Dormant train movement monitoring and wake-up position verification device and method
Through the logic judgment of the on-board signal system and the design of manual bypass switches, the train movement status is directly supervised, and the beacon reading failure and rail-side ATP interference problems of the existing train wake-up position verification method are solved, which improves the positioning and recovery success rate, which is in line with ATP functional safety requirements.
Patent Information
- Application Number
- CN202411256953.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-29
AI Technical Summary
The existing position verification method when the train wakes up has interference problems such as beacon reading failure and railside ATP software upgrade, which affects the wake-up success rate.
Through the logical judgment of the on-board signal system combined with the design of manual bypass switches and train movement monitoring relays, the movement monitoring of dormant trains and the position verification after wake-up are realized, and the train movement status is directly supervised to avoid the impact of beacon reading and track occupation.
It improves the success rate of train positioning and recovery, is easy to detect single point failures, meets ATP functional safety requirements, and reduces the impact of beacon reading and track occupancy factors.
Smart Images

Figure CN119037500A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a dormant train movement monitoring and awakening position verification device and method. Background Art
[0002] With the development of fully automatic unmanned driving technology, the train automatic sleep wake-up and position recovery functions have been widely used. Generally, the on-board signal system (VOBC) stores the train position before sleep, verifies the memory position after wake-up, and restores accurate positioning after verification.
[0003] At present, there are several ways to verify the position of a train when it wakes up, such as the wake-up beacon verification and the trackside ATP verification. Among them, the wake-up beacon verification method relies on the beacon reading when the train wakes up. If the beacon reading fails, the position cannot be automatically restored, and there is a certain probability of wake-up failure. The trackside ATP verification method requires the trackside ATP to continuously track the dormant train through information such as track section occupancy and clearance, which is easily disturbed by operations such as yard operations and trackside ATP software upgrades, affecting the wake-up success rate.
[0004] Therefore, a dormant train movement monitoring and wake-up position verification device and method are provided. Summary of the invention
[0005] The purpose of the present invention is to overcome the existing defects and provide a dormant train movement monitoring and awakening position verification device and method, combined with the logical judgment of the on-board signal system, to achieve movement monitoring of the dormant train and position verification after awakening.
[0006] The technical solution to achieve the above purpose is:
[0007] One of the present invention is a dormant train movement monitoring and wake-up position verification device, including: a manual bypass switch, one end of the manual bypass switch is connected to a permanent power supply, and the other end is connected to a train movement monitoring relay, the other end of the train movement monitoring relay is connected in series with two emergency brake relay contacts in sequence, the other end of the emergency brake relay contact is grounded, the train movement monitoring relay is also connected to a train movement monitoring indicator light, and the other end of the train movement monitoring indicator light is grounded; the train movement monitoring output end of the on-board signal system is connected to both ends of the train movement monitoring relay, the train movement monitoring relay inspection end of the on-board signal system is connected to the train movement monitoring relay through the train movement monitoring relay recovery contact, and the train movement monitoring input end of the on-board signal system is connected to the train movement monitoring relay through the train movement input contact.
[0008] Preferably, the train movement monitoring relay is connected to the train movement monitoring indicator light via a normally-contact switch.
[0009] A second method of the present invention for monitoring movement of a dormant train and verifying the awakening position includes:
[0010] Step S1, when the train is running normally, the train movement monitoring output command of the onboard signal system remains disconnected, the normally closed contacts of the emergency brake relay contacts are disconnected, and the train movement monitoring relay coil shall not be energized;
[0011] Step S2, when the on-board signal system is powered on and self-checked periodically, the train movement monitoring input contact and the train movement monitoring relay recovery contact input monitoring relay and self-holding circuit fail;
[0012] Step S3, when the train is dormant, after the onboard signal system disconnects other outputs, the train movement monitoring outputs a command, and the train movement monitoring relay is energized;
[0013] Step S4, after the onboard signal system detects that the train operation monitoring input state becomes high, it commands the train to sleep, and then the onboard signal system is powered off and shut down, and the train movement monitoring relay is kept in the attracted state through the self-closing circuit composed of its normally open contact and the emergency brake relay contact;
[0014] Step S5, during the shutdown of the on-board signal system, if the emergency brake is not released, the train movement monitoring relay remains lifted; if the operator moves the train and the emergency brake is released, the self-closing circuit of the train movement monitoring relay is disconnected and the train movement monitoring relay falls;
[0015] Step S6, when the on-board signal system wakes up, it first reads the train operation monitoring input status. If the input is high, the on-board signal system determines that the train has not moved and can restore the train positioning according to the memory position; if the input is low, it triggers a suspicious position alarm and requires manual intervention to restore the train positioning.
