By dynamically generating scheduling ratios and real-time monitoring of the power generation of the power supply terminal, the matching between the power supply terminal and the power consumption area is optimized, and the problems of waste of electricity and insufficient power supply caused by improper fixed proportions are solved, and the efficiency and utilization rate of energy management are improved.
Patent Information
- Application Number
- CN202411125658.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, fixed preset ratios lead to a decrease in the scheduling efficiency and utilization rate of the power supply terminal, which cannot reflect the load state of the power supply terminal in real time, resulting in waste of electricity or insufficient power supply.
By obtaining the basic data information of the power supply terminal in real time, dynamically generate scheduling ratios, monitoring and comparing the power generation and power consumption of the power supply terminal in real time, switching the power supply terminal according to the switching rules, optimizing the matching relationship between the power supply terminal and the power consumption area, and improving the Flexibility and efficiency of energy management scheduling.
Real-time matching between the power supply terminal and the power consumption area is achieved, the energy distribution effect is improved, the power consumption needs is met, the utilization rate of renewable energy is maximized, and the scheduling efficiency and utilization rate of electricity is improved.
Smart Images

Figure CN119026800A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy management, and in particular to an energy management method and system based on the Internet of Things. Background Art
[0002] Renewable energy generation maintains a rapid development trend. However, due to the limitations of the power grid's own regulation and control capabilities and load demand, some regions have a relatively serious phenomenon of "abandoning wind, solar and hydropower", which has become a prominent problem restricting the development of clean energy. The existing power and electricity balance does not fully consider the power generation characteristics of various energy sources and the differences in electricity demand in different regions. Various prediction models are often used in the management and dispatch of comprehensive energy. However, since renewable energy is affected by many external factors, the output results of the prediction model often have a large deviation from the actual total power generation, resulting in low utilization of renewable energy during low electricity consumption. In special periods when the power load increases sharply, the peak-shaving demand of the power grid increases, and the dispatching difficulty of various renewable energy power stations increases, resulting in insufficient power supply, which leads to the destruction of the power and electricity balance.
[0003] The Chinese invention patent with application number 202310110217.7 provides a comprehensive energy distributed management and scheduling method and system, which divides the locations of electricity users into regions to obtain multiple electricity consumption areas; allocates multiple electricity consumption areas to the power supply end according to the power generation of renewable energy uploaded by the power supply end and the power consumption of the power consumption area; when the total power consumption of multiple power consumption areas corresponding to the first power supply end is greater than the product of the power generation of the first power supply end and the preset ratio, a mobile power consumption area corresponding to the first power supply end is changed to the second power supply end for power supply, and the electric energy of the second power supply end is dispatched to the mobile power consumption area corresponding to the first power supply end. Using the preset ratio, the electric energy is dispatched between each distributed power supply end only according to the current real-time data situation.
[0004] In the prior art, a pre-set preset ratio is used to adjust the power supply end. However, in actual use, the actual load situation at the power supply end may change, resulting in the preset ratio being unable to reflect the current load status in real time. Improper setting of the fixed ratio may cause power waste or insufficient power supply. The comprehensive energy management scheduling is not flexible enough, resulting in reduced scheduling efficiency and utilization of electricity. Summary of the invention
[0005] The present application provides an energy management method and system based on the Internet of Things, which solves the problem in the prior art that fixed preset ratios lead to reduced power scheduling efficiency and utilization, and achieves the technical effect of improving scheduling efficiency and utilization.
[0006] The present application provides an energy management method based on the Internet of Things, the method comprising: S100: acquiring basic data information of the power supply end in real time, and obtaining a scheduling adaptation coefficient and a power generation evaluation index according to the basic data information, and dynamically generating a scheduling ratio according to the scheduling adaptation coefficient and the power generation evaluation index; the basic data information includes power generation data and equipment status of the power supply end; S200: Divide the location of the electricity user into regions to obtain multiple electricity consumption areas; obtain the power consumption of the power consumption areas; allocate multiple power consumption areas to the power supply end according to the scheduling ratio of the power supply end and the power consumption of the power consumption areas; wherein the power consumption areas include fixed power consumption areas and mobile power consumption areas; S300: Acquire the real-time power generation and dispatch ratio of the power supply end in real time, and use the product of the real-time power generation and the dispatch ratio to compare with the total power consumption of the power consumption area; if the total power consumption is greater than the product of the real-time power generation and the dispatch ratio, switch the mobile power consumption area corresponding to the power supply end according to the exchange rule and switch to the remaining power supply ends.
