Alternating-current micro-grid energy storage optimal configuration method and system for transformer area, and electronic equipment
By optimizing the configuration of energy storage system in the AC microgrid in the Taiwan area, the energy storage system is solved in the face of renewable energy instability and load uncertainty, and the economic and stability of the system is improved, and the system is enhanced. Autonomous operation capability.
Patent Information
- Application Number
- CN202411111914.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-26
AI Technical Summary
When facing the intermittent and instability of renewable energy and load uncertainty, there are insufficient optimization operation and management of energy storage systems in Taiwan, which makes it difficult to ensure the stability and economics of the power grid.
Adopting the optimization configuration method of AC microgrid energy storage for the station area, by establishing an AC microgrid system model, setting the minimum full life cycle cost and minimum net load fluctuations as the goal, combining the multi-objective particle swarm algorithm and entropy weight method to optimize storage The system configuration results can be achieved to improve the system's autonomous operation capability and stability.
It effectively improves the operating capacity and stability of the energy storage system in the station area, ensures the economic and reliability of the system, optimizes the configuration of the energy storage system, and enhances the ability to manage load fluctuations.
Smart Images

Figure CN119029975A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of energy storage system optimization configuration, and in particular to an AC microgrid energy storage optimization configuration method, system and electronic equipment for a substation. Background Art
[0002] With the rapid development of renewable energy and the widespread application of distributed generation technology, traditional distribution networks are facing more and more challenges. As the basic unit of the distribution network, the optimized operation and autonomous management of the substation are crucial to improving the reliability, economy and environmental friendliness of the entire power grid. However, due to the intermittent and unstable nature of renewable energy and the uncertainty of substation load, the optimized operation and management of the substation are still insufficient. Summary of the invention
[0003] The present invention provides an AC microgrid energy storage optimization configuration method, system and electronic equipment for a substation, which improves the operation capability of the substation energy storage system, ensures the system stability and improves the autonomous operation capability of the substation energy storage system.
[0004] In a first aspect, an embodiment of the present invention provides an AC microgrid energy storage optimization configuration method for a substation, comprising:
[0005] Establish AC microgrid system model;
[0006] Taking the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the goal, an objective function is established;
[0007] Establishing constraint conditions according to the AC microgrid system model;
[0008] The optimal configuration result of the energy storage system is obtained by solving the objective function and the constraint conditions.
[0009] Optionally, taking the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the goal, an objective function is established, including:
[0010] The objective function of the minimum life cycle cost is expressed as a ratio of the life cycle cost to a preset period, wherein the life cycle cost is obtained based on investment cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost;
[0011] The objective function of the minimum net load fluctuation is expressed as the sum of the absolute values of the difference between the net load power at the current moment and the net load power at the previous moment within a preset period;
[0012] The net load power at the current moment is obtained based on the system load power, photovoltaic output power, and energy storage system charging and discharging power.
[0013] Optionally, the objective function of the minimum life cycle cost is as follows:
[0014]
[0015] Among them, L CC,BE is the life cycle cost, C TCC,BESS is the investment cost, C MC,BESS is the maintenance cost, C OC,BESS is the operating cost, C RC,BESS is the replacement cost, C DRC,BESS for the disposal and recovery costs.
[0016] Optionally, the objective function of the minimum net load fluctuation is as follows:
[0017]
[0018] Among them, P load,n (t) is the system load power, P pv,n (t) is the photovoltaic output power, i is the number of energy storage batteries in the energy storage system, t is the time, n is the collection period, P L,n (t) is the net load power at the current moment, P L,n (t-1) is the net load power at the previous moment, P cha / dis,BESS (t) is the charging and discharging power of the energy storage battery at the current moment, P dis,BESS(t) is the discharge power of the energy storage battery at the current moment.
[0019] Optionally, the investment cost is:
[0020]
[0021] Where: i is the number of energy storage batteries in the energy storage system; N BESS is the number of installed energy storage batteries; C battery With C inverter are the costs of energy storage batteries and converters respectively; P BESS,i is the rated power of the energy storage battery; μ CRF,BESS is the capital recovery factor of the energy storage battery;
[0022] The maintenance cost is:
[0023] Where: w MC,battery With w MC,inverter are the proportion of battery and converter maintenance costs to investment costs; E rated,i is the energy storage capacity of the energy storage battery;
[0024] The operating costs are:
[0025]
[0026] Where: e pur (t) and e sell (t) are the electricity prices at the time of buying and selling respectively; P cha,BESSi (t) is the charging power of the energy storage battery at the current moment, P dis,BESSi (t) is the discharge power of the energy storage battery at the current moment;
[0027] The replacement cost is:
[0028]
[0029] Where: R battery is the number of battery replacements, t ime,battery is the battery life; BESS is the annual reduction ratio of energy storage battery cost; g battery is the number of times the battery is currently replaced; d is the battery recycling rate;
[0030] The disposal and recycling costs are:
[0031]
[0032] Where: γ BESS is the recycling benefit of BESS, and d is the battery recycling rate.
