flash tripping, tower collapse and line breakage of the transmission line, it is necessary to promptly issue an ice warning for the target transmission line. Exemplarily, an early warning message containing an on-site image of the target transmission line can be sent to the operation and maintenance equipment corresponding to the target transmission line, and the target transmission line is informed of the possibility of ice covering.
[0089] In the above-mentioned transmission line icing warning method, the current temperature and the current maximum sag of the target transmission line are obtained, and the predicted maximum sag of the target transmission line at the current temperature is determined according to the corresponding relationship between the current temperature and the maximum sag and the temperature; further, according to the current maximum sag and the predicted maximum sag, it is determined whether the target transmission line is icing, and in the case where it is determined that the target transmission line is icing, an icing warning is issued for the target transmission line. The above-mentioned scheme, by introducing the corresponding relationship between the maximum sag and the temperature, can accurately reflect the maximum sag of the target transmission line at different temperatures. Therefore, based on the corresponding relationship between the maximum sag and the temperature, the predicted maximum sag of the target transmission line at the current temperature can be accurately determined, that is, the maximum sag when no icing occurs; further, according to the current maximum sag and the predicted maximum sag, it can be reasonably and accurately determined whether the target transmission line is icing, so the target transmission line can be accurately warned of icing.
[0090] Optionally, in one embodiment, Figure 3 As shown, a method for determining the corresponding relationship between the maximum sag and the temperature is provided, which specifically includes the following steps:
[0091] S301, obtaining historical monitoring data of the target transmission line through a monitoring instrument installed on the target transmission line.
[0092] Among them, historical monitoring data include historical temperatures and historical maximum sags at different historical moments.
[0093] Optionally, the historical temperature and the historical maximum sag of the target transmission line monitored at different historical moments during the historical period may be extracted from the monitoring instrument installed on the target transmission line and used as the historical monitoring data of the target transmission line.
[0094] S302, extracting historical monitoring data of a target transmission line in an ideal environment from historical monitoring data as target monitoring data.
[0095] Among them, the ideal environment at least includes an ice-free and windless environment.
[0096] Optionally, considering that in an ideal environment, that is, in an ice-free and windless environment, the historical temperature and historical maximum sag of the target transmission line at different historical moments are more referenceable, it is necessary to extract the historical monitoring data of the target transmission line in an ideal environment from the historical monitoring data. Specifically, the environmental temperature and humidity data and meteorological data at different historical moments can be combined to extract the historical monitoring data of the target transmission line in an ideal environment from the historical monitoring data as the target monitoring data.
[0097] S303, constructing a corresponding relationship between the maximum sag and temperature of the target transmission line according to the target monitoring data.
[0098] Optionally, there are many methods for constructing the corresponding relationship between the maximum sag and temperature of the target transmission line based on the target monitoring data, which are not limited here. One method may be to fit the maximum sag versus temperature curve based on the historical temperature and historical maximum sag in the target monitoring data through a fitting method to characterize the corresponding relationship between the maximum sag and temperature of the target transmission line. For example, Figure 4 As shown, it is a curve of maximum sag variation with temperature of the target transmission line constructed in an embodiment of the present application.
[0099] In this embodiment, the accuracy of the historical monitoring data obtained is guaranteed by the monitoring instrument; at the same time, the target monitoring data of the target transmission line under an ideal environment is extracted, which ensures the availability and reference of the target monitoring data, and further ensures the accuracy and reference of the corresponding relationship between the maximum sag and temperature of the constructed target transmission line.
[0100] Optionally, in one embodiment, Figure 5 As shown, a method for determining whether a target transmission line is covered with ice is provided, which specifically includes the following steps:
[0101] S501, taking the difference between the current maximum sag and the predicted maximum sag as the sag difference.
[0102] Optionally, the current maximum sag and the predicted maximum sag may be subtracted, and the obtained difference may be used as the sag difference. Specifically, the sag difference may be expressed by the following formula (1):
[0103] (1)
[0104] in, is the sag difference; is the current maximum sag; To predict the maximum sag.
[0105] S502: If the sag difference is greater than a preset error threshold, it is determined that ice is present on the target transmission line.
[0106] The error threshold is a threshold value set according to actual conditions or experiments.
[0107] Optionally, if the sag difference is greater than a preset error threshold, it indicates that the target transmission line is likely to be covered with ice, and it can be determined that a warning phenomenon has occurred on the target transmission line.
[0108] In this embodiment, by introducing the sag difference and the error threshold value, it is possible to accurately and reasonably determine whether the target transmission line is iced.
[0109] Optionally, in one embodiment, Figure 6 As shown, a method for early warning of ice coverage on a target transmission line is provided, which specifically includes the following steps:
[0110] S601, obtaining characteristic data and current load parameters of the target transmission line.