[0007] Furthermore, the power generation data refers to the real-time power generation of the power supply end, and the equipment status refers to the operating status, maintenance record and load condition of the power supply end; the scheduling adaptation coefficient is obtained by weighted summation based on the basic data information; the specific calculation formula of the scheduling adaptation coefficient is as follows:
[0008] Among them, M is the scheduling adaptation coefficient, N refers to the number of state indicators, is the weight coefficient of the i-th indicator, is the value of the ith indicator; The power generation evaluation index is used to evaluate the power generation situation of the current power supply end, which is calculated based on the ratio of the real-time power generation to the expected power generation, and the scheduling ratio is generated based on the scheduling adaptation coefficient and the power generation evaluation index; the scheduling ratio is used to dynamically adjust the power consumption area allocation of the power supply end and evaluate whether the power supply end can meet the power consumption of the current power consumption area; the scheduling ratio is dynamically generated based on the real-time status of the power supply end; The specific calculation formula of the dispatch ratio is as follows:
[0009] in, refers to the dispatch ratio in period t, and are the weight indexes of the dispatch adaptation coefficient M and the power generation evaluation index F in period t, It refers to the scheduling adaptation coefficient in time period t, It refers to the power generation evaluation index in period t.
[0010] Furthermore, the switching rules include obtaining the scheduling ratio data of each of the power supply ends to obtain the initial floating interval of each of the power supply ends; setting a time period, obtaining the change of the scheduling ratio within the time period, and adjusting the initial floating interval according to the scheduling ratio to form a stable floating interval; obtaining the maximum power supply and the minimum power supply of the power supply end according to the stable floating interval, comparing the power consumption of the mobile power consumption area with the power supply in the stable floating interval to obtain the difference value, and selecting the power supply end with the smallest difference value as the switching power supply end for switching.
[0011] Furthermore, the time period refers to the frequency of adjusting the initial floating interval. The initial floating interval is adjusted once after a time period, and the time period needs to be set in advance; the initial floating interval is the maximum and minimum values of the scheduling ratio obtained based on historical power supply data and power demand data.
[0012] Furthermore, the difference value is obtained by comparing the power consumption of the mobile power consumption area with the maximum power supply and the minimum power supply respectively. If the power consumption is less than the maximum power supply, the difference value is the difference between the power consumption and the minimum power supply; if the power consumption is greater than the maximum power supply, the power supply end is replaced for re-comparison.
[0013] Furthermore, the replacement rules also include obtaining the basic data information of each of the power supply ends, calculating a comprehensive score value for each power supply end, and dividing each of the power supply ends into different power supply levels according to the comprehensive score value; obtaining the historical power consumption data and historical power consumption fluctuations of the mobile power consumption area, and dividing the mobile power consumption area into different power consumption levels; and replacing the power supply end according to the power supply level and power consumption level.
[0014] Furthermore, the comprehensive score is used to comprehensively evaluate the power generation capacity, equipment status and scheduling flexibility of the power supply end. The power supply level is divided into three levels, namely, level one, level two and level three; the power consumption level is divided into three levels, namely, high, medium and low, which are used to evaluate the power consumption fluctuation and power consumption urgency of different mobile power consumption areas; the specific calculation formula of the comprehensive score is as follows:
[0015] in, is the scheduling adaptation coefficient, J refers to the number of state indicators, refers to the weight coefficient of the jth indicator, is the value of the jth indicator, T refers to the total period of a power supply process, and t refers to a single period. It is the time period variation index of the dispatch ratio.
[0016] Furthermore, the method also includes: S400: obtaining the exchange result of the exchange rule and generating an analysis report, the analysis report including a result status report of each of the power supply ends and the power consumption area; in step S200 and step S300, the power consumption area of the power supply end is allocated and exchanged according to the analysis report.
[0017] An energy management system based on the Internet of Things is used to implement the above-mentioned energy management method based on the Internet of Things, and the system includes: A data information acquisition module, used to acquire basic data information of the power supply end, and obtain a scheduling adaptation coefficient and a power generation evaluation index according to the basic data information; An area allocation module, used for dividing the power consumption area and allocating the power consumption area to the power supply end; The area switching module is used to switch the mobile power consumption area corresponding to the power supply end according to the switching rules and switch it to the other power supply ends.
[0018] Furthermore, the system further comprises: a feedback optimization module, which is used to generate an analysis report according to the exchange result of the exchange rule, and optimize and adjust the area allocation module and the area exchange module according to the analysis report.
