Micro energy network system and day-ahead scheduling strategy optimization method thereof
By constructing a variety of data sets and optimization models, combining the adjustable variables of flexible loads, the 'source-load' fluctuations in the microenergy network system are solved, and the problem of ignoring electric refrigerators and flexible thermal loads in the existing technology is improved. System stability and energy utilization efficiency reduce scheduling costs.
Patent Information
- Application Number
- CN202411417507.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-26
AI Technical Summary
When dealing with uncertainty in new energy generation, the existing micro-energy network system ignores the potential of electric refrigerators and flexible thermal loads, resulting in high scheduling costs and poor system scheduling effects, and the existing technology is complex and the solution speed is slow.
By constructing a diverse data set to predict wind speed, photovoltaic power and load, a scenario optimization model is constructed to determine the "source-load" scenario, and combined with adjustable variables of flexible electrical load, cooling load and thermal load, suppress the "source-load" in the system 'Fluctuation, optimize the scheduling strategy of the micro-energy network system.
Effectively utilize the potential of electric refrigerators and electric heating machines, mobilize flexible loads to reduce the fluctuations in new energy generation, improve system stability and energy utilization efficiency, reduce scheduling costs, and achieve independent operation and economic benefits of the system.
Smart Images

Figure CN119030028A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of clean energy technology, and in particular to a micro energy network system and a day-ahead dispatching strategy optimization method thereof. Background Art
[0002] The micro energy grid system is a regional network for the comprehensive utilization of intelligent energy. It is guided by the optimal utilization of energy and realizes intelligent regional energy production, use, storage, scheduling and control through organic links with the energy Internet. It has a high proportion of new energy access and operates relatively independently. It can achieve a basic balance between energy production and energy use through energy storage and optimized configuration, and realize the multi-energy complementarity of various distributed energy sources such as wind energy, solar energy, and natural gas. It can also interact flexibly with the public power grid as needed. The micro energy grid system supports a variety of new energy Internet networks, covering renewable resources such as solar energy and wind energy. Under the policy background of "carbon neutrality and carbon peak", a high proportion of new energy will be connected to the micro energy grid system. The randomness and intermittency of new energy have made the operation and scheduling of the micro energy grid system more difficult.
[0003] At present, with the large-scale access of distributed power generation, greater requirements are placed on the operation of combined heating, cooling and power systems. The following are three existing technologies related to micro energy grid systems.
[0004] Prior art 1: The article "Micro-energy grid operation optimization for shared energy storage" involves the construction of "source-load" uncertainty set (the "source-load" uncertainty set is used to characterize the uncertainty of photovoltaic power generation, wind power generation and user load power in the micro-energy grid). The difference between the sum of the output power of distributed power generation equipment in the micro-energy grid and the end-user load power is recorded as the "source-load" unbalanced power of the micro-energy grid. (Where: and are the output power of the wind power generation device and the photovoltaic power generation device in time period t respectively; It represents the power of the electric load in time period t after adopting the day-ahead electricity price model. )
[0005] For the existing technology 1, the “source-load” unbalanced power in the micro energy grid The cooling power of air conditioner is ignored. Thus, the potential of electric refrigerators in smoothing out the uncertainty of renewable energy generation is ignored. In addition, there is no electric heating device in the micro energy grid system of the prior art 1, so the potential of flexible heat load in smoothing out the uncertainty of renewable energy generation is not involved.
[0006] Prior art 2: The existing patent "A method for robust two-layer coordinated scheduling of multi-energy building systems" (application number: CN202110334150.6) uses a two-stage robust optimization model method to deal with uncertainty.
[0007] The second prior art adopts a two-stage robust optimization model method to deal with uncertainty. During the solution process, the original optimization problem is decomposed into a main problem and sub-problems for iterative solution. This operation is relatively complicated and the solution speed is slow, which is not practical enough. In addition, the second prior art also ignores the potential of electric refrigerators in smoothing the uncertainty of renewable energy power generation.
[0008] Prior art three: The article “Research on Optimal Operation of Micro-Energy Network Considering Uncertainty of New Energy” deals with how to deal with the uncertainty of new energy power generation.
[0009] When dealing with the uncertainty of renewable energy generation, the third existing technology does not utilize the flexibility of demand-side resources (cold, hot and electric loads), which results in an increase in the system's scheduling cost when dealing with the uncertainty of renewable energy generation.
[0010] In summary, the existing day-ahead dispatching strategies for micro-energy grid systems that consider the uncertainty of "source-load" are more about isolated reduction or increase of flexible electric loads and flexible cooling and heating loads to cope with the fluctuation of "source-load". Moreover, the existing day-ahead dispatching strategies do not deeply explore the coupling relationship between flexible electric loads, flexible cooling (heating) loads and "source-load" unbalanced voltage, so that the day-ahead dispatching strategies are not effective enough in dealing with the uncertainty of "source-load", and the dispatching cost of the system is also high. Summary of the invention
[0011] The purpose of the present invention is to provide a micro energy grid system and a method for optimizing its day-ahead dispatching strategy, while mobilizing flexible electric load, flexible cooling load and flexible thermal load to smooth the volatility of renewable energy power generation and reduce the dispatching cost of the system.
[0012] To achieve the above object, the solution of the present invention is:
[0013] A micro energy grid system, the micro energy grid system comprising an energy supply side, an energy conversion device, an energy storage device and a load side; the energy supply side comprises a power grid, a wind power generation device, a photovoltaic power generation device, a gas turbine and a gas boiler; the energy conversion device comprises an electric refrigerator, an electric heater, a waste heat recovery boiler, an absorption refrigerator and a heat exchanger; the energy storage device comprises a battery and a heat storage tank; the load side comprises an electric load, a cooling load and a heating load;
[0014] The power grid is connected to the electric energy bus for mutual transmission of electric energy between the power grid and the electric energy bus;
[0015] The wind power generation device is connected to the electric energy bus and is used to convert wind energy into electric energy and transmit it to the electric energy bus;
[0016] The photovoltaic power generation device is connected to the electric energy bus and is used to convert light energy into electric energy and transmit it to the electric energy bus;
[0017] The gas turbine is connected to the electric energy bus and the waste heat recovery boiler respectively. The gas turbine transmits the generated electric energy to the electric energy bus by burning natural gas, and transmits the generated high-temperature waste heat to the waste heat recovery boiler by burning natural gas.
[0018] The gas boiler is connected to the heat energy bus, and the gas boiler transmits the high-temperature heat energy generated by burning natural gas to the heat energy bus;
[0019] The first electric energy of the electric energy bus is transmitted to the electric load, the second electric energy is transmitted to the battery, the third electric energy is transmitted to the electric refrigerator, and the fourth electric energy is transmitted to the electric heater;
[0020] The storage battery is used to store and output electric energy. When the micro energy grid system has sufficient electric energy, the storage battery stores electric energy. When the micro energy grid system has insufficient electric energy, the storage battery outputs electric energy to the electric energy bus.
