Anchor chain installation method for double-anchor-gear ship

Through the anchor chain installation method of double anchor ships, the combination device of two anchor machines and traction ropes is used to efficiently install anchor chains in the closed area, solving the problem of low anchor chain installation efficiency and safety, and realizing the inclusion of closed environments Efficient and safe installation.

CN119037666APending Publication Date: 2024-11-29SHANGHAI WAIGAOQIAO SHIP BUILDING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411402501.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the closed area of ​​the double-anchor ship, the anchor chain installation efficiency and safety are low, especially because the anchor chain and other equipment are arranged in the hull, which makes the anchor chain installation time-consuming and labor-intensive.

Method used

The anchor chain installation method of double anchor ships is adopted, and the anchor chain is pulled together by two anchor machines, so that it can be installed into the anchor cabin in the reverse order of the anchor, and the anchor cabin is successively installed from the anchor hole, the anchor barrel, and the anchor chain sieve to the anchor cabin in the reverse order with the anchor. The installation of the anchor chain is achieved in a closed environment using mechanical devices that wrap the traction rope and twisted head.

Benefits of technology

Improve the efficiency and safety of anchor chain installation, allowing the anchor chain to be installed efficiently and safely in the closed area to the designated location, reducing the complexity and risk of manpower operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119037666A_ABST
    Figure CN119037666A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of ships, and discloses an anchor chain mounting method for a double-anchor-gear ship, which comprises the following steps: connecting one end, far away from an anchor head, of one anchor chain to a first end of a traction rope, enabling a second end of the traction rope to sequentially penetrate through an anchor recess, a hawse pipe and a chain controller to reach an anchor chain hinge wheel of a corresponding anchor gear, and connecting the anchor chain with the anchor chain; winding the traction rope on the anchor chain hinge wheel for multiple circles; the second end of the pulling rope is pulled to a winch of the other windlass to be fixed; the two anchor gears are connected with the pulling rope to jointly pull the anchor chain, so that the anchor chain is sequentially pulled and installed to the chain locker from the outer side of the ship body through the anchor recess, the hawse pipe and the chain controller according to the reverse direction of anchoring, the anchor chain is installed in a closed environment, and the installation efficiency and safety are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ships, and in particular to an anchor chain installation method for a double-anchor windlass ship. Background Art

[0002] Large ships generally have heavier anchor chains. One end of the anchor chain is connected to the anchor chain locker, and the other end of the anchor chain is connected to the anchor through the anchor windlass, chain stopper, anchor chain barrel, and anchor hole in sequence. It is used to connect the anchor and the hull to ensure that the ship is moored at the designated location.

[0003] The anchor winches and other mooring equipment of some large ships are generally arranged in a closed area inside the hull. For example, large ships such as cruise ships with double anchor winches are arranged in a closed area on deck 3 of the bow of the cruise ship. There is an anchor winch on both the starboard and port sides. Each anchor winch needs to be connected to an anchor chain, and the weight of a single anchor chain is very heavy.

[0004] Based on the above characteristics, when a cruise ship such as the above double anchor winch is manufactured in a dock, since the area where its mooring equipment such as the anchor winch is arranged is a closed place, the installation of the anchor chain is time-consuming and laborious. Summary of the invention

[0005] The object of the present invention is to provide an anchor chain installation method for a double-anchor windlass ship, thereby improving installation efficiency and safety.

[0006] To achieve this object, the present invention adopts the following technical solutions:

[0007] The anchor chain installation method of a double anchor winch ship comprises two anchor chains, the anchor chains comprise multiple segments of sub-rings, an anchor hole, an anchor chain barrel, a chain stopper, an anchor chain compartment and two anchor winches are arranged in the hull of the ship, each of the anchor winches has two independent output ends, one of the output ends is connected to an anchor chain hinge wheel, and the other output end is connected to a twisting head, and the anchor chain installation method of the double anchor winch ship comprises the following steps:

[0008] S1, connecting one end of one of the anchor chains away from the anchor head to the first end of the traction rope, passing the second end of the traction rope through the anchor hole, the anchor chain tube, the chain stopper in sequence to the anchor chain hinge wheel of the corresponding anchor windlass, and winding the traction rope around the anchor chain hinge wheel for multiple turns;

[0009] S2, pulling the second end of the traction rope to the winding head of another anchor machine for fixing;

[0010] S3, starting the anchor chain hinge wheel wound around the traction rope and the twisting head fixing the traction rope to jointly pull the anchor chain, so that the anchor chain is placed on the anchor chain hinge wheel and engaged;

[0011] S4, the anchor windlass stops and disconnects the traction rope from the anchor chain;

[0012] S5, driving the anchor windlass engaged with the anchor chain, after pulling the anchor chain to the anchor chain locker, stopping the anchor windlass engaged with the anchor chain, and recovering the traction rope;

[0013] S6, repeating S1 to S5, installing another anchor chain to the corresponding anchor windlass.