[0019] One or more technical solutions provided in this application have at least the following technical effects or advantages: By dynamically acquiring data to generate scheduling ratios, real-time matching between the power supply end and the power consumption area is achieved, and the effect of energy distribution is improved. By real-time monitoring and comparison of the real-time power generation of the power supply end and the power consumption of the power consumption area, the power supply strategy is adjusted in time to ensure that the power demand is met. By optimizing the matching relationship between the power supply end and the power consumption area, the power generation of renewable energy is maximized, achieving the effect of improving energy utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of a flow chart of an energy management method based on the Internet of Things in an embodiment of the present invention; Figure 2 The figure is an architecture diagram of an energy management system based on the Internet of Things in an embodiment of the present invention. DETAILED DESCRIPTION
[0021] To facilitate the understanding of the present invention, the present application will be described more comprehensively below with reference to the relevant drawings; the drawings show preferred embodiments of the present invention, but the present invention can be implemented in many different forms and is not limited to the embodiments described herein; on the contrary, the purpose of providing these embodiments is to enable a more thorough and comprehensive understanding of the disclosed content of the present invention.
[0022] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs; the terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the term "and / or" used herein includes any and all combinations of one or more related listed items.
[0023] Embodiment 1: Figure 1 As shown, an energy management method based on the Internet of Things, the method comprising: S100: Acquire basic data information of the power supply end in real time, and obtain a scheduling adaptation coefficient and a power generation evaluation index based on the basic data information, and dynamically generate a scheduling ratio based on the scheduling adaptation coefficient and the power generation evaluation index; the basic data information includes the power generation data and equipment status of the power supply end.
[0024] In some embodiments, the power generation data refers to the real-time power generation of the power supply end, and the equipment status refers to the operating status, maintenance records, and load conditions of the power supply end; the scheduling adaptation coefficient is obtained by weighted summation based on the basic data information, and is used to represent the basic status of the power supply end. Different weight values are set for each indicator, namely, the operating status, maintenance records, and load conditions, and the reasonable contribution of each factor is determined according to the actual situation and historical data of the power supply end. Since the operating status, maintenance records, and load conditions belong to different representation levels, normalization processing is required first when performing weighted summation to unify the data standards and data dimensions, and then calculation is performed. The specific calculation formula of the scheduling adaptation coefficient is as follows:
[0025] Among them, M is the scheduling adaptation coefficient, N refers to the number of state indicators, is the weight coefficient of the i-th indicator, is the value of the ith indicator.
[0026] In some embodiments, the power generation evaluation index is used to evaluate the power generation situation of the current power supply end, and is calculated based on the ratio of real-time power generation to expected power generation. The power generation evaluation index is used to evaluate the specific state of current power generation; a scheduling ratio is generated based on the scheduling adaptation coefficient and the power generation evaluation index. The scheduling ratio is used to dynamically adjust the specific number of power application areas of the power supply end and evaluate whether the power supply end can meet the power consumption of the current power consumption area. The specific calculation formula of the scheduling ratio is as follows:
[0027] in, refers to the dispatch ratio in period t, and are the weight indexes of the dispatch adaptation coefficient M and the power generation evaluation index F in period t, refers to the scheduling adaptation coefficient in period t, It refers to the power generation evaluation index in time period t; the scheduling adaptation coefficient and power generation evaluation index of the power supply end will produce different changes at different times, so the scheduling ratio is dynamically generated according to the real-time status of the power supply end, and the scheduling ratio is used to indicate the power supply ratio that the power supply end can ensure. The scheduling ratio is multiplied by the real-time power generation to obtain the actual stable power supply of the power supply end, and the product value is compared with the total power consumption of the power consumption area. If the product value is greater than the total power consumption, it means that the power supply end can stably supply power to the allocated power consumption area. If it is less than the total power consumption, it means that the power supply of the power supply end is insufficient and needs to be adjusted.
[0028] In some embodiments, the scheduling ratio needs to pre-set an initial ratio value, and set the basic ratio of flat peak, peak and underestimated electricity consumption according to historical data and actual electricity demand forecasts. The scheduling ratio is obtained based on the actual situation of the power supply end, and the basic ratio is adjusted using the scheduling ratio to achieve the correspondence and control strategy between the power supply end and the power consumption area, and adjust the output and scheduling of the power supply end in real time to ensure the effective allocation of energy, meet electricity demand and maximize the utilization rate of renewable energy.
[0029] In some embodiments, the basic data information and the remaining data information are based on the Internet of Things technology, and energy data is monitored and collected in real time through sensors, smart meters and other equipment. The data is transmitted to the management platform for analysis and processing using wireless transmission technology to achieve automated management and optimization of energy. Energy data can be collected and processed in real time and accurately, improving data accuracy and real-time performance, which helps to promptly discover and solve problems in energy use; reduce manual intervention and improve management efficiency.