[0021] The electric refrigerator is used to convert electrical energy into cold energy and transmit it to the cold energy bus;
[0022] The electric heating machine is used to convert electrical energy into thermal energy and transmit it to the thermal energy bus;
[0023] The waste heat recovery boiler is connected to the thermal energy bus and is used to transport the high-temperature waste heat of the gas turbine to the thermal energy bus;
[0024] The heat storage tank is connected to the thermal energy bus. The heat storage tank is used to store and output thermal energy. When the micro energy grid system has sufficient thermal energy, the heat storage tank stores thermal energy. When the micro energy grid system has insufficient thermal energy, the heat storage tank outputs thermal energy to the thermal energy bus.
[0025] The heat energy bus is connected to the cold energy bus through an absorption refrigerator, and the absorption refrigerator is used to convert the heat energy of the heat energy bus into cold energy and transmit it to the cold energy bus, and the cold energy of the cold energy bus is transmitted to the cold load;
[0026] The heat energy of the heat energy bus is transported to the heat load through a heat exchanger;
[0027] A method for optimizing a day-ahead scheduling strategy for a micro energy grid system, the method comprising the following steps:
[0028] S1: construct a diverse data set, wherein the data includes wind speed, wind power, sunshine intensity, photovoltaic power and load, and construct a prediction value sequence according to the wind speed, wind power, sunshine intensity, photovoltaic power and load;
[0029] S2: Construct a micro-energy grid system optimization model for the “source-load” scenario;
[0030] S3: Solve the optimization model constructed in step S2 and output the result;
[0031] S4: Constructing an uncertain data set under the "source-load" uncertain scenario of fluctuating power value by defining the "source-load" unbalanced power and cooperating with the prediction value sequence constructed in step S1;
[0032] S5: By defining adjustable variables to coordinate with the uncertain data set in the "source-load" uncertain scenario of the fluctuating power value in step S4, the "source-load" fluctuation in the system is jointly smoothed;
[0033] S6: The output result of step S3 is used in conjunction with steps S4 and S5 to jointly construct a micro-energy grid system optimization model for the "source-load" uncertain scenario;
[0034] S7: Solve the optimization model constructed in step S6 and output the final result.
[0035] After adopting the above scheme, the beneficial effects of the present invention are:
[0036] 1. The micro energy grid system provided by the present invention fully utilizes the potential of electric refrigerators and electric heaters in smoothing the uncertainty of new energy power generation, and at the same time mobilizes flexible electric loads, flexible cooling loads and flexible heating loads to smooth the volatility of new energy power generation. Flexible loads can adjust their own load power according to the size of new energy power generation, thereby reducing the impact of its power generation volatility on the power grid, which helps to improve the stability of the micro energy grid system. By adjusting the flexible load, it is possible to achieve optimal allocation of power resources, improve energy utilization efficiency, and enhance the flexibility of the entire micro energy system scheduling. In addition, through the reasonable configuration of the energy conversion device and energy storage device of the micro energy grid system, the independent operation of the micro energy grid system can be achieved, which has good economic benefits.
[0037] 2. A method for optimizing the day-ahead dispatching strategy of a micro-energy grid system provided by the present invention constructs an optimization model for a micro-energy grid system for a "source-load" deterministic scenario through a predicted value sequence of historical power grid data and outputs the result, and constructs an uncertain data set for a "source-load" uncertain scenario with fluctuating power values by defining the "source-load" unbalanced power based on the predicted value sequence. This uncertain data set is used in conjunction with the defined adjustable variables to smooth the "source-load" fluctuations in the system, and finally obtains an optimization model for a micro-energy grid system for a "source-load" uncertain scenario and its results. This process is closely linked to achieve unified and coordinated dispatching of the energy supply side, energy conversion device, energy storage device and load side, and can better cope with the "source-load" uncertainty. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 is a system block diagram of the micro energy grid system of the present invention;
[0039] Figure 2 It is a method flow chart of the day-ahead scheduling strategy method of the micro energy grid system of the present invention.
[0040] Description of labels:
[0041] 100, energy supply side; 200, energy conversion device; 300, energy storage device; 400, load side. DETAILED DESCRIPTION
[0042] The present invention will now be further described with reference to the accompanying drawings and specific implementation methods.
[0043] This embodiment provides a micro energy network system, such as Figure 1 As shown, the micro energy grid system includes an energy supply side 100, an energy conversion device 200, an energy storage device 300 and a load side 400; the energy supply side 100 includes a power grid, a wind power generation device, a photovoltaic power generation device, a gas turbine and a gas boiler; the energy conversion device 200 includes an electric refrigerator, an electric heater, a waste heat recovery boiler, an absorption refrigerator and a heat exchanger; the energy storage device 300 includes a battery and a heat storage tank; the load side 400 includes an electric load, a cold load and a hot load;
[0044] The power grid is connected to the electric energy bus for mutual transmission of electric energy between the power grid and the electric energy bus;
[0045] The wind power generation device is connected to the electric energy bus to convert wind energy into electric energy and transmit it to the electric energy bus. This embodiment adopts a grid-connected wind power generation device, which is directly connected to the power grid through the electric energy bus. The generated electric energy can be supplied to the power grid in real time or complemented with other power generation devices to form a self-sufficient micro-energy grid system and improve energy utilization.
[0046] The photovoltaic power generation device is connected to the electric energy bus and is used to convert light energy into electric energy and transmit it to the electric energy bus. This embodiment adopts a grid-connected photovoltaic power generation device, including a photovoltaic array, a high-frequency boost circuit, an inverter, etc. After the solar radiation energy is converted by the photovoltaic array, it is converted into high-voltage direct current by the high-frequency boost circuit, and then outputs sinusoidal alternating current with the same frequency as the grid voltage to the grid through the inverter. This is known to those skilled in the art.
[0047] The gas turbine is connected to the power bus and the waste heat recovery boiler respectively. The gas turbine transmits the generated electricity to the power bus by burning natural gas, and transmits the generated high-temperature waste heat to the waste heat recovery boiler by burning natural gas. The gas turbine of this embodiment generates electricity by burning natural gas and directly transmits this part of electricity to the power bus, thus realizing efficient conversion and utilization of energy. While burning natural gas, the high-temperature waste heat generated by the gas turbine is transmitted to the waste heat recovery boiler, thus avoiding energy waste and further improving the energy utilization efficiency of the overall system.
