Hydroelectric generating set AGC and primary frequency modulation coordination control method

By adopting AGC and primary frequency regulation coordination control methods in hydropower units, the problems of failure to meet the standard of primary frequency regulation and reverse direction adjustment in commercial operations are solved, and the stability of the power grid frequency and the load stability of the hydropower plant are achieved, reducing the Assessment losses.

CN119030048APending Publication Date: 2024-11-26CHANGDIAN NEW ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410976688.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-21
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

During commercial operation, hydropower generator sets often experience problems such as failure to meet the standard of frequency regulation or reverse direction adjustment, resulting in unstable grid frequency and increasing the burden on the power grid and the assessment losses of power generation companies.

Method used

A method of coordination control between AGC and primary frequency modulation is adopted. The output of a frequency modulation action is superimposed on a given target in the speed controller power mode by monitoring system, and the control logic is added in the opening mode, and the active power within the first 10 seconds is used. The average value is used as the adjustment target to eliminate interference from the AGC regulation process and ensure that the frequency modulation performance is consistent with the test results of the Academy of Electrical Sciences.

Benefits of technology

It effectively improves the power quality of the power grid, ensures the safety of power supply, reduces the load stability problems and assessment losses of hydropower plants, avoids the reciprocating pull of AGC and the primary frequency modulation function, and ensures the stability of the grid frequency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119030048A_ABST
    Figure CN119030048A_ABST
Patent Text Reader

Abstract

A hydroelectric generating set AGC and primary frequency modulation coordination control method comprises the steps that when a speed regulator is in a power mode, a power closed loop is in a speed regulator system, a monitoring system issues a power target value to the speed regulator, and the speed regulator gives an adjusting load according to the power issued by monitoring; when the primary frequency modulation action is performed, the speed regulator automatically superposes the primary frequency modulation action output to a given target; the primary frequency modulation action output generated by frequency deviation belongs to one part of active given; the performance index of the primary frequency modulation action depends on the active given stability of the monitoring system. When a speed regulator is in an opening mode, a speed regulator system is in a power mode after power generation and grid connection by default, when a power measurement module breaks down, the speed regulator system is switched to the opening mode, in the opening mode, unit active closed loop is in a monitoring system, a monitoring system in-situ control unit receives active given power issued by AGC, and the in-situ control unit controls the stability of unit active power.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydroelectric power generation, and in particular to a method for coordinated control of an AGC and primary frequency regulation of a hydroelectric generator set. Background Art

[0002] With the rapid rise of wind and solar energy, the primary frequency regulation function of both pumped-storage power plants and conventional hydropower plants is an important stabilizer of the grid frequency. The performance indicators of primary frequency regulation are related to the stability of the grid and the profits of power generation companies.

[0003] At the beginning of the operation of the hydropower unit, the Electric Power Research Institute has completed a frequency regulation performance test. Only the model parameters that meet the standards can be officially put into commercial operation. However, the units put into commercial operation often fail to meet the frequency regulation standards, or even adjust in the opposite direction.

[0004] The main reason for substandard performance or reverse regulation is that the AGC is in the process of load regulation according to the plan or under the control of the AGC flow command of the network. The conventional practice is to set a frequency limit for the AGC, issue an increase in active power command when the blocking frequency is high, and issue a reduction in active power command when the blocking frequency is low. However, more and more unstable wind and solar renewable energy sources are being put into the power grid, and the success rate of the frequency blocking AGC command is getting lower and lower. When the frequency is near the critical value, once the AGC command is issued, it cannot be coordinated and controlled with the primary frequency regulation in the process. The AGC command will cause the primary frequency regulation performance indicators to fail to meet the standards, or reverse regulation will occur. Reverse regulation increases the burden on the stability of the power grid frequency.

[0005] It is necessary to study a method to ensure that the primary frequency regulation performance of hydropower units put into commercial operation can still maintain the performance indicators tested by the Electric Power Research Institute in the early stage of operation. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a method for coordinated control of AGC and primary frequency regulation of a hydroelectric generator set, which solves the contradiction between load regulation of the primary frequency regulation function of a hydroelectric generator plant and load regulation of the AGC system.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for coordinated control of AGC and primary frequency regulation of a hydroelectric generator set, When the speed regulator is in power mode, the power closed loop is in the speed regulator system, and the monitoring system sends the power target value to the speed regulator. The speed regulator adjusts the load according to the power given by the monitoring system. When the primary frequency regulation is in action, the speed regulator automatically adds the primary frequency regulation output to the given target. The primary frequency regulation output caused by the frequency deviation belongs to the active power given part. The performance index of the primary frequency regulation depends on the stability of the active power given by the monitoring system. When the unit is in a stable period, the performance index of the primary frequency regulation should be the same as the test result of the Electric Power Research Institute. When the unit is in a load increase or decrease period, the primary frequency regulation performance may be affected.