[0033] Optionally, establishing constraint conditions according to the AC microgrid system model includes:
[0034] Establish energy storage capacity constraints, charge and discharge power constraints, state of charge constraints, energy storage battery maximum discharge power constraints and energy storage battery remaining capacity constraints according to the energy storage system;
[0035] Establish interactive power constraints of microgrids in grid-connected situations;
[0036] The AC microgrid system model also includes a photovoltaic system, and photovoltaic output constraints are established according to the photovoltaic system;
[0037] A power balance constraint of the AC microgrid system is established.
[0038] Optionally, the energy storage capacity constraint is:
[0039] The energy storage capacity constraint is: E min ≤E(t)≤E max
[0040] Where: E max and E min They are the upper and lower limits of the energy storage battery capacity respectively;
[0041] The charge and discharge power constraints are:
[0042]
[0043] Where: and They are the upper and lower limits of the charging and discharging power of the energy storage battery respectively;
[0044] The state of charge constraint is:
[0045] Where: and They are the upper and lower limits of the state of charge of the energy storage battery respectively;
[0046] The maximum discharge power constraint of the energy storage battery is: d-max (t)≤P SB (t)≤P c-max (t)
[0047] Where P c-max (t), and P d-max (t) are the maximum charging power and discharging power of the energy storage battery at time t;
[0048] The remaining capacity constraint of the energy storage battery is: S min ≤S(t)≤S max
[0049] In the formula, S max and S min They are the maximum remaining capacity and the minimum remaining capacity of the battery respectively;
[0050] The remaining power of the energy storage battery at the beginning of each day is equal to the remaining power at the end of the day:
[0051] S(0)=S(Nend)
[0052] Where S(0) is the remaining power of the energy storage battery at the beginning of each day; S(Nend) is the remaining power of the energy storage battery at the end of each day;
[0053] The interaction power constraint is: P GD(t) ≤P GD-MAX
[0054] Where P GD (t) is the interaction power, P GD-MAX The maximum value allowed for the interaction power between the microgrid and the grid;
[0055] The photovoltaic output constraint: 0≤P PV (T)≤P PV-MAX (t)
[0056] Where P PV-MAX (t) is the maximum output power of the photovoltaic at time t;
[0057] The power balance constraint of the AC microgrid system is:
[0058] P PV (t)+P GD (t)-P SB (t) = P L-AC (t)
[0059] Where P L-AC (t) is the AC side load in the microgrid, P SB (t) is the charging and discharging power of the energy storage system, P PV (t) is the photovoltaic output power.
[0060] Optionally, obtaining an optimal configuration result of the energy storage system according to the objective function and the constraint condition includes:
[0061] According to actual AC microgrid application parameters, the objective function and the constraint conditions are substituted to obtain a decision model to be solved including the objective function and the constraint conditions;
[0062] According to the decision model to be solved, the Pareto solution of the optimal energy storage capacity, charging and discharging power and interaction power is calculated based on the multi-objective particle swarm algorithm;
[0063] Based on the entropy weight method, the optimal configuration result is selected from the Pareto solution.
[0064] In a second aspect, an embodiment of the present invention provides an AC microgrid energy storage optimization configuration system for a substation, comprising:
[0065] The initial module is used to set system parameters and establish an AC microgrid system model;
[0066] A target setting module, used to establish an objective function with the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the target;
[0067] A constraint setting module, used to establish constraint conditions according to the AC microgrid system model;
[0068] The calculation module is used to obtain the optimal configuration result of the energy storage system according to the objective function and the constraint conditions.
[0069] In a third aspect, an embodiment of the present invention provides an electronic device, including:
[0070] at least one processor; and,
[0071] a memory communicatively connected to the at least one processor; wherein,
[0072] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the AC microgrid energy storage optimization configuration method for the substation as described in any embodiment of the present invention.
[0073] The technical solution provided by the embodiment of the present invention establishes an AC microgrid system model, analyzes the load and power supply structure of the substation, takes the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the goal, establishes an objective function, establishes constraints according to the AC microgrid system model, obtains the optimal configuration result of the energy storage system according to the objective function and the constraints, calculates with the life cycle cost and net load fluctuation as the goal, ensures the economy and reliability of the substation, and calculates with net load fluctuation as the goal. It effectively improves the operation capacity of the substation energy storage system, ensures the stability of the system, and improves the autonomous operation capacity of the substation energy storage system. BRIEF DESCRIPTION OF THE DRAWINGS
[0074] Figure 1 A schematic flow chart of an AC microgrid energy storage optimization configuration method for a substation is provided for an embodiment of the present invention;
[0075] Figure 2 A structural schematic diagram of an AC microgrid system is provided for an embodiment of the present invention;
[0076] Figure 3 A flow chart of another method for optimizing energy storage configuration of AC microgrids in a substation is provided for an embodiment of the present invention;
[0077] Figure 4 Pareto solution graph;
[0078] Figure 5 Energy storage charging and discharging power and energy storage charge curve;
[0079] Figure 6 Power balance bar graph;
[0080] Figure 7 A schematic diagram of the structure of an AC microgrid energy storage optimization configuration device for a substation provided by an embodiment of the present invention;
[0081] Figure 8 A schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0082] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0083] Due to the intermittent and unstable nature of renewable energy and the uncertainty of the load in the substation, the optimized operation and management of the substation has become complicated. However, as an effective means of regulation, the energy storage system can play a role in shaving peaks and filling valleys, balancing supply and demand, and improving system stability and reliability in the power grid. At the substation level, the configuration of the energy storage system can not only alleviate the fluctuation of the power grid load, but also provide the necessary support for distributed power sources, and realize the local consumption and optimal configuration of energy.