[0048] The gas boiler is connected to the thermal energy bus, and the gas boiler transmits the generated high-temperature thermal energy to the thermal energy bus by burning natural gas. This embodiment uses natural gas as the fuel of the gas boiler. Natural gas, as a clean energy, has the characteristics of high calorific value and simple composition, which makes the gas boiler have higher combustion efficiency. Compared with traditional coal-fired and oil-fired boilers, the use of natural gas as fuel can improve the combustion efficiency by more than 10%, realize efficient energy utilization, and reduce the system operation cost. The connection between the gas boiler and the thermal energy bus makes the heating of the entire micro energy network system more stable and reliable.
[0049] The first electric energy of the electric energy bus is transmitted to the electric load, the second electric energy is transmitted to the battery, the third electric energy is transmitted to the electric refrigerator, and the fourth electric energy is transmitted to the electric heater;
[0050] The battery is used to store and output electric energy. When the micro-energy grid system has sufficient electric energy, the battery stores electric energy. When the micro-energy grid system has insufficient electric energy, the battery outputs electric energy to the electric energy bus. The battery in this embodiment plays the role of electric energy storage and regulation. When the micro-energy grid system has sufficient electric energy, the battery can effectively store excess electric energy to prevent energy waste. When the micro-energy grid system has insufficient electric energy, the battery can quickly release electric energy and output it to the electric energy bus to ensure a continuous supply of electric energy to meet user needs. By storing energy during off-peak hours and releasing electric energy during peak hours, the battery can optimize the use of electricity, improve energy utilization efficiency, help balance the power supply and demand of the micro-energy grid system, and reduce dependence on traditional energy. In other embodiments, the battery can also be set as other energy storage devices according to actual needs.
[0051] The electric refrigerator is used to convert electrical energy into cold energy and transmit it to the cold energy bus;
[0052] The electric heating machine is used to convert electrical energy into thermal energy and transmit it to the thermal energy bus;
[0053] The waste heat recovery boiler is connected to the thermal energy bus and is used to transport the high-temperature waste heat of the gas turbine to the thermal energy bus;
[0054] The heat storage tank is connected to the thermal energy bus. The heat storage tank is used to store and output thermal energy. When the micro energy network system has sufficient thermal energy, the heat storage tank stores thermal energy. When the micro energy network system has insufficient thermal energy, the heat storage tank outputs thermal energy to the thermal energy bus. The heat storage tank of this embodiment plays the role of thermal energy storage and regulation. When the micro energy network system has sufficient thermal energy, the heat storage tank can efficiently store excess thermal energy. This helps to balance energy supply and demand, avoid energy waste, and improve energy utilization efficiency. When the system has insufficient thermal energy, the heat storage tank can quickly release the stored thermal energy and output it to the thermal energy bus to meet the needs of users. This rapid response capability ensures a stable supply of thermal energy. The heat storage tank provides a thermal energy buffer pool for the micro energy network system, which can help the system transition smoothly and avoid sudden energy shortages or surpluses.
[0055] The heat energy bus is connected to the cold energy bus through an absorption refrigerator, and the absorption refrigerator is used to convert the heat energy of the heat energy bus into cold energy and transmit it to the cold energy bus, and the cold energy of the cold energy bus is transmitted to the cold load;
[0056] The heat energy of the thermal energy bus is transported to the thermal load through the heat exchanger; the heat exchanger of this embodiment can efficiently transfer the heat energy on the thermal energy bus to the thermal load, ensuring full utilization of the thermal energy and avoiding energy waste.
[0057] The micro energy grid system provided in this embodiment makes full use of the potential of electric refrigerators and electric heaters in smoothing the uncertainty of new energy power generation, and at the same time mobilizes flexible electric loads, flexible cooling loads and flexible heating loads to smooth the volatility of new energy power generation. The flexible load can adjust its own load power according to the size of new energy power generation, thereby reducing the impact of its power generation volatility on the power grid, which helps to improve the stability of the micro energy grid system. By adjusting the flexible load, it is possible to achieve optimal allocation of power resources, improve energy utilization efficiency, and enhance the flexibility of the entire micro energy system scheduling. In addition, through the reasonable configuration of the energy conversion device 200 and the energy storage device 300 of the micro energy grid system, the independent operation of the micro energy grid system is achieved, which has good economic benefits.
[0058] For the above-mentioned micro energy grid system, electric energy is provided by the power grid, wind power generation devices, photovoltaic power generation devices and gas turbines. When transmitting electricity to the electric energy bus, wind power generation devices and photovoltaic power generation devices are given priority to produce electric energy. Then, the power grid and gas turbine are selected to produce electric energy by comprehensively considering the load demand and energy cost of the entire system. When the electric energy is sufficient, the electric energy is stored in the battery. When the electric energy is insufficient, the electric energy is output to the electric energy bus through the battery, thereby improving the flexibility of the entire system scheduling.
[0059] For the above-mentioned micro energy grid system, thermal energy is provided by gas turbines, waste heat recovery boilers, heat storage tanks, gas boilers and electric heating machines. When transmitting thermal energy to the thermal energy bus, electric heating machines are given priority to produce thermal energy. The electric heating machines are powered by the electric energy bus. Then, considering the load demand and energy cost of the entire system, gas turbines, waste heat recovery boilers and gas boilers are selected to produce thermal energy. When the thermal energy is sufficient, the thermal energy is stored in the heat storage tank. When the thermal energy is insufficient, the thermal energy is output to the thermal energy bus through the heat storage tank.
[0060] For the above-mentioned micro energy grid system, cold energy is provided by electric refrigerators and absorption refrigerators. When cold energy is transported to the cold energy bus, electric refrigerators are given priority to produce cold energy. Then, absorption refrigerators are selected to produce cold energy by comprehensively considering the load demand and energy cost of the entire system. The absorption refrigerator is provided with heat energy by the heat energy bus.
[0061] For the above-mentioned micro energy grid system, the output end of the electric energy bus is connected to the electric load, the output end of the thermal energy bus is connected to the thermal load through the switch, and the output end of the cold energy bus is connected to the cold load.