[0111] Among them, the static characteristic data include the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, elevation difference angle, wind deviation angle, the first temperature under ideal environment and the second temperature under abnormal environment of the target transmission line; the current load ratio parameters include the deadweight load ratio under ideal environment and the comprehensive load ratio under abnormal environment; the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-and-windy environment.
[0112] Optionally, the characteristic data of the target transmission line can be obtained by consulting relevant parameters of the target transmission line and by field measurement. At the same time, the current load ratio parameter of the target transmission line can be obtained by consulting relevant information and reasonable deduction.
[0113] S602: Determine the ice thickness of the target transmission line based on the characteristic data and the current load ratio parameter.
[0114] Among them, the ice thickness refers to the thickness of ice on the target transmission line.
[0115] Optionally, the relationship between the characteristic parameters and the stress and the current load ratio parameters can be considered to reasonably deduce the ice thickness and obtain the relationship between the ice thickness, the characteristic data and the current load ratio parameters. Furthermore, based on this relationship and in combination with the characteristic data and the current load ratio parameters, the ice thickness of the target transmission line can be calculated.
[0116] S603: Issue an ice warning to the target transmission line according to the ice thickness.
[0117] Optionally, after calculating the ice thickness, the monitoring instrument can be controlled to collect on-site images of the target transmission line and generate early warning information containing the ice thickness and the on-site images; further, the early warning information is sent to the operation and maintenance equipment corresponding to the target transmission line to issue an ice warning for the target transmission line.
[0118] In this embodiment, the ice thickness is calculated by comprehensively considering the characteristic data of the target transmission line and the current load ratio parameters, thereby ensuring the rationality and accuracy of the calculated ice thickness; further, ice warning is performed based on the ice thickness, thereby ensuring the efficiency and effectiveness of the warning process.
[0119] Optionally, the feature data includes static feature data and dynamic feature data; in one embodiment, Figure 7As shown, a method for obtaining characteristic data and current load parameters is provided, which specifically includes the following steps:
[0120] S701, obtaining dynamic characteristic data through monitoring instruments installed on the target transmission line.
[0121] Optionally, since dynamic data is changeable and real-time, dynamic characteristic data including the horizontal span, elevation difference angle, wind angle, first temperature under ideal conditions and second temperature under abnormal conditions of the target transmission line can be obtained by installing monitoring instruments on the target transmission line.
[0122] S702: Determine static characteristic data according to the attribute information of the target transmission line.
[0123] Optionally, since static characteristic data are generally inherent properties of the target transmission line, static characteristic data including the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line can be obtained through the attribute information of the target transmission line and by consulting relevant materials.
[0124] S703, determining the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0125] Optionally, an expression for the current load ratio parameter can be obtained through reasonable deduction, and based on the expression, the current load ratio parameter of the target transmission line can be calculated according to static characteristic data, dynamic characteristic data, predicted maximum sag and current maximum sag.
[0126] In this embodiment, dynamic characteristic data, static characteristic data and current load parameters are obtained respectively through different methods and approaches, thereby ensuring the reliability of the data source and further ensuring the accuracy of the obtained data.
[0127] Optionally, in one embodiment, Figure 8 As shown, a method for determining the current load ratio parameter of a target transmission line is provided, which specifically includes the following steps:
[0128] S801: taking the product of the mass parameter and the gravitational acceleration as the first intermediate parameter.
[0129] Among them, the quality parameter is a parameter that characterizes the quality of the target transmission line. In the embodiment of the present application, the quality parameter may be the quality per unit length of the target transmission line.
[0130] Optionally, considering that the self-weight load is related to the mass properties of the target transmission line, the self-weight load can be determined based on the mass parameter, weight acceleration and cross-sectional area. First, the product between the mass parameter and the gravity acceleration needs to be used as the first intermediate parameter. Specifically, the first intermediate parameter can be expressed by the following formula (2):
[0131] (2)
[0132] in, is the first intermediate parameter; is the quality parameter, i.e. the quality per unit length of the target transmission line, in units of ; is the acceleration due to gravity, which can be taken as 9.80665 .
[0133] S802: Determine the deadweight specific load according to the ratio between the first intermediate parameter and the cross-sectional area.
[0134] Optionally, according to the ratio between the first intermediate parameter and the cross-sectional area, the process of determining the deadweight specific load can be expressed by the following formula (3):
[0135] (3)
[0136] in, is the self-weight specific load, in units of ; is the cross-sectional area in units of .
[0137] S803, determining a comprehensive specific load according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0138] Optionally, an expression for the comprehensive specific load can be obtained through reasonable deduction, and based on the expression, the comprehensive specific load can be calculated according to the self-weight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0139] In this embodiment, by introducing the first intermediate parameter, a method for calculating the self-weight specific load is provided; at the same time, based on the self-weight specific load, predicted maximum sag, current maximum sag, static characteristic data and dynamic characteristic data, a method for determining a comprehensive specific load is provided.
