Extra-high voltage power grid state optimization method, system and device, medium and product

Through the Newton interpolation method and the Newton-Ravson method combined with the capacitor group strategy adjustment, the operating status of the ultra-high voltage power grid is optimized, and the stability problem of the power grid in large-scale and long-distance power transmission is solved, and the safe and efficient operation of the power grid is achieved.

CN119029872AActive Publication Date: 2024-11-26STATE GRID XINJIANG ELECTRIC POWER CORP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411163077.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-26
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

Ultra-high voltage power grids have challenges in stable operation during large-scale and long-distance power transmission, especially the impact of voltage fluctuations and load changes on the state of the power grid is difficult to effectively optimize.

Method used

Newton's interpolation method and Newton-Ravson method are used to determine the target operating state and final current solution of the ultra-high voltage power grid through multiple iterations and adjustment of the capacitor bank's turnover strategy, ensuring that the power grid voltage is within a safe range and avoiding the DC voltage from rising. and by updating the load change step and capacitor bank policy multiple times until the preset critical point is reached.

Benefits of technology

The stable operation state optimization of the ultra-high voltage power grid is achieved, ensuring the safe and efficient operation of the power grid. Through multiple iterations and strategy adjustments, the power grid reaches its final stable state under preset conditions, and improving the voltage stability and load management capabilities of the power grid. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029872A_ABST
    Figure CN119029872A_ABST
Patent Text Reader

Abstract

The invention discloses an extra-high voltage power grid state optimization method, system and device, a medium and a product, and relates to the technical field of extra-high voltage engineering evaluation, and the method comprises the steps: determining a target initial operation state, an initial first power flow solution, an initial second power flow solution, an initial third power flow solution, an initial load change step length, a target node and an initial correction power flow solution of an extra-high voltage power grid; performing multiple rounds of first iteration on the correction power flow solution to obtain a first target correction power flow solution; if the DC voltage is out of limit, adjusting the switching strategy of each capacitor bank in the extra-high voltage power grid, performing multiple rounds of second iteration on the correction power flow solution to obtain a second target correction power flow solution, and performing power flow calculation to obtain a critical judgment power flow solution; and if the preset critical point is not reached, performing multiple rounds of third iteration on the correction power flow solution, otherwise, determining the operation state corresponding to the third target correction power flow solution as the final operation state of the extra-high voltage power grid. According to the invention, stable operation of the extra-high voltage power grid is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ultra-high voltage engineering evaluation, and in particular to an ultra-high voltage power grid state optimization method, system, device, medium and product. Background Art

[0002] UHV transmission technology has been vigorously developed and applied in the field of ultra-long-distance and ultra-large-capacity power transmission from large energy bases, and has become a key technology and important guarantee for breaking resource bottlenecks and optimizing energy allocation. As the backbone grid for clean energy transmission, UHV transmission technology will rely on clean energy bases to coordinate the construction of UHV DC channels, continue to expand the transmission and consumption capacity and scope of clean energy, accelerate the construction of a new power system with new energy as the main body, and build a clean, low-carbon, safe and efficient energy supply, transmission and consumption system as soon as possible to help China's energy clean and low-carbon upgrade and transformation.

[0003] China's primary energy and power load are unevenly distributed, with abundant energy in the west and a developed economy and concentrated power load in the east. This uneven distribution requires large-scale, long-distance transmission technology to address the geographical differences between energy supply and demand. By the end of 2020, China had built 35 UHV projects, including 14 AC and 16 DC lines, with a total line length of 48,000 kilometers. The investment scale of UHV projects experienced rapid growth between 2014 and 2020, reaching 196.6 billion.

[0004] UHV power grid will continue to play an important role in optimizing energy structure, promoting clean energy development and realizing large-scale energy configuration. As a key technology to solve large-scale and long-distance power transmission problems, the research and development and application of UHV technology are of great significance to optimizing energy structure, promoting clean energy development and realizing large-scale energy configuration.

[0005] With the rapid development of UHV power grid, requirements are put forward for the stable operation of UHV power grid. Summary of the invention

[0006] The purpose of this application is to provide a method, system, device, medium and product for optimizing the state of a UHV power grid, thereby ensuring the stable operation of the UHV power grid.