[0062] This embodiment also provides a method for optimizing the day-ahead scheduling strategy of a micro energy grid system. Figure 2 As shown, the following steps are included:
[0063] Step S1, constructing a diverse data set, and constructing a prediction value sequence from the diverse data set;
[0064] The data include wind speed, wind power, sunshine intensity, photovoltaic power and load, and a prediction value sequence is constructed based on the wind speed, wind power, sunshine intensity, photovoltaic power and load;
[0065] The predicted value sequence is:
[0066] Photovoltaic power output power prediction value sequence:
[0067] Wind power output prediction value sequence:
[0068] Electric load power forecast value sequence:
[0069] Heat load power forecast value sequence:
[0070] Cooling load power forecast value sequence:
[0071] Step S2, constructing a micro-energy grid system optimization model for the “source-load” determination scenario, including the objective function:
[0072]
[0073] In the formula, It represents the total daily operating cost of the micro energy grid system in the “source-load” determination scenario; They represent respectively the cost of purchasing natural gas, the cost of purchasing electricity from the distribution network, and the operation and maintenance cost of the equipment of the micro energy grid system in the “source-load” determination scenario;
[0074] The objective function The expression is as follows:
[0075]
[0076] Where, T represents the total number of time periods for the micro energy grid to be dispatched in the day-ahead manner; π gas is the price of natural gas; and Respectively represent the amount of natural gas consumed by gas boilers and gas turbines in the “source-load” determination scenario; σ LHV Indicates the lower heating value of natural gas;
[0077] π grid,t It represents the electricity price that the micro energy grid purchases from the upper power grid during time period t; Indicates the power purchased by the micro energy grid system in the "source-load" determination scenario;
[0078] κ GT , κ WT , κ PV , κ AC , κ EC , κ GB , κ EB , κ ES , κ TS Respectively represent the operation and maintenance cost coefficients of gas turbines, wind power generation devices, photovoltaic power generation devices, absorption refrigerators, electric refrigerators, gas boilers, electric heating machines, batteries, and heat storage tanks; and They represent the output power of gas turbine, wind power generation device and photovoltaic power generation device respectively in the “source-load” determination scenario; and They represent the cooling power output of the absorption chiller and the electric chiller respectively in the “source-load” determination scenario; Indicates the output thermal power of the gas boiler; They respectively represent the electric power consumed by the electric heating machine of the micro energy grid system in the “source-load” determination scenario; and They are respectively represented as the charging power and discharging power of the battery in time period t under the “source-load” determination scenario; and They are respectively represented as the heat storage power and heat release power of the heat storage tank in time period t;
[0079] In addition, step S2 also includes constraints, which include power balance constraints, equipment operation constraints, and transmission power constraints;
[0080] The power balance constraint includes an electric power balance constraint, a thermal power balance constraint and a cold power balance constraint. The electric power balance constraint is as follows:
[0081]
[0082] Where: They represent the predicted values of wind power generation device, photovoltaic power generation device and electric load power in the “source-load” determination scenario respectively; They represent the output power of the gas turbine, the purchased power of the micro-energy grid system, the power consumed by the electric refrigerator, and the power consumed by the electric heater in the “source-load” determination scenario; and They represent the charging power and discharging power of the battery in time period t in the “source-load” determination scenario respectively;
[0083] The thermal power balance constraint is as follows:
[0084]
[0085] In the formula, and They represent the thermal power output of the waste heat recovery boiler and the gas boiler in the “source-load” determination scenario; and They represent the heat storage power and heat release power of the heat storage tank in the “source-load” determination scenario respectively; It represents the input power of the absorption refrigeration unit in the "source-load" determination scenario; Represents the predicted value of heat load power; η HE Indicates the efficiency of the heat exchanger;
[0086] The cooling power balance constraint is as follows:
[0087]
[0088] In the formula, represents the cooling load power forecast value sequence; and They represent the output cooling power of the electric refrigeration unit and the absorption refrigeration unit in the “source-load” determination scenario respectively;
[0089] The equipment operation constraints are as follows:
[0090]
[0091]
[0092] Where: Respectively represent the maximum output power of the gas turbine, waste heat recovery boiler, gas boiler, absorption refrigeration unit, electric refrigerator, electric heating machine, and heat exchanger;
[0093]
[0094] Where: and They represent the storage capacity of the energy storage device in time period t and time period t-1 respectively under the “source-load” determination scenario; η ES , η ES,C and η ES,D They represent the self-discharge rate, charging efficiency and discharge efficiency of the battery respectively; and They respectively represent the charging power and discharging power of the battery in the “source-load” determination scenario; and All are 0-1 variables; and Respectively represent the maximum value of battery charging power and the maximum value of battery discharging power; and Respectively represent the maximum and minimum values of the battery storage energy;
[0095]
[0096] Where: and They represent the heat storage amount of the heat storage device in time period t and time period t-1 respectively under the “source-load” determination scenario; η TS , η TS,C and η TS,D They represent the self-heat release rate, heat storage efficiency and heat release efficiency of the heat storage tank respectively; and They represent the heat storage power and heat release power of the heat storage tank in time period t under the “source-load” determination scenario respectively; and All are 0-1 variables; and They represent the maximum value of the heat storage power and the maximum value of the heat release power of the heat storage tank respectively; and Respectively represent the maximum and minimum heat storage capacity of the heat storage tank;
[0097] The transmission power constraint is as follows:
[0098]
[0099] Where: and They represent the maximum value of the power purchased by the micro energy grid from the power grid and the maximum value of the natural gas purchased from the natural gas company during time period t.
[0100] Step S3, solve the micro-energy grid system optimization model for the "source-load" determination scenario and output its results; in this embodiment, since the "source-load" determination scenario micro-energy grid system optimization model constructed in step S2 belongs to a mixed integer linear programming problem, a commercial solver can be used for fast solution. This embodiment uses the Gurobi solver, and other solvers can also be used in other embodiments.
