Intelligent power grid line loss detection system based on Internet of Things
Through IoT technology, the grid line loss data is collected and analyzed in real time, and abnormalities are discovered in a timely manner using the line loss diagnosis model and the maintenance allocation is optimized, which solves the problems of traditional line loss detection accuracy and maintenance efficiency, and improves the grid operation efficiency and user experience.
Patent Information
- Application Number
- CN202411497028.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional linear loss detection method has low accuracy, unreasonable resource utilization, and the failure to detect abnormal linear loss situations in a timely and accurate manner, resulting in low operating efficiency of the power grid, increasing energy waste and operation costs, and low maintenance and allocation efficiency.
The smart grid wire loss detection system based on the Internet of Things collects current, voltage and temperature data in real time through the acquisition module, and the data transmission module conducts comprehensive analysis and encryption compression. The cloud service platform uses the line loss diagnosis model to judge the line loss and notify users, and repair and distribution. The module filters the appropriate maintenance personnel and time period for repair.
It improves the accuracy and maintenance efficiency of line loss detection, reduces user waiting time, rationally utilizes maintenance resources, and ensures timely handling of line loss faults.
Smart Images

Figure CN119030153A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power detection, and in particular relates to a smart grid line loss detection system based on the Internet of Things. Background Art
[0002] With the continuous development of smart grids, the problem of power grid line loss has received increasing attention. Traditional line loss detection methods have problems such as low accuracy, unreasonable resource utilization, and low maintenance efficiency. They are unable to detect abnormal line losses in a timely and accurate manner, resulting in low power grid operation efficiency, increased energy waste and operating costs; at the same time, in terms of maintenance allocation, it is often impossible to quickly find the most suitable maintenance personnel, which prolongs the fault repair time and affects the user's electricity experience. For this reason, we propose a smart grid line loss detection system based on the Internet of Things. Summary of the invention
[0003] The purpose of the present invention is to provide a smart grid line loss detection system based on the Internet of Things to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a smart grid line loss detection system based on the Internet of Things, comprising a collection module, a data transmission module, a cloud service platform, a registration module, and a maintenance allocation module; The collection module sets the collection interval, and collects the current value, voltage value, and temperature value at the household incoming line, the general socket in the room, and the power consumption location of important electrical appliances according to the collection interval, and sends the collected data to the data transmission module, where important household appliances include: air conditioners, refrigerators, electric water heaters, washing machines, and televisions; The data transmission module is connected to the cloud service platform for communication, and comprehensively analyzes the received current value, voltage value, and temperature value at the same power consumption location to obtain the transmission evaluation value at each power consumption location. The transmission evaluation value of each power consumption location is compared with the corresponding preset transmission evaluation threshold value to determine whether the power consumption information data packet formed by the current value, voltage value, and temperature value corresponding to each power consumption location is encrypted and compressed and sent to the cloud service platform; The cloud service platform combines the stored information registered in the registration module to calculate the line loss value of the power consumption location corresponding to the power consumption information sent to the cloud service platform, and uses historical data to train the line loss diagnosis model. If the line loss value of the power consumption location is greater than the corresponding line loss threshold, the power consumption information of the power consumption location is substituted into the line loss diagnosis model, and the line loss diagnosis fault type is output. At the same time, a text message notification is sent to the relevant family. If the relevant family needs on-site repair, the on-site repair time period is replied. For the family that accepts on-site repair, the family address, on-site repair time, and power consumption location line loss diagnosis fault type are obtained and sent to the maintenance allocation module; The maintenance allocation module diagnoses the fault type and the on-site maintenance time period based on the line loss diagnosis at the power consumption location, selects the most suitable maintenance personnel, and dispatches them to perform maintenance.
[0005] Preferably, the acquisition module works in the following manner: The collection module installs current sensors, voltage sensors and temperature sensors at the household's incoming lines, general sockets in the room and important electrical equipment, and collects current value Ia, voltage value Va and temperature value Ca data in real time according to the corresponding collection interval at each power consumption location, and sends the collected current value Ia, voltage value Va and temperature value Ca data to the data transmission module, where a is the number of the power consumption location, a=1, 2,..., n.