[0084] Although energy storage technology has great potential for application in substations, there are still some problems and challenges. The existing energy storage configuration methods often fail to fully consider the specific characteristics and needs of the substation, such as load characteristics and power supply structure, resulting in the lack of systematicness and optimization of the configuration and operation strategies of the energy storage system.
[0085] In view of this, Figure 1 A flow chart of an AC microgrid energy storage optimization configuration method for a substation is provided for an embodiment of the present invention. This embodiment is applicable to the case of energy storage optimization configuration. The method can be executed by an energy storage optimization configuration system. The device can be implemented in hardware and / or software. The method specifically includes the following steps:
[0086] S110, establish an AC microgrid system;
[0087] Specifically, the AC microgrid system has the characteristics of a small power generation unit and is geographically closer to users, which is an important means of local consumption of renewable energy power generation. A stable AC microgrid system, in which each distributed energy source and load can operate in an orderly manner under the regulation of intelligent algorithms, can achieve efficient conversion between isolated islands and grid-connected, thus providing users with efficient and reliable energy. Figure 2 A schematic diagram of the structure of an AC microgrid system is provided in accordance with an embodiment of the present invention. Figure 2The AC microgrid system is composed of a photovoltaic power generation device 210 connected to the AC / DC bus through a converter 220, an energy storage battery 230 connected to the AC / DC bus through a bidirectional energy storage converter 240, and a system load 250 and a power grid 260 connected to the AC / DC bus respectively. The AC microgrid system model is established by setting system parameters, wherein the system parameters include system planning parameters, alternative equipment models, economic and technical parameters of alternative equipment, annual hourly loads and renewable resource data.
[0088] S120, establishing an objective function with the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system model as the goal;
[0089] Specifically, due to the high cost of the energy storage system, if most of the power fluctuations in the microgrid are to be smoothed, more energy storage equipment needs to be purchased, which is not conducive to economic control. If only a small part of the power fluctuations are smoothed, although the economy is guaranteed, the net load power fluctuation in the microgrid will be large, affecting the power quality of the microgrid. Therefore, there is mutual inhibition between the energy storage configuration cost of the microgrid and the net load power fluctuation. Therefore, the embodiment of the present invention proposes a multi-objective optimization model for the energy storage configuration of the microgrid, and the minimum life cycle cost and the minimum net load fluctuation of the energy storage system are used as the target for multi-objective optimization. Among them, according to the AC microgrid system model, the life cycle cost reflects the investment cost, maintenance cost, operating cost, replacement cost, disposal and recovery cost throughout the life cycle, which better reflects the economy of the energy storage system. Net load fluctuation is a measure of the severity of the net load change in the power system within a certain period of time. When a distributed power source, such as a photovoltaic system, is connected, the user's electricity is first provided by the distributed power source, and then the main grid supplies power to the user. Due to the instability and reverse load of the output of the distributed power source, huge net load fluctuations and peak-to-valley differences will be caused, resulting in a decrease in the stability of the power grid operation. Therefore, the embodiment of the present invention selects the net load fluctuation after connecting to the distributed power source as the objective function. The net load fluctuation objective function measures the severity of the net load change in the power system within a certain period of time. Net load refers to the total load in the power system (that is, the total power demand of users) minus the power generation of distributed power generation (such as wind power, photovoltaic and other renewable energy power generation). Therefore, the net load fluctuation reflects the changes in power demand that the power grid needs to cope with. Optimizing this objective function helps to reduce the instability in the operation of the power grid, because large fluctuations in net load may cause problems such as changes in power grid frequency and voltage fluctuations, affecting the reliability and power quality of the power grid. By reducing net load fluctuations, the stability and operation efficiency of the power grid can be improved.
[0090] S130, establishing constraint conditions according to the AC microgrid system model;
[0091] Specifically, for the energy storage system, load and power grid in the AC microgrid system model, it is necessary to establish energy storage capacity constraints, charge and discharge power constraints, state of charge constraints, maximum discharge power constraints of energy storage batteries and remaining capacity constraints of energy storage batteries for the energy storage system to ensure that each energy storage battery meets the application requirements. When the microgrid is connected to the grid, it is also necessary to meet the interactive power constraints for the stable operation of the large power grid. The output of the distributed power source in the microgrid should be less than the maximum output power, and the photovoltaic output constraints need to be set for the photovoltaic output. At any time, the microgrid should meet the AC microgrid load and output balance constraints.
[0092] S140. Obtain an optimal configuration result of the energy storage system based on the objective function and constraint conditions.
