Comprehensive energy system low-carbon scheduling method and system considering CCS-P2G and photo-thermal power station

By combining the low-carbon scheduling method of CCS-P2G and CSP power stations in an integrated energy system, using the coupling model of carbon capture and electric gas conversion equipment and the ladder-type carbon trading mechanism, the failure to effectively reduce carbon emissions in the existing technology and Cost issues achieve more efficient renewable energy utilization and risk management.

CN119026845APending Publication Date: 2024-11-26STATE GRID GANSU ELECTRIC POWER CORP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411064905.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The existing technology has failed to effectively combine CCS-P2G and CSP power stations, and has not fully utilized the coordinated optimization of the operation of the two to reduce the carbon emissions and total costs of the integrated energy system, and has not considered the joint operation model of low-carbon technology and low-carbon policies.

Method used

Establish a low-carbon scheduling method for integrated energy systems for CCS-P2G and photothermal power plants. By constructing a coupling model of carbon capture power plants and electric to gas equipment at the low-carbon technology level, and establishing a ladder-type carbon trading mechanism model at the low-carbon policy level, integrating To achieve low-carbon economic scheduling of IES, the two use trapezoidal fuzzy number relaxation power balance constraints, and risk assessment is carried out in combination with the conditional risk value theory to obtain the optimal scheduling plan.

Benefits of technology

It improves CO2 recycling rate, reduces IES' carbon emissions and operating costs, promotes the absorption of renewable energy, enhances the ability to respond to load uncertainty, and provides a reasonable risk avoidance solution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026845A_ABST
    Figure CN119026845A_ABST
Patent Text Reader

Abstract

The invention discloses a comprehensive energy system low-carbon scheduling method and system considering CSC-P2G and a photo-thermal power station. The method comprises the steps that an IES model containing the CSC-P2G, a fuel gas hydrogen-doped unit and the photo-thermal power station is established on the low-carbon technology level; establishing a stepped carbon transaction mechanism model on the low-carbon policy level; integrating the IES model and the stepped carbon transaction mechanism model, and establishing an IES low-carbon economic dispatching model by taking the minimization of the IES operation cost as a target; using a trapezoidal fuzzy number to relax an IES power balance constraint and convert the IES power balance constraint into a clear equivalence class model, and establishing an IES optimization scheduling model based on a fuzzy opportunity constraint; taking the weight coefficient as a risk assessment index, and establishing an IES risk assessment model based on the conditional value-at-risk theory; carrying out model solving by taking economy optimization as an objective function and combining with constraint conditions to obtain an optimal scheduling scheme; the carbon emission and total cost of the system are effectively reduced, and the utilization rate of renewable energy sources is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of optimized operation of integrated energy systems, and more specifically to a low-carbon scheduling method and system for an integrated energy system taking into account CCS-P2G and solar thermal power stations. Background Art

[0002] An integrated energy system (IES) couples multiple energy sources internally, with gas flow and electric current as the main energy sources, supplemented by energy storage equipment and energy conversion equipment, which can achieve multi-energy complementarity, coordinated optimization and cascade utilization. With the complexity of IES structure and the diversification of load types, the integrated energy system with distributed renewable energy as the main body can meet the needs of various loads and improve the low-carbon economy and renewable energy consumption rate of IES.

[0003] At present, the existing technical routes for IES to achieve low-carbon operation are indirect emission reduction and direct emission reduction:

[0004] In terms of indirect emission reduction, the combined heat and power unit CHP, as the core output equipment of IES, has strong thermal and electrical coupling and high carbon emission. It improves the consumption rate of renewable energy such as wind power and photovoltaic power, and combines with energy storage equipment to achieve energy time shifting. On the basis of meeting load demand, the output of CHP units is minimized to achieve indirect emission reduction of IES.

[0005] In terms of direct emission reduction, IES direct emission reduction can be achieved through carbon sinks and market trading policies. For example, in terms of the carbon reduction benefits of carbon capture power plants CCS and power-to-gas P2G, a CCS-wind power joint operation model was established to make full use of the dispatchable resources of sources and loads to achieve low-carbon economic dispatch of the system; an IES low-carbon economic dispatch strategy taking into account CCS-P2G was established, which effectively improved the renewable energy absorption rate and IES economy; in terms of the carbon reduction benefits of the carbon emission trading mechanism CET, an IES optimization dispatch strategy taking into account the step-type CET and load demand response was established. The proposed strategy reduced the operating cost of IES by 5.18% and the carbon emissions by 13.96%.

[0006] In addition, CSP is a new type of solar power generation that integrates photothermal conversion power generation, large-capacity heat storage and synchronous power generation. The low-carbon scheduling model of CSP power station-wind hydrogen system under the GCT mechanism realizes the complementarity of photothermal and hydrogen, reduces the carbon emissions of the system, and the multi-time scale optimization scheduling strategy of source, grid and load under the wind-photothermal-photothermal combined transmission mode solves the problem of renewable energy abandonment under large-scale grid connection.

[0007] However, the prior art has the following problems and defects:

[0008] (1) Only the carbon reduction potential of IES equipment or carbon commodity market is considered separately, without considering the carbon reduction benefits under the joint operation mode of low-carbon technology and low-carbon policy; only the carbon reduction benefits of demand response resources are considered, without considering its coordinated optimization effect with traditional energy storage equipment; the CCS-P2G joint model ignores the P2H stage of hydrogen production and other ways of utilizing hydrogen energy;

[0009] (2) CSP power plants are used in conjunction with renewable energy units to generate electricity, but the potential of CSP power plants to participate in the optimized operation of IES is ignored, and the coordinated optimized operation of CSP and CCS-P2G is not used to improve the energy conservation and emission reduction potential of IES.