[0140] Optionally, in the embodiment of the present application, the comprehensive specific load is the specific load of the target transmission line in an ice and wind environment, that is, the specific load after comprehensive consideration of the deadweight, ice weight and wind pressure. Therefore, the horizontal stress expression of the target transmission line can be obtained through the relationship between the maximum sag, stress and specific load, and then the comprehensive specific load can be calculated based on the horizontal stress expression.
[0141] Specifically, according to the deformation of the oblique parabola sag formula, the circumferential stress at the center of the target transmission line span can be obtained as:
[0142] (4)
[0143] in, is the circumferential stress at the center of the span; is the comprehensive load ratio of the target transmission line; is the maximum sag; is the horizontal span; is the height difference angle.
[0144] In the ideal environment (i.e., ice-free and windless environment) and the abnormal environment (i.e., ice-covered and windy environment), the relationship between the axial stress and the comprehensive specific load of the target transmission line under the two environments can be obtained according to the parabolic state equation of the target transmission line, which can be specifically expressed by the following formula (5):
[0145] (5)
[0146] in, is the axial stress under abnormal environment; is the axial stress under ideal conditions; is the elastic coefficient of the target transmission line; is the deadweight specific load; is the comprehensive load ratio; is the temperature expansion coefficient of the target transmission line; The first temperature of the target transmission line under an ideal environment; It is the second temperature when the target transmission line is in an abnormal environment.
[0147] Furthermore, by combining the above formula (4) and formula (5), the relationship between the comprehensive specific load and the deadweight specific load can be obtained. Specifically, on this basis, in one embodiment, Fig. 9 As shown, a method for determining the comprehensive load ratio of a target transmission line is provided, which specifically includes the following steps:
[0148] S901, taking the ratio of the product of the current maximum sag and the deadweight load to the predicted maximum sag as the second intermediate parameter.
[0149] Optionally, the process of taking the product of the current maximum sag and the deadweight load ratio and the ratio of the predicted maximum sag as the second intermediate parameter can be expressed by the following formula (6):
[0150] (6)
[0151] in, is the second intermediate parameter; is the current maximum sag; To predict the maximum sag; It is the specific load of deadweight.
[0152] S902, determining a third intermediate parameter according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle.
[0153] Optionally, according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle, the process of determining the third intermediate parameter can be expressed by the following formula (7):
[0154] (7)
[0155] in, is the third intermediate parameter.
[0156] S903, determining a fourth intermediate parameter according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle, and the horizontal span.
[0157] Optionally, according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span, the process of determining the fourth intermediate parameter can be shown by the following formula (8):
[0158] (8)
[0159] in, is the fourth intermediate parameter; is the temperature expansion coefficient.
[0160] S904: Take the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter as a comprehensive ratio.
[0161] Optionally, the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive load ratio process, which can be expressed by the following formula (9):
[0162] (9)
[0163] in, For the comprehensive load ratio.
[0164] In this embodiment, a method for quickly and accurately calculating the comprehensive specific load is provided by introducing the second intermediate parameter, the third intermediate parameter and the fourth intermediate parameter.
[0165] It should be noted that the comprehensive specific load of the target transmission line is the vector sum of the vertical specific load and the horizontal specific load of the target output line, where the vertical specific load includes the self-weight specific load and the ice weight specific load. The self-weight specific load is determined by its own properties, and the ice weight specific load is affected by the thickness of the ice cover; the horizontal specific load mainly considers the ice cover wind pressure specific load.
[0166] Optionally, the comprehensive specific load is obtained by the vector sum of the vertical specific load and the horizontal specific load of the target output line, which can be specifically expressed by the following formula (10):
[0167] (10)
[0168] in, is the vertical specific load; is the horizontal load.
[0169] Optionally, the vertical specific load includes the self-weight specific load and the ice weight specific load, specifically:
[0170] (11)
[0171] The relationship between the vertical specific load and the horizontal specific load can be expressed by the following formula (12):
[0172] (12)
[0173] in, The wind deflection angle.
[0174] Furthermore, by combining formula (10), formula (11) and formula (12), the relationship between ice weight specific load, deadweight specific load and comprehensive specific load can be obtained, as shown in the following formula (13):
[0175] (13)
[0176] At the same time, considering the relationship between ice weight load and ice thickness:
[0177] (14)
[0178] in, is the ice density. In the embodiment of the present application, the ice density can be ; is the outer diameter of the target transmission line, in units of ; is the thickness of ice cover.
[0179] Therefore, by combining formula (13) and formula (14), the relationship between ice thickness and comprehensive specific load and deadweight specific load can be derived. On this basis, Fig.10As shown, a method for determining the ice thickness of a target transmission line is provided, which specifically includes the following steps:
[0180] S1001, taking the product of the cosine value of the wind deflection angle and the comprehensive specific load and the difference between the self-weight specific load as the fifth intermediate parameter.
[0181] Optionally, the process of taking the product of the cosine value of the wind deflection angle and the comprehensive specific load and the difference between the deadweight specific load as the fifth intermediate parameter can be expressed by the following formula (15):
[0182] (15)
[0183] in, is the fifth intermediate parameter.