[0030] S200: Divide the locations of electricity users into regions to obtain multiple electricity consumption areas; obtain the power consumption of the power consumption areas; allocate multiple power consumption areas to the power supply end according to the scheduling ratio of the power supply end and the power consumption of the power consumption areas; wherein the power consumption areas include fixed power consumption areas and mobile power consumption areas.
[0031] In some embodiments, a city area is divided into grids, and around the distributed power supply end corresponding to the power consumption area, multiple power consumption areas that match the power generation of the power supply end are selected to correspond to the power supply end according to the power generation capacity of the renewable energy of the power supply end; the power consumption of the power consumption area is obtained according to the analysis of the historical power consumption data of the power consumption area. Since the power consumption of the power consumption area in each time period will fluctuate, the power consumption of the power consumption area at the current time point can be roughly predicted based on the historical power consumption data. In addition, the power consumption of the power consumption area can be further accurately predicted based on the development level of the current power consumption area or the number of newly added or reduced load equipment or the number of power users. The specific number of power supply ends is not limited.
[0032] In some embodiments, the power consumption area includes a fixed power consumption area and a mobile power consumption area. The power consumption area obtained by grid division is a small demand area. The power consumption of the demand area is limited. Even if the number of users or load equipment in the power consumption area reaches saturation, its power consumption will not exceed the power generation of one power supply end. Therefore, the power consumption of one power supply end can at least ensure the saturation of power consumption in more than one power consumption area. For example, one power supply end can match 3-5 power consumption areas. The fixed power consumption area refers to the area range where it is not easy to replace the power supply end. If the power supply end is switched, it is easy to cause large economic losses; the mobile power consumption area refers to the area range where the power supply end can be switched briefly, and the loss caused by the switch can be ignored. For example, production plants and workshops belong to fixed power consumption areas, and ordinary office areas or residential areas belong to mobile power consumption areas. The specific division should be based on historical data.
[0033] S300: Acquire the real-time power generation and dispatch ratio of the power supply end in real time, and use the product of the real-time power generation and the dispatch ratio to compare with the total power consumption of the power consumption area; if the total power consumption is greater than the product of the real-time power generation and the dispatch ratio, switch the mobile power consumption area corresponding to the power supply end according to the exchange rule and switch to the remaining power supply ends.
[0034] In some embodiments, a power consumption area is allocated to each power supply end according to a basic ratio, and after a period of operation after the allocation, the scheduling adaptation coefficient and the power generation evaluation index of the current power supply end are obtained to generate a scheduling ratio, and the dynamically generated scheduling ratio is multiplied by the actual power generation of the current power supply end, and the product obtained is compared with the total power consumption of the power consumption area. If the total power consumption of multiple power consumption areas corresponding to the power supply end is greater than the product of the power generation of the power supply end and the scheduling ratio, one of the mobile power consumption areas corresponding to the power supply end is changed to supply power to the remaining power supply ends according to the exchange rules.
[0035] In some embodiments, the switching rule is to perform a secondary comparison based on the actual power consumption of the flow area that currently needs to be switched and the scheduling ratio and actual power generation of the remaining power supply ends, and select the most suitable remaining power supply end to continue power supply.
[0036] In some embodiments, the specific steps are briefly described as follows: collecting and preprocessing relevant data information of the power supply end and the power consumption area, calculating the scheduling adaptation coefficient and the power generation evaluation index, generating a scheduling ratio, allocating the power consumption area to the power supply end, and monitoring and comparing the real-time power generation and scheduling ratio of the power supply end with the total power consumption of the power consumption area in real time. If the power generation and scheduling ratio of the power supply end do not meet the power consumption area, the mobile power consumption area is switched according to the switching rules, and the above monitoring and switching steps are repeated for real-time adjustment and optimization; setting the scheduling ratio, dynamically obtaining the real-time status of the power supply end, solving the problem of power waste or insufficient power supply due to improper setting of the fixed ratio, and improving the scheduling flexibility of comprehensive energy management as well as the scheduling efficiency and utilization rate of electric energy.
[0037] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages: This application achieves real-time matching between the power supply end and the power consumption area and improves the effect of energy distribution by dynamically acquiring data to generate a scheduling ratio; by real-time monitoring and comparing the real-time power generation of the power supply end and the power consumption of the power consumption area, the power supply strategy is adjusted in time to ensure that the power demand is met; by optimizing the matching relationship between the power supply end and the power consumption area, the power generation of renewable energy is maximized, achieving the effect of improving energy utilization.