[0010] Therefore, how to comprehensively consider CCS-P2G and CSP power stations, effectively reduce the carbon emissions and total cost of IES, and improve the utilization rate of renewable energy in order to effectively avoid economic losses caused by uncertainty risks is an urgent problem that technicians in this field need to solve. Summary of the invention

[0011] In view of this, the present invention provides a low-carbon scheduling method and system for an integrated energy system taking into account CCS-P2G and solar thermal power plants to solve some of the technical problems mentioned in the background technology.

[0012] In order to achieve the above object, the present invention adopts the following technical solution:

[0013] A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants comprises the following steps:

[0014] S1. Introduce CSP as a new type of energy storage into the integrated energy system IES, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP;

[0015] S2. Establish a ladder-type carbon trading mechanism model at the low-carbon policy level. The ladder-type carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder-type carbon trading model;

[0016] S3. Integrate the IES model established at the low-carbon technology level and the ladder-type carbon trading mechanism model established at the low-carbon policy level, and establish an IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system;

[0017] S4. Use trapezoidal fuzzy numbers to relax the IES power balance constraint, perform fuzzy planning and transform it into a clear equivalent class model of wind power and load, so as to establish an IES optimal scheduling model based on fuzzy chance constraints;

[0018] S5. Using the weight coefficient as the risk assessment indicator, establish an IES risk assessment model based on the conditional risk value theory to quantitatively assess the IES operation risk;

[0019] S6. Taking economic optimization as the objective function and combining the constraints, the IES low-carbon economic dispatch model, the IES optimization dispatch model based on fuzzy opportunity constraints and the IES risk assessment model based on conditional risk value theory are solved respectively to obtain the optimal dispatch plan.

[0020] Preferably, the IES model in step S1 includes a CCS-P2G coupling operation mechanism and model, a hydrogen-doped gas turbine model, a hydrogen-doped gas turbine model, a CSP power plant model, an electric heating model, and an energy storage model;

[0021] The CCS-P2G coupling operation mechanism and model include the CCS operation mechanism and model and the P2G two-stage operation mechanism and model.

[0022] Preferably, the specific contents of the CCS operation mechanism and model are:

[0023] Introduce a flue gas diversion system and liquid storage containers in CCS to capture the CO2 generated by gas boilers, gas turbines and thermal power units during operation, and send it to the methane reactor for methanation. Actively discharge CO2 to the atmosphere through the flue gas diversion system according to IES requirements, and seal it;

[0024] The specific contents of the P2G two-stage operation mechanism and model are as follows:

[0025] Phase 1: The electrolyzer EL electrolyzes water to realize the conversion of electrical energy into hydrogen energy; Phase 2: The electrolyzer EL transports hydrogen energy to the methane reactor MR, gas turbine GT, gas boiler GB and hydrogen storage tank HES respectively. MR performs methanation treatment to produce CH4, which is directly supplied to gas load or transported to the cogeneration CHP unit or GB unit to generate electricity or heat energy. The excess hydrogen energy is stored in the hydrogen storage tank HES.

[0026] The specific contents of the hydrogen-doped gas turbine model and the hydrogen-doped gas turbine model are as follows: the gas turbine GT and the gas boiler GB operate in a hydrogen-doped manner by generating hydrogen energy and natural gas through P2G and purchasing gas from the external gas grid;

[0027] The CSP power station model includes the concentrating and collecting links, the heat storage link and the power generation link. The CSP power station mirror field absorbs solar energy into the collector, generates high-pressure steam through the heat exchange device and transmits it to the steam turbine TG for power generation. The remaining heat energy is stored in the heat storage tank TES. When the light intensity is weak or there is no light, the stored heat energy is transmitted to the steam turbine TG for power generation or directly supplied to the heat load.

[0028] Preferably, for step S2:

[0029] The IES carbon emission quota model uses a free quota model based on the baseline method for allocation. The IES carbon emission sources are GB, GT and external electricity purchase;

[0030] The IES actual carbon emission model is the amount of CO2 generated minus the amount of CO2 used by P2G and the amount of CO2 stored. The amount of CO2 discharged into the atmosphere by IES during period t is divided into the amount of CO2 discharged into the atmosphere through the flue gas diversion system and the amount of CO2 that cannot be used by CCS, thus obtaining the IES actual carbon emission amount.

[0031] The IES ladder carbon trading model calculates the IES carbon trading amount based on the IES carbon emission allocation and the IES actual carbon emission. It uses different carbon trading prices in different carbon emission ranges. The more carbon emission quotas, the higher the carbon trading price in the corresponding range, and the IES carbon trading cost is obtained.

[0032] Preferably, the operating cost of the integrated energy system IES in step S3 is the total cost of IES's carbon trading cost, carbon sequestration cost, gas purchase cost, thermal power unit start-up and shutdown cost, thermal power unit coal consumption cost and each unit's operation and maintenance cost.

[0033] Preferably, the clear equivalence class model of wind power and load in step S4 is:

[0034]

[0035]

[0036] r i L =j i P t L , i∈[1,4]

[0037] in, It is a trapezoidal fuzzy type for predicting wind power output. It is a trapezoidal fuzzy type of load forecasting. and is the trapezoidal fuzzy number of wind power output, and is the load trapezoidal fuzzy number, and α is the confidence level.

[0038] Preferably, the IES risk assessment model based on the conditional value at risk theory in step S5 is specifically:

[0039]

[0040] Among them, F2 is the total operating cost of IES based on CVaR, is the weight coefficient, f E is the expected operating cost of IES, fVaR is the VaR cost, f CVaR is the CVaR cost, F1 n is the total operating cost of IES under scenario n, z n is the occurrence probability of scenario n.

[0041] Preferably, the constraints include power balance constraints and IES equipment constraints. The IES equipment constraints include WT and CSP power plant output constraints, gas turbine and gas boiler output and ramp constraints, electric heating constraints, thermal power unit constraints, carbon capture constraints, P2G constraints, and CSP power plant thermal storage system energy storage constraints.