[0007] To achieve the above objectives, this application provides the following solutions:

[0008] In a first aspect, the present application provides a method for optimizing a UHV power grid state, comprising:

[0009] Determine the target initial operation state of the UHV power grid, the initial first power flow solution, the initial second power flow solution, the initial third power flow solution and the initial load change step; each power flow solution includes: load and voltage;

[0010] Determine a target node based on the voltage of each operating node in the UHV power grid under the initial first power flow solution and the voltage of each operating node under the initial third power flow solution; the target node is the operating node with the largest difference between the voltage under the initial first power flow solution and the voltage under the initial third power flow solution;

[0011] Using the Newton interpolation method, the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node are fitted to obtain an initial fitting curve, and the extreme points and extreme values ​​of the initial fitting curve are determined. The extreme points and extreme values ​​of the initial fitting curve are determined as the initial predicted power flow solution, and the power flow calculation is performed based on the initial predicted power flow solution to obtain the initial corrected power flow solution; the abscissa of the fitting curve is the load, and the ordinate is the voltage;

[0012] Based on the initial corrected power flow solution, the corrected power flow solution is iterated for multiple rounds by updating the load change step size to obtain a first target corrected power flow solution;

[0013] Determine whether the DC voltage exceeds the limit; if so, adjust the switching strategy of each capacitor bank in the UHV power grid until the limit is not exceeded, all capacitor banks are fully switched on or all capacitor banks are switched off, and based on the first target corrected power flow solution, perform multiple rounds of second iterations on the corrected power flow solution by updating the load change step size to obtain a second target corrected power flow solution;

[0014] Based on the second objective corrected power flow solution, power flow calculation is performed to obtain the initial critical judgment power flow solution;

[0015] Determine the initial critical point to determine whether the power flow solution has reached the preset critical point;

[0016] If it is not reached, based on the second target corrected power flow solution, by updating the load change step, the corrected power flow solution is subjected to multiple rounds of third iterations until the preset critical point is reached to obtain the third target corrected power flow solution;

[0017] If it is reached, the operating state corresponding to the third target corrected power flow solution is determined as the final operating state of the UHV power grid.

[0018] Optionally, determining a target initial operating state and an initial first power flow solution of the UHV power grid includes:

[0019] Initialize the operating status of the UHV power grid;

[0020] Based on the initial operation state and power flow calculation of the UHV power grid, the operation state of the UHV power grid is iterated for multiple rounds to obtain the target initial operation state and the initial first power flow solution; wherein the iteration process in any current round includes:

[0021] Perform power flow calculation based on the operating status of the current round to obtain the initial power flow solution of the current round;

[0022] According to the load in the initial power flow solution in the current round, it is judged whether the power flow in the current iteration round is converged, and the first convergence judgment result in the current round is obtained;

[0023] If the first convergence judgment result in the current round is convergence, the operation state in the current round is determined as the target initial operation state, and the initial power flow solution in the current round is determined as the initial first power flow solution;

[0024] If the first convergence judgment result in the current round is non-convergence, the operating status in the current round is updated to the operating status in the next round, and returns to "perform power flow calculation based on the operating status in the current round to obtain the initial power flow solution in the current round" until the initial first power flow solution is obtained.

[0025] Optionally, determining an initial second power flow solution, an initial third power flow solution, and an initial load change step of the UHV power grid includes:

[0026] Under the target initial operating state, initialize the load change step size;

[0027] The Newton-Raphson method is used to iterate the load change step of the UHV power grid for multiple rounds to obtain the initial second power flow solution, the initial third power flow solution and the initial load change step. The iterative process in any current round includes:

[0028] Using the Newton-Raphson method, based on the initial first power flow solution and the load change step size in the current round, the second power flow solution and the third power flow solution in the current round are determined;

[0029] Based on the second power flow solution and the third power flow solution in the current round, determine whether the power flow in the current iteration round has converged, and obtain the second convergence judgment result in the current round;

[0030] If the second convergence judgment result in the current round is convergence, the second power flow solution in the current round is determined as the initial second power flow solution, the third power flow solution in the current round is determined as the initial third power flow solution, and the load change step size in the current round is determined as the initial load change step size;

[0031] If the second convergence judgment result in the current round is non-convergence, the load change step size in the current round is updated to the load change step size in the next round, and return to "using the Newton-Raphson method, based on the initial first power flow solution and the load change step size in the current round, determine the second power flow solution and the third power flow solution in the current round" until the initial second power flow solution, the initial third power flow solution and the initial load change step size are obtained.

[0032] Optionally, based on the initial corrected power flow solution, by updating the load change step size, performing multiple rounds of first iterations on the corrected power flow solution to obtain a first target corrected power flow solution, including:

[0033] The iterative process of correcting the power flow solution in any current first iteration round includes:

[0034] Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current first iteration round;

[0035] Determine the target node in the current first iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current first iteration round and the voltage of each operating node under the initial third power flow solution;

[0036] Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current first iteration round to obtain a fitting curve in the current first iteration round, and the extreme points and extreme values ​​of the fitting curve in the current first iteration round are determined. The extreme points and extreme values ​​in the current first iteration round are determined as the predicted power flow solution in the current first iteration round, and power flow calculation is performed based on the predicted power flow solution in the current first iteration round to obtain a corrected power flow solution in the current first iteration round;

[0037] According to the load in the corrected power flow solution in the current first iteration round, judging whether the power flow in the current first iteration round is converged, and obtaining a third convergence judgment result in the current first iteration round;

[0038] If the third convergence judgment result of the current first iteration round is convergence, the corrected power flow solution of the current first iteration round is determined as the first target corrected power flow solution;

[0039] If the third convergence judgment result of the current first iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size of the current first iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size of the next first iteration round, and return to "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current first iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node under the current first iteration round" until the first target corrected power flow solution is obtained.

