Method for controlling head warping and buckling of first-pass plate blank between racks

By constructing a warp height calculation model, combining the warp and sled coefficients before rolling, the problem of poor control of the buckle head in the existing technology is solved, and efficient automatic slab buckle head between racks is achieved. Control improves the safety and production efficiency of the rolling process.

CN119035278AActive Publication Date: 2024-11-29UNIV OF SCI & TECH BEIJING
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410923293.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-29
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

The existing buckle head control technology failed to effectively consider the impact of the warping height of the slab before rolling on the warping of the outlet slab during the rolling process, resulting in the unsatisfactory control effect of the first pass between the frames.

Method used

By calculating the warping height and sled coefficient of the slab, a warping height calculation model is constructed, and combining the pre-rolling warping and traditional sled coefficient control method, the automatic control of the first pass slab buckle between the frames is realized.

Benefits of technology

The control accuracy and efficiency of the first-pass slab buckle head between the frames is improved, and the automatic control of the buckle head can be achieved more accurately, reducing the risk of rolled parts impact guard plates and steel stacking accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119035278A_ABST
    Figure CN119035278A_ABST
Patent Text Reader

Abstract

The invention discloses a method for controlling head warping and buckling of a first-pass slab between racks, which belongs to the technical field of automatic control and comprises the following steps of: calculating a control coefficient of the head warping and buckling of the first-pass slab to obtain a slab first-pass warping height calculation model; the first pass process parameters of the upper plate blank in the same furnace corresponding to the current plate blank are obtained; calculating a first-pass warping height calculation value of the upper plate blank in the same furnace; first-pass process parameters of the current plate blank are obtained; calculating a first-pass sled coefficient of the current slab; and on the basis of the first-pass sleigh coefficient of the current plate blank, first-pass plate blank head warping and buckling automatic control between racks is achieved. According to the scheme, head warping and buckling control over the first-pass plate blank between the racks can be achieved through the reduction rate, the sleigh coefficient and the warping height before rolling, and the control effect of head warping and buckling of the first pass between the racks is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of automatic control, and in particular to a method for controlling a buckle head of a first-pass slab between frames. Background Art

[0002] Buckle head is a common defect in the rough rolling process of hot rolling. If the buckle head control effect is not obvious, the rolled piece will impact the guard plate and roller, and even a steel pile accident may occur in serious cases. In the current hot rolling rough rolling production process, there are many types of slabs and the rolling rhythm is fast, so it is necessary to achieve good automatic control of the buckle head of the slab after the rolling specifications change.

[0003] Using the sled coefficient to control the buckle head is the most commonly used method in existing control technology. This method achieves buckle head control within the head range of the slab by adjusting the roller speed difference between the upper and lower rollers. However, in the existing buckle head control technology, the influence of the slab warping height before rolling on the export slab warping is not considered, resulting in the problem that the control effect of the first pass buckle head between the stands is not ideal. Summary of the invention

[0004] The invention provides a method for controlling the buckle head of a first-pass slab between frames, so as to solve the technical problem that the control effect of the buckle head of the first-pass between frames in the existing buckle head control technology is not ideal.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0006] On the one hand, the present invention provides a method for controlling the buckle head of the first slab between frames, comprising:

[0007] Calculate the first pass slab buckle control coefficient to obtain the first pass slab buckle height calculation model;

[0008] Obtain the first pass process parameters of the slab on the same furnace corresponding to the current slab;

[0009] Based on the first-pass process parameters of the slab on the same furnace, the first-pass warping height calculation value of the slab on the same furnace is calculated by using the slab first-pass warping height calculation model;

[0010] Get the first pass process parameters of the current slab;

[0011] Based on the first-pass process parameters of the current slab, combined with the first-pass process parameters of the slab on the same furnace and the calculated value of the first-pass warping height of the slab on the same furnace, the first-pass sled coefficient of the current slab is calculated;

[0012] Based on the first-pass sled coefficient of the current slab, automatic control of the first-pass slab buckle head between racks is achieved.