[0042] A low-carbon dispatching system for an integrated energy system taking into account CCS-P2G and a solar thermal power station, based on the low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and a solar thermal power station, comprises an IES low-carbon economic dispatching subsystem, an IES optimization dispatching subsystem, an IES risk assessment subsystem and an optimal dispatching output subsystem; the IES low-carbon economic dispatching subsystem comprises an IES model operation module, a ladder-type carbon trading module and a low-carbon economic dispatching module;

[0043] IES model operation module, which is used to introduce CSP power plants into the integrated energy system IES as a new type of energy storage, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP power plants;

[0044] The ladder carbon trading module is used to establish a ladder carbon trading mechanism model at the low-carbon policy level. The ladder carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder carbon trading model;

[0045] The low-carbon economic dispatch module is used to integrate the IES model established at the low-carbon technology level with the ladder-type carbon trading mechanism model established at the low-carbon policy level, and to establish the IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system;

[0046] IES optimization dispatch subsystem is used to relax IES power balance constraints using trapezoidal fuzzy numbers, perform fuzzy planning and convert it into a clear equivalent class model of wind power and load, so as to establish an IES optimization dispatch model based on fuzzy chance constraints;

[0047] IES risk assessment subsystem, which is used to establish an IES risk assessment model based on the conditional risk value theory, using the weight coefficient as the risk assessment indicator;

[0048] The optimal scheduling output subsystem is used to solve the IES low-carbon economic scheduling model, the IES optimization scheduling model based on fuzzy opportunity constraints, and the IES risk assessment model based on conditional risk value theory with economic optimization as the objective function and combined with constraints, and output the optimal scheduling plan.

[0049] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements a low-carbon scheduling method for an integrated energy system taking into account CCS-P2G and a solar thermal power station.

[0050] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a low-carbon scheduling method and system for an integrated energy system taking into account CCS-P2G and solar thermal power stations. Through the P2G two-stage model and the gas hydrogen blending model, the H2 generated by P2G is doped into CH4 to participate in combustion, which gives full play to the utilization of hydrogen energy and improves the methanation efficiency; a CCS-P2G coupled operation model is constructed to improve the CO2 recycling rate and reduce IES carbon emissions and operating costs; low-carbon technologies and low-carbon policies are coupled to participate in IES low-carbon optimization operation, and CSP power stations are coupled to participate in IES low-carbon optimization operation, which improves energy storage utilization and promotes renewable energy consumption; research on IES renewable energy and load uncertainty is realized, providing a reference for IES to reasonably avoid operating risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0052] Figure 1 A schematic flow chart of a low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and a solar thermal power station provided by the present invention;

[0053] Figure 2 A schematic diagram of the structure of the integrated energy system IES provided by the present invention;

[0054] Figure 3 Energy flow diagram of CCS-P2G joint operation mode provided by the present invention;

[0055] Figure 4 A schematic diagram of the P2H and H2G two-stage operation process of the P2G provided by the present invention;

[0056] Figure 5A schematic diagram showing the relationship between the IES total cost and CO2 emissions of the gas turbine and gas boiler provided by the present invention at different hydrogen blending ratios;

[0057] Figure 6 A schematic diagram of the relationship curve between IES total cost and carbon emissions under different fuzzy membership parameters provided by the present invention;

[0058] Figure 7 This is a schematic diagram of the relationship curve between IES total cost and CVaR under different weight coefficients provided by the present invention. DETAILED DESCRIPTION

[0059] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0060] The embodiment of the present invention discloses a low-carbon scheduling method for an integrated energy system taking into account CCS-P2G and a solar thermal power station, comprising the following steps:

[0061] S1. Introduce CSP as a new type of energy storage into the integrated energy system IES, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP;

[0062] S2. Establish a ladder-type carbon trading mechanism model at the low-carbon policy level. The ladder-type carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder-type carbon trading model;

[0063] S3. Integrate the IES model established at the low-carbon technology level and the ladder-type carbon trading mechanism model established at the low-carbon policy level, and establish an IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system;

[0064] S4. Use trapezoidal fuzzy numbers to relax the IES power balance constraint, perform fuzzy planning and transform it into a clear equivalent class model of wind power and load, so as to establish an IES optimal scheduling model based on fuzzy chance constraints;

[0065] S5. Using the weight coefficient as the risk assessment indicator, establish an IES risk assessment model based on the conditional risk value theory to quantitatively assess the IES operation risk;

[0066] S6. Taking economic optimization as the objective function and combining the constraints, the IES low-carbon economic dispatch model, the IES optimization dispatch model based on fuzzy opportunity constraints and the IES risk assessment model based on conditional risk value theory are solved respectively to obtain the optimal dispatch plan.

[0067] In this embodiment, the integrated energy system IES is composed of a thermal power unit TU, a gas turbine GT, a gas boiler GB, a power-to-gas device P2G, a solar thermal power station CSP, a wind turbine WT, a carbon capture power plant CCS and electric energy storage, and the load is composed of electric and thermal loads, such as Figure 2 .

[0068] In order to further implement the above technical solution, the IES model in step S1 includes the CCS-P2G coupling operation mechanism and model, the hydrogen-doped gas turbine model, the hydrogen-doped gas turbine model, the CSP power plant model, the electric heating model and the energy storage model;

[0069] The CCS-P2G coupling operation mechanism and model include the CCS operation mechanism and model and the P2G two-stage operation mechanism and model.

