Preparation method of high-speed fan impeller

Through metal powder injection molding and mold shaping processes, the problem of fatigue and overlapping projection at high speed rotation is solved, and cost-effective impeller preparation is achieved.

CN119035554APending Publication Date: 2024-11-29JIANGSU LICHENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310620802.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-29
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

High-speed fan impeller is prone to fatigue damage when rotating at high speed. Traditional metal impeller is expensive to produce and cannot be demolded when projected overlapping adjacent blades.

Method used

Mixed with metal or metal alloy powder with polymer binder, and obtain a semi-finished impeller product without projection overlap by injection molding. Then press the blades in the shaping mold, causing the blades to twist and partially projection overlap on any plane perpendicular to the hub axis. .

Benefits of technology

The integrated preparation of high-speed fan impeller is realized, avoiding traditional casting defects and projection overlap problems, and reducing production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119035554A_ABST
    Figure CN119035554A_ABST
Patent Text Reader

Abstract

According to the preparation method of the high-speed fan impeller, firstly, a semi-finished impeller product is prepared through a metal powder injection molding technology, projections of adjacent blades of the semi-finished impeller product on any plane perpendicular to the axis of a hub are not overlapped, and therefore the technical problem that demolding cannot be conducted or is difficult to conduct does not exist; and then the blades of the impeller are shaped by adopting the shaping mold according to the design requirements to obtain the finished impeller, so that the casting defects of the impeller prepared by adopting a casting method are avoided, and the problem that the integrated impeller cannot be obtained under the condition that the projections of the blades are overlapped is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for preparing a fan impeller, and in particular to a method for preparing a high-speed fan impeller. Background Art

[0002] The impellers of high-speed fans are prone to fatigue damage due to the alternating stress caused by high-speed rotation and blade airflow impact and vibration during operation. Compared with common plastic impellers, impellers made of stainless steel or titanium alloy have better mechanical properties than traditional materials under the same structure.

[0003] However, if the impeller is made of stainless steel or titanium alloy using traditional machining methods, the cost is relatively high; if metal powder injection molding technology is used, there is a problem of being unable to demold when the projections of adjacent blades overlap.

[0004] Chinese patent document CN 107775005 B (application number 201711221178.9) discloses a method for injection molding a high-strength aluminum alloy turbine impeller, including raw material configuration, adhesive formulation, primary smelting, secondary smelting, injection molding, solvent degreasing, thermal degreasing, sintering, solution treatment, and aging treatment. According to the above injection molding steps, it is impossible to manufacture an impeller with overlapping projections of adjacent blades. Summary of the Invention

[0005] The technical problem to be solved by the present invention is to provide a method for preparing an impeller integral part with overlapping projections on any plane perpendicular to the hub axis.

[0006] The technical solution for achieving the purpose of the present invention is a method for preparing a high-speed fan impeller, comprising the following steps: ① Mix the metal or metal alloy powder and the polymer binder in the equipment to obtain a mixed material.

[0007] ② Add the mixed material into the barrel of the injection molding machine, and then inject it into the mold cavity through the nozzle of the injection molding machine to obtain the impeller injection blank, and demold it.

[0008] ③ Degreasing of impeller injection blank.

[0009] ④ Sinter the impeller blank after degreasing in step ③ and keep it at 1200℃~1400℃ for 2h~4h to obtain an impeller semi-finished product, wherein adjacent blades of the impeller semi-finished product have no overlapping projections on any plane perpendicular to the hub axis.

[0010] ⑤ Fix the impeller semi-finished product in the shaping mold, and press the mold downward to lower the height h of the blade. During the process of lowering the height h of the blade, the blade twists. After twisting, the projections of adjacent blades on any plane perpendicular to the hub axis overlap.

[0011] Optionally, the metal or metal alloy powder is one of stainless steel powder, titanium alloy powder, aluminum alloy powder or titanium powder.

[0012] Optionally, when titanium alloy powder is used to make an impeller semi-finished product, the impeller semi-finished product is fixed in front of a shaping mold, first heated to 400° C. to 1000° C., and then placed in the mold to shape the blades.

[0013] In the above step ⑤, the mold presses the blade height down by 20% to 40% relative to the initial height of the impeller semi-finished product.

[0014] In step ⑤ above, the included angle between the hub axis and the blade is a. During shaping and molding, the blade height h is lowered, causing the angle a to change. The lower the blade height, the larger the angle a. During the lowering process, the blade twists, resulting in overlapping parts on the projection. The present invention has positive effects: The impeller prepared by the method of the present invention is a one-piece impeller, and the projections of adjacent blades on any plane perpendicular to the hub axis partially overlap.