[0006] Preferably, the collection interval is set as follows: Initial stage: Collect the electricity consumption history data of each household electricity consumption location in the past week, analyze the electricity consumption history data in the past week, determine the common electricity load value at each electricity consumption location, and mark it as the collection interval load calculation value Fa; A location importance coefficient Za is preset for each power consumption location, and a collection interval coefficient t is preset at the same time. The collection interval calculation value CGa of each power consumption location is obtained by using the formula CGa=(Fa+Za)*t. Several collection interval calculation interval values are preset. Each collection interval calculation interval corresponds to a collection interval duration. The collection interval calculation value CGa of each power consumption location is matched with each preset collection interval calculation interval value to obtain the collection interval duration of each power consumption location. According to the collection interval duration of each power consumption location, the current value Ia, voltage value Va, and temperature value Ca data at the power consumption location are collected and sent to the data transmission module; Update phase: The preset collection interval triggers the update duration. The system continues to run and monitors the running time. The most recently set collection interval is used as the starting time, and the elapsed time is recorded. When the elapsed time is the same as the preset collection interval trigger update duration, the collection interval update step is triggered; The updating collection interval step is: collecting the power load value of each power consumption location during the time period in the middle of this period, for each power consumption location, summing up the collected new power load values and taking the average value, and marking the average value as the collection interval load update calculation value FGa; The updated collection calculation value CXa of each power consumption location is obtained by using the formula: CXa=(FGa+Za)*t, and the updated collection calculation value CXa of each power consumption location is matched with its corresponding preset collection interval calculation interval value, thereby obtaining the updated collection interval duration of each power consumption location; Then, the current value Ia, voltage value Va, and temperature value Ca data at each power consumption location are collected according to the updated collection interval and sent to the data transmission module in a timely manner.
[0007] Preferably, the working mode of the data transmission module is: The data transmission module communicates with the cloud service platform. For each power consumption location, a standard current value, a standard voltage value, and a standard temperature value are preset. The data transmission module marks the absolute value of the difference between the current value and the standard current value at the same power consumption location as the current deviation value PIa, the absolute value of the difference between the voltage value and the standard voltage value as the voltage deviation value PVa, and the absolute value of the difference between the temperature value and the standard temperature value as the temperature deviation value PCa, and substitutes the current deviation value PIa, the voltage deviation value PVa, and the temperature deviation value PCa into the preset formula model: FSa=PIa*a1+ PVa*a2+PCa*a3, get the sending evaluation value FSa at each power consumption location, set each power consumption location with a corresponding preset sending evaluation threshold, the data transmission module compares the sending evaluation value FSa of each power consumption location with its corresponding preset sending evaluation threshold, if the sending evaluation value FSa of the power consumption location is greater than its corresponding preset sending evaluation threshold, then the current value Ia, voltage value Va, temperature value Ca at the power consumption location are encapsulated together to form a power consumption information data packet, and then the power consumption information data packet corresponding to the power consumption location is encrypted and compressed and sent to the cloud service platform.
[0008] Preferably, the process of the data transmission module encrypting and compressing the power consumption information data packet at the power consumption location is: For each power consumption information data packet to be sent, the data transmission module first extracts the current value Ia, voltage value Va and temperature value Ca of the location, and substitutes the current value Ia, voltage value Va and temperature value Ca into the preset conversion formula model respectively, and obtains the corresponding current conversion value ZIa, voltage conversion value ZVa and temperature conversion value ZCa through calculation. These three conversion values are used as the three vertex coordinates of the triangle to construct a triangle in the two-dimensional coordinate system. The triangle in this two-dimensional coordinate system is the encryption model of the power consumption information data packet. The constructed encryption model of the power information data packet is compressed and sent to the cloud service platform through the home Wi-Fi connection.
[0009] Preferably, the registration module is connected to the cloud service platform for communication, and the registration module is used to collect basic household information, electrical equipment information, and electrical usage habit information; Basic family information includes: home address, mobile phone number and ID number of family contact person; The information of electrical equipment includes: the name, model, service life and rated power of the equipment at each power consumption location; Electricity usage habit information includes the peak electricity usage time period that households need to provide and the average monthly electricity consumption at each electricity usage location.
[0010] Preferably, the working process of the cloud service platform is: After receiving the encrypted models sent by each household electricity consumption location, the cloud service platform decompresses and decrypts the encrypted models sent by each electricity consumption location to obtain the original current value Ia, voltage value Va and temperature value Ca of each electricity consumption location; For each electricity consumption location of each household, the cloud service platform calculates the input power Pina based on the current value Ia and the voltage value Va: Pina=Ia*Va. At the same time, combined with the equipment name, model, service life, rated power, power consumption period, and power consumption factors of the electricity consumption location stored in the registration module, the output power Pouta of the electricity consumption location is estimated. The formula: La=Pina-Pouta is used to obtain the line loss value La of the electricity consumption location; It is preset that each power consumption location corresponds to a line loss threshold, and the line loss value La of the power consumption location is compared with the corresponding line loss threshold. If the line loss value La of the power consumption location is greater than the corresponding line loss threshold, the power consumption location is marked as a diagnostic location; Collect historical line loss data, as well as current values, voltage values, temperature values, corresponding power equipment information, power consumption time period, and power consumption data as the training set for the line loss diagnosis model; use the random forest algorithm, take whether the line loss value exceeds the threshold as the classification target, take the current value, voltage value, temperature value, equipment information, power consumption time period, and power consumption as input features, and use the pre-processed training set data to train the line loss diagnosis model; When a diagnostic location appears, the current value Ia, voltage value Va, temperature value Ca and related equipment information, power consumption period, and power consumption at the diagnostic location are input into the line loss diagnosis model, and the line loss diagnosis fault type at the diagnostic location is output; After the cloud service platform determines the line loss diagnosis fault type at the diagnosis location, it sends a text message notification to the relevant family, and obtains the door-to-door repair time period if a door-to-door repair is required; The line loss diagnosis fault type at the diagnosis location, the door-to-door repair time, and the address of the family corresponding to the diagnosis location are sent to the maintenance allocation module.
