The invention discloses a construction technology of pipeline suspension cable span bridge body installation, and belongs to the technical field of pipeline suspension cable span bridge construction. The construction technology includes the following contents of A, technology implementation process analysis, wherein the side of which the terrain is more flat of two shores serves as the sending shore, and the mechanics condition of a pipeline suspension cable span bridge structure in the installation process is analyzed, B, bridge body grouping, C, pre-displacement setup of towers on the two shores, D, lifting of the first group of bridge body, E, lifting of the rest bridge body and F, monitoring in the installation process and after a bridge is built. By means of the construction technology of pipeline suspension cable span bridge body installation, the asymmetric installation of the bridge body is achieved, the adaptability to the project territory is high, the transportability is achieved for most of the span structures, the workload of the site flattening construction and construction difficulty are low, the cycle is short, and the efficiency is higher.