[0015] The present invention designs a preparation process of pre-forming + post-shaping, firstly adopts metal powder injection molding technology to prepare the impeller semi-finished product, and the projections of adjacent blades of the impeller semi-finished product on any plane perpendicular to the hub axis do not overlap, so there is no technical problem of being unable or difficult to demold; then, a shaping mold is used to shape the impeller blades according to the design requirements to obtain a finished impeller, which not only avoids the casting defects of the impeller prepared by the casting method, but also solves the problem that an integral impeller cannot be obtained when the blade projections overlap. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a top view of the semi-finished impeller.

[0017] Figure 2 This is the front view of the semi-finished impeller.

[0018] Figure 3 This is a top view of the finished impeller.

[0019] Figure 4 This is the front view of the finished impeller.

[0020] Figure 5 Schematic diagram of the blade shaping principle.

[0021] Figure 6 This is an exploded view of the plastic mold.

[0022] The symbols in the above drawings are as follows: Hub 1, end cover 1-1, outer boss 1-2, blade 2, upper mold base plate 3, upper mold plate 4, upper mold core 5, upper mold core insert 6, lower mold core insert 7, lower mold core 8, lower mold plate 9, lower mold base plate 10. DETAILED DESCRIPTION

[0023] (Example 1) See Figure 3 and Figure 4 The high-speed fan impeller prepared in this embodiment is a one-piece impeller, and is made of one of stainless steel, titanium, titanium alloy, aluminum alloy, and plastic, preferably metal materials such as stainless steel, titanium, titanium alloy, and aluminum alloy.

[0024] The high-speed fan impeller includes a hub 1 and N blades 2 extending outward along the circumference of the hub 1, where 11≤N≤17.

[0025] The hub 1 comprises an annular body and an end cap 1-1, which is arranged on one side of the annular body and serves as a closed end of the hub 1. A coaxial annular outer boss 1-2 is arranged on the outer side of the end cap 1-1, and an axial hole is provided in the center of the end cap 1-1.

[0026] The geometric shape, structure and size of the N blades 2 are identical.

[0027] The projections of adjacent blades on any plane perpendicular to the hub axis partially overlap; in other words, when the impeller is placed on a horizontal plane and viewed from above, the projections of two adjacent blades partially overlap. The area of ​​the overlapping projections of the two adjacent blades accounts for 1 / 6 to 1 / 3 of the surface area of ​​one side of the blade.

[0028] See Figures 1 to 6 In this embodiment, the one-piece impeller is prepared by a metal powder injection molding process + mold shaping. During the metal powder injection molding process, an impeller semi-finished product is obtained in which adjacent blades have no overlap in projection on any plane perpendicular to the hub axis. Then, the impeller is placed in a mold, and the blades are shaped by the mold to obtain an impeller in which adjacent blades have partial overlap in projection on any plane perpendicular to the hub axis.

[0029] Specifically, the preparation method comprises the following steps: ① Mix stainless steel powder and polymer binder in a device to obtain a mixed material. Specifically, weigh 80%-93% stainless steel powder and 15%-25% binder and mix to obtain a mixed material.

[0030] ② Add the mixed material into the barrel of the injection molding machine, and then inject it into the impeller mold through the nozzle of the injection molding machine to obtain the impeller injection blank, and demold it.

[0031] ③ Keep the impeller blank at 90℃ to 150℃ to remove the binder. The holding time is determined according to the maximum thickness of the blank and controlled at 1-2mm / h to obtain a degreased impeller blank.

[0032] ④ Place the impeller blank after degreasing in step ③ into a vacuum furnace or atmosphere furnace for sintering, and keep it at 1200℃~1400℃ for 2h~4h to densify the metal powder to obtain an impeller semi-finished product. When the temperature drops to a touchable level, for example, 50℃, take it out of the furnace.

[0033] See Figure 1 and Figure 2 , the projections of adjacent blades of the impeller semi-finished product on any plane perpendicular to the hub axis do not overlap.

[0034] ⑤ Secure the impeller semi-finished product from step ④ in a shaping mold. Press the mold downward, lowering the blade height h. As the blade height h decreases, the blades twist, causing the projections of adjacent blades to overlap on any plane perpendicular to the hub axis. The mold lowers the height of blade 2 by 20% to 40% relative to the initial height of the impeller semi-finished product.

[0035] See Figure 5 The angle between the hub axis and the blade is a. During the shaping molding, the blade height h is lowered, causing the angle a to change. The lower the blade height, the larger the angle a. During the lowering process, the blade twists, resulting in overlapping parts on the projection.