[0093] Specifically, the objective function and constraints are introduced into the simulation algorithm, such as the Normal-Boundary Intersection (NBI) or the interval multi-objective particle swarm optimization (IMOPSO), to obtain the Pareto optimal solution including energy storage capacity, energy storage battery charging and discharging power, and interaction power. Among them, for a set of Pareto solutions, the decision maker needs to select the optimal solution from them based on the preference information, which is essentially a multi-attribute decision-making problem. In order to ensure that the selection is not affected by other influencing factors, the entropy weight method can be further used to select the optimal solution.
[0094] The technical solution provided by the embodiment of the present invention establishes an AC microgrid system model, analyzes the load and power supply structure of the substation, takes the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the goal, establishes an objective function, establishes constraints according to the AC microgrid system model, obtains the optimal configuration result of the energy storage system according to the objective function and the constraints, calculates with the life cycle cost and net load fluctuation as the goal, ensures the economy and reliability of the substation, and calculates with the net load fluctuation as the goal. It effectively improves the operation capacity of the substation energy storage system, ensures the stability of the system, and improves the autonomous operation capacity of the substation energy storage system.
[0095] Figure 3 A flow chart of another method for optimizing energy storage configuration of AC microgrids in a substation is provided for the embodiment of the present invention. Figure 3 ,include:
[0096] S310, establishing an AC microgrid system model;
[0097] See also Figure 2The AC microgrid system consists of a photovoltaic power generation device connected to the AC / DC bus through a converter, an energy storage battery connected to the AC / DC bus through a bidirectional energy storage converter, and the system load and the grid connected to the AC / DC bus respectively. The AC microgrid system model is established by setting system parameters, where the system parameters include system planning parameters, alternative equipment models, economic and technical parameters of alternative equipment, annual hourly load and renewable resource data, etc. Energy storage parameter setting: Set time parameters, cost parameters, grid parameters and energy storage parameters, including the number of time periods t (take 24 hours), the number of days in a year (take 365 days as an example), and the battery cost c battery 、Electricity price at the time of purchase pur and the electricity price at the time of selling sell 、The upper limit of the capacity of the energy storage battery E max and the lower capacity limit of the energy storage battery E min , the maximum value of the interaction power between the microgrid and the grid is P GD-MAX Grid and load parameter settings: Set parameters related to grid load, photovoltaic, etc. For example, enter specific load data P load and photovoltaic data P pv Optimized variable definition: Energy storage capacity E of the energy storage battery rated 、Charge and discharge power P of energy storage battery SB (t) and interaction power P GD (t).
[0098] S320, establishing an objective function with the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system model as the goal;
[0099] Specifically, the objective function of the minimum life cycle cost is expressed as the ratio of the life cycle cost to the preset period, where the life cycle cost is obtained based on the investment cost, maintenance cost, operating cost, replacement cost, and disposal and recycling cost;
[0100] Among them, the life cycle cost can be obtained by summing up the investment cost, maintenance cost, operating cost and replacement cost and subtracting the disposal and recycling cost. The objective function minF of the minimum life cycle cost is 1 As shown below:
[0101]
[0102] Among them, L CC,BE is the life cycle cost, C TCC,BESS is the investment cost, C MC,BESS is the maintenance cost, C OC,BESS is the operating cost, C RC,BESS is the replacement cost, C DRC,BESS for disposal and recovery costs.
[0103] The investment cost is:
[0104]
[0105] Where: i is the number of energy storage batteries in the energy storage system; N BESS is the number of installed energy storage batteries; C battery With C inverter are the costs of energy storage batteries and converters respectively; P BESS,i is the rated power of the energy storage battery; μ CRF,BESS is the capital recovery factor of the energy storage battery;
[0106] The maintenance cost is:
[0107] Where: w MC,battery With w MC,inverter are the proportion of battery and converter maintenance costs to investment costs; E rated,i is the energy storage capacity of the energy storage battery; C battery With C inverter are the costs of the energy storage battery and converter respectively;
[0108] The operating costs are:
[0109]
[0110] Where: e pur (t) and e sell (t) are the electricity prices at the time of buying and selling respectively; P cha,BESSi (t) is the charging power of the energy storage battery at the current moment, P dis,BESSi (t) is the discharge power of the energy storage battery at the current moment;
[0111] The replacement cost is:
[0112]
[0113] Where: R battery is the number of battery replacements, t ime,battery is the battery life; BESS is the annual reduction ratio of energy storage battery cost; d is the battery recycling rate; g is the annual reduction ratio of energy storage battery cost; battery The number of times the battery is currently replaced;
[0114] The disposal and recycling costs are:
[0115]
[0116] Where: γ BESS is the recycling benefit of BESS, and d is the battery recycling rate.
[0117] The objective function of minimum net load fluctuation is expressed as the sum of the absolute values of the difference between the net load power at the current moment and the net load power at the previous moment within a preset period; the net load power at the current moment is obtained based on the system load power, photovoltaic output power, and energy storage system charging and discharging power.