[0040] Optionally, the expression for the fitted curve is:

[0041]

[0042] Among them, λ is the load; a is the quadratic coefficient; U kis the voltage of the target node; b is the coefficient of the first-order term; c is the constant term; a1, a2 and a3 are all intermediate quantities; λ A is the load in the first power flow solution; B is the load in the second power flow solution; U kA Solve the voltage of the target node for the first power flow; U kB Solve the voltage of the target node for the second power flow; λ C is the load in the third power flow solution; U kC Solve for the voltage at the target node for the third power flow.

[0043] Optionally, based on the first target corrected power flow solution, by updating the load change step size, performing multiple rounds of second iterations on the corrected power flow solution to obtain a second target corrected power flow solution, including:

[0044] The iterative process of correcting the power flow solution in any current second iteration round includes:

[0045] Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current second iteration round;

[0046] Determine the target node in the current second iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current second iteration round and the voltage of each operating node under the initial third power flow solution;

[0047] Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current second iteration round to obtain a fitting curve in the current second iteration round, and the extreme points and extreme values ​​of the fitting curve in the current second iteration round are determined. The extreme points and extreme values ​​in the current second iteration round are determined as the predicted power flow solution in the current second iteration round, and power flow calculation is performed based on the predicted power flow solution in the current second iteration round to obtain a corrected power flow solution in the current second iteration round;

[0048] According to the load in the corrected power flow solution in the current second iteration round, judging whether the power flow in the current second iteration round is converged, and obtaining a fourth convergence judgment result in the current second iteration round;

[0049] If the fourth convergence judgment result in the current second iteration round is convergence, the corrected power flow solution in the current second iteration round is determined as the second target corrected power flow solution;

[0050] If the fourth convergence judgment result of the current second iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size in the current second iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size in the next second iteration round, and return to "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current second iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node in the current second iteration round" until the second target corrected power flow solution is obtained.

[0051] Optionally, based on the second target corrected power flow solution, by updating the load change step, performing multiple rounds of third iterations on the corrected power flow solution until a preset critical point is reached, and obtaining a third target corrected power flow solution, including:

[0052] The iterative process of correcting the power flow solution in any current third iteration round includes:

[0053] Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current third iteration round;

[0054] Determine the target node in the current third iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current third iteration round and the voltage of each operating node under the initial third power flow solution;

[0055] Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current third iteration round to obtain a fitting curve in the current third iteration round, and the extreme points and extreme values ​​of the fitting curve in the current third iteration round are determined. The extreme points and extreme values ​​in the current third iteration round are determined as the predicted power flow solution in the current third iteration round, and power flow calculation is performed based on the predicted power flow solution in the current third iteration round to obtain a corrected power flow solution in the current third iteration round;

[0056] According to the corrected power flow solution in the current third iteration round, it is judged whether the preset critical point is reached in the current third iteration round, and a fifth convergence judgment result in the current third iteration round is obtained;

[0057] If the fifth convergence judgment result of the current third iteration round is convergence, the corrected power flow solution of the current third iteration round is determined as the third target corrected power flow solution;

[0058] If the fifth convergence judgment result of the current third iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size of the current third iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size of the next third iteration round, and return to "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution of the current third iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node under the current third iteration round" until the third target corrected power flow solution is obtained.

[0059] In a second aspect, the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the above-mentioned methods for optimizing the state of an ultra-high voltage power grid.

[0060] In a third aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-mentioned methods for optimizing the state of an ultra-high voltage power grid.

[0061] In a fourth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements any of the above-mentioned methods for optimizing the state of an ultra-high voltage power grid.

[0062] According to the specific embodiments provided in this application, this application discloses the following technical effects:

[0063] The present application discloses a method, system, device, medium and product for optimizing the state of an ultra-high voltage power grid. First, the target initial operating state, the initial first power flow solution, the initial second power flow solution, the initial third power flow solution and the initial load change step of the ultra-high voltage power grid are determined; based on the voltage of each operating node in the ultra-high voltage power grid under the initial first power flow solution and the voltage of each operating node under the initial third power flow solution, the target node is determined; using the Newton interpolation method, the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node are fitted to obtain an initial fitting curve, the extreme points and extreme values ​​of the initial fitting curve are determined, the extreme points and extreme values ​​of the initial fitting curve are determined as the initial predicted power flow solution, and based on the initial predicted power flow solution, power flow calculation is performed to obtain an initial corrected power flow solution; secondly, based on the initial corrected power flow solution, the corrected power flow solution is subjected to multiple rounds of sequential calculations by updating the load change step. After one iteration, the first target correction flow solution is obtained; then, it is determined whether the DC voltage exceeds the limit; if it exceeds the limit, the switching strategy of each capacitor group in the UHV power grid is adjusted until it does not exceed the limit, all capacitor groups are fully put into operation or all capacitor groups are withdrawn. Based on the first target correction flow solution, the load change step is updated, and the correction flow solution is iterated for multiple rounds for the second time to obtain the second target correction flow solution; based on the second target correction flow solution, the flow calculation is performed to obtain the initial critical judgment flow solution; finally, it is determined whether the initial critical judgment flow solution reaches the preset critical point; if it is not reached, based on the second target correction flow solution, the load change step is updated, and the correction flow solution is iterated for multiple rounds for the third time until the preset critical point is reached to obtain the third target correction flow solution; if it is reached, the operating state corresponding to the third target correction flow solution is determined as the final operating state of the UHV power grid. The present application determines the final operating state of the UHV power grid by updating the load change step and the switching strategy of the capacitor group multiple times, thereby ensuring the stable operation of the UHV power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0065] Figure 1 A schematic diagram of a process flow of a method for optimizing the state of an ultra-high voltage power grid provided in an embodiment of the present application;

[0066] Figure 2 It is a schematic diagram of load voltage curve;

[0067] Figure 3 A schematic diagram of the structure of a computer device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0068] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0069] The purpose of this application is to provide a method, system, device, medium and product for optimizing the state of a UHV power grid, aiming to ensure the stable operation of the UHV power grid.

[0070] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0071] In an exemplary embodiment, Figure 1 As shown, the UHV power grid state optimization method in this embodiment includes:

[0072] Step 1: Determine the target initial operating state of the UHV power grid, the initial first power flow solution, the initial second power flow solution, the initial third power flow solution and the initial load change step.

[0073] Among them, each power flow solution includes: load and voltage.

[0074] Step 2: Determine the target node based on the voltage of each operating node in the UHV power grid under the initial first power flow solution and the voltage of each operating node under the initial third power flow solution.

[0075] The target node is an operating node having the largest difference between the voltage under the initial first power flow solution and the voltage under the initial third power flow solution.

[0076] Step 3: Using the Newton interpolation method, fit the initial first flow solution, the initial second flow solution and the initial third flow solution of the target node to obtain the initial fitting curve, determine the extreme points and extreme values ​​of the initial fitting curve, determine the extreme points and extreme values ​​of the initial fitting curve as the initial predicted flow solution, and perform flow calculation based on the initial predicted flow solution to obtain the initial corrected flow solution.

[0077] Among them, the horizontal axis of the fitting curve is load, and the vertical axis is voltage.

[0078] Step 4: Based on the initial corrected power flow solution, the load change step is updated and the corrected power flow solution is iterated for multiple rounds to obtain the first target corrected power flow solution.

[0079] Step 5: Determine whether the DC voltage exceeds the limit; if so, adjust the switching strategy of each capacitor bank in the UHV power grid until it does not exceed the limit, all capacitor banks are fully put into operation, or all capacitor banks are withdrawn. Based on the first target corrected power flow solution, the load change step size is updated, and the corrected power flow solution is iterated for multiple rounds to obtain the second target corrected power flow solution.

[0080] Step 6: Based on the second objective corrected power flow solution, perform power flow calculations to obtain an initial critical judgment power flow solution.

[0081] Step 7: Determine whether the initial critical point has been reached.

[0082] Step 8: If it is not reached, based on the second target corrected power flow solution, by updating the load change step, the corrected power flow solution is subjected to multiple rounds of third iterations until the preset critical point is reached to obtain the third target corrected power flow solution.

[0083] Step 9: If achieved, the operating state corresponding to the third target corrected power flow solution is determined as the final operating state of the UHV power grid.

[0084] Furthermore, after step 9, the method further includes: calculating the value of each index in the final operating state, wherein the index includes: active power margin, active power reserve coefficient, effective short circuit ratio and voltage stability.

[0085] The calculation formula of active margin is:

[0086]

[0087] Among them, D P is the active power margin; P max is the static voltage stability limit value; P0 is the active power output under the final operating state, S B This is the system baseline capacity.

[0088] The calculation formula of active reserve coefficient is:

[0089]

[0090] Among them, D P % is the active power reserve coefficient.

[0091] The calculation formula of effective short circuit ratio is:

[0092]

[0093] Where ESCR is the effective short circuit ratio; S ac is the short-circuit capacity of the system; Q c P is the reactive power compensation capacity of the converter station; dc The actual active power delivered to the system in the final operating state.