[0184] S1002: Determine the ice thickness of the target transmission line based on the cross-sectional area, the outer diameter and the fifth intermediate parameter.
[0185] Optionally, the process of determining the ice thickness of the target transmission line according to the cross-sectional area, the outer diameter and the fifth intermediate parameter can be expressed by the following formula (16):
[0186] (16)
[0187] In this embodiment, by introducing the fifth intermediate parameter, the cross-sectional area and the outer diameter, a method for quickly and accurately determining the ice thickness of the target transmission line is provided.
[0188] Fig.11 FIG. 2 is a flow chart of a method for early warning of ice coating on a transmission line in another embodiment. Based on the above embodiment, this embodiment provides an optional example of a method for early warning of ice coating on a transmission line. Fig.11 The specific implementation process is as follows:
[0189] S1101, obtaining the current temperature and current maximum sag of the target transmission line.
[0190] S1102, determining the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature.
[0191] Optionally, historical monitoring data of the target transmission line is obtained by installing a monitoring instrument on the target transmission line; wherein the historical monitoring data includes historical temperature and historical maximum sag at different historical moments; from the historical monitoring data, historical monitoring data of the target transmission line in an ideal environment is extracted as target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment; based on the target monitoring data, a corresponding relationship between the maximum sag and temperature of the target transmission line is constructed.
[0192] S1103: taking the difference between the current maximum sag and the predicted maximum sag as the sag difference.
[0193] S1104, determine whether the sag difference is greater than a preset error threshold; if so, determine that the target transmission line is iced, and execute S1105; if not, determine that the target transmission line is not iced, and continue monitoring.
[0194] S1105, obtaining characteristic data of the target transmission line.
[0195] The characteristic data include static characteristic data and dynamic characteristic data. The static characteristic data include the outer diameter, cross-sectional area, mass parameter, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, height difference angle, wind deviation angle, first temperature under ideal environment and second temperature under abnormal environment of the target transmission line; the current load ratio parameter includes the deadweight load ratio under ideal environment and the comprehensive load ratio under abnormal environment; the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-covered and windy environment.
[0196] Optionally, dynamic characteristic data can be obtained by monitoring instruments installed on the target transmission line; static characteristic data can be determined based on the attribute information of the target transmission line; and current load parameters of the target transmission line can be determined based on the static characteristic data, dynamic characteristic data, predicted maximum sag and current maximum sag.
[0197] S1106: The product of the mass parameter in the characteristic data and the gravitational acceleration is used as the first intermediate parameter.
[0198] S1107, determining the deadweight specific load according to the ratio between the first intermediate parameter and the cross-sectional area in the characteristic data.
[0199] S1108, determining the comprehensive specific load according to the deadweight specific load, the predicted maximum sag, the current maximum sag and the characteristic data.
[0200] Optionally, the ratio of the product of the current maximum sag and the deadweight specific load to the predicted maximum sag is used as the second intermediate parameter; the third intermediate parameter is determined according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; the fourth intermediate parameter is determined according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span; the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive specific load.
[0201] S1109, taking the difference between the product of the cosine value of the wind angle in the characteristic data and the comprehensive specific load and the deadweight specific load as the fifth intermediate parameter.
[0202] S1110, determining the ice thickness of the target transmission line based on the cross-sectional area, outer diameter and fifth intermediate parameter in the characteristic data.
[0203] S1111: Issue an ice cover warning for the target transmission line based on the ice cover thickness.
[0204] The specific process of the above S1101-S1111 can refer to the description of the above method embodiment, and its implementation principle and technical effect are similar, which will not be repeated here.
[0205] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0206] Based on the same inventive concept, the embodiment of the present application also provides a transmission line icing warning device for implementing the above-mentioned transmission line icing warning method. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more transmission line icing warning device embodiments provided below can refer to the limitations of the transmission line icing warning method above, and will not be repeated here.
[0207] In one embodiment, Fig.12 As shown, a transmission line icing warning device 1 is provided, comprising: a data acquisition module 10, a sag determination module 20, an icing determination module 30 and an icing warning module 40, wherein:
[0208] The data acquisition module 10 is used to acquire the current temperature and the current maximum sag of the target transmission line.
[0209] The sag determination module 20 is used to determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature.
[0210] The icing determination module 30 is used to determine whether the target transmission line is iced according to the current maximum sag and the predicted maximum sag.
[0211] The icing warning module 40 is used to issue an icing warning to the target transmission line when it is determined that the target transmission line is iced.