[0038] Embodiment 2: In embodiment 1, a dynamic dispatching ratio is set for real-time monitoring and adjustment, which improves the flexibility of integrated energy management dispatching as well as the dispatching efficiency and utilization rate of electric energy, and switches according to the switching rules based on actual conditions. However, when switching, a secondary comparison is required to accurately select the appropriate power supply end, which makes the switching operation cumbersome and reduces the response efficiency of the allocation. This embodiment makes further limitations on the basis of the above embodiment.
[0039] The switching rules include obtaining the scheduling ratio data of each of the power supply ends to obtain the initial floating interval of each of the power supply ends; setting a time period, obtaining the change of the scheduling ratio within the time period, adjusting the initial floating interval according to the scheduling ratio, and forming a stable floating interval; obtaining the maximum power supply and the minimum power supply of the power supply end according to the stable floating interval, comparing the power consumption of the mobile power consumption area with the power supply in the stable floating interval to obtain the difference value, and selecting the power supply end with the smallest difference value as the switching power supply end for switching.
[0040] The time period refers to the frequency of adjusting the initial floating interval. The initial floating interval is adjusted once after a time period, and the time period needs to be set in advance; the initial floating interval is the maximum and minimum values of the scheduling ratio obtained based on historical power supply data and power demand data.
[0041] The difference value is obtained by comparing the power consumption of the mobile power consumption area with the maximum power supply and the minimum power supply respectively. If the power consumption is less than the maximum power supply, the difference value is the difference between the power consumption and the minimum power supply; if the power consumption is greater than the maximum power supply, the power supply end is replaced for re-comparison.
[0042] In some embodiments, the time period needs to be pre-set, which refers to the time range within a certain period of time in the power supply process, and the time period can be set in hours or days; the change of the scheduling ratio within the time period is obtained, and the initial floating interval is adjusted according to the scheduling ratio to form a stable floating interval, and the initial power supply capacity and historical power supply data of each power supply end are collected, including basic data information and demand change records of each power consumption area, and the initial dynamic adjustment range is pre-set. Setting the time period is to set the frequency of adjustment. Adjustment is required after a time period. The initial floating interval is adjusted for the first time to form a stable floating interval. The current stable floating interval will continue to be adjusted in the next time period until the power supply ends. The stable floating interval only refers to being stable within a time period, but the stable floating interval is not a floating interval that is always fixed. In a power supply During the process (referring to the state from full power to no power at the power supply end), the floating interval will always change with the change of the scheduling ratio. The initial floating interval is the maximum and minimum values of the scheduling ratio obtained according to historical data at the beginning of power supply. Specifically, the change of the historical scheduling ratio is obtained, and the maximum and minimum values of the scheduling ratio are obtained in each power supply process. The average of all the maximum values is calculated to obtain the average maximum value. Similarly, the minimum value of all scheduling ratios is obtained, and the average of all the minimum values is calculated to obtain the average minimum value. The average maximum value and the average minimum value are used as the maximum value and the minimum value of the initial floating interval. According to the initial floating interval, the maximum power supply and the minimum power supply of the power supply end can be obtained; the maximum power supply and the minimum power supply are compared with the power consumption of the mobile power consumption area that needs to be switched to obtain the difference value, and the closest power supply end is selected for switching, that is, the power supply end with the smallest difference value.
[0043] In some embodiments, after each ratio adjustment, the adjustment effect data is collected and analyzed, including power utilization efficiency, energy allocation rate, power supply stability, etc., and the data before and after the adjustment are compared to evaluate the impact of the ratio adjustment on the power supply end and the power consumption area; when a new change in electricity demand occurs, first determine which power supply ends are capable and suitable for adjustment based on the current ratio of each power supply end and its floating range, and select the most suitable power supply end and power consumption area for adjustment based on the judgment result. Based on the judgment result, select the most suitable power supply end and power consumption area for ratio adjustment without a second verification, and directly implement the adjustment to monitor the power supply after the adjustment to ensure that the power supply is stable and meets the electricity demand.
[0044] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages: The present application reduces unnecessary energy consumption and losses and improves the efficiency of electric energy utilization by optimizing the selection and switching process of the power supply end. By calculating the difference value and selecting the most suitable power supply end for switching, the secondary comparison process is avoided, the response speed and adaptability of the switch are improved, and a more suitable power supply end is accurately selected for switching, thereby achieving the effect of improving the accuracy of power consumption area allocation.
[0045] Embodiment three: In the above embodiment, a floating interval is set to analyze each power supply end to obtain the maximum power supply amount, and the closest power supply end is selected for switching according to the floating interval, which enhances the adaptability of the switching. However, due to the power consumption fluctuations in the mobile power consumption area and the power generation fluctuations at the power supply end, the system stability is reduced. This embodiment makes further improvements on the basis of the above embodiment.