[0094] The calculation formula for voltage stability is:

[0095]

[0096] Where VSI is voltage stability; Q dc is the reactive power actually absorbed by the system in the final operating state; U is the bus voltage in the final operating state.

[0097] As an optional implementation manner, determining the target initial operating state and the initial first power flow solution of the UHV power grid in step 1 includes:

[0098] Step 101: Initialize the operating state of the UHV power grid.

[0099] Step 102: Based on the initial operating state and power flow calculation of the UHV power grid, perform multiple rounds of iterations on the operating state of the UHV power grid to obtain the target initial operating state and the initial first power flow solution. The iteration process in any current round includes:

[0100] Step 1021: Perform power flow calculation based on the operating status of the current round to obtain an initial power flow solution of the current round.

[0101] Step 1022: According to the load in the initial power flow solution in the current round, determine whether the power flow in the current iteration round has converged, and obtain the first convergence judgment result in the current round.

[0102] Step 1023: If the first convergence judgment result in the current round is convergence, the operating state in the current round is determined as the target initial operating state, and the initial power flow solution in the current round is determined as the initial first power flow solution.

[0103] Step 1024: If the first convergence judgment result in the current round is non-convergence, the operating state in the current round is updated to the operating state in the next round, and return to step 1021 until the initial first power flow solution is obtained.

[0104] As an optional implementation manner, determining the initial second power flow solution, the initial third power flow solution and the initial load change step of the UHV power grid in step 1 includes:

[0105] Step 111: Initialize the load change step size under the target initial operating state.

[0106] Step 112: using the Newton-Raphson method, iterate the load change step of the UHV power grid for multiple rounds to obtain an initial second power flow solution, an initial third power flow solution and an initial load change step, wherein the iteration process in any current round includes:

[0107] Step 1121: Using the Newton-Raphson method, based on the initial first power flow solution and the load change step size in the current round, determine the second power flow solution and the third power flow solution in the current round.

[0108] Specifically, the calculation formulas for the loads in the second and third power flow solutions are:

[0109] λ B =λ A +Δλ.

[0110] λ C =λ B +Δλ.

[0111] Among them, λ B is the load in the second power flow solution; A is the load in the first power flow solution; Δλ is the load change step; λ C is the load in the third power flow solution.

[0112] Step 1122: Based on the second power flow solution and the third power flow solution in the current round, determine whether the power flow in the current iteration round has converged, and obtain a second convergence determination result in the current round.

[0113] Step 1123: If the second convergence judgment result in the current round is convergence, the second power flow solution in the current round is determined as the initial second power flow solution, the third power flow solution in the current round is determined as the initial third power flow solution, and the load change step in the current round is determined as the initial load change step.

[0114] Step 1124: If the second convergence judgment result in the current round is non-convergence, update the load change step in the current round to the load change step in the next round, and return to step 1121 until the initial second power flow solution, the initial third power flow solution and the initial load change step are obtained.

[0115] As an optional implementation, step 4 includes:

[0116] The iterative process of correcting the power flow solution in any current first iteration round includes:

[0117] Step 41: Obtain the initial second power flow solution, initial third power flow solution and initial load change step size in the current first iteration round.

[0118] Step 42: Determine the target node in the current first iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current first iteration round and the voltage of each operating node under the initial third power flow solution.

[0119] Step 43: Using the Newton interpolation method, fit the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node in the current first iteration round to obtain the fitting curve in the current first iteration round, determine the extreme points and extreme values ​​of the fitting curve in the current first iteration round, determine the extreme points and extreme values ​​in the current first iteration round as the predicted power flow solution in the current first iteration round, and perform power flow calculation based on the predicted power flow solution in the current first iteration round to obtain the corrected power flow solution in the current first iteration round.

[0120] Specifically, Figure 2 As shown, the fitting curve is a parabola, and the extreme value is close to the static voltage stability limit of the PV curve. The extreme point and extreme value can be expressed as (U cr ,λ max ).

[0121]

[0122] Among them, U cr is the extreme point; max is an extreme value.

[0123] Step 44: judging whether the power flow in the current first iteration round has converged according to the load in the corrected power flow solution in the current first iteration round, and obtaining a third convergence judgment result in the current first iteration round.

[0124] Step 45: If the third convergence judgment result in the current first iteration round is convergence, the corrected power flow solution in the current first iteration round is determined as the first target corrected power flow solution.

[0125] Step 46: If the third convergence judgment result of the current first iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size of the current first iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size of the next first iteration round, and return to step 42 until the first target correction power flow solution is obtained.