[0013] Further, the calculation of the first-pass slab buckle control coefficient to construct a slab first-pass warpage height calculation model includes:

[0014] Obtaining the first-pass process parameters of multiple slabs in the historical rolling process; wherein the first-pass process parameters of each slab include: the first-pass reduction rate of the slab, the first-pass sled coefficient of the slab, the first-pass exit warpage height of the slab, and the first-pass pre-rolling warpage height of the slab;

[0015] The following calculation model for the first-pass warping height of the slab is constructed:

[0016]

[0017] Where i is the rack number, and its value is 2; i is the warping height of the slab at the first exit of the i-th rack; ε i SKI is the first pass reduction rate of the slab in the i-th stand obtained on site; i is the first pass sled coefficient of the slab in the i-th rack; Pre_Wh i is the warping height of the slab before the first rolling pass in the i-th stand obtained on site, that is, the warping height of the slab at the last exit of the i-1-th stand; p1~p 17 It is the control coefficient of the first pass slab buckle head;

[0018] The first pass process parameters of multiple slabs in the historical rolling process are used to fit equation (1) to obtain p1~p 17 The value of p1~p 17 Substituting the value of into formula (1), the calculation model of the first-pass warping height of the slab is obtained.

[0019] Furthermore, the first-pass process parameters of the slabs on the same furnace include: the first-pass reduction rate of the slabs on the same furnace, the first-pass sled coefficient of the slabs on the same furnace, the first-pass exit warping height of the slabs on the same furnace, and the first-pass pre-rolling warping height of the slabs on the same furnace.

[0020] Furthermore, the calculation formula for the first pass warping height calculation value of the slab on the same furnace is:

[0021]

[0022] Where i is the rack number, and its value is 2; is the calculated value of the outlet warping height of the slab on the same furnace at the first pass of the i-th rack; p1~p 17 It is the control coefficient of the first pass slab buckle head; is the first pass reduction rate of the slab on the same furnace at the i-th stand; is the sled coefficient of the first pass of the slab on the same furnace at the i-th rack; is the warping height of the slab on the same furnace at the first exit of the i-th rack; is the warping height of the slab on the same furnace before the first pass of the i-th frame, that is, the warping height of the slab on the same furnace at the exit of the last pass of the i-1 frame

[0023] Furthermore, the first-pass process parameters of the current slab include: the first-pass reduction rate of the current slab and the first-pass warping height of the current slab before rolling.

[0024] Further, the first pass sled coefficient of the current slab is calculated based on the first pass process parameters of the current slab, combined with the first pass process parameters of the slab on the same furnace and the first pass warping height calculation value of the slab on the same furnace, including:

[0025] Construct the following function:

[0026]

[0027] Where i is the rack number, and its value is 2; is the calculated value of the exit warping height of the current slab at the first pass of the i-th rack; x i is the discrete value of the sled coefficient selected within the settable interval at the first pass of the i-th rack. The value is an integer ranging from -10 to 10; p1~p 17 is the control coefficient of the first pass slab buckling head; α is the preset coefficient, and its value range is 0 to 1; is the warping height of the slab on the same furnace at the first exit of the i-th rack; is the calculated value of the exit warping height of the slab on the same furnace at the first pass of the i-th rack; is the first pass reduction rate of the current slab in the i-th stand; is the warping height of the current slab before the first pass of the i-th stand, that is, the warping height of the current slab at the exit of the last pass of the i-1-th stand

[0028] Based on formula (3), we can obtain x i The optimal solution is taken as the first pass sled coefficient of the i-th stand of the current slab.

[0029] Furthermore, based on the first pass sled coefficient of the current slab, the first pass slab buckle head between racks is automatically controlled, including:

[0030] The first-pass sled coefficient of the i-th stand of the current slab is sent to the basic rolling automation control system. The system calculates the automatic control strategy for the buckle head and realizes the automatic control of the first-pass buckle head of the slab between stands.