[0046] The replacement rules also include obtaining the basic data information of each of the power supply terminals, calculating a comprehensive score value for each power supply terminal, and dividing each of the power supply terminals into different power supply levels according to the comprehensive score value; obtaining the historical power consumption data and historical power consumption fluctuations of the mobile power consumption area, and dividing the mobile power consumption area into different power consumption levels; and replacing the power supply terminal according to the power supply level and power consumption level.
[0047] The comprehensive score is used to comprehensively evaluate the power generation capacity, equipment status and scheduling flexibility of the power supply end. The power supply level is divided into three levels, namely level one, level two and level three; the power consumption level is divided into three levels, namely high, medium and low, which are used to evaluate the power consumption fluctuation and power consumption urgency of different mobile power consumption areas. The specific calculation formula of the comprehensive score is as follows:
[0048] in, is the scheduling adaptation coefficient, J refers to the number of state indicators, refers to the weight coefficient of the jth indicator, is the value of the jth indicator, T refers to the total period of a power supply process, and t refers to a single period. It is the time period variation index of the scheduling ratio; in the present application, the time period is consistent with the time period.
[0049] In some embodiments, based on the renewable energy power generation capacity of the power supply end, including real-time power generation, historical average power generation, etc., the operating status, maintenance records, load conditions, etc. of the power supply end are taken into consideration to reflect the stability and reliability of the power supply end. Based on the historical scheduling data and the changes in the current scheduling ratio, the response speed and adaptability of the power supply end to the scheduling instruction are evaluated. Preferably, the basic data information of each power supply end is collected, and at the same time, combined with the stable floating range of each power supply end, the sum of the time period change index of the scheduling ratio within a power supply process is calculated, the data is pre-processed and normalized, and then a weighted summation method is used to comprehensively consider the power generation capacity, equipment status and scheduling flexibility, and a comprehensive score value is calculated for each power supply end. According to the comprehensive score and the pre-set threshold range, the power supply end is divided into different levels, such as level one (excellent), level two (good), and level three (general). When conducting power consumption area analysis, the power supply end is divided into different levels, such as level one (excellent), level two (good), and level three (general). When switching domains, priority is given to power supply terminals with higher levels to improve the stability and reliability of power supply; the power urgency is divided according to the importance of the power consumption area and the urgency of power demand, and the historical power consumption fluctuations of the power consumption area are considered. Areas with stable power consumption and accurate predictions are easier to match with power supply. Preferably, the switching cost of the power consumption area should also be considered, and the cost of switching the power consumption area from one power supply terminal to another should be evaluated. The historical power consumption data, power urgency information and switching cost evaluation of each mobile power consumption area are collected. The mobile power consumption area is divided into different levels using a cluster analysis method, such as high-level (high urgency, fluctuating power consumption), medium-level (medium urgency, relatively stable power consumption), and low-level (low urgency, stable power consumption). When switching power supply terminals, priority is given to matching power consumption areas and power supply terminals of corresponding levels to improve the stability of power supply and meet the urgency of power demand.
[0050] In some embodiments, the power supply end is replaced according to the power supply level and the power consumption level. Preferably, for high-level mobile power consumption areas, a first-level power supply end should be selected; for medium-level mobile power consumption areas, a second-level power supply end should be selected; for low-level mobile power consumption areas, a third-level power supply end should be selected; when switching according to the level, the difference value in the above embodiment still needs to be considered. In actual applications, it is possible to prioritize the difference value and then perform level correspondence, or to prioritize level correspondence and then consider the difference value. Preferably, considering level correspondence first and then calculating the difference value can achieve a more stable power supply guarantee.
[0051] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages: This application combines the difference values and comprehensively considers multiple factors at the power supply end and classifies them into levels, then classifies the mobile power consumption areas, and uses the levels for matching to ensure the stability and reliability of power supply, thereby achieving accurate switching and improving switching adaptability.
[0052] Embodiment 4: In the above embodiment, a difference value is set, and the power supply end and the power consumption area are divided into different levels. This embodiment makes further improvements on the basis of the above embodiment.
[0053] The method also includes: S400: obtaining the exchange result of the exchange rule and generating an analysis report, wherein the analysis report includes a result status report of each of the power supply ends and the power consumption area; in steps S200 and S300, the power consumption area is allocated and exchanged for the power supply end according to the analysis report.