[0014] In some embodiments, before the second end of the towing rope is towed to the anchor head of the anchor machine and fixed, a plurality of line transfer pulleys are arranged on the hull, and the towing rope is wound around the line transfer pulleys and then connected to the anchor head, and the line transfer pulleys are configured to convert the direction of the towing rope.

[0015] In some embodiments, the traction rope transferred from the transfer pulley close to the capstan to the capstan is perpendicular to the own rotation axis of the capstan.

[0016] In some embodiments, after both anchor chains are installed, the line transfer pulley is removed.

[0017] In some embodiments, S3 further includes:

[0018] Before starting the anchor windlass, the anchor chain is partially lifted by connecting the anchor chain with a lifting device. When the anchor windlass pulls the anchor chain, the lifting device cooperates with the anchor windlass to lower the anchor chain, and the connection between the lifting device and the anchor chain is disconnected after the anchor chain is engaged with the anchor chain wheel.

[0019] In some embodiments, the S4 further includes:

[0020] After the anchor windlass stops, the hydraulic tensioning hook of the chain stopper is connected to the anchor chain through a protective rope.

[0021] In some embodiments, the S5 further includes:

[0022] After the anchor chain hinge wheel of the anchor windlass engages with the sub-rings of several sections of the anchor chain, the anchor windlass stops, disconnects the connection between the protection rope and the anchor chain, and then starts the anchor windlass again to continue to pull the anchor chain to the anchor chain compartment.

[0023] In some embodiments, after the anchor chain wheel of the anchor windlass engages the anchor chain so that the end of the anchor chain enters the hatch of the anchor chain locker, the anchor windlass stops.

[0024] In some embodiments, the protective rope is a steel wire rope.

[0025] In some embodiments, the traction rope is an 8-strand or 12-strand aramid cable.

[0026] Beneficial effects of the present invention:

[0027] The two anchor machines are connected with the towing rope to jointly pull the anchor chain, so that the anchor chain is pulled from the outside of the hull through the anchor hole, anchor chain tube, chain stopper in the reverse order of anchoring and installed in the anchor chain compartment, so that the anchor chain is installed in a closed environment, which improves installation efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of connecting the traction rope to the anchor chain in the anchor chain installation method of the double anchor windlass ship of the present invention;

[0029] Figure 2 The present invention is a schematic diagram of a method for installing an anchor chain of a double anchor windlass ship in which a traction rope is pulled from an anchor chain wheel of one anchor windlass to a winch head of another anchor windlass.

[0030] In the figure:

[0031] 1. Anchor chain; 2. Anchor hole; 3. Anchor chain barrel; 4. Chain stopper; 5. Anchor chain compartment; 6. Anchor windlass; 7. Anchor chain pulley; 8. Capstan; 9. Towing rope; 10. Turning pulley. DETAILED DESCRIPTION

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0035] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0036] like Figure 1 and Figure 2 As shown, the present invention provides an anchor chain installation method for a double anchor winch ship, which is used for installing two anchor chains 1 on the ship, the anchor chain 1 includes multiple sub-rings connected in sequence, and the ship's hull is provided with an anchor hole 2, an anchor chain barrel 3, a chain stopper 4, an anchor chain compartment 5 and two anchor winches 6, each anchor winch 6 has two independent output ends, one of which is connected to an anchor chain hinge wheel 7, and the other is connected to a twisting head 8. It should be noted here that the anchor hole 2, the anchor chain barrel 3, the chain stopper 4 and the anchor chain compartment 5 are all prior arts, and their specific structures and uses are not described in detail; the anchor chain installation method for a double anchor winch ship comprises the following steps:

[0037] S1, such as Figure 2 As shown, one end of one of the anchor chains 1 away from the anchor head is connected to the first end of the traction rope 9, and then the second end of the traction rope 9 is passed through the anchor hole 2, the anchor chain barrel 3, the chain stopper 4 in sequence to the anchor chain hinge wheel 7 of the corresponding anchor winch 6, and the traction rope 9 is wound around the anchor chain hinge wheel 7 for multiple turns; the number of turns can be set according to the size and weight of the anchor chain 1; for example, when the single anchor chain 1 used by the cruise ship with double anchor winches 6 is about 27m and weighs 6.9t, the traction rope 9 can be selected as an 8-strand or 12-strand aramid cable with a diameter of not less than 18mm and a breaking tension of not less than 19.5t, so as to ensure the strength of the traction rope 9. In the above case, the traction rope 9 can be wound around the chain hinge wheel for 2-3 turns.