[0126] As an optional implementation, the expression of the fitting curve is:

[0127]

[0128] Among them, λ is the load; a is the quadratic coefficient; U k is the voltage of the target node; b is the coefficient of the first-order term; c is the constant term; a1, a2 and a3 are all intermediate quantities; λ A is the load in the first power flow solution; B is the load in the second power flow solution; U kA Solve the voltage of the target node for the first power flow; U kBSolve the voltage of the target node for the second power flow; λ C is the load in the third power flow solution; U kC Solve for the voltage at the target node for the third power flow.

[0129] As an optional implementation, in step 5, based on the first target corrected power flow solution, by updating the load change step size, performing multiple rounds of second iterations on the corrected power flow solution to obtain a second target corrected power flow solution includes:

[0130] The iterative process of correcting the power flow solution in any current second iteration round includes:

[0131] Step 51: Obtain the initial second power flow solution, the initial third power flow solution and the initial load change step size in the current second iteration round.

[0132] Step 52: Determine the target node in the current second iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current second iteration round and the voltage of each operating node under the initial third power flow solution.

[0133] Step 53: Using the Newton interpolation method, fit is performed based on the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node in the current second iteration round to obtain a fitting curve in the current second iteration round, determine the extreme points and extreme values ​​of the fitting curve in the current second iteration round, determine the extreme points and extreme values ​​in the current second iteration round as the predicted power flow solution in the current second iteration round, and perform power flow calculation based on the predicted power flow solution in the current second iteration round to obtain a corrected power flow solution in the current second iteration round.

[0134] Step 54: judging whether the power flow in the current second iteration round is converged according to the load in the corrected power flow solution in the current second iteration round, and obtaining a fourth convergence judgment result in the current second iteration round.

[0135] Step 55: If the fourth convergence judgment result in the current second iteration round is convergence, the corrected power flow solution in the current second iteration round is determined as the second target corrected power flow solution.

[0136] Step 56: If the fourth convergence judgment result of the current second iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size of the current second iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size of the next second iteration round, and return to step 52 until the second target correction power flow solution is obtained.

[0137] As an optional implementation, step 8 includes:

[0138] The iterative process of correcting the power flow solution in any current third iteration round includes:

[0139] Step 81: Obtain the initial second power flow solution, the initial third power flow solution and the initial load change step size in the current third iteration round.

[0140] Step 82: Determine the target node in the current third iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current third iteration round and the voltage of each operating node under the initial third power flow solution.

[0141] Step 83: Using the Newton interpolation method, fit is performed based on the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node in the current third iteration round to obtain a fitting curve in the current third iteration round, determine the extreme points and extreme values ​​of the fitting curve in the current third iteration round, determine the extreme points and extreme values ​​in the current third iteration round as the predicted power flow solution in the current third iteration round, and perform power flow calculation based on the predicted power flow solution in the current third iteration round to obtain a corrected power flow solution in the current third iteration round.

[0142] Step 84: According to the corrected power flow solution in the current third iteration round, determine whether the preset critical point is reached in the current third iteration round, and obtain a fifth convergence determination result in the current third iteration round.

[0143] Step 85: If the fifth convergence judgment result in the current third iteration round is convergence, the corrected power flow solution in the current third iteration round is determined as the third target corrected power flow solution.

[0144] Step 86: If the fifth convergence judgment result of the current third iteration round is non-convergence, the initial second power flow solution, initial third power flow solution and initial load change step size of the current third iteration round are updated to the initial second power flow solution, initial third power flow solution and initial load change step size of the next third iteration round, and return to step 82 until the third target correction power flow solution is obtained.

[0145] In an exemplary embodiment, a computer device is provided, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement a method for optimizing a UHV power grid state.

[0146] In an exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, a method for optimizing the state of an ultra-high voltage power grid is implemented.

[0147] In an exemplary embodiment, a computer program product is provided, including a computer program, which implements a method for optimizing a UHV power grid state when executed by a processor.

[0148] In an exemplary embodiment, a computer device is provided. The computer device may be a server or a terminal. The internal structure diagram thereof may be as follows: Figure 3 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for optimizing the state of an ultra-high voltage power grid is implemented.

[0149] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0150] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0151] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0152] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.

[0153] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0154] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.