[0054] In some embodiments, step S400 obtains the exchange result of the exchange rule and generates an analysis report, the analysis report including a result status report of each of the power supply ends and the power consumption area, the result status report of the power supply end including a comprehensive score value for each of the power supply ends and the power supply level to which it belongs; the result status report of the power consumption area includes obtaining the historical power consumption data and historical power consumption fluctuations of the mobile power consumption area, and dividing the mobile power consumption area into different power consumption levels; when allocating power consumption areas according to the result status reports of the power supply ends and the power consumption areas, the initial steps S200 and S300 are optimized, and priority is given to matching power consumption areas and power supply ends of corresponding levels. When performing primary allocation, the power supply level and power consumption level, as well as the difference between each power supply end and each power consumption area are comprehensively considered for allocation. It can comprehensively consider multiple factors of the power supply end and the characteristics of the power consumption area, classify them and match them, thereby ensuring the stability and reliability of power supply.
[0055] In some embodiments, preferably, in step S200, when allocating power consumption areas, priority is given to matching power consumption areas and power supply ends of corresponding levels; in step S300, the comprehensive score value of the power supply end and the power consumption level of the power consumption area are also considered, and when switching the power supply end, priority is given to power supply ends with matching levels and smaller difference values.
[0056] On the other hand, the present invention also provides an energy management system based on the Internet of Things, such as Figure 2 As shown, the system includes: a data information acquisition module, which is used to acquire basic data information of the power supply end, and obtain a scheduling adaptation coefficient and a power generation evaluation index based on the basic data information.
[0057] The area allocation module is used to divide the power consumption area and allocate the power consumption area to the power supply end.
[0058] The area switching module is used to switch the mobile power consumption area corresponding to the power supply end according to the switching rules and switch it to the other power supply ends.
[0059] The system further comprises: a feedback optimization module, which is used to generate an analysis report according to the exchange result of the exchange rule, and optimize and adjust the area allocation module and the area exchange module according to the analysis report.
[0060] Specifically, this application is based on the Internet of Things technology, and uses sensors, smart meters and other equipment to monitor and collect energy data in real time, and uses wireless transmission technology to transmit data to a management platform for analysis and processing, thereby realizing automated energy management and optimization; the Internet of Things-based system can collect and process energy data in real time and accurately, improve data accuracy and real-time performance, and help to promptly discover and solve problems in energy use; reduce manual intervention, improve management efficiency, and reduce manpower and material costs; conduct in-depth analysis and prediction of energy use, and provide managers with scientific decision-making support.
[0061] The technical solutions in the above embodiments of the present application have at least the following technical effects or advantages: The present application generates an analysis report, and according to the analysis report, comprehensively considers the comprehensive score value, power consumption level and power supply level when allocating power consumption areas to the power supply ends in step S200 and step S300 according to the analysis report. When switching the power supply end, priority is given to power supply ends with matching levels and smaller difference values, thereby effectively improving the power supply stability and reliability and energy management efficiency.
[0062] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An energy management method based on the Internet of Things, characterized in that: The method comprises: S100: acquiring basic data information of the power supply end in real time, and obtaining a scheduling adaptation coefficient and a power generation evaluation index according to the basic data information, and dynamically generating a scheduling ratio according to the scheduling adaptation coefficient and the power generation evaluation index; the basic data information includes power generation data and equipment status of the power supply end; S200: Divide the location of the electricity user into regions to obtain multiple electricity consumption areas; obtain the power consumption of the power consumption areas; allocate multiple power consumption areas to the power supply end according to the scheduling ratio of the power supply end and the power consumption of the power consumption areas; wherein the power consumption areas include fixed power consumption areas and mobile power consumption areas; S300: Acquire the real-time power generation and dispatch ratio of the power supply end in real time, and use the product of the real-time power generation and the dispatch ratio to compare with the total power consumption of the power consumption area; if the total power consumption is greater than the product of the real-time power generation and the dispatch ratio, switch the mobile power consumption area corresponding to the power supply end according to the exchange rule and switch to the remaining power supply ends.
2. The energy management method based on the Internet of Things as claimed in claim 1, characterized in that: The power generation data refers to the real-time power generation of the power supply end, and the equipment status refers to the operating status, maintenance record and load condition of the power supply end; the scheduling adaptation coefficient is obtained by weighted summation based on the basic data information; the specific calculation formula of the scheduling adaptation coefficient is as follows: Among them, M is the scheduling adaptation coefficient, N refers to the number of state indicators, is the weight coefficient of the i-th indicator, is the value of the ith indicator; The power generation evaluation index is used to evaluate the power generation situation of the current power supply end, which is calculated based on the ratio of the real-time power generation to the expected power generation, and the scheduling ratio is generated based on the scheduling adaptation coefficient and the power generation evaluation index; the scheduling ratio is used to dynamically adjust the power consumption area allocation of the power supply end and evaluate whether the power supply end can meet the power consumption of the current power consumption area; the scheduling ratio is dynamically generated based on the real-time status of the power supply end; The specific calculation formula of the dispatch ratio is as follows: in, refers to the dispatch ratio in period t, and are the weight indexes of the dispatch adaptation coefficient M and the power generation evaluation index F in period t, It refers to the scheduling adaptation coefficient in time period t, It refers to the power generation evaluation index in period t.