[0038] S2, the second end of the traction rope 9 is led out from the anchor chain wheel 7, and is pulled to the winding head 8 of another anchor machine 6 for fixing;

[0039] S3, start the anchor chain wheel 7 of the anchor winder 6 that winds the traction rope 9 and the twisting head 8 of the anchor winder 6 that fixes the traction rope 9, so that the two anchor winders 6 pull the anchor chain 1 together through the traction rope 9, so that the anchor chain 1 is placed on the anchor chain wheel 7 and bites;

[0040] Based on the two relatively independent output ends arranged on the anchor winch 6, the traction rope 9 is wound around the anchor chain wheel 7 of one of the anchor winches 6 in steps S2 and S3, and the traction rope 9 is connected to the winding head 8 of the other anchor winch 6. During this period, the two anchor winches 6 act together on the above-mentioned anchor chain 1, so that one end of the anchor chain 1 can pass through the anchor hole 2, the anchor chain barrel 3, and the chain stopper 4 in sequence in a closed environment, so that the anchor chain 1 is installed in a manner opposite to the order of anchoring.

[0041] Furthermore, if Figure 2 As shown, before the second end of the traction rope 9 is pulled to the winding head 8 of the anchor machine 6 and fixed, a plurality of turning pulleys 10 can be arranged on the hull. After the traction rope 9 is pulled out from the anchor chain wheel 7, it is first wrapped around the turning pulley 10 and then fixed to the winding head 8 of another anchor machine 6, so that the direction of the traction rope 9 is changed by the turning pulley 10 to avoid unnecessary interference. Exemplarily, the turning pulley 10 can be a V-shaped wheel or a U-shaped wheel. Furthermore, when installing the turning pulley 10, the two turning pulleys 10 close to the winding heads 8 of the two anchor machines 6 are directly opposite to the winding heads 8 of the anchor machines 6, so that the traction rope 9 transferred from the turning pulley 10 close to the winding head 8 to the winding head 8 is perpendicular to the rotation axis of the winding head 8 itself, so that the traction rope 9 is more comfortable.

[0042] Further, S3 also includes the following steps: before starting the anchor winch 6, the anchor chain 1 is connected with a lifting device, and one end of the anchor chain 1 close to the traction rope 9 is lifted, and the anchor chain 1 is lowered synchronously with the anchor winch 6 pulling the anchor chain 1, so as to reduce the traction burden of the anchor winch 6; after the anchor chain 1 is put on the anchor chain wheel 7 and the two are engaged with each other, the connection between the lifting device and the anchor chain 1 can be disconnected. For example, the lifting device can be a crane or a crane, without limitation; and in order to facilitate lifting, a fixed rope can be connected between the hook of the lifting device and the anchor chain 1.

[0043] S4. After the anchor chain 1 is engaged with the anchor chain wheel 7, both anchor windlasses 6 are stopped and the connection between the traction rope 9 and the anchor chain 1 is disconnected. That is to say, after the anchor chain 1 can be pulled by the anchor chain wheel 7 alone, the traction rope 9 can be disconnected. Further, after the traction rope 9 is disconnected from the anchor chain 1, since the anchor chain 1 is only restricted by the anchor chain wheel 7, it has the risk of falling off. In order to avoid the above unnecessary risks, after the anchor windlass 6 is stopped, the hydraulic tensioning hook of the chain stopper 4 is connected to the anchor chain 1 through the protection rope, and then the traction rope 9 is disconnected, so that the chain stopper 4 can provide additional protection for the anchor chain 1; illustratively, the protection rope can be directly selected as a steel wire rope, thereby reducing the impact of pulling the anchor chain 1.

[0044] S5, drive the anchor windlass 6 that engages the anchor chain 1, and after the anchor chain wheel 7 engages several segments of the anchor chain 1, stop the anchor windlass 6, then disconnect the connection between the protection rope and the anchor chain 1 to avoid interference with the protection rope, and then start the anchor windlass 6 again to continue to pull the anchor chain 1 to the anchor chain locker 5, so as to complete the installation of one side of the anchor chain 1. Further, in order to ensure that the anchor chain 1 can smoothly enter the anchor chain locker 5, in the above S5, the anchor windlass 6 can be stopped after the anchor chain wheel 7 of the anchor windlass 6 engages the anchor chain 1 so that its end enters the hatch of the anchor chain locker 5, so as to avoid the risk of the anchor chain 1 not entering the anchor chain locker 5.

[0045] S6, after completing the installation of the anchor chain 1 on one side, repeat the above steps S1 to S5, install the other anchor chain 1 to the other anchor winch 6 corresponding thereto, thereby completing the installation of the two anchor chains 1 on the double anchor winch ship; and after the installation of the anchor chains 1 is completed, the above-installed turning pulley 10 can be removed. It should be noted here that when installing another anchor chain 1, the twisting head 8 on the previous anchor chain 1 needs to be used, and the twisting head 8 and the anchor chain hinge wheel 7 can be driven independently without affecting the installed anchor chain 1.