[0118] The net load power at the current moment is the sum of the system load power minus the photovoltaic output power and the charging and discharging power of the energy storage system. The objective function minF of the minimum net load fluctuation is 2 As shown below:
[0119]
[0120] Among them, P load,n (t) is the system load power, P pv,n (t) is the photovoltaic output power, i is the number of energy storage batteries in the energy storage system, t is the time, n is the collection period, P L,n (t) is the net load power at the current moment, P L,n (t-1) is the net load power at the previous moment, P cha / dis,BESS (t) is the charging and discharging power of the energy storage battery at the current moment.
[0121] S330. Establish energy storage capacity constraints, charging and discharging power constraints, state of charge constraints, maximum discharge power constraints of energy storage batteries and remaining capacity constraints of energy storage batteries according to the energy storage system; establish interactive power constraints of the microgrid when connected to the grid; the AC microgrid system model also includes a photovoltaic system, and photovoltaic output constraints are established according to the photovoltaic system; establish power balance constraints for the AC microgrid system.
[0122] Specifically, considering the structural relationship between the energy storage system, load and power grid in the AC microgrid system model, energy storage capacity constraints, charge and discharge power constraints, state of charge constraints, maximum discharge power constraints of energy storage batteries and remaining capacity constraints of energy storage batteries are established for the energy storage system to ensure that each energy storage battery meets the application requirements. When the microgrid is connected to the grid, it is also necessary to meet the interactive power constraints for the stable operation of the large power grid. The output of the distributed power source in the microgrid should be less than the maximum output power, and photovoltaic output constraints need to be set for photovoltaic output. At any time, the microgrid should meet the AC microgrid load and output balance constraints.
[0123] Among them, for the energy storage system, when the energy storage battery is charged and discharged, its model can be expressed as:
[0124]
[0125] Where: η cha , η disis the charge and discharge efficiency, Δt is the time variable, and illustratively, in the embodiment of the present invention, η cha , η dis Take 96% and Δt as 1h. The state of charge (SOC) characterizes the charge and discharge operation state of the battery, namely:
[0126]
[0127] The energy storage capacity constraint can be expressed as:
[0128] The energy storage capacity constraint is: E min ≤E(t)≤E max
[0129] Where: E max and E min They are the upper and lower limits of the energy storage battery capacity respectively;
[0130] The charge and discharge power constraints can be expressed as:
[0131]
[0132] Where: and They are the upper and lower limits of the charging and discharging power of the energy storage battery respectively;
[0133] The state of charge constraint can be expressed as:
[0134] Where: and They are the upper and lower limits of the state of charge of the energy storage battery respectively;
[0135] The maximum discharge power constraint of the energy storage battery can be expressed as:
[0136] -P d-max (t)≤P SB (t)≤P c-max (t)
[0137] Where P c-max (t), and P d-max (t) are the maximum charging power and discharging power of the energy storage battery at time t;
[0138] The remaining capacity constraint of the energy storage battery can be expressed as: S min ≤S(t)≤S max
[0139] In the formula, S max and S min They are the maximum remaining capacity and the minimum remaining capacity of the battery respectively;
[0140] The power grid and AC / DC hybrid microgrid must work periodically, and the energy storage battery must also meet the requirements of periodic operation. Therefore, the remaining power of the energy storage battery at the beginning of each day must be equal to the remaining power at the end of the day: S(0) = S(Nend)
[0141] Where S(0) is the remaining power of the energy storage battery at the beginning of each day; S(Nend) is the remaining power of the energy storage battery at the end of each day;
[0142] The interaction power constraint can be expressed as: P GD (t)≤P GD-MAX
[0143] Where P GD (t) is the interaction power, P GD-MAX The maximum value allowed for the interaction power between the microgrid and the grid;
[0144] The photovoltaic output constraint can be expressed as: 0≤P PV (t)≤P PV-MAX (t)
[0145] Where P PV-MAX (t) is the maximum output power of the photovoltaic at time t;
[0146] The power balance constraint of the AC microgrid system can be expressed as:
[0147] P PV (t)+P GD (t)-P SB (t) = P L-AC (t)
[0148] Where P L-AC (t) is the AC side load in the microgrid, P SB (t) is the charging and discharging power of the energy storage system, P PV (t) is the photovoltaic output power.
[0149] S340, according to the actual AC microgrid application parameters, substituting the objective function and the constraint conditions into the objective function and obtaining a decision model to be solved including the objective function and the constraint conditions;
[0150] S350. According to the decision model to be solved, the Pareto solution of the optimal energy storage capacity, charging and discharging power and interaction power is calculated based on the multi-objective particle swarm algorithm; based on the entropy weight method, the optimal configuration result is selected from the Pareto solution.
[0151] Specifically, the solution method is: each particle updates its speed and position by tracking two "optimal solutions", and the optimal explanation is the comprehensive selection of the two goals of life cycle cost and net load fluctuation. rated , Energy storage battery charging and discharging power PSB (t), and the interaction power P GD (t) is the optimization variable, and the optimal solution corresponds to the energy storage capacity E rated , Battery charging and discharging power P SB (t), and the interaction power P GD (t) is the establishment of optimization variables.