[0101] Step S4, by defining the "source-load" unbalanced power and coordinating the predicted value sequences of various data sets to jointly construct an uncertain data set in the "source-load" uncertain scenario of fluctuating power values; in the "source-load" uncertain scenario, the "source-load" unbalanced power of the micro energy grid system is defined as:
[0102] P t unbal =P t WT +P t PV -P t EL -P t EC -P t EB ;
[0103] Where: P t WT , P t PV , P t EL They represent the output power of wind power generation device, photovoltaic power generation device and electric load power in the “source-load” uncertain scenario, respectively. t EC and P t EBThey represent the power consumption of electric refrigerators and electric heaters in the “source-load” uncertain scenario;
[0104] In the "source-load" uncertainty scenario, the maximum and minimum values of the "source-load" unbalanced power of the micro energy grid system can be expressed as:
[0105]
[0106] Where: They represent the minimum output power of the wind power generation equipment, the minimum output power of the photovoltaic power generation equipment, and the minimum power of the electric load in the time period t respectively; They represent the maximum output power of the wind turbine, the maximum output power of the photovoltaic power, and the maximum power of the electric load in time period t respectively;
[0107] In the "source-load" uncertainty scenario, the "source-load" unbalanced power P of the micro energy grid system t unbal The predicted value of unbalanced power And the fluctuating power value ΔP t unbal The composition is as follows:
[0108]
[0109] Where: and Respectively represent the wind power generation output power prediction value sequence, photovoltaic power generation output power prediction value sequence and electric load power prediction value sequence in time period t in step S1;
[0110] The "source-load" uncertainty data set expressing the constructed fluctuating power value in interval form is:
[0111]
[0112] Step S5, by defining adjustable variables to cooperate with the uncertain data set in the "source-load" uncertain scenario of the fluctuating power value to jointly smooth the "source-load" fluctuation in the system; in the "source-load" uncertain scenario, the adjustable variables of the micro energy grid system and the fluctuating power value ΔP t unbal The following corresponding relationship exists:
[0113] ΔP t grid =β t grid ×ΔP t unbal ;
[0114] ΔP t GT =-βt GT ×ΔP t unbal ;
[0115] ΔP t EC =-β t EC ×ΔP t unbal ;
[0116] ΔP t EB =-β t GT×ΔP t unbal ;
[0117] Where: ΔP t grid , ΔP t GT , ΔP t EC , ΔP t EB They represent the power regulation of the grid tie line, gas turbine, electric refrigerator, and electric heater in time period t under the “source-load” uncertainty scenario; β t grid , β t GT , β t EC , β t EB They represent the power regulation coefficients of the grid tie line, gas turbine, electric refrigerator, and electric heater in time period t under the “source-load” uncertainty scenario;
[0118] By linearly allocating the adjustment coefficients to cope with the “source-load” fluctuations in the micro-energy grid system, the adjustable variables have the following constraints:
[0119]
[0120] Step S6, the optimization model of the micro-energy grid system for the "source-load" uncertain scenario is constructed by combining the results of the optimization model of the micro-energy grid system for the "source-load" determined scenario with the uncertain data set of the adjustable variables and the fluctuating power values under the "source-load" uncertain scenario; including the objective function:
[0121] minC=C gas +C grid +C OM ;
[0122] Where C represents the total daily operating cost of the micro energy grid system under the “source-load” uncertainty scenario; C gas , Cgrid , C OM They represent respectively the natural gas purchasing cost, electricity purchasing cost from the distribution network, and equipment operation and maintenance cost of the micro energy grid system under the “source-load” uncertainty scenario;
[0123] C in the objective function gas , C grid , C OM The expression is as follows:
[0124]
[0125] Where, T represents the total number of time periods for the micro energy grid to be dispatched in the day-ahead manner; π gas represents the natural gas price; F t GB With F t GT represents the amount of natural gas consumed by gas boilers and gas turbines in the “source-load” uncertainty scenario; σ LHV is the lower calorific value of natural gas;
[0126] π grid,t P represents the price of electricity purchased by the micro energy grid from the upper power grid during time period t; t grid It represents the power purchase of the micro energy grid system in the “source-load” uncertain scenario;
[0127] κ GT , κ WT , κ PV , κ AC , κ EC , κ GB , κ EB , κ ES , κ TS Respectively represent the operation and maintenance cost coefficients of gas turbine, wind power generation device, photovoltaic power generation device, absorption refrigerator, electric refrigerator, gas boiler, electric heating machine, battery, and heat storage tank; P t GT , P t WT With P t PV They represent the output power of the gas turbine, wind power generation device and photovoltaic power generation device in time period t under the “source-load” uncertainty scenario respectively; and They represent the output cooling power of absorption refrigerator and electric refrigerator respectively under the “source-load” uncertainty scenario; represents the thermal power output of the gas boiler in time period t under the “source-load” uncertainty scenario; represents the electric power consumed by the electric heating machine of the micro energy grid system in the “source-load” uncertain scenario; Pt ES,C With P t ES,D They represent the charging power and discharging power of the battery in time period t under the “source-load” uncertainty scenario respectively; and They represent the heat storage power and heat release power of the heat storage tank in time period t under the “source-load” uncertainty scenario;
[0128] In addition, step S6 also includes constraints, which include power balance constraints, device operation constraints, transmission power constraints, and device output power adjustment amount and device output power constraints;
[0129] The power balance constraint includes an electric power balance constraint, a thermal power balance constraint and a cold power balance constraint. The electric power balance constraint is as follows:
[0130] P t GT +P t WT +P t PV +P t grid +P t ES,D =P t EC +P t ES,C +P t EL +P t EB;
[0131] Where: P t WT , P t PV , P t EL They represent the output power of wind power generation device, photovoltaic power generation device and electric load power respectively under the “source-load” uncertainty scenario; P t GT , P t grid , P t EC , P t EB They represent the output power of the gas turbine, the purchased power of the micro-energy grid system, the power consumed by the electric refrigerator, and the power consumed by the electric heater under the “source-load” uncertainty scenario; P t ES,C and P t ES,DThey represent the charging power and discharging power of the battery in the “source-load” uncertain scenario respectively;
[0132] The thermal power balance constraint is as follows:
[0133]
[0134] Where: and They represent the thermal power output of the waste heat recovery boiler and the gas boiler in the “source-load” uncertain scenario; and They represent the heat storage power and heat release power of the heat storage tank in the “source-load” determination scenario respectively; represents the input power of the absorption refrigeration unit in time period t under the “source-load” uncertainty scenario; represents the heat load power prediction value sequence; η HE Indicates the efficiency of the heat exchanger;
[0135] The cooling power balance constraint is as follows:
[0136]
[0137] In the formula, and They represent the cooling power output of the electric refrigeration unit and the absorption refrigeration unit in time period t under the “source-load” uncertainty scenario; represents the cooling load power forecast value sequence;
[0138] The equipment operation constraints are as follows:
[0139]
[0140] Where: Respectively represent the maximum output power of the gas turbine, waste heat recovery boiler, gas boiler, absorption refrigeration unit, electric refrigerator, electric heating machine, and heat exchanger;
[0141] The operating constraints of the battery are as follows:
[0142]
[0143] Where: and They represent the storage capacity of the energy storage device in time period t and time period t-1 under the “source-load” uncertainty scenario respectively; η ES , η ES,C and η ES,D Respectively represent the self-discharge rate, charging efficiency and discharge efficiency of the battery; P t ES,C and Pt ES,D They are the charging power and discharging power of the battery in the “source-load” uncertain scenario; and They are all 0-1 variables to ensure that the charging and discharging processes cannot occur simultaneously in the "source-load" uncertainty scenario; and Respectively represent the maximum value of battery charging power and the maximum value of battery discharging power; and Respectively represent the maximum and minimum values of the battery storage energy;
[0144] The operating constraints of the heat storage tank are as follows:
[0145]
[0146]
[0147] Where: and They represent the heat storage of the heat storage device in time period t and time period t-1 under the “source-load” uncertainty scenario respectively; η TS , η TS,C and η TS,D They represent the self-heat release rate, heat storage efficiency and heat release efficiency of the heat storage tank respectively; and They represent the heat storage power and heat release power of the heat storage tank in time period t under the “source-load” uncertainty scenario; and They are all 0-1 variables to ensure that heat storage and heat release cannot occur simultaneously in the “source-load” uncertainty scenario; and They represent the maximum value of the heat storage power and the maximum value of the heat release power of the heat storage tank respectively; and Respectively represent the maximum and minimum heat storage capacity of the heat storage tank;
[0148] The transmission power constraint is as follows:
[0149]
[0150] In the formula, and They represent the maximum value of the power purchased by the micro energy grid from the power grid and the maximum value of the natural gas purchased from the natural gas company in time period t respectively;
[0151] The device output power adjustment amount and the constraint of the device output power are as follows:
[0152]
[0153] Where: They represent the gas turbine output power, grid tie line power, electric refrigerator power consumption and electric heater power consumption in the “source-load” determination scenario respectively; ΔP t GT , ΔP t grid , ΔP t EC , ΔP t EB They are respectively represented as the power adjustment amounts of gas turbine, interconnecting line, electric refrigeration machine and electric heating in the "source-load" uncertain scenario.