[0031] On the other hand, the present invention further provides an electronic device, comprising a processor and a memory; wherein the memory stores at least one instruction, and the instruction is loaded and executed by the processor to implement the above method.

[0032] In yet another aspect, the present invention further provides a computer-readable storage medium, wherein at least one instruction is stored in the storage medium, and the instruction is loaded and executed by a processor to implement the above method.

[0033] The beneficial effects brought about by the technical solution provided by the present invention include at least:

[0034] The present invention takes into account that the warping height of the slab before rolling has a certain influence on the warping of the export slab, and therefore combines the warping before rolling with the traditional sled coefficient control method to form a warping head control strategy for the first pass between frames. The sled coefficient of the first pass of the slab between frames is calculated by the reduction rate, sled coefficient and warping height before rolling. It has a faster calculation speed and can more accurately and efficiently realize the warping head control of the first pass of the slab between frames. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0036] Figure 1 It is a flow chart of a method for controlling the first-pass slab buckle head between racks provided by an embodiment of the present invention;

[0037] Figure 2 It is a system block diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0038] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0039] First of all, it should be noted that in the embodiments of the present invention, words such as "exemplarily" and "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "exemplary" in the present invention should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of the word "exemplarily" is intended to present the concept in a concrete way. In addition, in the embodiments of the present invention, the meaning expressed by "and / or" can be both, or it can be either of the two.

[0040] First embodiment

[0041] Considering that the warpage height of the slab before rolling has a certain influence on the warpage of the exported slab, this embodiment combines the warpage before rolling with the traditional sled coefficient control method to form a warpage control strategy for the first pass between racks, and provides a method for controlling the warpage of the slab in the first pass between racks. The method can be implemented by an electronic device, which can be a terminal or a server. The execution flow of the method is as follows: Figure 1 As shown, the following steps are included:

[0042] S1, calculate the control coefficient of the first pass slab buckle head to obtain the calculation model of the first pass slab buckle height;

[0043] Specifically, in this embodiment, the implementation process of the above S1 is as follows:

[0044] S11, obtaining the first-pass process parameters of the first N slabs in the historical rolling process; wherein N ranges from 2000 to 5000; the first-pass process parameters of each slab include the first-pass reduction rate of the slab, the first-pass sled coefficient of the slab, the first-pass exit warpage height of the slab, and the first-pass pre-rolling warpage height of the slab;

[0045] S12, construct the following slab first pass warping height calculation model:

[0046]

[0047] Where i is the rack number, and its value is 2; i is the warping height of the slab at the first exit of the i-th rack, in mm; ε i SKI is the first pass reduction rate of the slab in the i-th stand obtained on site; i is the first pass sled coefficient of the slab in the i-th rack; Pre_Wh i is the warping height of the slab before the first rolling pass of the i-th stand obtained on site, that is, the warping height of the slab at the last exit of the i-1 stand, in mm; p1~p 17 It is the control coefficient of the first pass slab buckle head;

[0048] S13, using the first pass process parameters of N slabs in the historical rolling process obtained in S11, fit equation (1) to obtain p1~p 17 The value of p1~p 17 Substitute the value of into formula (1) to obtain the calculation model of the first-pass warping height of the slab.

[0049] S2, obtaining the first pass process parameters of the slab on the same furnace corresponding to the current slab;

[0050] Specifically, in this embodiment, the first-pass process parameters of the slabs on the same furnace obtained include: the first-pass reduction rate of the slabs on the same furnace, the first-pass sled coefficient of the slabs on the same furnace, the first-pass outlet warping height of the slabs on the same furnace, and the first-pass pre-rolling warping height of the slabs on the same furnace.