[0152] The update method is as follows:
[0153]
[0154] Where: w is the inertia weight; c 1 、c 2 is the acceleration factor; r 1 , r 2 , is a random number between (0, 1); is the d-th dimension component of the optimal position vector of the ith particle at time k; is the d-th dimension component of the optimal position vector of the population at time k.
[0155] When the particle swarm algorithm is used to solve multi-objective problems, the conventional method is to combine the Pareto sorting mechanism with the basic particle swarm algorithm, determine the historical optimal solution of the particles through the dominance relationship between particles and update the non-inferior solution set.
[0156] The final optimization result of the IMOPSO algorithm is a set of Pareto solutions. The decision maker needs to select the optimal solution from them based on the preference information. In essence, it is a multi-attribute decision-making problem. In the embodiment of the present invention, the TOPSIS method based on information entropy is used to select the optimal solution. The ordinal preference method is essentially to make decisions by calculating the distance between the alternative solution and the ideal solution and the negative ideal solution, so that the distance between the selected solution and the ideal solution is the smallest and the distance between the selected solution and the negative ideal solution is the largest. The non-inferior solutions in the Pareto solution set constitute N alternative solutions x 1 , x 2 , …, x n , the number of attributes of the scheme is n, that is, the number of objective functions, then scheme x i The mth attribute value of m (x i ). Since there are dimensional differences between the attributes, they should be normalized first, and different types of attributes should be converted into dimensionless attributes. That is, the life cycle cost and net load fluctuation are the objective functions, and their corresponding attributes need to be converted into dimensionless steel attributes, so that they can be selected regularly. i The attribute values of 1 (x i ), f′ 2 (x i ), f′n (x i )]. The expressions for each attribute value are:
[0157]
[0158] Plan x i The relative distance d(x i ) can be calculated by the following formula:
[0159]
[0160] The TOPSIS method needs to assign weights to each target value during the calculation process, and the selection of weights has high requirements on the decision maker's experience and knowledge. In order to avoid the influence of the decision maker on the final decision, the information entropy method is used to determine the weight of each target value. If the difference of the mth target value of each Pareto solution in the solution set is small, it means that the target value has little influence on the final decision, and its weight should also be small accordingly.
[0161] Results analysis: see Figure 4 Pareto solution graph, Figure 5 Energy storage charging and discharging power and energy storage charge curve Figure 6 The power balance bar chart gives the energy storage charging and discharging power curve, Pareto results and power balance bar chart. The Pareto results of target 1 life cycle cost and target 2 net load fluctuation obtained by particle swarm are as follows: Figure 4 As shown, the TOPSIS method based on information entropy is then used to select the optimal solution. The charging and discharging power of the energy storage system after optimization is as follows: Figure 5 As shown. Figure 6 It can be seen that when the microgrid is short of electricity, it purchases electricity from the large power grid, and vice versa, it sells electricity to the large power grid. Energy storage smoothes load fluctuations by shaving peaks and filling valleys, and the entire system meets the power balance constraint.
[0162] Existing energy storage configuration methods often fail to fully consider the specific characteristics and needs of the substations. Due to the diversity and large scale of the substations, they have high requirements on power supply reliability and economy. The embodiment of the present invention uses the full life cycle cost and net load fluctuation as the target for calculation, ensuring the economy and reliability of the substation. In addition, the substation energy storage system has insufficient autonomous operation capabilities and is difficult to cope with complex and changeable operating environments. The embodiment of the present invention uses net load fluctuation as the target for calculation, effectively improving the operation capabilities of the substation energy storage system and ensuring system stability.
[0163] Figure 7 A schematic diagram of a structure of an AC microgrid energy storage optimization configuration device for a substation provided by an embodiment of the present invention, see Figure 7 ,include:
[0164] An initial module 110 is used to set system parameters and establish an AC microgrid system model;
[0165] A target setting module 120 is used to establish an objective function with the minimum life cycle cost and the minimum net load fluctuation of the energy storage system in the AC microgrid system as the target;
[0166] A constraint setting module 130, used to establish constraint conditions according to the AC microgrid system model;
[0167] The calculation module 140 is used to obtain the optimal configuration result of the energy storage system according to the objective function and the constraint conditions.
[0168] Specifically, the AC microgrid system has the characteristics of a small power generation unit and is geographically closer to users. It is an important means of local consumption of renewable energy power generation. A stable AC microgrid system, in which each distributed energy source and load can operate in an orderly manner under the regulation of intelligent algorithms, and can achieve efficient conversion between isolated islands and grid-connected, thereby providing users with efficient and reliable energy. The initial module 110 sets the system parameters to establish an AC microgrid system model, see Figure 2 ,The AC microgrid system consists of photovoltaic power generation equipment connected to the AC / DC bus through a converter, the energy storage battery is connected to the AC / DC bus through a bidirectional energy storage converter, and the system load and the grid are connected to the AC / DC bus respectively.