[0011] Preferably, the maintenance allocation module works as follows: The maintenance allocation module has a maintenance personnel database, which records the information of each maintenance personnel, including maintenance personnel number, professional skill type, maintenance skill working hours, current location, current task status, i.e. busy or idle, and mobile vehicle type; Assume that the line loss diagnosis fault type of the diagnosis position is T, and find the maintenance personnel set S1 whose professional skill type matches T from the maintenance personnel database, that is, for each maintenance personnel Pm in the maintenance personnel database, where m is the maintenance personnel number, m=1, 2, ..., n, if the professional skill type of Pm includes T, then Pm is added to the set S1; Assume that the on-site maintenance time period is [t1, t2]. For each maintenance personnel Pm in set S1, if the current task status of Pm is idle, and the time period between t1 and t2 has no conflicting task schedule with Pm, then Pm is added to the new set S2. According to the current location of the maintenance personnel Pm and the home address corresponding to the diagnosis location, the number of routes from the maintenance personnel Pm to the home address corresponding to the diagnosis location is obtained. If the number of routes is greater than two, the routes are prioritized. The specific evaluation process is as follows: Obtain the distance Ldm of each route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, obtain the number Hdm of traffic lights on each route and the number XSdm of driving lanes on each route; where d is the number of the route, d=1, 2, ..., n; The formula: LXm=XSdm*k1 / (Ldm*k2+Hdm*k3) is used to obtain the priority value LXm of each route from the maintenance personnel to the home address corresponding to the diagnosis location, where k1, k2, and k3 are preset weight coefficients. The larger the priority value LXm, the higher the priority; The route corresponding to the highest priority is selected as the driving route of each maintenance personnel. If there is only one route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, the only route is used as the driving route; Obtain the distance value XSm of each maintenance personnel's driving route to the home address corresponding to the diagnosis location; Set each maintenance personnel's mobile vehicle to correspond to a preset average driving speed Vm, and use the formula: Tm=XSm / Vm to obtain the estimated arrival time Tm of the maintenance personnel Pm; The maintenance skill working time of the maintenance personnel Pm is marked as Wm, and the comprehensive maintenance evaluation value FCm of the maintenance personnel Pm is obtained using the formula FCm=Tm*c1 / Wm*c2, where c1 and c2 are preset weight coefficients; For each maintenance personnel Pm in the set S2, the comprehensive maintenance evaluation value FCm of each maintenance personnel Pm is calculated, and the maintenance personnel Pm with the smallest FCm value is selected as the person most suitable for on-site maintenance. The maintenance allocation module will send an on-site maintenance task to the person most suitable for on-site maintenance.
[0012] Compared with the prior art, the present invention has the following beneficial effects: (1) The smart grid line loss detection system based on the Internet of Things can improve the accuracy of line loss detection by dynamically adjusting the collection interval through the collection module. It can detect abnormal line loss in a more timely manner, provide strong support for taking repair and optimization measures, and thus improve the operation efficiency of the power grid.
[0013] (2) The smart grid line loss detection system based on the Internet of Things first performs a comprehensive analysis based on the current value, voltage value, and temperature value at the power consumption location through the data transmission module to obtain a sending evaluation value, and compares it with the preset sending evaluation threshold. The power consumption information exceeding the threshold is encrypted and compressed and then sent to the cloud service platform. In this way, while ensuring data security, key data can be transmitted in a targeted manner, reducing unnecessary data transmission volume and improving data transmission efficiency.