[0051] S3, based on the first-pass process parameters of the slab on the same furnace, using the slab first-pass warping height calculation model, calculate the first-pass warping height calculation value of the slab on the same furnace;

[0052] Specifically, in this embodiment, the calculation formula for the first pass warping height calculation value of the slab on the same furnace is:

[0053]

[0054] Where i is the rack number, and its value is 2; is the calculated value of the outlet warping height of the slab on the same furnace at the first pass of the i-th rack; p1~p 17 It is the control coefficient of the first pass slab buckle head; is the first pass reduction rate of the slab on the same furnace at the i-th stand; is the first pass sled coefficient of the slab on the same furnace obtained on site at the i-th rack; The warping height of the slab on the same furnace at the first pass exit of the i-th rack obtained on site, in mm; is the warping height of the slab on the same furnace before the first pass of the i-th stand, that is, the warping height of the slab on the same furnace at the exit of the last pass of the i-1 stand The unit is mm.

[0055] S4, obtaining the first pass process parameters of the current slab;

[0056] Specifically, in this embodiment, the first-pass process parameters of the current slab include: the first-pass reduction rate of the current slab and the first-pass warping height of the current slab before rolling.

[0057] S5, calculating the first pass sled coefficient of the current slab based on the first pass process parameters of the current slab, combined with the first pass process parameters of the slab on the same furnace and the first pass warping height calculation value of the slab on the same furnace;

[0058] Specifically, in this embodiment, the implementation process of the above S5 is as follows:

[0059] S51, construct the following function:

[0060]

[0061] Where i is the rack number, and its value is 2; is the calculated value of the exit warping height of the current slab at the first pass of the i-th rack; x i is the discrete value of all sled coefficients in the settable interval at the first pass of the i-th rack. The value is an integer ranging from -10 to 10; p1~p 17 is the control coefficient of the first pass slab buckling head; α is the preset coefficient, and its value range is 0 to 1; is the warping height of the slab on the same furnace at the first exit of the i-th rack; is the calculated value of the exit warping height of the slab on the same furnace at the first pass of the i-th rack; is the first pass reduction rate of the current slab in the i-th stand; is the warping height of the current slab before the first pass of the i-th stand, that is, the warping height of the current slab at the exit of the last pass of the i-1-th stand

[0062] S52, based on formula (3), obtain the parameter x i The optimal solution of is the first pass sled coefficient of the i-th stand of the current slab: in, It is the first pass sled coefficient of the i-th stand of this slab.

[0063] S6, based on the first pass sled coefficient of the current slab, realizes automatic control of the first pass slab buckle head between racks.

[0064] Specifically, in this embodiment, the implementation process of the above S6 is as follows:

[0065] The first pass sled coefficient of the i-th rack It is sent to the basic rolling automation control system, and the system calculates the automatic control strategy for the buckle head, thereby realizing the automatic control of the buckle head of the first pass slab between the frames.

[0066] Moreover, it should be noted that when applying the present control method, S1 is first executed to calculate the first-pass slab buckle control coefficient; thereafter, the first-pass slab buckle control coefficient is kept unchanged, and for each slab, only S2 to S6 need to be executed to calculate the corresponding first-pass sled coefficient to perform first-pass buckle control.

[0067] Next, taking the hot rolling rough rolling production of a certain factory as an example, the first pass slab buckle control method between stands provided by the present invention is used to control the buckle. The specific control process is as follows:

[0068] Step 1, calculating the first pass slab buckle control coefficient to obtain the first pass slab buckle height calculation model;

[0069] Specifically, in this embodiment, the implementation process of step 1 is as follows:

[0070] Step 11, obtaining the first pass process parameters of the first 2000 slabs, the parameters of each slab include:

[0071] First pass reduction ratio of slab ε i ;

[0072] First pass sled coefficient SKI of slab i ;

[0073] The first exit warping height of the slab Wh i ;

[0074] Slab warping height Pre_Wh before first rolling i ;

[0075] Where i is the rack number and its value is 2; ε i SKI is the first pass reduction rate of the slab in the i-th stand obtained on site; i is the first pass sled coefficient of the slab on the i-th stand; Wh i Pre_Wh is the warping height of the slab at the first exit of the i-th rack, in mm; i It is the warping height of the slab before the first rolling pass of the i-th stand obtained on site, that is, the warping height of the slab at the last exit of the i-1 stand, in mm.