[0212] The above-mentioned transmission line icing warning device obtains the current temperature and the current maximum sag of the target transmission line, and determines the predicted maximum sag of the target transmission line at the current temperature according to the corresponding relationship between the current temperature and the maximum sag and the temperature; further, according to the current maximum sag and the predicted maximum sag, it is determined whether the target transmission line is icing, and in the case of determining that the target transmission line is icing, an icing warning is issued for the target transmission line. The above scheme, by introducing the corresponding relationship between the maximum sag and the temperature, can accurately reflect the maximum sag of the target transmission line at different temperatures. Therefore, based on the corresponding relationship between the maximum sag and the temperature, it can accurately determine the predicted maximum sag of the target transmission line at the current temperature, that is, the maximum sag when no icing occurs; further, according to the current maximum sag and the predicted maximum sag, it can reasonably and accurately determine whether the target transmission line is icing, so it can accurately issue an icing warning for the target transmission line.
[0213] In one embodiment, the transmission line icing warning device 1 further includes:
[0214] The data monitoring module is used to obtain the historical monitoring data of the target transmission line through the monitoring instrument installed on the target transmission line; wherein the historical monitoring data includes the historical temperature and the historical maximum sag at different historical moments.
[0215] The data extraction module is used to extract the historical monitoring data of the target transmission line in an ideal environment from the historical monitoring data as the target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment.
[0216] The relationship determination module is used to construct the corresponding relationship between the maximum sag and temperature of the target transmission line according to the target monitoring data.
[0217] In one embodiment, the ice coating determination module 30 is specifically configured to:
[0218] The difference between the current maximum sag and the predicted maximum sag is taken as the sag difference; if the sag difference is greater than a preset error threshold, it is determined that ice is present on the target transmission line.
[0219] In one embodiment, the ice warning module 40 includes:
[0220] The data acquisition unit is used to acquire characteristic data and current load parameters of the target transmission line.
[0221] The thickness determination unit is used to determine the ice thickness of the target transmission line based on the characteristic data and the current load ratio parameter.
[0222] The ice warning unit is used to provide ice warning for the target transmission line according to the ice thickness.
[0223] In one embodiment, the feature data includes static feature data and dynamic feature data, and the data acquisition unit includes:
[0224] The first acquisition slave unit is used to acquire dynamic characteristic data through a monitoring instrument installed on the target transmission line.
[0225] The second acquisition slave unit is used to determine static characteristic data according to the attribute information of the target transmission line.
[0226] The third acquisition slave unit is used to determine the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0227] In one embodiment, the static characteristic data include the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, elevation angle, wind deviation angle, the first temperature under an ideal environment and the second temperature under an abnormal environment of the target transmission line; the current load ratio parameters include the deadweight load ratio under an ideal environment and the comprehensive load ratio under an abnormal environment; wherein, the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-free and windy environment.
[0228] In one embodiment, the third acquisition slave unit includes:
[0229] The first subunit is used to take the product of the mass parameter and the gravitational acceleration as the first intermediate parameter.
[0230] The second subunit is used to determine the deadweight specific load according to the ratio between the first intermediate parameter and the cross-sectional area.
[0231] The third subunit is used to determine the comprehensive specific load according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0232] In one embodiment, the third subunit comprises:
[0233] The product of the current maximum sag and the deadweight specific load and the ratio of the predicted maximum sag are used as the second intermediate parameter; the third intermediate parameter is determined according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; the fourth intermediate parameter is determined according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span; the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive specific load.
[0234] In one embodiment, the thickness determination unit is configured to:
[0235] The product of the cosine value of the wind deflection angle and the comprehensive specific load, and the difference between the self-weight specific load, are used as the fifth intermediate parameter; the ice thickness of the target transmission line is determined based on the cross-sectional area, outer diameter and the fifth intermediate parameter.
[0236] Each module in the above-mentioned transmission line ice warning device can be implemented in whole or in part by software, hardware and their combination. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to each of the above modules.
[0237] In an exemplary embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be shown in FIG13. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a transmission line icing warning method is implemented.
[0238] Those skilled in the art will understand that the structure shown in FIG. 13 is merely a block diagram of a partial structure related to the scheme of the present application, and does not constitute a limitation on the computer device to which the scheme of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.
[0239] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0240] Obtain the current temperature and current maximum sag of the target transmission line;
[0241] According to the corresponding relationship between the current temperature and the maximum sag and temperature, the predicted maximum sag of the target transmission line at the current temperature is determined;
[0242] Determine whether the target transmission line is covered with ice based on the current maximum sag and the predicted maximum sag;
[0243] When it is determined that the target transmission line is covered with ice, an ice covering warning is issued for the target transmission line.
[0244] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0245] By installing monitoring instruments on the target transmission line, historical monitoring data of the target transmission line is obtained; wherein the historical monitoring data includes historical temperatures and historical maximum sags at different historical moments; from the historical monitoring data, historical monitoring data of the target transmission line in an ideal environment is extracted as target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment; based on the target monitoring data, a corresponding relationship between the maximum sag and the temperature of the target transmission line is constructed.