[0008] When the speed governor is in the opening mode, the speed governor system defaults to the power mode after the power generation is connected to the grid. When the power measurement module fails, it switches to the opening mode. In the opening mode, the active closed loop of the unit is in the monitoring system. The local control unit of the monitoring system receives the active reference issued by the AGC, and the local control unit controls the stability of the active power of the unit. The output of the primary frequency regulation action of the speed governor is a disturbance signal in the active regulation closed loop of the monitoring system. The monitoring system will increase the reference to offset the disturbance. Therefore, even if the unit is in a stable period in the opening mode, the primary frequency regulation performance cannot meet the expected indicators.

[0009] Preferably, in order to prevent the governor from reverse regulation in power mode, control logic is added to the monitoring system. When the AGC controls the load of the unit to rise or fall, the system frequency exceeds 50±0.05Hz for more than 5 seconds, and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the primary frequency regulation action is sent to the governor as the power setting and maintained for 55 seconds. This is used to eliminate interference in the AGC regulation process and hand over all the primary frequency regulation functions of the governor to serve the power grid.

[0010] Preferably, in case the monitoring system uses the primary frequency modulation output as a disturbance signal, the primary frequency modulation output is transmitted to the monitoring system in real time, and the monitoring system superimposes the primary frequency modulation output on the power setting, thus achieving the same effect as the speed regulator power mode, which is equivalent to adding a primary frequency modulation function to the monitoring system.

[0011] Preferably, when the unit adjusts the load under AGC control, the same control strategy as the power mode is used. When the system frequency exceeds 50±0.05Hz for more than 5 seconds and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the moment is used as the AGC given target and maintained for 55 seconds. This given target is superimposed with the primary frequency regulation output transmitted in real time by the speed regulator as the power given to control the unit's active power.

[0012] The present invention provides a method for coordinated control of AGC and primary frequency regulation of a hydroelectric generator set, which has the following beneficial effects: 1. This method gives priority to the load regulation of primary frequency regulation, which plays a very important role in the frequency stability of the receiving power grid (a power grid that mainly consumes electricity). It can effectively improve the power quality of the power grid and ensure the safety of power supply.

[0013] 2. This method automatically blocks the reverse regulation caused by the AGC load curve or power setting during the primary frequency regulation action, and the total blocking time is 60 seconds. The regulation effect of the primary frequency regulation is released to avoid the reciprocating pull of the AGC and primary frequency regulation functions on the load of the hydropower generator set. It can improve the load stability of the hydropower plant.

[0014] 3. Failure of the primary frequency regulation to meet the standards often results in the hydropower plant being assessed hundreds of thousands of yuan per minute by the power grid. This method can completely avoid the interference of AGC on the primary frequency regulation and reduce unnecessary assessment losses for hydropower companies.

[0015] 4. The highlight of this method is to use the average active power of the unit 10 seconds before the instant of a frequency regulation action as the adjustment target of the generator speed regulator, which is consistent with the calculation method of the power grid assessment rules. It does not simply use the current active power as the adjustment target of the speed regulator, avoiding the power measurement deviation caused by the adjustment process of the hydropower generator unit.

[0016] 5. This method not only provides a coordinated control strategy of primary frequency modulation and AGC in the speed regulator power mode, but also performs superposition processing on the adjustment amount of primary frequency modulation in the speed regulator opening mode to avoid instability caused by mode switching due to speed regulator measurement failure. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a frequency modulation control logic diagram of the speed regulator in power mode of the present invention; Figure 2 This is a frequency modulation control logic diagram under the speed regulator opening mode of the present invention. DETAILED DESCRIPTION

[0018] A method for coordinated control of AGC and primary frequency regulation of a hydroelectric generator set. When the speed regulator is in power mode, the power closed loop is in the speed regulator system, and the monitoring system sends the power target value to the speed regulator. The speed regulator adjusts the load according to the power given by the monitoring system. When the primary frequency regulation is in action, the speed regulator automatically adds the primary frequency regulation output to the given target. The primary frequency regulation output caused by the frequency deviation belongs to the active power given part. The performance index of the primary frequency regulation depends on the stability of the active power given by the monitoring system. When the unit is in a stable period, the performance index of the primary frequency regulation should be the same as the test result of the Electric Power Research Institute. When the unit is in a load increase or decrease period, the primary frequency regulation performance may be affected.

[0019] When the speed governor is in the opening mode, the speed governor system defaults to the power mode after the power generation is connected to the grid. When the power measurement module fails, it switches to the opening mode. In the opening mode, the active closed loop of the unit is in the monitoring system. The local control unit of the monitoring system receives the active reference issued by the AGC, and the local control unit controls the stability of the active power of the unit. The output of the primary frequency regulation action of the speed governor is a disturbance signal in the active regulation closed loop of the monitoring system. The monitoring system will increase the reference to offset the disturbance. Therefore, even if the unit is in a stable period in the opening mode, the primary frequency regulation performance cannot meet the expected indicators.