[0154] It is worth noting that step S6 also includes equivalent robustness processing, and the objective function and constraint conditions in step S6 constitute a mixed integer nonlinear optimization problem containing random variables. The equivalent robustness processing in step S6 converts the mixed integer nonlinear optimization problem containing random variables into a mixed integer linear programming problem.
[0155] Since the optimization problem constituted by the objective function and constraints of step S6 is a mixed integer nonlinear optimization problem containing random variables, the computer cannot directly solve the optimization problem. Therefore, this embodiment converts the original mixed integer nonlinear optimization problem containing random variables into a mixed integer linear programming problem, which is convenient for practical commercial solvers to solve.
[0156] The process of equivalent conversion is now introduced according to the optimization model of this embodiment:
[0157] In step S5, the constraint of the adjustable power variable includes the random variable ΔP t unbal , as follows:
[0158]
[0159] For the above four equality constraints containing random variables, we can introduce the robustness index Γ, (Γ∈(0,1), Γ=0 means the uncertainty is 0, Γ=1 means the uncertainty is the strongest), and combine it with the uncertainty of “source-load” scenario. The maximum value of the unbalanced power and minimum value Substituting ΔP in the original expression t unbal .
[0160] Specifically, for It can be converted robustly to:
[0161]
[0162] Where: and are the dual variables about the tie line power introduced in the robust equivalent transformation process, and No actual physical meaning.
[0163] If targeted It can be converted robustly to:
[0164]
[0165] Where: and are the dual variables about gas turbine output power introduced in the robust equivalent transformation process, and No actual physical meaning.
[0166] If targeted It can be converted robustly to:
[0167]
[0168] Where: and are the dual variables about the output power of the electric refrigerator introduced in the robust equivalent transformation process, and No actual physical meaning.
[0169] If targeted It can be converted robustly to:
[0170]
[0171] Where: and are the dual variables about the output power of the electric heating machine introduced in the robust equivalent transformation process, and No actual physical meaning.
[0172] Step S7, solve the "source-load" uncertain scenario micro-energy grid system optimization model and output the final result; after the equivalent robustness conversion of step S6, the optimization problem composed of the objective function and constraints of step S6 is converted into a mixed integer linear programming problem, which can be quickly solved using commercial solvers such as Gurobi. This is known to those skilled in the art and will not be explained in detail.
[0173] The present embodiment provides a method for optimizing the day-ahead dispatching strategy of a micro-energy grid system. The method constructs an optimization model for a micro-energy grid system facing a "source-load" deterministic scenario through a predicted value sequence of historical power grid data and outputs the result. The method also defines the "source-load" unbalanced power based on the predicted value sequence to jointly construct an uncertain data set under a "source-load" uncertain scenario with fluctuating power values. The uncertain data set is used in conjunction with the defined adjustable variables to smooth the "source-load" fluctuations in the system. Finally, an optimization model for a micro-energy grid system facing a "source-load" uncertain scenario and its result are obtained. This process is closely linked to achieve unified and coordinated dispatching of the energy supply side 100, the energy conversion device 200, the energy storage device 300 and the load side 400, and can better cope with the "source-load" uncertainty.
[0174] The above description is only a preferred embodiment of the present invention and is not a limitation on the design of this case. Any equivalent changes made based on the design key of this case shall fall within the protection scope of this case.
Claims
1. A method for optimizing the day-ahead dispatching strategy of a micro energy grid system, used to control the operation of the micro energy grid system. Features: The micro energy grid system includes an energy supply side, an energy conversion device, an energy storage device and a load side; The energy supply side includes a power grid, a wind power generation device, a photovoltaic power generation device, a gas turbine and a gas boiler; the energy conversion device includes an electric refrigerator, an electric heater, a waste heat recovery boiler, an absorption refrigerator and a heat exchanger; the energy storage device includes a battery and a heat storage tank; the load side includes an electric load, a cooling load and a heating load; The power grid is connected to the electric energy bus for mutual transmission of electric energy between the power grid and the electric energy bus; The wind power generation device is connected to the electric energy bus and is used to convert wind energy into electric energy and transmit it to the electric energy bus; The photovoltaic power generation device is connected to the electric energy bus and is used to convert light energy into electric energy and transmit it to the electric energy bus; The gas turbine is connected to the electric energy bus and the waste heat recovery boiler respectively. The gas turbine transmits the generated electric energy to the electric energy bus by burning natural gas, and transmits the generated high-temperature waste heat to the waste heat recovery boiler by burning natural gas. The gas boiler is connected to the heat energy bus, and the gas boiler transmits the high-temperature heat energy generated by burning natural gas to the heat energy bus; The first electric energy of the electric energy bus is transmitted to the electric load, the second electric energy is transmitted to the battery, the third electric energy is transmitted to the electric refrigerator, and the fourth electric energy is transmitted to the electric heater; The storage battery is used to store and output electric energy. When the micro energy grid system has sufficient electric energy, the storage battery stores electric energy. When the micro energy grid system has insufficient electric energy, the storage battery outputs electric energy to the electric energy bus. The electric refrigerator is used to convert electrical energy into cold energy and transmit it to the cold energy bus; The electric heating machine is used to convert electrical energy into thermal energy and transmit it to the thermal energy bus; The waste heat recovery boiler is connected to the thermal energy bus and is used to transport the high-temperature waste heat of the gas turbine to the thermal energy bus; The heat storage tank is connected to the thermal energy bus. The heat storage tank is used to store and output thermal energy. When the micro energy grid system has sufficient thermal energy, the heat storage tank stores thermal energy. When the micro energy grid system has insufficient thermal energy, the heat storage tank outputs thermal energy to the thermal energy bus. The heat energy bus is connected to the cold energy bus through an absorption refrigerator, the absorption refrigerator is used to convert the heat energy of the heat energy bus into cold energy and transmit it to the cold energy bus, and the cold energy of the cold energy bus is transmitted to the cold load; The heat energy of the heat energy bus is transported to the heat load through a heat exchanger; The day-ahead scheduling strategy optimization method comprises the following steps: S1: construct a diverse data set, wherein the data includes wind speed, wind power, sunshine intensity, photovoltaic power and load, and construct a prediction value sequence according to the wind speed, wind power, sunshine intensity, photovoltaic power and load; S2: Construct a micro-energy grid system optimization model for the "source-load" scenario, including the objective function: In the formula, It represents the total daily operating cost of the micro energy grid system in the "source-load" determination scenario; They represent respectively the cost of purchasing natural gas, the cost of purchasing electricity from the distribution network, and the operation and maintenance cost of the equipment of the micro energy grid system in the "source-load" determination scenario; The objective function The expression is as follows: Where, T represents the total number of time periods for the micro energy grid to be dispatched in the day-ahead manner; π gas is the price of natural gas; and Respectively represent the amount