Claims

1. A method for optimizing the state of an ultra-high voltage power grid, characterized in that: The UHV power grid state optimization method comprises: Determine the target initial operation state of the UHV power grid, the initial first power flow solution, the initial second power flow solution, the initial third power flow solution and the initial load change step; each power flow solution includes: load and voltage; Determine a target node based on the voltage of each operating node in the UHV power grid under the initial first power flow solution and the voltage of each operating node under the initial third power flow solution; the target node is the operating node with the largest difference between the voltage under the initial first power flow solution and the voltage under the initial third power flow solution; Using the Newton interpolation method, the initial first power flow solution, the initial second power flow solution and the initial third power flow solution of the target node are fitted to obtain an initial fitting curve, and the extreme points and extreme values ​​of the initial fitting curve are determined. The extreme points and extreme values ​​of the initial fitting curve are determined as the initial predicted power flow solution, and the power flow calculation is performed based on the initial predicted power flow solution to obtain the initial corrected power flow solution; the abscissa of the fitting curve is the load, and the ordinate is the voltage; Based on the initial corrected power flow solution, the corrected power flow solution is iterated for multiple rounds by updating the load change step size to obtain a first target corrected power flow solution; Determine whether the DC voltage exceeds the limit; if so, adjust the switching strategy of each capacitor bank in the UHV power grid until the limit is not exceeded, all capacitor banks are fully switched on or all capacitor banks are switched off, and based on the first target corrected power flow solution, perform multiple rounds of second iterations on the corrected power flow solution by updating the load change step size to obtain a second target corrected power flow solution; Based on the second objective corrected power flow solution, power flow calculation is performed to obtain the initial critical judgment power flow solution; Determine the initial critical point to determine whether the power flow solution has reached the preset critical point; If it is not reached, based on the second target corrected power flow solution, by updating the load change step, the corrected power flow solution is subjected to multiple rounds of third iterations until the preset critical point is reached to obtain the third target corrected power flow solution; If it is reached, the operating state corresponding to the third target corrected power flow solution is determined as the final operating state of the UHV power grid.

2. The method for optimizing the state of the ultra-high voltage power grid according to claim 1, characterized in that: Determine the target initial operating state and initial first power flow solution of the UHV power grid, including: Initialize the operating status of the UHV power grid; Based on the initial operation state and power flow calculation of the UHV power grid, the operation state of the UHV power grid is iterated for multiple rounds to obtain the target initial operation state and the initial first power flow solution; wherein the iteration process in any current round includes: Perform power flow calculation based on the operating status of the current round to obtain the initial power flow solution of the current round; According to the load in the initial power flow solution in the current round, it is judged whether the power flow in the current iteration round is converged, and the first convergence judgment result in the current round is obtained; If the first convergence judgment result in the current round is convergence, the operation state in the current round is determined as the target initial operation state, and the initial power flow solution in the current round is determined as the initial first power flow solution; If the first convergence judgment result in the current round is non-convergence, the operating state in the current round is updated to the operating state in the next round, and returns to "perform power flow calculation based on the operating state in the current round to obtain the initial power flow solution in the current round" until the initial first power flow solution is obtained.

3. The method for optimizing the state of the ultra-high voltage power grid according to claim 2, characterized in that: Determine the initial second power flow solution, initial third power flow solution and initial load change step of the UHV power grid, including: Under the target initial operating state, initialize the load change step size; The Newton-Raphson method is used to iterate the load change step of the UHV power grid for multiple rounds to obtain the initial second power flow solution, the initial third power flow solution and the initial load change step. The iterative process in any current round includes: Using the Newton-Raphson method, based on the initial first power flow solution and the load change step size in the current round, the second power flow solution and the third power flow solution in the current round are determined; Based on the second power flow solution and the third power flow solution in the current round, determine whether the power flow in the current iteration round has converged, and obtain the second convergence judgment result in the current round; If the second convergence judgment result in the current round is convergence, the second power flow solution in the current round is determined as the initial second power flow solution, the third power flow solution in the current round is determined as the initial third power flow solution, and the load change step size in the current round is determined as the initial load change step size; If the second convergence judgment result in the current round is non-convergence, the load change step size in the current round is updated to the load change step size in the next round, and return to "using the Newton-Raphson method, based on the initial first power flow solution and the load change step size in the current round, determine the second power flow solution and the third power flow solution in the current round" until the initial second power flow solution, the initial third power flow solution and the initial load change step size are obtained.

4. The method for optimizing the state of the ultra-high voltage power grid according to claim 3, characterized in that: Based on the initial corrected power flow solution, the corrected power flow solution is iterated for multiple rounds by updating the load change step size to obtain the first target corrected power flow solution, including: The iterative process of correcting the power flow solution in any current first iteration round includes: Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current first iteration round; Determine the target node in the current first iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current first iteration round and the voltage of each operating node under the initial third power flow solution; Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current first iteration round to obtain a fitting curve in the current first iteration round, and the extreme points and extreme values ​​of the fitting curve in the current first iteration round are determined. The extreme points and extreme values ​​in the current first iteration round are determined as the predicted power flow solution in the current first iteration round, and power flow calculation is performed based on the predicted power flow solution in the current first iteration round to obtain a corrected power flow solution in the current first iteration round; According to the load in the corrected power flow solution in the current first iteration round, judging whether the power flow in the current first iteration round is converged, and obtaining a third convergence judgment result in the current first iteration round; If the third convergence judgment result of the current first iteration round is convergence, the corrected power flow solution of the current first iteration round is determined as the first target corrected power flow solution; If the third convergence judgment result under the current first iteration round is non-convergence, the initial second power flow solution, the initial third power flow solution and the initial load change step size under the current first iteration round are updated to the initial second power flow solution, the initial third power flow solution and the initial load change step size under the next first iteration round, and return "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution under the current first iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node under the current first iteration round" until the first target corrected power flow solution is obtained.