[0014] (3) The IoT-based smart grid line loss detection system uses a maintenance allocation module to select maintenance personnel with corresponding professional skills according to the line loss diagnosis fault type. It further selects maintenance personnel who are idle and have no task conflicts based on the on-site maintenance time period. It then selects the most suitable maintenance personnel by calculating the estimated arrival time and the comprehensive maintenance evaluation value, thereby improving maintenance efficiency, reducing user waiting time, and making rational use of maintenance resources to ensure that line loss faults are handled promptly and effectively. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of the present invention; DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] Embodiment 1
[0018] See also Figure 1 The present invention provides a smart grid line loss detection system based on the Internet of Things, including a collection module, a data transmission module, a cloud service platform, a registration module, and a maintenance allocation module; The acquisition module installs current sensors, voltage sensors and temperature sensors at the household's incoming line, the room's universal sockets and important electrical appliances, collects the current value Ia, voltage value Va and temperature value Ca data in real time according to the corresponding acquisition interval at each power consumption location, and sends the collected current value Ia, voltage value Va and temperature value Ca data to the data transmission module, where a is the number of the power consumption location, a=1, 2, ..., n; the important household appliances include: air conditioners, refrigerators, electric water heaters, washing machines, and televisions; The collection interval is set as follows: Initial stage: Collect the electricity consumption history data of each household electricity consumption location in the past week, analyze the electricity consumption history data in the past week, determine the common electricity load value at each electricity consumption location, and mark it as the collection interval load calculation value Fa. The determination method is: by statistically analyzing the distribution of electricity loads at each electricity consumption location in different time periods, find the load value with the highest frequency as the common electricity load value of the location, and mark it as the collection interval load calculation value; A location importance coefficient Za is preset for each power consumption location, and a collection interval coefficient t is preset at the same time. The collection interval calculation value CGa of each power consumption location is obtained by using the formula CGa=(Fa+Za)*t. Several collection interval calculation interval values are preset. Each collection interval calculation interval corresponds to a collection interval duration. The collection interval calculation value CGa of each power consumption location is matched with each preset collection interval calculation interval value to obtain the collection interval duration of each power consumption location. According to the collection interval duration of each power consumption location, the current value Ia, voltage value Va, and temperature value Ca data at the power consumption location are collected and sent to the data transmission module; Update phase: The preset collection interval triggers the update duration. The system continues to run and monitors the running time. The most recently set collection interval is used as the starting time, and the elapsed time is recorded. When the elapsed time is the same as the preset collection interval trigger update duration, the collection interval update step is triggered; The updating collection interval step is: collecting the power load value of each power consumption location during the time period in the middle of this period, for each power consumption location, summing up the collected new power load values and taking the average value, and marking the average value as the collection interval load update calculation value FGa; The updated collection calculation value CXa of each power consumption location is obtained by using the formula: CXa=(FGa+Za)*t, and the updated collection calculation value CXa of each power consumption location is matched with its corresponding preset collection interval calculation interval value, thereby obtaining the updated collection interval duration of each power consumption location; Then, the current value Ia, voltage value Va, and temperature value Ca data at each power consumption location are collected according to the updated collection interval and sent to the data transmission module in a timely manner.
[0019] It should be noted that, in the initial stage, the collection module obtains the collection interval duration of each power consumption location by performing a comprehensive analysis based on the collection interval load calculation value, the power consumption location importance coefficient, and the collection interval coefficient at the power consumption location, and then collects the current, voltage, and temperature data at the power consumption location based on the collection interval duration. Secondly, during the operation of the system, the update duration is triggered by the preset collection interval, and the operation time is continuously monitored. When the update duration is reached, the collection interval duration at the power consumption location can be updated. By dynamically setting the collection interval duration at the power consumption location, on the one hand, the accuracy of line loss detection is improved, and abnormal line loss situations can be discovered more promptly, providing strong support for taking repair and optimization measures, thereby improving the operation efficiency of the power grid; on the other hand, the utilization of system resources is optimized, and the collection interval is dynamically adjusted according to the importance of different locations and the actual load conditions. On the premise of ensuring data accuracy, system resources are reasonably allocated to reduce data redundancy and storage costs.
[0020] The data transfer module works as follows: The data transmission module communicates with the cloud service platform. For each power consumption location, a standard current value, a standard voltage value, and a standard temperature value are preset. The data transmission module marks the absolute value of the difference between the current value and the standard current value at the same power consumption location as the current deviation value PIa, the absolute value of the difference between the voltage value and the standard voltage value as the voltage deviation value PVa, and the absolute value of the difference between the temperature value and the standard temperature value as the temperature deviation value PCa, and substitutes the current deviation value PIa, the voltage deviation value PVa, and the temperature deviation value PCa into the preset formula model: FSa=PIa*a1+ PVa*a2+PCa*a3, get the sending evaluation value FSa at each power consumption location, set each power consumption location to have a corresponding preset sending evaluation threshold, the data transmission module compares the sending evaluation value FSa of each power consumption location with its corresponding preset sending evaluation threshold, if the sending evaluation value FSa of the power consumption location is greater than its corresponding preset sending evaluation threshold, then the current value Ia, voltage value Va, temperature value Ca at the power consumption location are packaged together to form a power consumption information data packet, and then the power consumption information data packet corresponding to the power consumption location is encrypted and compressed and sent to the cloud service platform; The process of the data transmission module encrypting and compressing the power consumption information data packet at the power consumption location is as follows: For each power information data packet to be sent, the data transmission module first extracts the current value Ia, voltage value Va and temperature value Ca of the position, and substitutes the current value Ia, voltage value Va and temperature value Ca into the preset conversion formula model respectively, and obtains the corresponding current conversion value ZIa, voltage conversion value ZVa and temperature conversion value ZCa through calculation, and uses these three conversion values as the three vertex coordinates of the triangle to construct a triangle in the two-dimensional coordinate system. The triangle in this two-dimensional coordinate system is the encryption model of the power information data packet, and the constructed power information data packet encryption model is compressed, and the compressed encryption model is sent to the cloud service platform through the home Wi-Fi connection; if the current conversion value ZIa, voltage conversion value ZVa and temperature conversion value ZCa are used as the three vertex coordinates of the triangle in the two-dimensional coordinate system, the following preset conversion formula model can be designed: ZIa = Ia * k1 + b1, where k1 and b1 are coefficients and constants determined according to actual conditions. The purpose is to linearly transform the current value so that it adapts to the numerical range of the vertex coordinates; ZVa = Va * k2 + b2. Similarly, k2 and b2 are used to adjust the voltage value to be suitable as the vertex coordinates. ZCa = Ca * k3 + b3, k3 and b3 are used to convert temperature values.