of natural gas consumed by gas boilers and gas turbines in the "source-load" determination scenario; σ LHV Indicates the lower heating value of natural gas; π grid,t It represents the electricity price that the micro energy grid purchases from the upper power grid during time period t; Indicates the power purchased by the micro energy grid system in the "source-load" determination scenario; κ GT , κ WT , κ PV , κ AC , κ EC , κ GB , κ EB , κ ES , κ TS Respectively represent the operation and maintenance cost coefficients of gas turbines, wind power generation devices, photovoltaic power generation devices, absorption refrigerators, electric refrigerators, gas boilers, electric heating machines, batteries, and heat storage tanks; and They represent the output power of gas turbine, wind power generation device and photovoltaic power generation device respectively in the "source-load" determination scenario; and They represent the cooling power output of the absorption chiller and the electric chiller respectively in the "source-load" determination scenario; Indicates the output thermal power of the gas boiler; They respectively represent the electric power consumed by the electric heating machine of the micro energy grid system in the "source-load" determination scenario; and They are respectively represented as the charging power and discharging power of the battery in time period t under the "source-load" determination scenario; and They are respectively represented as the heat storage power and heat release power of the heat storage tank in time period t; S3: Solve the optimization model constructed in step S2 and output the result; S4: Constructing an uncertain data set under the "source-load" uncertain scenario of fluctuating power value by defining the "source-load" unbalanced power and cooperating with the prediction value sequence constructed in step S1; S5: By defining adjustable variables to coordinate with the uncertain data set in the "source-load" uncertain scenario of the fluctuating power value in step S4, the "source-load" fluctuation in the system is jointly smoothed; S6: The output result of step S3 is used in conjunction with steps S4 and S5 to jointly construct a micro-energy grid system optimization model for the "source-load" uncertain scenario, including the objective function: minC=C gas +C grid +C OM ; Where C represents the total daily operating cost of the micro energy grid system under the "source-load" uncertainty scenario; C gas , C grid , C OM They represent the cost of purchasing natural gas, the cost of purchasing electricity from the distribution network, and the cost of equipment operation and maintenance of the micro energy grid system under the "source-load" uncertainty scenario; C in the objective function gas , C grid , C OM The expression is as follows: Where, T represents the total number of time periods for the micro energy grid to be dispatched in the day-ahead manner; π gas represents the price of natural gas; and represents the amount of natural gas consumed by gas boilers and gas turbines in the "source-load" uncertainty scenario; σ LHV is the lower calorific value of natural gas; π grid,t It represents the electricity price that the micro energy grid purchases from the upper power grid during time period t; Indicates the power purchased by the micro energy grid system in the "source-load" uncertain scenario; κ GT , κ WT , κ PV , κ AC , κ EC , κ GB , κ EB , κ ES , κ TS Respectively represent the operation and maintenance cost coefficients of gas turbines, wind power generation devices, photovoltaic power generation devices, absorption refrigerators, electric refrigerators, gas boilers, electric heating machines, batteries, and heat storage tanks; and They represent the output power of the gas turbine, wind power generation device and photovoltaic power generation device in time period t under the "source-load" uncertainty scenario respectively; and They represent the output cooling power of absorption refrigerator and electric refrigerator respectively under the "source-load" uncertainty scenario; Indicates the thermal power output of the gas boiler in time period t under the "source-load" uncertainty scenario; Indicates the electric power consumed by the electric heating machine of the micro energy grid system in the "source-load" uncertain scenario; and They represent the charging power and discharging power of the battery in time period t under the "source-load" uncertainty scenario respectively; and They represent the heat storage power and heat release power of the heat storage tank in time period t under the "source-load" uncertainty scenario; S7: Solve the optimization model constructed in step S6 and output the final result.
2. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: The predicted value sequence of step S1 is: Photovoltaic power output power prediction value sequence: Wind power output prediction value sequence: Electric load power forecast value sequence: Heat load power forecast value sequence: Cooling load power forecast value sequence:
3. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: The step S2 also includes constraints, which include power balance constraints, equipment operation constraints and transmission power constraints; The power balance constraint includes an electric power balance constraint, a thermal power balance constraint and a cold power balance constraint. The electric power balance constraint is as follows: Where: They respectively represent the predicted values of wind power generation device, photovoltaic power generation device and electric load power in the "source-load" determination scenario; They represent the output power of the gas turbine, the purchased power of the micro energy grid system, the power consumed by the electric refrigerator, and the power consumed by the electric heater in the "source-load" determination scenario; and They respectively represent the charging power and discharging power of the battery in time period t in the "source-load" determination scenario; The thermal power balance constraint is as follows: In the formula, and Respectively represent the thermal power output of the waste heat recovery boiler and the gas boiler in the "source-load" determination scenario; and They represent the heat storage power and heat release power of the heat storage tank in the "source-load" determination scenario respectively; Indicates the input power of the absorption refrigeration unit in the "source-load" determination scenario; Represents the predicted value of heat load power; η HE Indicates the efficiency of the heat exchanger; The cooling power balance constraint is as follows: In the formula, represents the cooling load power forecast value sequence; and Respectively represent the output cooling power of the electric refrigeration unit and the absorption refrigeration unit in the "source-load" determination scenario; The equipment operation constraints are as follows: Where: Respectively represent the maximum output power of the gas turbine, waste heat recovery boiler, gas boiler, absorption refrigeration unit, electric refrigerator, electric heating machine, and heat exchanger; Where: and They respectively represent the storage capacity of the electric energy storage device in time period t and time period t-1 in the "source-load" determination scenario; η ES , η ES,C and η ES,D They represent the self-discharge rate, charging efficiency and discharge efficiency of the battery respectively; and Respectively represent the charging power and discharging power of the battery in the "source-load" determination scenario; and All are 0-1 variables; and Respectively represent the maximum value of battery charging power and the maximum value of battery discharging power; and Respectively represent the maximum and minimum values of the battery storage energy; Where: and They represent the heat storage amount of the heat storage device in time period t and time period t-1 respectively under the "source-load" determination scenario; η TS , η TS,C and η TS,D They represent the self-heat release rate, heat storage efficiency and heat release efficiency of the heat storage tank respectively; and They represent the heat storage power and heat release power of the heat storage tank in time period t under the "source-load" determination scenario respectively; and All are 0-1 variables; and They represent the maximum value of the heat storage power and the maximum value of the heat release power of the heat storage tank respectively; and Respectively represent the maximum and minimum heat storage capacity of the heat storage tank; The transmission power constraint is as follows: Where: and They respectively represent the maximum value of the power purchased by the micro energy grid from the power grid and the maximum value of the natural gas purchased from the natural gas company during time period t.
4. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: The optimization model of step S2 is a mixed integer linear programming problem, and step S3 solves the mixed integer linear programming problem of step S2 through a solver.
5. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: In step S4, in the "source-load" uncertain scenario, the "source-load" unbalanced power of the micro energy grid system is defined as: Where: They represent the output power of wind power generation device, photovoltaic power generation device and electric load power respectively under the "source-load" uncertainty scenario, and Respectively represent the power consumption of electric refrigerators and electric heaters in the "source-load" uncertain scenario; In the "source-load" uncertainty scenario, the maximum and minimum values of the "source-load" unbalanced power of the micro energy grid system can be expressed as: Where: They represent the minimum output power of the wind power generation equipment, the minimum output power of the photovoltaic power generation equipment, and the minimum power of the electric load in the time period t respectively; They represent the maximum output power of the wind turbine, the maximum output power of the photovoltaic power, and the maximum power of the electric load in time period t respectively; In the "source-load" uncertainty scenario, the "source-load" unbalanced power of the micro energy grid system The predicted value of unbalanced power and fluctuating power values The composition is as follows: Where: and Respectively represent the wind power generation output power prediction value sequence, photovoltaic power generation output power prediction value sequence and electric load power prediction value sequence in time period t in step S1; The "source-load" uncertainty data set expressing the constructed fluctuating power value in interval form is:
6. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: In step S5, in the "source-load" uncertain scenario, the adjustable variables and fluctuating power values of the micro energy grid system The following corresponding relationship exists: Where: They represent the power regulation of the grid tie line, gas turbine, electric refrigerator, and electric heater in time period t under the "source-load" uncertainty scenario; They represent the power regulation coefficients of the grid tie line, gas turbine, electric refrigerator, and electric heater in time period t under the "source-load" uncertainty scenario; By linearly allocating the adjustment coefficients to cope with the "source-load" fluctuations in the micro energy grid system, the adjustable variables have the following constraints:
7. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: The step S6 also includes constraints, which include power balance constraints, equipment operation constraints, transmission power constraints, and constraints on equipment output power adjustment and equipment output power; The power balance constraint includes an electric power balance constraint, a thermal power balance constraint and a cold power balance constraint. The electric power balance constraint is as follows: Where: They represent the output power of wind power generation device, photovoltaic power generation device and electric load power respectively under the "source-load" uncertainty scenario; They represent the output power of the gas turbine, the purchased power of the micro-energy grid system, the power consumed by the electric refrigerator, and the power consumed by the electric heater in the "source-load" uncertainty scenario; and They represent the charging power and discharging power of the battery in the "source-load" uncertain scenario respectively; The thermal power balance constraint is as follows: Where: and They represent the thermal power output of the waste heat recovery boiler and the gas boiler in the "source-load" uncertain scenario; and They represent the heat storage power and heat release power of the heat storage tank in the "source-load" determination scenario respectively; represents the input power of the absorption refrigeration unit in time period t under the "source-load" uncertainty scenario; represents the heat load power forecast value sequence; η HE Indicates the efficiency of the heat exchanger; The cooling power balance constraint is as follows: In the formula, and They represent the cooling power output of the electric refrigeration unit and the absorption refrigeration unit in time period t under the "source-load" uncertainty scenario; represents the cooling load power forecast value sequence; The equipment operation constraints are as follows: Where: Respectively represent the maximum output power of the gas turbine, waste heat recovery boiler, gas boiler, absorption refrigeration unit, electric refrigerator, electric heating machine, and heat exchanger; Where: and They represent the storage capacity of the energy storage device in time period t and time period t-1 respectively under the "source-load" uncertainty scenario; η ES , η ES,C and η ES,D They represent the self-discharge rate, charging efficiency and discharge efficiency of the battery respectively; and They are respectively the charging power and discharging power of the battery in the "source-load" uncertain scenario; and All are 0-1 variables; and Respectively represent the maximum value of battery charging power and the maximum value of battery discharging power; and Respectively represent the maximum and minimum values of the battery storage energy; Where: and They represent the heat storage amount of the heat storage device in time period t and time period t-1 under the "source-load" uncertainty scenario respectively; η TS , η TS,C and η TS,D They represent the self-heat release rate, heat storage efficiency and heat release efficiency of the heat storage tank respectively; and They represent the heat storage power and heat release power of the heat storage tank in the "source-load" uncertainty scenario within time period t respectively; and All are 0-1 variables; and They represent the maximum value of the heat storage power and the maximum value of the heat release power of the heat storage tank respectively; and Respectively represent the maximum and minimum heat storage capacity of the heat storage tank; The transmission power constraint is as follows: In the formula, and They represent the maximum value of the power purchased by the micro energy grid from the power grid and the maximum value of the natural gas purchased from the natural gas company in time period t respectively; The device output power adjustment amount and the constraint of the device output power are as follows: Where: They represent the gas turbine output power, grid tie line power, electric refrigerator power consumption and electric heater power consumption respectively in the "source-load" determination scenario; They are respectively represented as the power adjustment amounts of gas turbine, interconnecting line, electric refrigeration machine and electric heating in the "source-load" uncertain scenario.
8. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 7, Features: It also includes equivalent robustness processing, the objective function and constraint conditions in step S6 constitute a mixed integer nonlinear optimization problem containing random variables, and the equivalent robustness processing in step S6 converts the mixed integer nonlinear optimization problem containing random variables into a mixed integer linear programming problem.
9. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 8, Features: In step S5, the constraints of the adjustable power variable include random variables As follows: For the above four equality constraints containing random variables, the robustness index Γ is introduced to coordinate with the uncertainty scenario of "source-load" The maximum value of the unbalanced power and minimum value Replace the original expression 10. A method for optimizing the day-ahead scheduling strategy of a micro energy grid system as claimed in claim 1, Features: The step S7 solves the mixed integer linear programming problem of step S6 by a solver.