[0070] In order to further implement the above technical solutions, the specific contents of the CCS operation mechanism and model are as follows:

[0071] The introduction of flue gas diversion system and liquid storage container in CCS forms a comprehensive and flexible operation mode of CCS, which improves the flexibility of its operation with P2G. In the CCS-P2G joint operation mode, the CO2 generated by gas boilers, gas turbines and thermal power units during operation is captured and sent to the methane reactor for methanation, which reduces the cost and carbon emissions of IES purchasing CO2 from outside, and avoids the leakage of CO2 during the transmission to CCS or CCUS, causing environmental pollution. According to the needs of IES, CO2 is actively discharged to the atmosphere through the flue gas diversion system, which improves the flexibility of CCS operation and reduces energy consumption, and is sealed, such as Figure 3 ;

[0072] In this embodiment, the CCS model is specifically:

[0073] Actual energy consumption of CCS during period t By operating energy consumption and fixed energy consumption The composition model is as follows:

[0074]

[0075] Among them, ω CCS The energy consumption required for CCS to capture unit mass of CO2 is 0.269MW·h / t. is the mass of CO2 captured by the CCS regeneration tower during period t;

[0076] The total amount of CO2 emitted by IES during period t is:

[0077]

[0078] in, is the amount of CO2 absorbed by CCS during period t, is the amount of CO2 discharged to the atmosphere by CCS through the flue gas diversion system during period t;

[0079] A liquid storage container is installed between the absorption tower and the regeneration tower. The CCS energy consumption is transferred by adjusting the liquid storage volume of the container, thereby realizing the decoupling of the CO2 absorption and regeneration processes. When the liquid storage volume of the rich liquid device is large and the liquid storage volume of the lean liquid device is small, the CCS energy consumption is reduced, and vice versa. The model is as follows:

[0080]

[0081] Where V t F 、V t P are the storage volumes of the rich liquid container and the lean liquid container in period t, are the volumes of the rich liquid flowing into and out of the container during period t, are the volumes of the lean liquid flowing into and out of the container during period t respectively;

[0082] This example uses the solution volume to replace the CO2 amount, assuming that a unit volume of rich liquid can absorb 20 times the volume of CO2:

[0083]

[0084] Where η CCS is the CCS capture efficiency, which is taken as 95%, is the mass of CO2 absorbed by CCS during period t, ρ CO2 is the gaseous density of CO2 during period t, assuming the temperature is 20℃, ρ CO2 =770kg / m 3 , is the amount of CO2 methanogenized by CCS capture and regeneration during period t, is the CO2 storage amount captured and regenerated by CCS during period t;

[0085] The regenerated CO2 will be transported to MR or stored, and part of it will be discharged into the atmosphere:

[0086]

[0087] in, is the amount of CO2 produced by CCS during period t, is the amount of CO2 stored in period t, It is the amount of CO2 discharged into the atmosphere after CCS regeneration during period t.

[0088] The specific contents of the P2G two-stage operation mechanism and model are as follows:

[0089] Phase 1: The electrolyzer EL electrolyzes water to realize the conversion of electric energy into hydrogen energy; Phase 2: The electrolyzer EL transports hydrogen energy to the methane reactor MR, gas turbine GT, gas boiler GB and hydrogen storage tank HES respectively. MR performs methanation treatment to produce CH4, which is directly supplied to gas load or transported to the cogeneration CHP unit or GB unit to generate electric energy or heat energy. The excess hydrogen energy is stored in the hydrogen storage tank HES, realizing the time shift of hydrogen energy and increasing the operational flexibility of P2G.

[0090] The P2G model is as follows:

[0091]

[0092]

[0093] Among them, P t P2G is the P2G power consumption during period t, is the hydrogen production power of EL during period t, η EL is the P2H conversion efficiency, are the MR hydrogen consumption power and gas production power in period t, η MR is the MR conversion efficiency;

[0094] The volume of CH4 produced by P2G is equal to the volume of CO2 consumed:

[0095]

[0096] The relationship between the volume of CH4 produced by P2G during period t and the power consumption is:

[0097]

[0098] In the formula, They are the calorific values ​​of H2 and CH4 respectively.

[0099] The specific contents of the hydrogen-blended gas turbine model and the hydrogen-blended gas turbine model are as follows: the gas turbine GT and the gas boiler GB operate by blending hydrogen through P2G to generate hydrogen energy and natural gas and purchasing gas from the external gas network. Compared with the traditional P2G model, GT and GB operate by blending gas with hydrogen, which reduces carbon emissions and improves P2G operation efficiency;

[0100] In this embodiment, the standard hydrogen-blended gas turbine can maintain safe operation within the range of 0% to 30% hydrogen blending ratio. Beyond this range, the standard hydrogen-blended gas turbine needs to be improved, which increases the investment cost. Therefore, a gas turbine with a hydrogen blending ratio of 10% to 20% is selected, and its model is as follows:

[0101]

[0102] in, is the GT mixed gas input power during period t, They are the power generation and heating power of GT in period t, They are GT power generation and heating efficiency, is the volume power conversion coefficient of CH4, is the gas consumption of GT during period t, is the hydrogen consumption of GT during period t, is the mass power conversion coefficient of H2, is the density of H2;

[0103] The operation model of gas boiler doped with a certain amount of H2 is as follows:

[0104]

[0105] in, P is the mixed gas input power of GB in period t, t GB is the heating power of GB in period t, η GB is the GB heating efficiency, are respectively the gas consumption and hydrogen consumption of GB in period t, is the hydrogen doping ratio of GB during period t.