[0021] It should be noted that the data transmission module obtains the sending evaluation value by substituting the current, voltage and temperature values of the power consumption location into the preset formula, and compares it with the preset sending evaluation threshold. The power consumption information exceeding the threshold is encrypted and compressed and sent to the cloud service platform. This method can ensure data security while transmitting key data in a targeted manner, reducing unnecessary data transmission and improving data transmission efficiency.
[0022] The registration module communicates with the cloud service platform and is used to collect basic household information, electrical equipment information, and electricity usage habit information; Basic family information includes: home address, mobile phone number and ID number of family contact person; The information of electrical equipment includes: the name, model, service life and rated power of the equipment at each power consumption location; Electricity usage habit information includes the peak electricity usage time period that households need to provide and the average monthly electricity consumption at each electricity usage location.
[0023] The cloud service platform process is: After receiving the encrypted model sent by each household power consumption location, the cloud service platform decompresses and decrypts the encrypted model sent by each power consumption location according to the known preset conversion formula model and encryption model, obtains the original current value Ia, voltage value Va and temperature value Ca of each power consumption location, and stores the decrypted household power consumption data according to the household address and power consumption location number; For each electricity consumption location of each household, the cloud service platform calculates the input power Pina based on the current value Ia and the voltage value Va: Pina=Ia*Va. At the same time, combined with the equipment name, model, service life, rated power, power consumption period, and power consumption factors of the electricity consumption location stored in the registration module, the output power Pouta of the electricity consumption location is estimated. The formula: La=Pina-Pouta is used to obtain the line loss value La of the electricity consumption location; It is preset that each power consumption location corresponds to a line loss threshold, and the line loss value La of the power consumption location is compared with the corresponding line loss threshold. If the line loss value La of the power consumption location is greater than the corresponding line loss threshold, the power consumption location is marked as a diagnostic location; Collect historical line loss data, as well as current values, voltage values, temperature values, corresponding power equipment information (equipment name, model, service life, rated power), power consumption time period, and power consumption data as the training set for the line loss diagnosis model; preprocess the collected data, and then use the random forest algorithm to train the line loss diagnosis model using whether the line loss value exceeds the threshold as the classification target, and current values, voltage values, temperature values, equipment information, power consumption time period, and power consumption as input features; When a diagnostic location appears, the current value Ia, voltage value Va, temperature value Ca and related equipment information, power consumption period, and power consumption at the diagnostic location are input into the line loss diagnosis model, and the line loss diagnosis fault type at the diagnostic location is output; After the cloud service platform determines the line loss diagnosis fault type at the diagnosis location, it sends a text message notification to the relevant family, specifically: Dear user, abnormal line loss occurs at [specific power location number] in your home, and the fault type is [specific fault type description]. This may lead to reduced power efficiency and increased costs. If you need on-site repair, please reply with the on-site repair time period; for example: 9:00-11:00; If a reply message of the home visit repair time corresponding to the diagnosis location is received, the line loss diagnosis fault type at the diagnosis location, the home visit repair time, and the address of the home corresponding to the diagnosis location are sent to the maintenance allocation module.