[0016] Preferably, it also includes:
[0017] Step S7: During the shutdown of the onboard signal system, the operator can determine the movement monitoring status according to the train movement monitoring indicator light.
[0018] Preferably, in step S7, if the emergency brake needs to be released due to operations such as train maintenance, the train movement monitoring indicator light goes out, and after confirming that the position has not moved, the operator activates the train movement monitoring relay through the manual bypass switch and connects the self-closing circuit.
[0019] The beneficial effects of the present invention are as follows: the dormant train movement monitoring and wake-up position verification device provided by the present invention realizes dormant train movement monitoring and position verification after wake-up through simple circuit design, is easy to implement, and any single point failure can be detected by the system, which meets the ATP functional safety requirements. It can be used alone as a wake-up position verification, or as a supplement to existing verification methods. It can directly supervise the movement status of dormant trains, is not affected by beacon reading, track occupancy and clearance factors, and has a high success rate of positioning recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a circuit diagram of a dormant train movement monitoring and awakening position verification device of the present invention;
[0021] Figure 2 The present invention is a flow chart of a method for monitoring movement of a dormant train and verifying the awakening position.
[0022] 1. Permanent power supply; 2. Manual bypass switch; 3. Train movement monitoring relay; 4. Emergency brake relay contact; 5. Train movement monitoring indicator light; 6. Train movement monitoring relay recovery contact; 7. Train movement monitoring input contact. DETAILED DESCRIPTION
[0023] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0024] The present invention will be further described below in conjunction with the accompanying drawings.
[0025] like Figure 1 As shown, a dormant train movement monitoring and awakening position verification device includes: a manual bypass switch 2, one end of the manual bypass switch 2 is connected to a permanent power supply 1, and the other end is connected to a train movement monitoring relay 3, the other end of the train movement monitoring relay 3 is connected in series with two emergency brake relay contacts 4 in sequence, the other end of the emergency brake relay contact 4 is grounded, the train movement monitoring relay 3 is also connected to a train movement monitoring indicator light 5, and the other end of the train movement monitoring indicator light 5 is grounded.
[0026] In the embodiment, the train movement monitoring output end of the on-board signal system is connected to both ends of the train movement monitoring relay 3, the train movement monitoring relay inspection end of the on-board signal system is connected to the train movement monitoring relay 3 through the train movement monitoring relay recovery contact 6, and the train movement monitoring input end of the on-board signal system is connected to the train movement monitoring relay 3 through the train movement input contact 7.
[0027] In the embodiment, the train movement monitoring relay 3 is connected to the train movement monitoring indicator light 5 via a normally-contact switch.
[0028] like Figure 2 As shown, a method for monitoring the movement of a dormant train and verifying its awakening position comprises:
[0029] Step S1, when the train is operating normally, the train movement monitoring output command of the on-board signal system remains disconnected, the normally closed contact of the emergency brake relay contact 4 is disconnected, and the coil of the train movement monitoring relay 3 shall not be energized.
[0030] Step S2, when the on-board signal system performs power-on self-test and periodic self-test, the train movement monitoring input contact 7 and the train movement monitoring relay recovery contact 6 input supervision relay and self-holding circuit fail.
[0031] Step S3, when the train is dormant, after the onboard signal system disconnects other outputs, the train movement monitoring output command is activated, and the train movement monitoring relay 3 is energized.
[0032] Step S4, after the on-board signal system detects that the train operation monitoring input state becomes high, it commands the train to sleep, and then the on-board signal system is powered off and shut down. The train movement monitoring relay 3 remains in the attracted state through the self-closing circuit composed of its normally open contact and the emergency brake relay contact 4.
[0033] Step S5, during the shutdown of the on-board signal system, if the emergency brake is not released, the train movement monitoring relay 3 remains lifted; if the operator moves the train and the emergency brake is released, the self-closing circuit of the train movement monitoring relay 3 is disconnected and the train movement monitoring relay 3 falls.