[0169] Due to the high cost of the energy storage system, if most of the power fluctuations in the microgrid are to be smoothed, more energy storage equipment needs to be purchased, which is not conducive to economic control. If only a small part of the power fluctuations are smoothed, although the economy is guaranteed, the net load power fluctuation in the microgrid will be large, affecting the power quality of the microgrid. Therefore, there is mutual inhibition between the energy storage configuration cost of the microgrid and the net load power fluctuation. The target setting module 120 of the embodiment of the present invention takes the minimum life cycle cost and the minimum net load fluctuation of the energy storage system in the AC microgrid system as the target to establish an objective function. The life cycle cost reflects the investment cost, maintenance cost, operating cost, replacement cost, disposal and recovery cost throughout the life cycle, and better reflects the economy of the energy storage system. Net load fluctuation is a measure of the severity of the net load change in the power system within a certain period of time. When a distributed power source, such as a photovoltaic system, is connected, the user's electricity is first provided by the distributed power source, and then the main grid supplies power to the user. Due to the instability and reverse load of the output of the distributed power source, huge net load fluctuations and peak-to-valley differences will be caused, resulting in a decrease in the stability of the power grid operation. Therefore, the embodiment of the present invention selects the net load fluctuation after the distributed power source is connected as the objective function. The net load fluctuation objective function measures the severity of the net load changes in the power system within a certain period of time. Net load refers to the total load in the power system (i.e. the total power demand of users) minus the power generation of distributed generation (such as wind power, photovoltaic and other renewable energy generation). Therefore, net load fluctuations reflect the changes in power demand that the power grid needs to cope with. Optimizing this objective function helps reduce the instability in power grid operation, because large fluctuations in net load may cause problems such as changes in grid frequency and voltage fluctuations, affecting the reliability and power quality of the grid. By reducing net load fluctuations, the stability and operation efficiency of the power grid can be improved.
[0170] For the energy storage system, load and power grid in the AC microgrid system model, the constraint setting module 130 establishes energy storage capacity constraints, charge and discharge power constraints, state of charge constraints, maximum discharge power constraints of energy storage batteries and remaining capacity constraints of energy storage batteries for the energy storage system to ensure that each energy storage battery meets the application requirements. When the microgrid is connected to the grid, it is also necessary to meet the interactive power constraints for the stable operation of the large power grid. The output of the distributed power source in the microgrid should be less than the maximum output power, and photovoltaic output constraints need to be set for photovoltaic output. At any time, the microgrid should meet the AC microgrid load and output balance constraints.
[0171] The calculation module 140 brings the objective function and constraints into the simulation algorithm, for example, the Normal-Boundary Intersection (NBI) or the interval multi-objective particle swarm optimization (IMOPSO), to obtain the Pareto optimal solution including the energy storage capacity, the energy storage battery charging and discharging power, and the interaction power. Among them, for a set of Pareto solutions, the decision maker needs to select the optimal solution from them based on the preference information, which is essentially a multi-attribute decision-making problem. In order to ensure that the selection is not affected by other influencing factors, the entropy weight method can be further used to select the optimal solution.
[0172] Figure 8 A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0173] like Figure 8 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0174] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0175] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The processor 11 executes the various methods and processes described above, such as the AC microgrid energy storage optimization configuration method for the substation.
[0176] In some embodiments, the AC microgrid energy storage optimization configuration method for the substation can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the AC microgrid energy storage optimization configuration method for the substation described above can be executed. Alternatively, in other embodiments, the processor 11 can be configured to execute the AC microgrid energy storage optimization configuration method for the substation in any other appropriate manner (for example, by means of firmware).
[0177] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimizing energy storage configuration of AC microgrids in substations, characterized in that: include: Establish AC microgrid system model; Taking the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system model as the goal, an objective function is established; Establishing constraint conditions according to the AC microgrid system model; The optimal configuration result of the energy storage system is obtained by solving the objective function and the constraint conditions.
2. The AC microgrid energy storage optimization configuration method for the substation according to claim 1 is characterized in that: Taking the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the goal, an objective function is established, including: The objective function of the minimum life cycle cost is expressed as a ratio of the life cycle cost to a preset period, wherein the life cycle cost is obtained based on investment cost, maintenance cost, operating cost, replacement cost, and disposal and recovery cost; The objective function of the minimum net load fluctuation is expressed as the sum of the absolute values of the difference between the net load power at the current moment and the net load power at the previous moment within a preset period; The net load power at the current moment is obtained based on the system load power, photovoltaic output power, and energy storage system charging and discharging power.
3. The AC microgrid energy storage optimization configuration method for the substation according to claim 2 is characterized in that: The objective function of the minimum life cycle cost is as follows: Among them, L CC,BE is the life cycle cost, C TCC,BESS is the investment cost, C MC,BESS is the maintenance cost, C OC,BESS is the operating cost, C RC,BESS is the replacement cost, C DRC,BESS for the disposal and recovery costs.
4. The AC microgrid energy storage optimization configuration method for the substation according to claim 2 is characterized in that: The objective function of the minimum net load fluctuation is as follows: Among them, P load,n (t) is the system load power, P pv,n (t) is the photovoltaic output power, i is the number of energy storage batteries in the energy storage system, t is the time, n is the collection period, P L,n (t) is the net load power at the current moment, P L,n (t-1) is the net load power at the previous moment, P cha / dis,BESS (t) is the charging and discharging power of the energy storage battery at the current moment.