[0024] The maintenance allocation module has a maintenance personnel database, which records the information of each maintenance personnel, including maintenance personnel number, professional skill type (such as good at line fault maintenance, equipment aging maintenance), maintenance skill working hours, current location, current task status (busy / idle), mobile vehicle type (bicycle, battery car, motorcycle, car); Assume that the line loss diagnosis fault type of the diagnosis position is T, and find the maintenance personnel set S1 whose professional skill type matches T from the maintenance personnel database, that is, for each maintenance personnel Pm in the maintenance personnel database, where m is the maintenance personnel number, m=1, 2, ..., n, if the professional skill type of Pm includes T, then Pm is added to the set S1; Assume that the on-site maintenance time period is [t1, t2]. For each maintenance personnel Pm in set S1, if the current task status of Pm is idle, and the time period between t1 and t2 has no conflicting task schedule with Pm, then Pm is added to the new set S2. According to the current location of the maintenance personnel Pm and the home address corresponding to the diagnosis location, the number of routes from the maintenance personnel Pm to the home address corresponding to the diagnosis location is obtained. If the number of routes is greater than two, the routes are prioritized. The specific evaluation process is as follows: Obtain the distance Ldm of each route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, obtain the number Hdm of traffic lights on each route and the number XSdm of driving lanes on each route; where d is the number of the route, d=1, 2, ..., n; The formula: LXm=XSdm*k1 / (Ldm*k2+Hdm*k3) is used to obtain the priority value LXm of each route from the maintenance personnel to the home address corresponding to the diagnosis location, where k1, k2, and k3 are preset weight coefficients. The larger the priority value LXm, the higher the priority; The route corresponding to the highest priority is selected as the driving route of each maintenance personnel. If there is only one route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, the only route is used as the driving route; Obtain the distance value XSm of each maintenance personnel's driving route to the home address corresponding to the diagnosis location; Set each maintenance personnel's mobile vehicle to correspond to a preset average driving speed Vm, and use the formula: Tm=XSm / Vm to obtain the estimated arrival time Tm of the maintenance personnel Pm; For each maintenance personnel Pm in the set S2, calculate the comprehensive maintenance evaluation value FCm of each maintenance personnel Pm, and select the maintenance personnel Pm with the smallest FCm value as the person most suitable for on-site maintenance. The maintenance allocation module will send an on-site maintenance task to the person most suitable for on-site maintenance. The maintenance task includes the line loss diagnosis fault type at the diagnosis location, the on-site repair time, and the home address information corresponding to the diagnosis location.
[0025] It should be noted that the cloud service platform uses the line loss diagnosis model to determine the fault type. The maintenance allocation module selects a set of maintenance personnel S1 with corresponding professional skills according to the line loss diagnosis fault type to ensure that the maintenance personnel have the ability to handle the fault. Then, combined with the on-site maintenance time period, a set of maintenance personnel S2 that are idle and have no task conflicts is further selected to meet the user's time requirements; then, by establishing a rectangular coordinate system and using the preset average driving speed to calculate the estimated arrival time Tm of the maintenance personnel, and combining the maintenance skill working time Wm, the comprehensive maintenance evaluation value FCm is analyzed to obtain the comprehensive maintenance evaluation value FCm, so that the arrival time and maintenance experience factors can be comprehensively considered when selecting maintenance personnel. Finally, the maintenance personnel with the smallest FCm value are selected as the most suitable personnel for on-site maintenance, and detailed maintenance task information is sent. This can improve maintenance efficiency and reduce user waiting time. At the same time, it can also make rational use of maintenance resources to ensure that line loss faults are handled in a timely and effective manner.
[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. The smart grid line loss detection system based on the Internet of Things includes a collection module, a data transmission module, a cloud service platform, a registration module, and a maintenance distribution module. Features: The collection module sets the collection interval, and collects the current value, voltage value, and temperature value at the household incoming line, the general socket in the room, and the power consumption location of important electrical appliances according to the collection interval, and sends the collected data to the data transmission module, where important household appliances include: air conditioners, refrigerators, electric water heaters, washing machines, and televisions; The data transmission module is connected to the cloud service platform for communication, and comprehensively analyzes the received current value, voltage value, and temperature value at the same power consumption location to obtain the transmission evaluation value at each power consumption location. The transmission evaluation value of each power consumption location is compared with the corresponding preset transmission evaluation threshold value to determine whether the power consumption information data packet formed by the current value, voltage value, and temperature value corresponding to each power consumption location is encrypted and compressed and sent to the cloud service platform; The cloud service platform combines the stored information registered in the registration module to calculate the line loss value of the power consumption location corresponding to the power consumption information sent to the cloud service platform, and uses historical data to train the line loss diagnosis model. If the line loss value of the power consumption location is greater than the corresponding line loss threshold, the power consumption information of the power consumption location is substituted into the line loss diagnosis model, and the line loss diagnosis fault type is output. At the same time, a text message notification is sent to the relevant family. If the relevant family needs on-site repair, the on-site repair time period is replied. For the family that accepts on-site repair, the family address, on-site repair time, and power consumption location line loss diagnosis fault type are obtained and sent to the maintenance allocation module; The maintenance allocation module diagnoses the fault type and the on-site maintenance time period based on the line loss diagnosis at the power consumption location, selects the most suitable maintenance personnel, and dispatches them to perform the maintenance.
2. According to the smart grid line loss detection system based on the Internet of Things according to claim 1, Features: The acquisition module works as follows: The collection module installs current sensors, voltage sensors and temperature sensors at the household's incoming lines, general sockets in the room and important electrical equipment, and collects current value Ia, voltage value Va and temperature value Ca data in real time according to the corresponding collection interval at each power consumption location, and sends the collected current value Ia, voltage value Va and temperature value Ca data to the data transmission module, where a is the number of the power consumption location, a=1, 2,..., n.