[0046] In the above steps, two anchor machines 6 engage the towing rope 9 to jointly tow the anchor chain 1, so that the anchor chain 1 is towed from the outside of the hull through the anchor hole 2, the anchor chain tube 3, and the chain stopper 4 in the reverse order of anchoring to the anchor chain compartment 5, thereby installing the anchor chain 1 in a closed environment, thereby improving the installation efficiency and safety.

[0047] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. An anchor chain installation method for a double anchor winch ship, comprising two anchor chains (1), the anchor chain (1) comprising multiple segments of sub-rings, an anchor hole (2), an anchor chain barrel (3), a chain stopper (4), an anchor chain compartment (5) and two anchor winches (6) are arranged in the hull of the ship, each of the anchor winches (6) has two independent output ends, one of the output ends is connected to an anchor chain hinge wheel (7), and the other output end is connected to a winding head (8), characterized in that: The anchor chain installation method of the double anchor windlass ship comprises the following steps: S1. Connect one end of one of the anchor chains (1) away from the anchor head to the first end of the traction rope (9); pass the second end of the traction rope (9) through the anchor hole (2), the anchor chain tube (3), the chain stopper (4) in sequence to the anchor chain wheel (7) of the corresponding anchor windlass (6); and wrap the traction rope (9) around the anchor chain wheel (7) for multiple turns; S2, pulling the second end of the traction rope (9) to the winding head (8) of another anchor machine (6) and fixing it; S3, starting the anchor chain wheel (7) wound around the traction rope (9) and the winding head (8) fixing the traction rope (9) to jointly pull the anchor chain (1), so that the anchor chain (1) is placed on the anchor chain wheel (7) and engaged; S4, the anchor windlass (6) stops, and the connection between the traction rope (9) and the anchor chain (1) is disconnected; S5, driving the anchor windlass (6) engaged with the anchor chain (1), after the anchor chain (1) is pulled to the anchor chain locker (5), the anchor windlass (6) engaged with the anchor chain (1) stops, and the pulling rope (9) is recovered; S6, repeating S1 to S5, installing another anchor chain (1) to the corresponding anchor windlass (6).

2. The anchor chain installation method for a double anchor windlass ship according to claim 1, characterized in that: Before the second end of the traction rope (9) is towed to the winding head (8) of the anchor machine (6) for fixing, a plurality of turning pulleys (10) are arranged on the hull, and the traction rope (9) is wound around the turning pulleys (10) and then connected to the winding head (8), and the turning pulleys (10) are configured to convert the direction of the traction rope (9).

3. The anchor chain installation method for a double anchor windlass ship according to claim 2, characterized in that: The traction rope (9) transferred from the transfer pulley (10) close to the capstan (8) to the capstan (8) is perpendicular to the rotation axis of the capstan (8).

4. The anchor chain installation method for a double anchor windlass ship according to claim 2, characterized in that: After the two anchor chains (1) are installed, the line transfer pulley (10) is removed.

5. The anchor chain installation method for a double anchor winch ship according to claim 1, characterized in that: The S3 further includes: Before starting the anchor windlass (6), the anchor chain (1) is partially lifted by connecting the anchor chain (1) with a lifting device. When the anchor windlass (6) pulls the anchor chain (1), the lifting device cooperates with the anchor windlass (6) to lower the anchor chain (1), and after the anchor chain (1) is engaged with the anchor chain wheel (7), the connection between the lifting device and the anchor chain (1) is disconnected.

6. The anchor chain installation method for a double anchor windlass ship according to claim 1, characterized in that: The S4 further comprises: After the anchor windlass (6) stops, the hydraulic tensioning hook of the chain stopper (4) is connected to the anchor chain (1) via a protective rope.

7. The anchor chain installation method for a double anchor winch ship according to claim 6, characterized in that: The S5 further includes: After the anchor chain wheel (7) of the anchor windlass (6) engages with several sections of the sub-rings of the anchor chain (1), the anchor windlass (6) stops, disconnects the connection between the protection rope and the anchor chain (1), and then starts the anchor windlass (6) again to continue to pull the anchor chain (1) to the anchor chain compartment (5).

8. The anchor chain installation method for a double anchor winch ship according to claim 7, characterized in that: After the anchor chain wheel (7) of the anchor windlass (6) engages with the anchor chain (1) so that the end of the anchor chain enters the hatch of the anchor chain locker (5), the anchor windlass (6) stops.

9. The anchor chain installation method for a double anchor windlass ship according to claim 6, characterized in that: The protective rope is a steel wire rope.

10. The method for installing anchor chains of a double anchor windlass ship according to any one of claims 1 to 8, characterized in that: The traction rope (9) is an 8-strand or 12-strand aramid cable.