[0106] The CSP power station model includes the concentrating and collecting link, the heat storage link and the power generation link. The CSP power station mirror field absorbs solar energy to the collector, generates high-pressure steam through the heat exchange device and transmits it to the steam turbine TG for power generation. The remaining heat energy is stored in the heat storage tank TES. When the light intensity is weak or there is no light, the stored heat energy is transmitted to the steam turbine TG for power generation or directly supplied to the heat load. In actual applications, the CSP power station will produce light and heat energy loss during operation. The degree of loss is related to factors such as TES material and external environment. Specifically:

[0107] For the concentrating and collecting link:

[0108] P t SF =η SF S SF D t

[0109] Among them, P t SFis the thermal power absorbed by the mirror field during period t, η SF is the light-to-heat conversion rate of the mirror field, S SF is the mirror field area, D t is the solar normal radiation intensity value during period t, w / m 2 ,

[0110] For heat storage:

[0111] During period t, the mirror field provides thermal power to TES for:

[0112]

[0113] in, is the heat loss rate of the mirror field, is the heating power supplied by the mirror field to the generator during period t;

[0114] In addition, the heat storage link of the CSP power station needs to meet the following constraints:

[0115]

[0116] Among them, P1 TES , is the initial and final heat storage in a TES dispatch cycle, P t TES is the TES heat storage capacity during period t, is the TES self-consumption rate, For TES heat charging and heat release efficiency, is the TES charging and releasing power during period t;

[0117] TES stored thermal energy can be used to directly supply heat load or for TG power generation:

[0118]

[0119] in, are the thermal power output of TES to TG and thermal load during period t respectively;

[0120] For power generation:

[0121] The output power P of CSP power station during period t t CSP for:

[0122]

[0123] in, is the thermal power output from the mirror field to TG, is the thermal-electricity conversion rate of the CSP power station.

[0124] Furthermore, the electric heating model is constructed as follows:

[0125]

[0126] in, are the electric heating input power and output thermal power in period t, n EH is the electrical-to-thermal conversion rate.

[0127] Furthermore, the energy storage model is constructed as follows:

[0128]

[0129] Among them, P t ESS is the ESS reserve in period t, is the ESS charging and discharging efficiency, is the ESS self-damage rate, are the charging and discharging power of ESS in period t, It is the ESS charge and discharge status bit, which is a 0-1 variable. It takes 1 for action, otherwise it takes 0. It is the lower and upper limits of ESS reserves.

[0130] The CET mechanism refers to a mechanism that puts carbon emissions into the market as trading volumes and allows entities to trade them in order to achieve the purpose of controlling carbon emissions; by issuing carbon emission quotas to IES carbon emission sources, when the actual carbon emissions of IES are higher than the allocated quotas, it is necessary to purchase carbon emission quotas from the carbon trading market; otherwise, the excess carbon emission quotas can be sold to the market to obtain profits; the ladder-type CET mechanism model mainly includes the carbon emission rights quota model, the actual carbon emission model and the ladder-type carbon emission trading model.

[0131] In order to further implement the above technical solution, for step S2:

[0132] The IES carbon emission quota model uses a free quota model with the baseline method as an indicator for allocation. The IES carbon emission sources are GB, GT and external power purchases. The external power purchases come from thermal power generation.

[0133] The IES carbon emission quota model is:

[0134]

[0135] In the formula, E IES 、E GT 、E GB 、E th are the carbon emission rights allocations of IES, gas turbines, gas boilers, and thermal power units, respectively. e is the carbon emission quota intensity per unit of electrical power output of the gas turbine, χ e-his the gas turbine electrical-thermal conversion factor, γ h is the intensity of carbon emission allocation per unit thermal power output; th It is the intensity of carbon emission allocation per unit electric power output of thermal power units.

[0136] The actual carbon emission model of IES is the amount of CO2 generated minus the amount of CO2 used by P2G and the amount of CO2 stored. The amount of CO2 discharged into the atmosphere by IES during period t Divided into the amount of CO2 discharged into the atmosphere through the flue gas diversion system and the amount of CO2 that cannot be used by CCS Thus, the actual carbon emission amount of IES is obtained;

[0137] Specific:

[0138]

[0139] Among them, η G is the CCS capture efficiency, is the amount of CO2 absorbed by CCS during period t;

[0140] The actual amount of CO2 produced by IES for:

[0141]

[0142] Among them, δ c is the carbon emission intensity corresponding to the consumption of unit gas power, δ th is the carbon emission intensity per unit of electrical power output of thermal power units, The power consumed by GB and GT in period t respectively.

[0143] The IES ladder carbon trading model is to obtain the IES carbon trading amount based on the IES carbon emission allocation and the IES actual carbon emission. Different carbon trading prices are used in different carbon emission ranges. The more carbon emission quotas there are, the higher the carbon trading price in the corresponding range is, and the IES carbon trading cost is obtained.

[0144] Specific:

[0145] Solve for the IES carbon emission allocation E for period t t,IES and IES actual carbon emissions You can get the IES carbon trading amount

[0146]

[0147] The ladder carbon trading model is:

[0148]

[0149] in, is the IES carbon trading cost in period t, λ is the carbon trading base price, l is the length of the carbon emission interval, and α is the increase in the carbon trading price.

[0150] In order to further implement the above technical solution, the operating cost of the integrated energy system IES in step S3 is the total cost of IES's carbon trading cost, carbon sequestration cost, gas purchase cost, thermal power unit start-up and shutdown cost, thermal power unit coal consumption cost and each unit's operation and maintenance cost;

[0151] Specific:

[0152]

[0153] Among them, F1 is the total cost of IES operation, f f 、f g , and f yw They are IES's carbon trading costs, carbon storage costs, gas purchase costs, thermal power unit start-up and shutdown costs, thermal power unit coal consumption costs, and each unit's operation and maintenance costs;

[0154]

[0155]

[0156]

[0157]

[0158]

[0159]

[0160]

[0161]

[0162] Among them, c f is the storage cost per unit mass of CO2, c g is the natural gas unit price, is the IES gas purchasing power in period t, S th is the start-up and shutdown cost coefficient of thermal power units, It is the start / stop status of the thermal power unit, which is a 0-1 variable. th , b th and c th is the coal consumption cost coefficient of thermal power units, and are the operation and maintenance cost coefficients of WT, EH, P2G, CCS, GB and ESS in period t, They are the operation and maintenance costs of CSP power station and GT in period t, are the operation and maintenance cost coefficients of power generation and heat storage-release of CSP power station, are the GT power generation and heat generation operation and maintenance cost coefficients respectively, It is the GT start / stop status bit, which is a 0-1 variable.