3. According to the smart grid line loss detection system based on the Internet of Things according to claim 2, Features: The collection interval is set as follows: Initial stage: Collect the electricity consumption history data of each household electricity consumption location in the past week, analyze the electricity consumption history data in the past week, determine the common electricity load value at each electricity consumption location, and mark it as the collection interval load calculation value Fa; A location importance coefficient Za is preset for each power consumption location, and a collection interval coefficient t is preset at the same time. The collection interval calculation value CGa of each power consumption location is obtained by using the formula CGa=(Fa+Za)*t. Several collection interval calculation interval values are preset. Each collection interval calculation interval corresponds to a collection interval duration. The collection interval calculation value CGa of each power consumption location is matched with each preset collection interval calculation interval value to obtain the collection interval duration of each power consumption location. According to the collection interval duration of each power consumption location, the current value Ia, voltage value Va, and temperature value Ca data at the power consumption location are collected and sent to the data transmission module; Update phase: The preset collection interval triggers the update duration. The system continues to run and monitors the running time. The most recently set collection interval is used as the starting time, and the elapsed time is recorded. When the elapsed time is the same as the preset collection interval trigger update duration, the collection interval update step is triggered; The updating collection interval step is: collecting the power load value of each power consumption location during the time period in the middle of this period, for each power consumption location, summing up the collected new power load values and taking the average value, and marking the average value as the collection interval load update calculation value FGa; The updated collection calculation value CXa of each power consumption location is obtained by using the formula: CXa=(FGa+Za)*t, and the updated collection calculation value CXa of each power consumption location is matched with its corresponding preset collection interval calculation interval value, thereby obtaining the updated collection interval duration of each power consumption location; Then, the current value Ia, voltage value Va, and temperature value Ca data at each power consumption location are collected according to the updated collection interval and sent to the data transmission module in a timely manner.
4. According to the smart grid line loss detection system based on the Internet of Things according to claim 3, Features: The data transfer module works as follows: The data transmission module communicates with the cloud service platform. For each power consumption location, a standard current value, a standard voltage value, and a standard temperature value are preset. The data transmission module marks the absolute value of the difference between the current value and the standard current value at the same power consumption location as the current deviation value PIa, the absolute value of the difference between the voltage value and the standard voltage value as the voltage deviation value PVa, and the absolute value of the difference between the temperature value and the standard temperature value as the temperature deviation value PCa, and substitutes the current deviation value PIa, the voltage deviation value PVa, and the temperature deviation value PCa into the preset formula model: FSa=PIa*a1+ PVa*a2+PCa*a3, get the sending evaluation value FSa at each power consumption location, set each power consumption location with a corresponding preset sending evaluation threshold, the data transmission module compares the sending evaluation value FSa of each power consumption location with its corresponding preset sending evaluation threshold, if the sending evaluation value FSa of the power consumption location is greater than its corresponding preset sending evaluation threshold, then the current value Ia, voltage value Va, temperature value Ca at the power consumption location are encapsulated together to form a power consumption information data packet, and then the power consumption information data packet corresponding to the power consumption location is encrypted and compressed and sent to the cloud service platform.
5. According to claim 4, the smart grid line loss detection system based on the Internet of Things, Features: The process of the data transmission module encrypting and compressing the power consumption information data packet at the power consumption location is as follows: For each power consumption information data packet to be sent, the data transmission module first extracts the current value Ia, voltage value Va and temperature value Ca of the location, and substitutes the current value Ia, voltage value Va and temperature value Ca into the preset conversion formula model respectively, and obtains the corresponding current conversion value ZIa, voltage conversion value ZVa and temperature conversion value ZCa through calculation. These three conversion values are used as the three vertex coordinates of the triangle to construct a triangle in the two-dimensional coordinate system. The triangle in this two-dimensional coordinate system is the encryption model of the power consumption information data packet. The constructed encryption model of the power information data packet is compressed and sent to the cloud service platform through the home Wi-Fi connection.
6. According to claim 5, the smart grid line loss detection system based on the Internet of Things, Features: The registration module communicates with the cloud service platform and is used to collect basic household information, electrical equipment information, and electricity usage habit information; Basic family information includes: home address, mobile phone number and ID number of family contact person; The information of electrical equipment includes: the name, model, service life and rated power of the equipment at each power consumption location; Electricity usage habit information includes the peak electricity usage time period that households need to provide and the average monthly electricity consumption at each electricity usage location.