3. The energy management method based on the Internet of Things as claimed in claim 1, characterized in that: The switching rules include obtaining the scheduling ratio data of each of the power supply ends to obtain the initial floating interval of each of the power supply ends; setting a time period, obtaining the change of the scheduling ratio within the time period, adjusting the initial floating interval according to the scheduling ratio, and forming a stable floating interval; obtaining the maximum power supply and the minimum power supply of the power supply end according to the stable floating interval, comparing the power consumption of the mobile power consumption area with the power supply in the stable floating interval to obtain the difference value, and selecting the power supply end with the smallest difference value as the switching power supply end for switching.
4. The energy management method based on the Internet of Things as claimed in claim 3, characterized in that: The time period refers to the frequency of adjusting the initial floating interval. The initial floating interval is adjusted once after a time period, and the time period needs to be set in advance; the initial floating interval is the maximum and minimum values of the scheduling ratio obtained based on historical power supply data and power demand data.
5. The energy management method based on the Internet of Things as claimed in claim 3, characterized in that: The difference value is the difference between the power consumption of the mobile power consumption area and the maximum power supply and the minimum power supply. If the power consumption is less than the maximum power supply, the difference value is the difference between the power consumption and the minimum power supply. If the power consumption is greater than the maximum power supply, the power supply end is replaced and re-compared.
6. The energy management method based on the Internet of Things as claimed in claim 1, characterized in that: The switching rule also includes obtaining the basic data information of each power supply end, calculating a comprehensive score value for each power supply end, and dividing each power supply end into different power supply levels according to the comprehensive score value; The historical power consumption data and historical power consumption fluctuation of the mobile power consumption area are obtained, and the mobile power consumption area is divided into different power consumption levels; the power supply end is replaced according to the power supply level and power consumption level.
7. The energy management method based on the Internet of Things as claimed in claim 6, characterized in that: The comprehensive score is used to comprehensively evaluate the power generation capacity, equipment status and scheduling flexibility of the power supply end. The power supply level is divided into three levels, namely level one, level two and level three; the power consumption level is divided into three levels, namely high, medium and low, which are used to evaluate the power consumption fluctuation and power urgency of different mobile power consumption areas; the specific calculation formula of the comprehensive score is as follows: in, is the scheduling adaptation coefficient, J refers to the number of state indicators, refers to the weight coefficient of the jth indicator, is the value of the jth indicator, T refers to the total period of a power supply process, and t refers to a single period. It is the time period variation index of the dispatch ratio.
8. The energy management method based on the Internet of Things as claimed in claim 1, characterized in that: The method also includes: S400: obtaining the exchange result of the exchange rule and generating an analysis report, wherein the analysis report includes a result status report of each of the power supply ends and the power consumption area; in steps S200 and S300, the power consumption area is allocated and exchanged for the power supply end according to the analysis report.
9. An energy management system based on the Internet of Things, used to implement an energy management method based on the Internet of Things as claimed in any one of claims 1 to 8, characterized in that: The system comprises: A data information acquisition module, used to acquire basic data information of the power supply end, and obtain a scheduling adaptation coefficient and a power generation evaluation index according to the basic data information; An area allocation module, used for dividing the power consumption area and allocating the power consumption area to the power supply end; The area switching module is used to switch the mobile power consumption area corresponding to the power supply end according to the switching rules and switch it to the other power supply ends.
10. An energy management system based on the Internet of Things as claimed in claim 9, characterized in that: The system further comprises: a feedback optimization module, which is used to generate an analysis report according to the exchange result of the exchange rule, and optimize and adjust the area allocation module and the area exchange module according to the analysis report.
Citation Information
Patent Citations
New energy system energy optimization scheduling method and system based on multi-agent combination
CN114462727A
Data monitoring method and system for electric energy balance management
CN116260248A
Power monitoring method of charging pile, electronic equipment and storage medium
CN116968585A
Electric energy monitoring method based on big data
CN118174459A
Cited By
A power supply management method and system for a blast vibration monitoring device
CN122717180A