[0246] In one embodiment, when the processor executes the computer program to determine whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag, the processor further implements the following steps:
[0247] The difference between the current maximum sag and the predicted maximum sag is taken as the sag difference; if the sag difference is greater than a preset error threshold, it is determined that ice is present on the target transmission line.
[0248] In one embodiment, when the processor executes the computer program to provide ice warning for the target transmission line, the processor also implements the following steps:
[0249] Acquire characteristic data and current load ratio parameters of the target transmission line; determine the ice thickness of the target transmission line based on the characteristic data and current load ratio parameters; and issue an ice warning for the target transmission line based on the ice thickness.
[0250] In one embodiment, the characteristic data includes static characteristic data and dynamic characteristic data. When the processor executes the computer program to obtain the characteristic data and the current load ratio parameter of the target transmission line, the processor also implements the following steps:
[0251] The dynamic characteristic data is obtained by installing monitoring instruments on the target transmission line; the static characteristic data is determined according to the attribute information of the target transmission line; the current load ratio parameter of the target transmission line is determined according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0252] In one embodiment, the static characteristic data include the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, elevation angle, wind deviation angle, the first temperature under an ideal environment and the second temperature under an abnormal environment of the target transmission line; the current load ratio parameters include the deadweight load ratio under an ideal environment and the comprehensive load ratio under an abnormal environment; wherein, the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-free and windy environment.
[0253] In one embodiment, when the processor executes the computer program to determine the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag, the following steps are also implemented:
[0254] The product of the mass parameter and the gravitational acceleration is used as the first intermediate parameter; the self-weight specific load is determined according to the ratio between the first intermediate parameter and the cross-sectional area; the comprehensive specific load is determined according to the self-weight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0255] In one embodiment, when the processor executes the computer program to determine the comprehensive specific load of the target transmission line according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the inherent characteristic data and the measured characteristic data of the target transmission line, the following steps are also implemented:
[0256] The product of the current maximum sag and the deadweight specific load and the ratio of the predicted maximum sag are used as the second intermediate parameter; the third intermediate parameter is determined according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; the fourth intermediate parameter is determined according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span; the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive specific load.
[0257] In one embodiment, when the processor executes the computer program to determine the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter, the processor further implements the following steps:
[0258] The product of the cosine value of the wind deflection angle and the comprehensive specific load, and the difference between the self-weight specific load, are used as the fifth intermediate parameter; the ice thickness of the target transmission line is determined based on the cross-sectional area, outer diameter and the fifth intermediate parameter.
[0259] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0260] Obtain the current temperature and current maximum sag of the target transmission line;
[0261] According to the corresponding relationship between the current temperature and the maximum sag and temperature, the predicted maximum sag of the target transmission line at the current temperature is determined;
[0262] Determine whether the target transmission line is covered with ice based on the current maximum sag and the predicted maximum sag;
[0263] When it is determined that the target transmission line is covered with ice, an ice covering warning is issued for the target transmission line.
[0264] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0265] By installing monitoring instruments on the target transmission line, historical monitoring data of the target transmission line is obtained; wherein the historical monitoring data includes historical temperatures and historical maximum sags at different historical moments; from the historical monitoring data, historical monitoring data of the target transmission line in an ideal environment is extracted as target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment; based on the target monitoring data, a corresponding relationship between the maximum sag and the temperature of the target transmission line is constructed.
[0266] In one embodiment, when the processor executes the computer program to determine whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag, the processor further implements the following steps:
[0267] The difference between the current maximum sag and the predicted maximum sag is taken as the sag difference; if the sag difference is greater than a preset error threshold, it is determined that ice is present on the target transmission line.
[0268] In one embodiment, when the processor executes the computer program to provide ice warning for the target transmission line, the processor also implements the following steps:
[0269] Acquire characteristic data and current load ratio parameters of the target transmission line; determine the ice thickness of the target transmission line based on the characteristic data and current load ratio parameters; and issue an ice warning for the target transmission line based on the ice thickness.
[0270] In one embodiment, the characteristic data includes static characteristic data and dynamic characteristic data. When the processor executes the computer program to obtain the characteristic data and the current load ratio parameter of the target transmission line, the processor also implements the following steps:
[0271] The dynamic characteristic data is obtained by installing monitoring instruments on the target transmission line; the static characteristic data is determined according to the attribute information of the target transmission line; the current load ratio parameter of the target transmission line is determined according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0272] In one embodiment, the static characteristic data include the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, elevation angle, wind deviation angle, the first temperature under an ideal environment and the second temperature under an abnormal environment of the target transmission line; the current load ratio parameters include the deadweight load ratio under an ideal environment and the comprehensive load ratio under an abnormal environment; wherein, the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-free and windy environment.