[0036] See Figure 6 The shaping mold includes an upper mold base plate 3, an upper mold plate 4, an upper mold core 5, an upper mold core insert 6, a lower mold core insert 7, a lower mold core 8, a lower mold plate 9 and a lower mold base plate 10.

[0037] The four corners of the upper mold base 3 and upper mold plate 4 are inserted and positioned, then secured with pins. A square through-hole is located in the center of the upper mold plate 4 for receiving the upper mold core 5. The center of the upper mold core 5 also contains a mounting hole for the upper mold core insert 6. The upper mold core insert 6 includes a cylindrical portion whose inner diameter is the same as the outer diameter of the impeller hub 1.

[0038] The four corners of the lower mold plate 10 are inserted and positioned into position with the lower mold plate 9, then secured with pins. A square through-hole is located in the center of the lower mold plate 9 for receiving the lower mold core 8. The center of the lower mold core 85 has a mounting hole for the lower mold core insert 7. The lower mold core insert 7 includes a cylindrical portion whose outer diameter is the same as the inner diameter of the impeller hub 1.

[0039] During shaping, the hub 1 of the semi-finished impeller is placed with its opening facing downward onto the lower mold insert 7. The upper mold insert 6 is then placed over the hub 1. After the semi-finished impeller is secured, the upper mold core 5 presses the blades downward to a height h. As the height decreases, the blades twist, and the projections of adjacent blades on any plane perpendicular to the hub axis overlap. The mold presses blades 2 down by 20% to 40% relative to the initial height of the semi-finished impeller, with the specific height determined by design requirements.

[0040] (Example 2) The rest of the preparation method of this embodiment is the same as that of Example 1, except that a metal titanium impeller is prepared.

[0041] In step ①, titanium metal powder and a polymer binder are mixed in a device to obtain a mixed material. Specifically, 75% to 85% of titanium powder and 15% to 25% of the binder are weighed and mixed to obtain the mixed material.

[0042] (Example 3) The rest of the preparation method of this embodiment is the same as that of Example 1, except that an aluminum alloy impeller is prepared.

[0043] In step ①, aluminum alloy powder and a polymer binder are mixed in a device to obtain a mixed material. Specifically, 75% to 85% of aluminum powder and 15% to 25% of the binder are weighed and mixed to obtain the mixed material.

[0044] (Example 4) The rest of the preparation method of this embodiment is the same as that of Example 1, except that a titanium alloy impeller is prepared.

[0045] In step ①, titanium alloy powder and a polymer binder are mixed in a device to obtain a mixed material. Specifically, 75% to 85% of titanium powder and 15% to 25% of the binder are weighed and mixed to obtain the mixed material.

[0046] Step ⑤: Fix the impeller semi-finished product obtained in step ④ in front of the shaping mold, heat the titanium alloy impeller semi-finished product to 400° C. to 1000° C., and then put it into the mold to shape the blades.

Claims

1. A method for preparing a high-speed fan impeller, characterized in that The following steps are involved: ① Mixing metal or metal alloy powder and polymer binder in the equipment to obtain a mixed material; ② Add the mixed material into the barrel of the injection molding machine, and then inject it into the mold cavity through the nozzle of the injection molding machine to obtain the impeller injection blank, and demold; ③ Degreasing of impeller injection blank; ④ Sinter the impeller blank after degreasing in step ③ to obtain a semi-finished impeller, wherein adjacent blades of the semi-finished impeller have no overlapping projections on any plane perpendicular to the hub axis; ⑤ Fix the impeller semi-finished product in the shaping mold, and press the mold downward to lower the height h of the blade. During the process of lowering the height h of the blade, the blade twists. After the twisting, the projection parts of adjacent blades on any plane perpendicular to the hub axis overlap.

2. The method for preparing a high-speed fan impeller according to claim 1, characterized in that: The metal or metal alloy powder is one of stainless steel powder, titanium alloy powder, aluminum alloy powder or titanium powder.

3. The method for preparing a high-speed fan impeller according to claim 2, characterized in that: When the impeller semi-finished product is made of titanium alloy powder, the impeller semi-finished product is fixed in front of the shaping mold, the titanium alloy impeller semi-finished product is first heated to 400° C. to 1000° C., and then placed in the mold to shape the blades.

4. The method for preparing a high-speed fan impeller according to claim 1, characterized in that: In step ⑤, the mold presses the height of the blade down by 20% to 40% relative to the initial height of the impeller semi-finished product.

5. The method for preparing a high-speed fan impeller according to claim 1, characterized in that: In step ⑤, the angle between the hub axis and the blade is a. During the shaping molding, the blade height h is lowered, causing the angle a to change. The lower the blade height, the larger the angle a. During the lowering process, the blade twists, resulting in overlapping parts on the projection.