[0034] Step S6, when the on-board signal system wakes up, it first reads the train operation monitoring input status. If the input is high, the on-board signal system determines that the train has not moved and can restore the train positioning according to the memory position; if the input is low, the trigger position can alarm and manual intervention is required to restore the train positioning.
[0035] Step S7: During the shutdown of the onboard signal system, the operator can judge the movement monitoring status according to the train movement monitoring indicator light 5.
[0036] In the embodiment, if the emergency brake needs to be released for operations such as train maintenance, the train movement monitoring indicator light 5 goes out, and after confirming that the position has not moved, the operator activates the train movement monitoring relay 3 through the manual bypass switch 2 and connects the self-closing circuit.
[0037] The present invention directly monitors the moving state of the dormant train and is not affected by factors such as beacon reading and track occupancy and clearing, and has a high success rate of positioning recovery.
[0038] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A dormant train movement monitoring and wake-up position verification device, characterized in that: include: A manual bypass switch (2), one end of the manual bypass switch (2) is connected to a permanent power supply (1), and the other end is connected to a train movement monitoring relay (3), the other end of the train movement monitoring relay (3) is sequentially connected in series with two emergency brake relay contacts (4), the other end of the emergency brake relay contact (4) is grounded, the train movement monitoring relay (3) is also connected to a train movement monitoring indicator light (5), and the other end of the train movement monitoring indicator light (5) is grounded; the train movement monitoring output end of the on-board signal system is connected to both ends of the train movement monitoring relay (3), the train movement monitoring relay inspection end of the on-board signal system is connected to the train movement monitoring relay (3) via a train movement monitoring relay recovery contact (6), and the train movement monitoring input end of the on-board signal system is connected to the train movement monitoring relay (3) via a train movement monitoring input contact (7).
2. A dormant train movement monitoring and wake-up position verification device according to claim 1, characterized in that: The train movement monitoring relay (3) is connected to the train movement monitoring indicator light (5) via a normally-contact switch.
3. A method for monitoring the movement of a dormant train and verifying its awakening position, characterized in that: include: Step S1, when the train is running normally, the train movement monitoring output command of the onboard signal system remains disconnected, the normally closed contact of the emergency brake relay contact (4) is disconnected, and the coil of the train movement monitoring relay (3) is not energized; Step S2, during the on-board signal system power-on self-check and periodic self-check, the supervisory relay and self-holding circuit faults are input through the train movement monitoring input contact (7) and the train movement monitoring relay recovery contact (6); Step S3, when the train is dormant, after the onboard signal system disconnects other outputs, the train movement monitoring outputs a command, and the train movement monitoring relay (3) is energized; Step S4, after the onboard signal system detects that the train operation monitoring input state has become high, it commands the train to sleep, and then the onboard signal system is powered off and shut down, and the train movement monitoring relay (3) is kept in the attracted state through the self-closing circuit formed by its normally open contact and the emergency brake relay contact (4); Step S5, during the shutdown of the on-board signal system, if the emergency brake is not released, the train movement monitoring relay (3) remains attracted; if the operator moves the train and the emergency brake is released, the self-closed circuit of the train movement monitoring relay (3) is disconnected, and the train movement monitoring relay (3) falls; Step S6, when the on-board signal system wakes up, it first reads the train operation monitoring input status. If the input is high, the on-board signal system determines that the train has not moved and can restore the train positioning according to the memory position; if the input is low, it triggers a suspicious position alarm and requires manual intervention to restore the train positioning.
4. A method for monitoring the movement of a dormant train and verifying its awakening position according to claim 3, characterized in that: Also includes: Step S7: During the shutdown of the onboard signal system, the operator can judge the movement monitoring status according to the train movement monitoring indicator light (5).
5. A method for monitoring the movement of a dormant train and verifying its awakening position according to claim 4, characterized in that: In step S7, if the emergency brake needs to be released due to operations such as train maintenance, the train movement monitoring indicator light (5) is turned off, and after confirming that the position has not moved, the operator uses the manual bypass switch (2) to pull up the train movement monitoring relay (3) and connect the self-closing circuit.