[0076] Step 12, construct the following function:

[0077]

[0078] Among them, p1 to p 17 is the coefficient.

[0079] Step 13: Fit the formula in step 12 using the first pass process parameters of the first 2000 slabs to obtain coefficients p1 to p 17 In this embodiment, p1 = -309.320593408107, p2 = 633.843197716423, p3 = 12.6601746904951, p4 = -10.8238105700621, p5 = 473.11810275713, p6 = 7.84598580604104, p7 = 9.24043315053756, p8 = -26.6985825515079, p9 = 192.973349135553, p 10 =79.9510230358937, p 11 =-1009.1678057171, p 12 =12.4472890784683, p 13 =-9.58714096760504, p14 =7.7954577459679, p 15 =8.62386053221719, p 16 =165.291951714586, p 17 =-796.060368160032.

[0080] Step 2, obtaining the first pass process parameters of the slab on the same furnace corresponding to the current slab;

[0081] Specifically, in this embodiment, the implementation process of step 2 is as follows:

[0082] Step 21, obtain the first pass reduction rate of the slab on the same furnace

[0083] Step 22, obtain the first pass sled coefficient of the slab on the same furnace

[0084] Step 23, obtain the first pass outlet warping height of the slab on the same furnace

[0085] Step 24, obtaining the warpage height of the slab on the same furnace before the first rolling

[0086] Among them, i is the rack number and its value is 2; is the first pass reduction rate of the slab on the same furnace at the i-th stand; is the first pass sled coefficient of the slab on the same furnace obtained on site at the i-th rack; The warping height of the slab on the same furnace at the first exit of the i-th rack obtained on site; is the warping height of the slab on the same furnace before the first pass of the i-th stand, that is, the warping height of the slab on the same furnace at the exit of the last pass of the i-1 stand In this example, They are 20, -3, 61.83 and 75.05 respectively.

[0087] Step 3, based on the first pass process parameters of the slab on the same furnace, using the slab first pass warping height calculation model, calculate the first pass warping height calculation value of the slab on the same furnace;

[0088] Specifically, in this embodiment, the calculation formula for the first pass warping height calculation value of the slab on the same furnace is:

[0089]

[0090] Among them, i is the rack number and its value is 2; is the calculated value of the outlet warping height of the slab on the same furnace at the first pass of the i-th rack, p1 to p 17 In this embodiment, the first pass warping height of the slab on the same furnace is calculated as follows: It is 75.94.

[0091] Step 4, obtaining the first pass process parameters of the current slab;

[0092] Specifically, in this embodiment, the implementation process of step 4 is as follows:

[0093] Step 41, obtaining the first pass reduction rate of the slab

[0094] Step 42, obtaining the warping height of the slab before the first rolling

[0095] Among them, i is the rack number and its value is 2; is the first pass reduction rate of the slab in the i-th stand; is the warping height of the slab before the first pass of the i-th stand, that is, the warping height of the slab at the exit of the last pass of the i-1-th stand In this example, They are 20 and 83.52 respectively.

[0096] Step 5, based on the first pass process parameters of the current slab, combined with the first pass process parameters of the slab on the same furnace and the first pass warping height calculation value of the slab on the same furnace, calculate the first pass sled coefficient of the current slab;

[0097] Specifically, in this embodiment, the implementation process of step 5 is as follows:

[0098] Step 51, construct the following function:

[0099]

[0100] Among them, i is the rack number and its value is 2; is the calculated value of the exit warpage height of the slab at the first pass of the i-th rack, x i is the discrete value of all sled coefficients in the settable interval at the first pass of the i-th rack, which is an integer ranging from -10 to 10; p1 to p 17 is the coefficient; α is the coefficient, ranging from 0 to 1; is the measured value of the outlet warping height of the slab on the same furnace at the first pass of the i-th rack; is the calculated value of the outlet warpage height of the slab in the same furnace at the first pass of the i-th rack. In this example, x i Set to discrete integers from -10 to 10, α, They are 0.5, 61.83 and 75.05 respectively.

