The invention discloses a surrounding rock reinforcement method for a junction tunnel section in an upper-soft lower-hard stratum constructed adopting a shield method and a mining method. The method comprises the steps that 1, tunnel face grouting reinforcement is carried out, specifically, grouting reinforcement is carried out on stratum in front of an excavation face of an upper tunnel body by adopting grouting pipes; 2, junction surface grouting reinforcement is carried out, specifically, grouting reinforcement is carried out on the reinforced stratum by adopting sleeve valve pipes; 3, tunnel arch part advanced support is carried out, specifically, advanced support is carried out on an arch part of the junction tunnel section; 4, grouting pipe removal is carried out; and 5, tunnel faceplugging is carried out, specifically, a tunnel face is plugged through concrete backfilling, and a tunnel face plugging structure is obtained. The method is reasonable in design, simple and convenient to construct and good in use effect, and surrounding rock of the junction tunnel section is effectively reinforced by the method of combining the surface grouting reinforcement with the in-tunnel reinforcement so that the mechanical property of the surrounding rock can be effectively improved; and the tunnel face of the junction tunnel section is reliably plugged before and after reinforcement so that tunnel safety construction can be effectively guaranteed, and ground settlement caused by excavation can be effectively reduced.