[0163] In order to further implement the above technical solutions and solve the uncertainty of renewable energy output and load caused by IES load diversification and dynamic energy supply and demand, trapezoidal fuzzy numbers are used for fuzzy programming, and the model is as follows:

[0164]

[0165] in, is the fuzzy membership function, is a fuzzy parameter, r1, r2, r3 and r4 are fuzzy membership parameters, r1≤r2≤r3≤r4;

[0166] Use quaternion to represent trapezoidal fuzzy numbers:

[0167] I = (r1, r2, r3, r4) = P pre (j1, j2, j3, j4)

[0168] Among them, I is a trapezoidal fuzzy array, P pre is the predicted value, j1, j2, j3 and j4 are proportional coefficients, all of which belong to [0, 1];

[0169] Since the trapezoidal fuzzy array represented by the quaternion cannot be solved linearly, the specific conversion process is:

[0170] Setting the confidence level to α, the clear equivalence class model is:

[0171]

[0172] Therefore, the clear equivalence class model of wind power and load in step S4 is:

[0173]

[0174]

[0175] r i L =j i P t L , i∈[1,4]

[0176] in, It is a trapezoidal fuzzy type for wind power output prediction, E[P t L ] is the load forecasting trapezoidal fuzzy type, and is the trapezoidal fuzzy number of wind power output, and is the load trapezoidal fuzzy number, and α is the confidence level.

[0177] In order to further implement the above technical solutions, IES presents the characteristics of a high proportion of renewable energy. Due to the volatility and randomness of renewable energy output, there are risks in optimizing scheduling based on forecast data. Therefore, in order to improve the risk-bearing capacity of IES in dealing with uncertain factors, an IES risk assessment model based on the conditional value at risk theory CVaR is established. Specifically:

[0178] VaR cost f VaR and CVaR cost f CVaR for:

[0179]

[0180] In the formula, x and y are decision variables and random variables respectively, α is the confidence level, which represents the degree of IES decision makers' likes and dislikes of risk, P(y) is the continuous probability density function, and δ(x, y) is the distribution function of f(x, y) less than the boundary value;

[0181] Discretize it:

[0182]

[0183] Among them, f VaR is the VaR cost, α is the confidence level, n is the number of scenarios, z n is the probability of the scenario occurring;

[0184] The IES risk assessment model based on the conditional value at risk theory in step S5 is specifically:

[0185]

[0186] Among them, F2 is the total operating cost of IES based on CVaR, is the weight coefficient, f E is the expected operating cost of IES, f VaR is the VaR cost, f CVaR is the CVaR cost, F1 n is the total operating cost of IES under scenario n, z n is the occurrence probability of scenario n.

[0187] In order to further implement the above technical solutions, the constraints include power balance constraints and IES equipment constraints. The IES equipment constraints include WT and CSP power plant output constraints, gas turbine and gas boiler output and ramp constraints, electric heating constraints, thermal power unit constraints, carbon capture constraints, P2G constraints, and CSP power plant thermal storage system energy storage constraints.

[0188] Specific:

[0189] 1) Power balance constraints:

[0190] IES internally couples electric energy, thermal energy, gas energy and hydrogen energy. To maintain the energy balance between loads and equipment, its constraints are:

[0191]

[0192]

[0193]

[0194]

[0195] Where P t WT is the electric power output of WT during period t, They are IES electrical and thermal loads during period t respectively;

[0196] 2)IES equipment constraints:

[0197] a) WT and CSP power station output constraints:

[0198]

[0199] In the formula, are the predicted values ​​of WT and CSP, respectively;

[0200] b) Gas turbine and gas boiler output and climbing constraints:

[0201]

[0202] In the formula, They are the upper and lower limits of GT output power in period t, They are the upper and lower limits of GT output thermal power in period t, They are the upper and lower limits of GT output power climbing, They are the upper and lower limits of GT output thermal power climbing respectively;

[0203]

[0204] In the formula, are the upper and lower limits of GB output thermal power in period t, They are the upper and lower limits of GB output thermal power climbing respectively.

[0205] c) Electric heating constraints:

[0206]

[0207] In the formula, are the upper and lower limits of EH output thermal power in period t, They are the upper and lower limits of the EH output thermal power ramping, respectively;

[0208] d) Constraints on thermal power units:

[0209]

[0210] In the formula, are the upper and lower limits of the output power of the thermal power unit in period t, They are the upper and lower limits of the output power ramp of thermal power units respectively;

[0211] e) Carbon capture constraints:

[0212] CCS operation cannot exceed the maximum operating power

[0213]

[0214] CCS liquid storage containers must meet the following constraints:

[0215]

[0216] In the formula, are the upper and lower limits of the rich liquid container storage capacity, are the upper and lower limits of the lean liquid container storage capacity, are the initial and final storage capacities of the rich liquid container, are the initial and final storage capacities of the lean liquid container respectively;

[0217] The storage capacity of CCS liquid storage container is the same at the beginning and end of a dispatching cycle:

[0218]

[0219] f) P2G constraints:

[0220]

[0221] In the formula, They are the upper and lower limits of P2G power consumption, They are the upper and lower limits of P2G power consumption climbing respectively;

[0222] g) Other constraints:

[0223] The CSP power station heat storage system cannot operate at full load 24 hours a day:

[0224]

[0225] Where, t max It is the maximum operating hours of the CSP power plant thermal storage system at full load.

[0226] The method of the present invention is further described below in combination with the real IES data of a certain region:

[0227] Attached Figure 5 The figure shows the IES total cost and CO2 emissions of gas turbines and gas boilers under different hydrogen blending ratios. By changing the hydrogen blending ratio of gas turbines and gas boilers, the IES total cost and CO2 emissions under different schemes are obtained. The impact of the hydrogen blending ratio on IES operation is further compared and analyzed to achieve the optimal economic and low-carbon operation scheme of IES.