[0101] Step 52, find the parameter x i The optimal solution of is the first pass sled coefficient of the i-th stand of this slab:

[0102]

[0103] in, is the first pass sled coefficient of the i-th stand of this slab. Specifically, in this embodiment, the calculated is 3.

[0104] Step 6, based on the first pass sled coefficient of the current slab, realize automatic control of the first pass slab buckle head between racks;

[0105] Specifically, in this embodiment, the implementation process of step 6 is as follows:

[0106] The first pass sled coefficient of the i-th rack It is sent to the basic rolling automation control system, and the system calculates the automatic control strategy for the buckle head, thereby realizing the automatic control of the buckle head of the first pass slab between the frames.

[0107] In summary, this embodiment provides a method for controlling the buckle head of the slab in the first pass between frames. The control method can realize automatic control of the buckle head of the slab in the first pass between frames, and can realize automatic setting of the sled coefficient by using the pre-rolling warping value and the reduction rate, thereby improving the control effect of the buckle head in the first pass between frames.

[0108] Second embodiment

[0109] This embodiment provides an electronic device, such as Figure 2 As shown, the electronic device includes: a processor and a memory; wherein the processor and the memory can be connected via a communication bus; the memory stores at least one instruction, and the instruction is loaded and executed by the processor to implement the method of the first embodiment. In addition, the electronic device may also include a transceiver, the processor and the transceiver can be connected via a communication bus, and the transceiver is used to communicate with other devices.

[0110] Next, combine Figure 2 The following is a detailed introduction to the various components of the electronic device:

[0111] Among them, the processor is the control center of the electronic device, and the electronic device may include multiple processors, each of which may be a single-core processor (single-CPU) or a multi-core processor (multi-CPU). The processor here may be a processor or a general term for multiple processing elements. For example, the processor is one or more central processing units (CPUs), or other general-purpose processors, application specific integrated circuits (ASICs), or one or more integrated circuits configured to implement an embodiment of the present invention, such as one or more microprocessors (digital signal processors, DSPs), or one or more field programmable gate arrays (field programmable gate arrays, FPGAs), or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor may execute various functions of the electronic device by running or executing software programs stored in the memory and calling data stored in the memory.

[0112] In a specific implementation, as an embodiment, the processor may include one or more CPUs, such as Figure 2 The CPU0 and CPU1 shown in the figure are, of course, only exemplary.

[0113] The memory is used to store the software program for executing the solution of the present invention, and the execution is controlled by the processor. The specific implementation method can refer to the above method embodiment and will not be repeated here.

[0114] Optionally, the memory may be a read-only memory (ROM) or other types of static storage devices that can store static information and instructions, a random access memory (RAM) or other types of dynamic storage devices that can store information and instructions, or an electrically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, optical disc storage (including compressed optical discs, laser discs, optical discs, digital versatile discs, Blu-ray discs, etc.), a magnetic disk storage medium or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but is not limited thereto. The memory may be integrated with the processor or exist independently and accessed through the interface circuit ( Figure 2 (not shown) is coupled to the processor, which is not specifically limited in this embodiment of the present invention.

[0115] The transceiver may include a receiver and a transmitter ( Figure 2 The receiver is used to implement the receiving function, and the transmitter is used to implement the sending function. The transceiver can be integrated with the processor or exist independently and communicate with the electronic device through the interface circuit ( Figure 2 (not shown) is coupled to the processor, which is not specifically limited in this embodiment of the present invention.

[0116] In addition, it should be noted that Figure 2 The structure of the electronic device shown in the figure does not constitute a limitation on the device, and the actual device may include more or fewer components than shown in the figure, or combine certain components, or arrange the components differently. In addition, the technical effects achieved by the electronic device when executing the method of the first embodiment above can refer to the technical effects described in the first embodiment above, so they are not repeated here.