5. The method for optimizing the state of the ultra-high voltage power grid according to claim 4, characterized in that: The expression of the fitting curve is: Among them, λ is the load; a is the quadratic coefficient; U k is the voltage of the target node; b is the coefficient of the first-order term; c is the constant term; a1, a2 and a3 are all intermediate quantities; λ A is the load in the first power flow solution; B is the load in the second power flow solution; U kA Solve the voltage of the target node for the first power flow; U kB Solve the voltage of the target node for the second power flow; λ C is the load in the third power flow solution; U kC Solve for the voltage at the target node for the third power flow.

6. The method for optimizing the state of the ultra-high voltage power grid according to claim 5, characterized in that: Based on the first target corrected power flow solution, by updating the load change step, the corrected power flow solution is subjected to multiple rounds of second iterations to obtain the second target corrected power flow solution, including: The iterative process of correcting the power flow solution in any current second iteration round includes: Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current second iteration round; Determine the target node in the current second iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current second iteration round and the voltage of each operating node under the initial third power flow solution; Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current second iteration round to obtain a fitting curve in the current second iteration round, and the extreme points and extreme values ​​of the fitting curve in the current second iteration round are determined. The extreme points and extreme values ​​in the current second iteration round are determined as the predicted power flow solution in the current second iteration round, and power flow calculation is performed based on the predicted power flow solution in the current second iteration round to obtain a corrected power flow solution in the current second iteration round; According to the load in the corrected power flow solution in the current second iteration round, judging whether the power flow in the current second iteration round is converged, and obtaining a fourth convergence judgment result in the current second iteration round; If the fourth convergence judgment result in the current second iteration round is convergence, the corrected power flow solution in the current second iteration round is determined as the second target corrected power flow solution; If the fourth convergence judgment result under the current second iteration round is non-convergence, the initial second power flow solution, the initial third power flow solution and the initial load change step size under the current second iteration round are updated to the initial second power flow solution, the initial third power flow solution and the initial load change step size under the next second iteration round, and return "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution under the current second iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node under the current second iteration round" until the second target corrected power flow solution is obtained.

7. The method for optimizing the state of the ultra-high voltage power grid according to claim 6, characterized in that: Based on the second target corrected power flow solution, by updating the load change step, the corrected power flow solution is iterated for multiple rounds until a preset critical point is reached, and a third target corrected power flow solution is obtained, including: The iterative process of correcting the power flow solution in any current third iteration round includes: Obtain the initial second power flow solution, initial third power flow solution and initial load change step size under the current third iteration round; Determine the target node in the current third iteration round based on the voltage of each operating node in the UHV power grid under the initial first power flow solution in the current third iteration round and the voltage of each operating node under the initial third power flow solution; Using the Newton interpolation method, fitting is performed based on the initial first power flow solution, the initial second power flow solution, and the initial third power flow solution of the target node in the current third iteration round to obtain a fitting curve in the current third iteration round, and the extreme points and extreme values ​​of the fitting curve in the current third iteration round are determined. The extreme points and extreme values ​​in the current third iteration round are determined as the predicted power flow solution in the current third iteration round, and power flow calculation is performed based on the predicted power flow solution in the current third iteration round to obtain a corrected power flow solution in the current third iteration round; According to the corrected power flow solution in the current third iteration round, it is judged whether the preset critical point is reached in the current third iteration round, and a fifth convergence judgment result in the current third iteration round is obtained; If the fifth convergence judgment result of the current third iteration round is convergence, the corrected power flow solution of the current third iteration round is determined as the third target corrected power flow solution; If the fifth convergence judgment result of the current third iteration round is non-convergence, the initial second power flow solution, the initial third power flow solution and the initial load change step size of the current third iteration round are updated to the initial second power flow solution, the initial third power flow solution and the initial load change step size of the next third iteration round, and return "based on the voltage of each operating node in the UHV power grid under the initial first power flow solution of the current third iteration round and the voltage of each operating node under the initial third power flow solution, determine the target node under the current third iteration round" until the third target corrected power flow solution is obtained.

8. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method for optimizing the state of an ultra-high voltage power grid as described in any one of claims 1 to 7.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for optimizing the state of an ultra-high voltage power grid described in any one of claims 1 to 7 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method for optimizing the state of an ultra-high voltage power grid described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Power system static voltage stability analysis method and system based on improved continuous power flow method

    CN111740425A

  • Phase load management system in electric power line

    KR1020020032129A