7. The smart grid line loss detection system based on the Internet of Things according to claim 6, Features: The working process of the cloud service platform is: After receiving the encrypted models sent by each household electricity consumption location, the cloud service platform decompresses and decrypts the encrypted models sent by each electricity consumption location to obtain the original current value Ia, voltage value Va and temperature value Ca of each electricity consumption location; For each electricity consumption location of each household, the cloud service platform calculates the input power Pina based on the current value Ia and the voltage value Va: Pina=Ia*Va. At the same time, combined with the equipment name, model, service life, rated power, power consumption period, and power consumption factors of the electricity consumption location stored in the registration module, the output power Pouta of the electricity consumption location is estimated. The formula: La=Pina-Pouta is used to obtain the line loss value La of the electricity consumption location; It is preset that each power consumption location corresponds to a line loss threshold, and the line loss value La of the power consumption location is compared with the corresponding line loss threshold. If the line loss value La of the power consumption location is greater than the corresponding line loss threshold, the power consumption location is marked as a diagnostic location; Collect historical line loss data, as well as current values, voltage values, temperature values, corresponding power equipment information, power consumption time period, and power consumption data as the training set for the line loss diagnosis model; use the random forest algorithm, take whether the line loss value exceeds the threshold as the classification target, take the current value, voltage value, temperature value, equipment information, power consumption time period, and power consumption as input features, and use the pre-processed training set data to train the line loss diagnosis model; When a diagnostic location appears, the current value Ia, voltage value Va, temperature value Ca and related equipment information, power consumption period, and power consumption at the diagnostic location are input into the line loss diagnosis model, and the line loss diagnosis fault type at the diagnostic location is output; After the cloud service platform determines the line loss diagnosis fault type at the diagnosis location, it sends a text message notification to the relevant family, and obtains the door-to-door repair time period if a door-to-door repair is required; The line loss diagnosis fault type at the diagnosis location, the door-to-door repair time, and the address of the family corresponding to the diagnosis location are sent to the maintenance allocation module.
8. According to claim 7, the smart grid line loss detection system based on the Internet of Things, Features: The maintenance allocation module works as follows: The maintenance allocation module has a maintenance personnel database, which records the information of each maintenance personnel, including maintenance personnel number, professional skill type, maintenance skill working hours, current location, current task status, i.e. busy or idle, and mobile vehicle type; Assume that the line loss diagnosis fault type of the diagnosis position is T, and find the maintenance personnel set S1 whose professional skill type matches T from the maintenance personnel database, that is, for each maintenance personnel Pm in the maintenance personnel database, where m is the maintenance personnel number, m=1, 2, ..., n, if the professional skill type of Pm includes T, then Pm is added to the set S1; Assume that the on-site maintenance time period is [t1, t2]. For each maintenance personnel Pm in set S1, if the current task status of Pm is idle, and the time period between t1 and t2 has no conflicting task schedule with Pm, then Pm is added to the new set S2. According to the current location of the maintenance personnel Pm and the home address corresponding to the diagnosis location, the number of routes from the maintenance personnel Pm to the home address corresponding to the diagnosis location is obtained. If the number of routes is greater than two, the routes are prioritized. The specific evaluation process is as follows: Obtain the distance Ldm of each route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, obtain the number Hdm of traffic lights on each route and the number XSdm of driving lanes on each route; where d is the number of the route, d=1, 2, ..., n; The formula: LXm=XSdm*k1 / (Ldm*k2+Hdm*k3) is used to obtain the priority value LXm of each route from the maintenance personnel to the home address corresponding to the diagnosis location, where k1, k2, and k3 are preset weight coefficients. The larger the priority value LXm, the higher the priority; The route corresponding to the highest priority is selected as the driving route of each maintenance personnel. If there is only one route from the maintenance personnel Pm to the home address corresponding to the diagnosis location, the only route is used as the driving route; Obtain the distance value XSm of each maintenance personnel's driving route to the home address corresponding to the diagnosis location; Set each maintenance personnel's mobile vehicle to correspond to a preset average driving speed Vm, and use the formula: Tm=XSm / Vm to obtain the estimated arrival time Tm of the maintenance personnel Pm; The maintenance skill working time of the maintenance personnel Pm is marked as Wm, and the comprehensive maintenance evaluation value FCm of the maintenance personnel Pm is obtained using the formula FCm=Tm*c1 / Wm*c2, where c1 and c2 are preset weight coefficients; For each maintenance personnel Pm in the set S2, the comprehensive maintenance evaluation value FCm of each maintenance personnel Pm is calculated, and the maintenance personnel Pm with the smallest FCm value is selected as the person most suitable for on-site maintenance. The maintenance allocation module will send an on-site maintenance task to the person most suitable for on-site maintenance.
Citation Information
Patent Citations
Intelligent home gateway capable of detecting equipment faults in real time
CN112235170A
Electrical equipment data intelligent acquisition and transmission method based on Internet of Things
CN118657517A
Radar embedded health management system
WO2021218003A1
Method for supporting operation of rail transit power system with big data
WO2022041264A1