[0273] In one embodiment, when the processor executes the computer program to determine the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag, the following steps are also implemented:
[0274] The product of the mass parameter and the gravitational acceleration is used as the first intermediate parameter; the self-weight specific load is determined according to the ratio between the first intermediate parameter and the cross-sectional area; the comprehensive specific load is determined according to the self-weight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0275] In one embodiment, when the processor executes the computer program to determine the comprehensive specific load of the target transmission line according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the inherent characteristic data and the measured characteristic data of the target transmission line, the following steps are also implemented:
[0276] The product of the current maximum sag and the deadweight specific load and the ratio of the predicted maximum sag are used as the second intermediate parameter; the third intermediate parameter is determined according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; the fourth intermediate parameter is determined according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span; the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive specific load.
[0277] In one embodiment, when the processor executes the computer program to determine the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter, the processor further implements the following steps:
[0278] The product of the cosine value of the wind deflection angle and the comprehensive specific load, and the difference between the self-weight specific load, are used as the fifth intermediate parameter; the ice thickness of the target transmission line is determined based on the cross-sectional area, outer diameter and the fifth intermediate parameter.
[0279] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps:
[0280] Obtain the current temperature and current maximum sag of the target transmission line;
[0281] According to the corresponding relationship between the current temperature and the maximum sag and temperature, the predicted maximum sag of the target transmission line at the current temperature is determined;
[0282] Determine whether the target transmission line is covered with ice based on the current maximum sag and the predicted maximum sag;
[0283] When it is determined that the target transmission line is covered with ice, an ice covering warning is issued for the target transmission line.
[0284] In one embodiment, when the processor executes the computer program, the processor further implements the following steps:
[0285] By installing monitoring instruments on the target transmission line, historical monitoring data of the target transmission line is obtained; wherein the historical monitoring data includes historical temperatures and historical maximum sags at different historical moments; from the historical monitoring data, historical monitoring data of the target transmission line in an ideal environment is extracted as target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment; based on the target monitoring data, a corresponding relationship between the maximum sag and the temperature of the target transmission line is constructed.
[0286] In one embodiment, when the processor executes the computer program to determine whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag, the processor further implements the following steps:
[0287] The difference between the current maximum sag and the predicted maximum sag is taken as the sag difference; if the sag difference is greater than a preset error threshold, it is determined that ice is present on the target transmission line.
[0288] In one embodiment, when the processor executes the computer program to provide ice warning for the target transmission line, the processor also implements the following steps:
[0289] Acquire characteristic data and current load ratio parameters of the target transmission line; determine the ice thickness of the target transmission line based on the characteristic data and current load ratio parameters; and issue an ice warning for the target transmission line based on the ice thickness.
[0290] In one embodiment, the characteristic data includes static characteristic data and dynamic characteristic data. When the processor executes the computer program to obtain the characteristic data and the current load ratio parameter of the target transmission line, the processor also implements the following steps:
[0291] The dynamic characteristic data is obtained by installing monitoring instruments on the target transmission line; the static characteristic data is determined according to the attribute information of the target transmission line; the current load ratio parameter of the target transmission line is determined according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
[0292] In one embodiment, the static characteristic data include the outer diameter, cross-sectional area, mass parameters, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, elevation angle, wind deviation angle, the first temperature under an ideal environment and the second temperature under an abnormal environment of the target transmission line; the current load ratio parameters include the deadweight load ratio under an ideal environment and the comprehensive load ratio under an abnormal environment; wherein, the ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-free and windy environment.
[0293] In one embodiment, when the processor executes the computer program to determine the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag, the following steps are also implemented:
[0294] The product of the mass parameter and the gravitational acceleration is used as the first intermediate parameter; the self-weight specific load is determined according to the ratio between the first intermediate parameter and the cross-sectional area; the comprehensive specific load is determined according to the self-weight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
[0295] In one embodiment, when the processor executes the computer program to determine the comprehensive specific load of the target transmission line according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the inherent characteristic data and the measured characteristic data of the target transmission line, the following steps are also implemented:
[0296] The product of the current maximum sag and the deadweight specific load and the ratio of the predicted maximum sag are used as the second intermediate parameter; the third intermediate parameter is determined according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; the fourth intermediate parameter is determined according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle and the horizontal span; the difference between the second intermediate parameter and the third intermediate parameter and the difference between the fourth intermediate parameter are used as the comprehensive specific load.
[0297] In one embodiment, when the processor executes the computer program to determine the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter, the processor further implements the following steps:
[0298] The product of the cosine value of the wind deflection angle and the comprehensive specific load, and the difference between the self-weight specific load, are used as the fifth intermediate parameter; the ice thickness of the target transmission line is determined based on the cross-sectional area, outer diameter and the fifth intermediate parameter.
[0299] It should be noted that the data involved in this application (including but not limited to data used for analysis, storage, display, etc.) are all information and data fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0300] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0301] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0302] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A transmission line icing warning method, characterized in that: The method comprises: Obtain the current temperature and current maximum sag of the target transmission line; Determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature; Determining whether ice coating occurs on the target transmission line according to the current maximum sag and the predicted maximum sag; When it is determined that ice is applied to the target transmission line, an ice application warning is issued to the target transmission line.