[0117] Third embodiment

[0118] This embodiment provides a computer-readable storage medium, which stores at least one instruction, and the instruction is loaded and executed by a processor to implement the method of the first embodiment. The computer-readable storage medium may be a ROM, a random access memory, a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, etc. The instructions stored therein may be loaded by a processor in a terminal to execute the method.

[0119] In addition, it should be noted that the present invention can be provided as a method, an apparatus or a computer program product. Therefore, the embodiment of the present invention can be in the form of a full or partial hardware embodiment, a full or partial software embodiment or an embodiment combining software and hardware. Moreover, when implemented using software, the embodiment of the present invention can be in the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program codes. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present invention is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that can be accessed by a computer or a data storage device such as a server or data center containing one or more available media sets. The available medium may be a magnetic medium (eg, a floppy disk, a hard disk, a magnetic tape), an optical medium (eg, a DVD), or a semiconductor medium. The semiconductor medium may be a solid state hard disk.

[0120] The embodiments of the present invention are described with reference to the flowcharts and / or block diagrams of the methods, terminal devices (systems), and computer program products according to the embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of the processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, an embedded processor, or other programmable data processing terminal device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing terminal device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0121] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing terminal device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device, so that a series of operation steps are executed on the computer or other programmable terminal device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable terminal device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0122] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. The terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of more restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements. In addition, the term "and / or" is only an association relationship describing the associated objects, indicating that there can be three relationships, for example, A and / or B, which can represent: A exists alone, A and B exist at the same time, and B exists alone, wherein A and B can be singular or plural. In addition, the character " / " in this article generally indicates that the objects before and after are in an "or" relationship, but it may also indicate an "and / or" relationship. Please refer to the context for specific understanding. "At least one" means one or more, and "plurality" means two or more. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can be represented by: a, b, c, ab, ac, bc or abc, where a, b, c can be single or plural.

[0123] In addition, it can be understood that in various embodiments of the present invention, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0124] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0125] In several embodiments provided by the present invention, it should be understood that the disclosed equipment, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of functional modules / units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another device, or some features can be ignored or not executed. Another point, the coupling or direct coupling or communication connection between each other shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms. The unit described as a separate component may or may not be physically separated, and the component displayed as a unit may or may not be a physical unit, that is, it may be located in one place, or it may be distributed on multiple network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, or each unit can exist physically alone, or two or more units can be integrated in one unit.

[0126] If the method is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0127] Finally, it should be noted that the above is only a preferred embodiment of the present invention. It should be pointed out that although the preferred embodiment of the present invention has been described, for ordinary technicians in this technical field, once the basic creative concept of the present invention is known, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention. Therefore, the attached claims are intended to be interpreted as including the preferred embodiment and all changes and modifications that fall within the scope of the embodiments of the present invention.

Claims

1. A method for controlling the buckle head of the first pass slab between racks, characterized in that: include: Calculate the control coefficient of the first pass slab buckle head to obtain the calculation model of the first pass slab buckle height; Obtain the first pass process parameters of the slab on the same furnace corresponding to the current slab; Based on the first-pass process parameters of the slab on the same furnace, the first-pass warping height calculation value of the slab on the same furnace is calculated using the slab first-pass warping height calculation model; Get the first pass process parameters of the current slab; Based on the first-pass process parameters of the current slab, combined with the first-pass process parameters of the slab on the same furnace and the calculated value of the first-pass warping height of the slab on the same furnace, the first-pass sled coefficient of the current slab is calculated; Based on the first-pass sled coefficient of the current slab, automatic control of the first-pass slab buckle head between racks is achieved.