5. The AC microgrid energy storage optimization configuration method for the substation according to claim 3 is characterized in that: The investment cost is: Where: i is the number of energy storage batteries in the energy storage system; N BESS is the number of installed energy storage batteries; C battery With C inverter are the costs of energy storage batteries and converters respectively; P BESS,i is the rated power of the energy storage battery; μ CRF,BESS is the capital recovery factor of the energy storage battery; The maintenance cost is: Where: w MC,battery With w MC,inverter are the proportion of battery and converter maintenance costs to investment costs; E rated,i is the energy storage capacity of the energy storage battery; The operating costs are: Where: e pur (t) and e sell (t) are the electricity prices at the time of buying and selling respectively; P cha,BESSi (t) is the charging power of the energy storage battery at the current moment, P dis,BESSi (t) is the discharge power of the energy storage battery at the current moment; The replacement cost is: Where: R battery is the number of battery replacements, t ime,battery is the battery life; BESS is the annual reduction ratio of energy storage battery cost; g battery is the number of times the battery is currently replaced; d is the battery recycling rate; The disposal and recycling costs are: Where: γ BESS is the recycling benefit of BESS, and d is the battery recycling rate.
6. The AC microgrid energy storage optimization configuration method for the substation according to claim 1 is characterized in that: Constraints are established according to the AC microgrid system model, including: Establish energy storage capacity constraints, charge and discharge power constraints, state of charge constraints, energy storage battery maximum discharge power constraints and energy storage battery remaining capacity constraints according to the energy storage system; Establish interactive power constraints of microgrids in grid-connected situations; The AC microgrid system model also includes a photovoltaic system, and photovoltaic output constraints are established according to the photovoltaic system; A power balance constraint of the AC microgrid system is established.
7. The AC microgrid energy storage optimization configuration method for the substation according to claim 6 is characterized in that: The energy storage capacity constraint is: The energy storage capacity constraint is: E min ≤E(t)≤E max Where: E max and E min They are the upper and lower limits of the energy storage battery capacity respectively; The charge and discharge power constraints are: Where: and They are the upper and lower limits of the charging and discharging power of the energy storage battery respectively; The state of charge constraint is: Where: and They are the upper and lower limits of the state of charge of the energy storage battery respectively; The maximum discharge power constraint of the energy storage battery is: d-max (t)≤P SB (t)≤P c-max (t) Where P c-max (t), and P d-max (t) are the maximum charging power and discharging power of the energy storage battery at time t; The remaining capacity constraint of the energy storage battery is: S min ≤S(t)≤S max In the formula, S max and S min They are the maximum remaining capacity and the minimum remaining capacity of the battery respectively; The remaining power of the energy storage battery at the beginning of each day is equal to the remaining power at the end of the day: S(0) = S(Nend) Where S(0) is the remaining power of the energy storage battery at the beginning of each day; S(Nend) is the remaining power of the energy storage battery at the end of each day; The interaction power constraint is: P GD(t) ≤P GD-MAX Where P GD (t) is the interaction power, P GD-MAX The maximum value allowed for the interaction power between the microgrid and the grid; The photovoltaic output constraint: 0≤P PV (t)≤P PV-MAX (t) Where P PV-MAX (t) is the maximum output power of the photovoltaic at time t; The power balance constraint of the AC microgrid system is: P PV (t)+P GD (t)-P SB (t)=P L-AC (t) Where P L-AC (t) is the AC side load in the microgrid, P SB (t) is the charging and discharging power of the energy storage system, P PV (t) is the photovoltaic output power.
8. The AC microgrid energy storage optimization configuration method for the substation according to claim 1 is characterized in that: The optimal configuration result of the energy storage system is obtained by solving the objective function and the constraint conditions, including: According to actual AC microgrid application parameters, the objective function and the constraint conditions are substituted to obtain a decision model to be solved including the objective function and the constraint conditions; According to the decision model to be solved, the Pareto solution of the optimal energy storage capacity, charging and discharging power and interaction power is calculated based on the multi-objective particle swarm algorithm; Based on the entropy weight method, the optimal configuration result is selected from the Pareto solution.
9. An AC microgrid energy storage optimization configuration system for substations, characterized in that: include: The initial module is used to set system parameters and establish an AC microgrid system model; A target setting module, used to establish an objective function with the minimum life cycle cost and minimum net load fluctuation of the energy storage system in the AC microgrid system as the target; A constraint setting module, used to establish constraint conditions according to the AC microgrid system model; The calculation module is used to obtain the optimal configuration result of the energy storage system according to the objective function and the constraint conditions.
10. An electronic device, characterized in that: include: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the AC microgrid energy storage optimization configuration method for the substation according to any one of claims 1-8.
Citation Information
Patent Citations
Robust optimization operation method for energy storage system of rail transit comprehensive energy station
CN118246677A