2. The method according to claim 1, characterized in that The corresponding relationship between the maximum sag and the temperature is determined by the following method: Obtaining historical monitoring data of the target transmission line by means of a monitoring instrument installed on the target transmission line; wherein the historical monitoring data includes historical temperatures and historical maximum sags at different historical moments; From the historical monitoring data, extract the historical monitoring data of the target transmission line in an ideal environment as the target monitoring data; wherein the ideal environment at least includes an ice-free and windless environment; According to the target monitoring data, a corresponding relationship between the maximum sag and the temperature of the target transmission line is constructed.
3. The method according to claim 1, characterized in that The determining, according to the current maximum sag and the predicted maximum sag, whether ice coating occurs on the target transmission line comprises: Taking the difference between the current maximum sag and the predicted maximum sag as the sag difference; If the sag difference is greater than a preset error threshold, it is determined that ice coating occurs on the target transmission line.
4. The method according to claim 1, characterized in that The step of providing an ice warning to the target transmission line includes: Acquiring characteristic data and current load parameters of the target transmission line; Determining the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter; According to the ice thickness, an ice cover warning is issued to the target transmission line.
5. The method according to claim 4, characterized in that The characteristic data includes static characteristic data and dynamic characteristic data, and the step of obtaining the characteristic data and current load ratio parameters of the target transmission line includes: Acquiring the dynamic characteristic data through a monitoring instrument installed on the target transmission line; Determining the static characteristic data according to the attribute information of the target transmission line; The current load ratio parameter of the target transmission line is determined according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag.
6. The method according to claim 5, characterized in that The static characteristic data include the outer diameter, cross-sectional area, mass parameter, temperature expansion coefficient and elastic coefficient of the target transmission line; the dynamic characteristic data include the horizontal span, height difference angle, wind deviation angle, the first temperature under ideal environment and the second temperature under abnormal environment of the target transmission line; the current specific load parameter includes the deadweight specific load under the ideal environment and the comprehensive specific load under the abnormal environment; The ideal environment at least includes an ice-free and windless environment, and the abnormal environment at least includes an ice-covered and windy environment.
7. The method according to claim 6, characterized in that The determining the current load ratio parameter of the target transmission line according to the static characteristic data, the dynamic characteristic data, the predicted maximum sag and the current maximum sag comprises: The product of the mass parameter and the gravitational acceleration is used as the first intermediate parameter; Determining the deadweight specific load according to the ratio between the first intermediate parameter and the cross-sectional area; The comprehensive specific load is determined according to the deadweight specific load, the predicted maximum sag, the current maximum sag, the static characteristic data and the dynamic characteristic data.
8. The method according to claim 7, characterized in that Determining the comprehensive specific load of the target transmission line according to the deadweight specific load of the target transmission line, the predicted maximum sag, the current maximum sag, the inherent characteristic data and the measured characteristic data includes: The ratio of the product of the current maximum sag and the deadweight specific load to the predicted maximum sag is used as a second intermediate parameter; Determining a third intermediate parameter according to the current maximum sag, the predicted maximum sag, the elastic coefficient, the horizontal span and the height difference angle; determining a fourth intermediate parameter according to the temperature expansion coefficient, the current maximum sag, the first temperature, the second temperature, the height difference angle, and the horizontal span; The difference between the second intermediate parameter and the third intermediate parameter, and the difference between the fourth intermediate parameter, are used as the comprehensive ratio.
9. The method according to claim 6, characterized in that The step of determining the ice thickness of the target transmission line according to the characteristic data and the current load ratio parameter comprises: The difference between the product of the cosine value of the wind deflection angle and the comprehensive specific load and the deadweight specific load is taken as the fifth intermediate parameter; The ice coating thickness of the target transmission line is determined according to the cross-sectional area, the outer diameter and the fifth intermediate parameter.
10. A transmission line icing warning device, characterized in that: The device comprises: A data acquisition module, used to obtain the current temperature and current maximum sag of the target transmission line; A sag determination module, used to determine the predicted maximum sag of the target transmission line at the current temperature according to the current temperature and the corresponding relationship between the maximum sag and the temperature; An icing determination module, used to determine whether icing occurs on the target transmission line according to the current maximum sag and the predicted maximum sag; The icing warning module is used to issue an icing warning to the target transmission line when it is determined that the target transmission line is iced.
Citation Information
Patent Citations
Ice-coated electric transmission line weak link early warning method
CN104167076A
Sag analysis method, device for power transmission line wire, equipment and medium
CN111666690A
Method for determining ice thickness of power transmission line
CN112329221A
Equivalent icing thickness monitoring method based on accurate measurement of conductor sag change
CN113324489A
Calculation method for monitoring icing thickness of power transmission line
CN114353734A
Cited By
Method and apparatus for power transmission line icing warning
EP4704301A1