[0020] Preferably, in order to prevent the governor from reverse regulation in power mode, control logic is added to the monitoring system. When the AGC controls the load of the unit to rise or fall, the system frequency exceeds 50±0.05Hz for more than 5 seconds, and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the primary frequency regulation action is sent to the governor as the power setting and maintained for 55 seconds. This is used to eliminate interference in the AGC regulation process and hand over all the primary frequency regulation functions of the governor to serve the power grid.

[0021] Preferably, in case the monitoring system uses the primary frequency modulation output as a disturbance signal, the primary frequency modulation output is transmitted to the monitoring system in real time, and the monitoring system superimposes the primary frequency modulation output on the power setting, thus achieving the same effect as the speed regulator power mode, which is equivalent to adding a primary frequency modulation function to the monitoring system.

[0022] Preferably, when the unit adjusts the load under AGC control, the same control strategy as the power mode is used. When the system frequency exceeds 50±0.05Hz for more than 5 seconds and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the moment is used as the AGC given target and maintained for 55 seconds. This given target is superimposed with the primary frequency regulation output transmitted in real time by the speed regulator as the power given to control the unit's active power.

[0023] Figure 1 This is the logic diagram of the frequency regulation control strategy in the governor power mode. When the active power setting value of the unit is greater than the actual active power value and the frequency is greater than 50.04Hz during the frequency regulation, or the active power setting value of the unit is less than the actual active power value and the frequency is less than 49.96Hz during the frequency regulation, the average output value of the first 10s of the unit during the frequency regulation is transmitted to the governor as the active power target value and maintained for 60s. After the time is up, the AGC active power regulation is restored. The output method of the average active power output of the unit in the first 10s is to make a circular array, store the active power once every 50ms, and store 200 data in a cumulative cycle. Perform average processing on the 200 data , where Y is the average value of the generator active power in N cycles, X is the measured value of each cycle, and n is taken as 200 in this method.

[0024] Figure 2 This is the logic diagram of the primary frequency modulation control strategy in the speed regulator opening mode. When the unit active power set value is greater than the actual active power value and the frequency is greater than 50.04Hz during the primary frequency modulation action, or the unit active power set value is less than the actual active power value and the frequency is less than 49.96Hz during the primary frequency modulation action, the unit's output average value of the first 10s during the primary frequency modulation action is superimposed on the primary frequency modulation action output transmitted to the monitoring system by the speed regulator in real time as the active power target, and the unit's active power is adjusted through the PID adjustment function of the monitoring system.

[0025] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for coordinated control of AGC and primary frequency regulation of a hydroelectric generator set, characterized in that: When the speed regulator is in power mode, the power closed loop is in the speed regulator system. The monitoring system sends the power target value to the speed regulator, and the speed regulator adjusts the load according to the power given by the monitoring system. When the primary frequency modulation is in action, the speed regulator automatically adds the primary frequency modulation output to the given target. The primary frequency modulation output caused by the frequency deviation is part of the active power given. When the speed governor is in the opening mode, the speed governor system defaults to the power mode after power generation and grid connection. When the power measurement module fails, it switches to the opening mode. In the opening mode, the active power closed loop of the unit is in the monitoring system. The local control unit of the monitoring system receives the active power given by the AGC, and the local control unit controls the stability of the active power of the unit.

2. According to claim 1, a method for coordinated control of AGC and primary frequency modulation of a hydroelectric generator set, characterized in that: In order to prevent the speed governor from making reverse adjustments in power mode, control logic is added to the monitoring system. When the AGC controls the load of the unit to increase or decrease, the system frequency exceeds 50±0.05Hz for more than 5 seconds, and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the primary frequency regulation action is sent to the speed governor as the power setting and maintained for 55 seconds.

3. According to claim 1, a method for coordinated control of AGC and primary frequency modulation of a hydroelectric generator set, characterized in that: In case the monitoring system uses the primary frequency modulation output as a disturbance signal, the primary frequency modulation output is transmitted to the monitoring system in real time, and the monitoring system adds the primary frequency modulation output to the power setting, thus achieving the same effect as the speed regulator power mode.

4. A method for coordinated control of AGC and primary frequency modulation of a hydroelectric generator set according to claim 3, characterized in that: When the unit adjusts the load under AGC control, the same control strategy as the power mode is used. When the system frequency exceeds 50±0.05Hz for more than 5 seconds and the primary frequency regulation is opposite to the AGC regulation direction, the actual output average value of the generator set within 10 seconds before the moment is used as the AGC given target and maintained for 55 seconds.