2. The method for controlling the buckle head of the first slab between frames according to claim 1, characterized in that: The method of calculating the first-pass slab buckle control coefficient to construct a slab first-pass warpage height calculation model includes: Obtaining the first-pass process parameters of multiple slabs in the historical rolling process; wherein the first-pass process parameters of each slab include: the first-pass reduction rate of the slab, the first-pass sled coefficient of the slab, the first-pass exit warpage height of the slab, and the first-pass pre-rolling warpage height of the slab; The following calculation model for the first-pass warping height of the slab is constructed: Where i is the rack number, and its value is 2; i is the warping height of the slab at the first exit of the i-th rack; ε i SKI is the first pass reduction rate of the slab in the i-th stand obtained on site; i is the first pass sled coefficient of the slab in the i-th rack; Pre_Wh i is the warping height of the slab before the first rolling pass in the i-th stand obtained on site, that is, the warping height of the slab at the last exit of the i-1-th stand; p1~p 17 It is the control coefficient of the first pass slab buckle head; The first pass process parameters of multiple slabs in the historical rolling process are used to fit equation (1) to obtain p1~p 17 The value of p1~p 17 Substituting the value of into formula (1), the calculation model of the first-pass warping height of the slab is obtained.

3. The method for controlling the buckle head of the first slab between frames according to claim 1, characterized in that: The first-pass process parameters of the slabs on the same furnace include: the first-pass reduction rate of the slabs on the same furnace, the first-pass sled coefficient of the slabs on the same furnace, the first-pass exit warping height of the slabs on the same furnace, and the first-pass pre-rolling warping height of the slabs on the same furnace.

4. The method for controlling the buckle head of the first slab between frames according to claim 3, characterized in that: The calculation formula for the first pass warping height of the slab on the same furnace is: Where i is the rack number, and its value is 2; is the calculated value of the outlet warping height of the slab on the same furnace at the first pass of the i-th rack; p1~p 17 It is the control coefficient of the first pass slab buckle head; is the first pass reduction rate of the slab on the same furnace at the i-th stand; is the sled coefficient of the first pass of the slab on the same furnace at the i-th rack; is the warping height of the slab on the same furnace at the first exit of the i-th rack; is the warping height of the slab on the same furnace before the first pass of the i-th frame, that is, the warping height of the slab on the same furnace at the exit of the last pass of the i-1 frame 5. The method for controlling the buckle head of the first slab between frames according to claim 1, characterized in that: The first-pass process parameters of the current slab include: the first-pass reduction rate of the current slab and the first-pass warping height of the current slab before rolling.

6. The method for controlling the buckle head of the first slab between racks according to claim 5, characterized in that: The first pass sled coefficient of the current slab is calculated based on the first pass process parameters of the current slab, combined with the first pass process parameters of the slab on the same furnace and the first pass warping height calculation value of the slab on the same furnace, including: Construct the following function: Where i is the rack number, and its value is 2; is the calculated value of the exit warping height of the current slab at the first pass of the i-th rack; x i is the discrete value of the sled coefficient selected within the settable interval at the first pass of the i-th rack. The value is an integer ranging from -10 to 10; p1~p 17 is the control coefficient of the first pass slab buckling head; α is the preset coefficient, and its value range is 0 to 1; is the warping height of the slab on the same furnace at the first exit of the i-th rack; is the calculated value of the exit warping height of the slab on the same furnace at the first pass of the i-th rack; is the first pass reduction rate of the current slab in the i-th stand; is the warping height of the current slab before the first pass of the i-th stand, that is, the warping height of the current slab at the exit of the last pass of the i-1-th stand Based on formula (3), we can obtain x i The optimal solution is taken as the first pass sled coefficient of the i-th stand of the current slab.

7. The method for controlling the buckle head of the first slab between frames according to claim 6, characterized in that: Based on the first pass sled coefficient of the current slab, the first pass slab buckle head between racks is automatically controlled, including: The first-pass sled coefficient of the i-th stand of the current slab is sent to the basic rolling automation control system. The system calculates the automatic control strategy for the buckle head and realizes the automatic control of the first-pass buckle head of the slab between stands.

Citation Information

Patent Citations

  • Hot-rolled slab warping detection device and method

    CN113204029A

  • Slab head warping and buckling control method

    CN115446123A

  • Method for controlling scratches on surface of ultra-low carbon hot-rolled strip steel

    CN115921543A

  • Hot rolling head warping and buckling online control method based on data driving