[0228] Attached Figure 6 The figure shows the relationship curve between the total cost and carbon emissions of IES under different fuzzy membership parameters. By selecting different fuzzy membership parameters, the total cost and CO2 emissions of IES under different schemes are obtained, and the uncertainty analysis of renewable energy output and load is carried out. As the degree of fuzziness increases, the uncertainty of IES source and load increases, and it faces higher operating risks. IES chooses to increase the gas purchase cost and gas unit output to deal with the risk, and carbon emissions increase accordingly. Among them, the growth rate of carbon emissions is gradually lower than the growth rate of IES total cost. The reason is that under the CET mechanism, the price growth rate of carbon emission rights is getting faster and faster, and the cost of purchasing carbon emission quotas is gradually increasing. IES chooses to purchase gas to deal with uncertainty risks.

[0229] Attached Figure 7 The figure shows the relationship curve between IES total cost and CVaR under different weight coefficients. By changing the weight coefficient of CVaR, the IES total cost and CVaR cost under different schemes are obtained. As the weight coefficient increases, the IES total cost increases and the CVaR decreases. The larger the weight coefficient, the greater the growth rate of IES total cost. The reason is that the larger the weight coefficient, the higher the risk aversion of the decision maker, and the decision maker chooses to increase the operating cost to avoid the risk; the smaller the weight coefficient, the higher the risk tolerance of the decision maker, and the decision maker chooses to take risks to obtain lower costs and ensure the economic efficiency of operation.

[0230] A low-carbon dispatch system for an integrated energy system taking into account CCS-P2G and solar thermal power plants, based on a low-carbon dispatch method for an integrated energy system taking into account CCS-P2G and solar thermal power plants, comprising an IES low-carbon economic dispatch subsystem, an IES optimization dispatch subsystem, an IES risk assessment subsystem and an optimal dispatch output subsystem; the IES low-carbon economic dispatch subsystem comprises an IES model operation module, a ladder-type carbon trading module and a low-carbon economic dispatch module;

[0231] IES model operation module, which is used to introduce CSP power plants into the integrated energy system IES as a new type of energy storage, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP power plants;

[0232] The ladder carbon trading module is used to establish a ladder carbon trading mechanism model at the low-carbon policy level. The ladder carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder carbon trading model;

[0233] The low-carbon economic dispatch module is used to integrate the IES model established at the low-carbon technology level with the ladder-type carbon trading mechanism model established at the low-carbon policy level, and to establish the IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system;

[0234] IES optimization dispatch subsystem is used to relax IES power balance constraints using trapezoidal fuzzy numbers, perform fuzzy planning and convert it into a clear equivalent class model of wind power and load, so as to establish an IES optimization dispatch model based on fuzzy chance constraints;

[0235] IES risk assessment subsystem, which is used to establish an IES risk assessment model based on the conditional risk value theory, using the weight coefficient as the risk assessment indicator;

[0236] The optimal scheduling output subsystem is used to solve the IES low-carbon economic scheduling model, the IES optimization scheduling model based on fuzzy opportunity constraints, and the IES risk assessment model based on conditional risk value theory with economic optimization as the objective function and combined with constraints, and output the optimal scheduling plan.

[0237] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements a low-carbon scheduling method for an integrated energy system taking into account CCS-P2G and solar thermal power plants.

[0238] A processing terminal includes a memory and a processor. The memory stores a computer program that can be run on the processor. When the processor executes the computer program, a low-carbon scheduling method for an integrated energy system taking into account CCS-P2G and a solar thermal power station is implemented.

[0239] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0240] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants, characterized in that: The following steps are involved: S1. Introduce CSP as a new type of energy storage into the integrated energy system IES, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP; S2. Establish a ladder-type carbon trading mechanism model at the low-carbon policy level. The ladder-type carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder-type carbon trading model; S3. Integrate the IES model established at the low-carbon technology level and the ladder-type carbon trading mechanism model established at the low-carbon policy level, and establish an IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system; S4. Use trapezoidal fuzzy numbers to relax the IES power balance constraint, perform fuzzy planning and transform it into a clear equivalent class model of wind power and load, so as to establish an IES optimal scheduling model based on fuzzy chance constraints; S5. Using the weight coefficient as the risk assessment indicator, establish an IES risk assessment model based on the conditional risk value theory to quantitatively assess the IES operation risk; S6. Taking economic optimization as the objective function and combining the constraints, the IES low-carbon economic dispatch model, the IES optimization dispatch model based on fuzzy opportunity constraints and the IES risk assessment model based on conditional risk value theory are solved respectively to obtain the optimal dispatch plan.

2. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: The IES model in step S1 includes a CCS-P2G coupling operation mechanism and model, a hydrogen-doped gas turbine model, a hydrogen-doped gas turbine model, a CSP power plant model, an electric heating model, and an energy storage model; The CCS-P2G coupling operation mechanism and model include the CCS operation mechanism and model and the P2G two-stage operation mechanism and model.

3. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 2, characterized in that: The specific contents of the CCS operation mechanism and model are as follows: Introduce a flue gas diversion system and liquid storage containers in CCS to capture the CO2 generated by gas boilers, gas turbines and thermal power units during operation, and send it to the methane reactor for methanation. Actively discharge CO2 to the atmosphere through the flue gas diversion system according to IES requirements, and seal it; The specific contents of the P2G two-stage operation mechanism and model are as follows: Phase 1: The electrolyzer EL electrolyzes water to realize the conversion of electrical energy into hydrogen energy; Phase 2: The electrolyzer EL transports hydrogen energy to the methane reactor MR, gas turbine GT, gas boiler GB and hydrogen storage tank HES respectively. MR performs methanation treatment to produce CH4, which is directly supplied to gas load or transported to the cogeneration CHP unit or GB unit to generate electricity or heat energy. The excess hydrogen energy is stored in the hydrogen storage tank HES. The specific contents of the hydrogen-doped gas turbine model and the hydrogen-doped gas turbine model are as follows: the gas turbine GT and the gas boiler GB operate in a hydrogen-doped manner by generating hydrogen energy and natural gas through P2G and purchasing gas from the external gas grid; The CSP power station model includes the concentrating and collecting links, the heat storage link and the power generation link. The CSP power station mirror field absorbs solar energy into the collector, generates high-pressure steam through the heat exchange device and transmits it to the steam turbine TG for power generation. The remaining heat energy is stored in the heat storage tank TES. When the light intensity is weak or there is no light, the stored heat energy is transmitted to the steam turbine TG for power generation or directly supplied to the heat load.

4. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: For step S2: The IES carbon emission quota model uses a free quota model based on the baseline method for allocation. The IES carbon emission sources are GB, GT and external electricity purchase; The IES actual carbon emission model is the amount of CO2 generated minus the amount of CO2 used by P2G and the amount of CO2 stored. The amount of CO2 discharged into the atmosphere by IES during period t is divided into the amount of CO2 discharged into the atmosphere through the flue gas diversion system and the amount of CO2 that cannot be used by CCS, thus obtaining the IES actual carbon emission amount. The IES ladder carbon trading model calculates the IES carbon trading amount based on the IES carbon emission allocation and the IES actual carbon emission. It uses different carbon trading prices in different carbon emission ranges. The more carbon emission quotas, the higher the carbon trading price in the corresponding range, and the IES carbon trading cost is obtained.

5. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: The operating cost of the integrated energy system IES in step S3 is the total cost of IES's carbon trading cost, carbon sequestration cost, gas purchase cost, thermal power unit start-up and shutdown cost, thermal power unit coal consumption cost and each unit's operation and maintenance cost.

6. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: The clear equivalence class model of wind power and load in step S4 is: r i L =j i P t L ,i∈[1,4] in, It is a trapezoidal fuzzy type for wind power output prediction, E[P t L ] is the load forecasting trapezoidal fuzzy type, r1 WT 、r2 WT 、r3 WT and r4 WT is the trapezoidal fuzzy number of wind power output, r1 L 、r2 L 、r3 L and r4 L is the load trapezoidal fuzzy number, and α is the confidence level.

7. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: The IES risk assessment model based on the conditional value at risk theory in step S5 is specifically: Among them, F2 is the total operating cost of IES based on CVaR, is the weight coefficient, f E is the expected operating cost of IES, f VaR is the VaR cost, f CVaR is the CVaR cost, F1 n is the total operating cost of IES under scenario n, z n is the occurrence probability of scenario n.

8. A low-carbon dispatching method for an integrated energy system taking into account CCS-P2G and CSP power plants according to claim 1, characterized in that: The constraints include power balance constraints and IES equipment constraints. The IES equipment constraints include WT and CSP power plant output constraints, gas turbine and gas boiler output and ramp constraints, electric heating constraints, thermal power unit constraints, carbon capture constraints, P2G constraints, and CSP power plant thermal storage system energy storage constraints.

9. A low-carbon dispatching system for an integrated energy system taking into account CCS-P2G and CSP power plants, characterized in that: A low-carbon dispatch method for an integrated energy system taking into account CCS-P2G and CSP power plants according to any one of claims 1 to 8, comprising an IES low-carbon economic dispatch subsystem, an IES optimized dispatch subsystem, an IES risk assessment subsystem and an optimal dispatch output subsystem; The IES low-carbon economic dispatch subsystem includes the IES model operation module, the ladder carbon trading module and the low-carbon economic dispatch module; IES model operation module, which is used to introduce CSP power plants into the integrated energy system IES as a new type of energy storage, establish a carbon capture power plant CCS-power-to-gas equipment P2G coupling model and a gas-hydrogen blending model at the low-carbon technology level, and thus establish an IES model containing CCS-P2G, gas-hydrogen blending units and CSP power plants; The ladder carbon trading module is used to establish a ladder carbon trading mechanism model at the low-carbon policy level. The ladder carbon trading model includes the IES carbon emission quota model, the IES actual carbon emission model and the IES ladder carbon trading model; The low-carbon economic dispatch module is used to integrate the IES model established at the low-carbon technology level with the ladder-type carbon trading mechanism model established at the low-carbon policy level, and to establish the IES low-carbon economic dispatch model with the goal of minimizing the IES operating cost of the integrated energy system; IES optimization dispatch subsystem is used to relax IES power balance constraints using trapezoidal fuzzy numbers, perform fuzzy planning and convert it into a clear equivalent class model of wind power and load, so as to establish an IES optimization dispatch model based on fuzzy chance constraints; IES risk assessment subsystem, which is used to establish an IES risk assessment model based on the conditional risk value theory, using the weight coefficient as the risk assessment indicator; The optimal scheduling output subsystem is used to solve the IES low-carbon economic scheduling model, the IES optimization scheduling model based on fuzzy opportunity constraints, and the IES risk assessment model based on conditional risk value theory with economic optimization as the objective function and combined with constraints, and output the optimal scheduling plan.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, it implements a low-carbon scheduling method for an integrated energy system taking into account CCS-P2G and a solar thermal power station as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Conditional value at risk-computed integrated energy system economic scheduling method

    CN108596442A

  • Economic dispatching method for regional integrated energy system containing carbon capture equipment and photo-thermal power station and considering integrated demand response

    CN114580863A

  • Energy system scheduling method considering operation coupling and equipment hydrogen doping

    CN118297752A

  • Comprehensive energy system optimization scheduling method containing P2G and CCS coupling based on stepped carbon transaction

    CN118365352A