Elevator for bridge construction

CN119038352APending Publication Date: 2024-11-29CHINA RAILWAY BRIDGE BUREAU OF THE NINTH ENG CO LTD
View PDF 0 Cites -1 Cited by

Patent Information

Application Number
CN202410806996.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The connection between the existing construction elevators and the functional areas during bridge construction has safety hazards and space occupation problems, and there is a lack of effective linkage mechanisms.

Method used

A bridge construction elevator was designed, using a cage and elevator protective door, equipped with electric telescopic door, connecting plate, bearing plate and linkage components. Through linkage components, the automatic docking of elevator protective door and electric telescopic door is achieved to ensure safety. , and improve stability and safety through reinforcement blocks, buffer blocks and friction bumps.

Benefits of technology

It realizes a safe and stable connection between the elevator and the functional area, avoids space occupation, reduces safety hazards, and improves the service life and safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119038352A_ABST
    Figure CN119038352A_ABST
Patent Text Reader

Abstract

The invention relates to the field of elevators, in particular to a bridge construction elevator which comprises a cage, an elevator protective door and the like. A control system is mounted in the lifting cage; each functional area of the integrated intelligent tower building machine is provided with an elevator protection door. The device further comprises an electric retractable door and a linkage assembly. An electric retractable door is installed at an outlet of the lifting cage, and a linkage assembly used for enabling the electric retractable door to be in butt joint with the elevator protective door is arranged on the electric retractable door. A connecting plate in the prior art is perfectly replaced by the first upper protection window and the connecting plate, and meanwhile, when a worker walks on a new connecting plate composed of the first upper protection window and the connecting plate, the connecting plate is connected with the cage and the elevator protection door for supporting; the stability and the safety of a new connecting plate formed by the first upper protective window and the connecting plate are greatly improved; meanwhile, the defect that an existing connecting plate occupies the space of the cage is overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of hoists, and in particular to a hoist for bridge construction. Background Art

[0002] In existing bridge construction, when constructing large bridge piers, an integrated intelligent tower-building machine is usually used for construction. The integrated intelligent tower-building machine can quickly construct the bridge piers by setting up multiple vertical functional areas. When constructing bridge piers, the integrated intelligent tower-building machine rises higher and higher and cannot move down, so workers and construction materials can only be brought to each functional area by a hoist.

[0003] Most of the existing hoists are construction elevators. After the existing construction elevator reaches the designated functional area, there will be a certain gap between the construction elevator and the functional area. In the prior art, a receiving plate is usually installed in the construction elevator, and the receiving plate is pushed out after the construction elevator is opened to fill the gap. This is convenient for workers and carts to enter and exit. However, this receiving plate is large, which not only occupies the elevator space, but also is only connected to the elevator by screws, which is easy to loosen after long-term use and has poor safety.

[0004] Moreover, there is no linkage mechanism installed between the existing functional area protection doors and the construction elevators. The elevator protection doors of each functional area can be opened or closed manually, which poses certain safety hazards. Summary of the invention

[0005] In order to overcome the shortcomings of the prior art that the construction elevator and the functional area are connected by a connecting plate, which has poor safety and the connecting plate occupies a lot of space in the construction elevator when not in use, the present invention provides a hoist for bridge construction.

[0006] Technical solution: A hoist for bridge construction, including a cage and an elevator protective door; a control system is installed in the cage; an elevator protective door is installed on each functional area of ​​the integrated intelligent tower building machine; it also includes an electric telescopic door, a connecting plate, a bearing plate and a linkage assembly; an electric telescopic door is installed at the exit of the cage, and a first lower protective window and a first upper protective window are slidably connected to the electric telescopic door; the first lower protective window is located at the lower side of the first upper protective window; two front-to-rear symmetrical connecting plates are installed on the upper side of the first lower protective window; a second lower protective window and a second upper protective window are slidably connected to the elevator protective door; the second lower protective window is located at the lower side of the second upper protective window; a bearing plate is fixed to the upper side of the second lower protective window; and a linkage assembly for connecting the electric telescopic door and the elevator protective door is provided on the electric telescopic door.

[0007] As an improvement of the above scheme, the linkage assembly includes a first electric telescopic block, a trigger block and a second electric telescopic block; a plurality of first electric telescopic blocks are installed on the upper side of the first lower protective window and the lower side of the first upper protective window; a plurality of docking grooves are provided on the second lower protective window and the second upper protective window; a trigger block is fixed in each docking groove; a plurality of left-right symmetrical fixing grooves are provided on the second lower protective window and the second upper protective window; a plurality of second electric telescopic blocks are slidably connected to the elevator protective door.

[0008] As an improvement to the above solution, two layers of protection nets are provided on the upper side of the first lower protection window, the first upper protection window, the second lower protection window and the second upper protection window.

[0009] As an improvement of the above solution, it also includes a reinforcement block; a plurality of two left-right symmetrical reinforcement blocks are installed on the upper side of the first upper protective window.

[0010] As an improvement of the above solution, a buffer block is also included; a plurality of buffer blocks are installed on the contact surface of the first upper protective window and the second upper protective window.

[0011] As an improvement of the above scheme, it also includes a third electric telescopic block, a first protective plate and a second protective plate; a plurality of third electric telescopic blocks are installed at the exit of the cage; the output ends of all the third electric telescopic blocks are commonly fixed to the electric telescopic door; a plurality of left-right symmetrical first protective plates for blocking gaps are fixed to the electric telescopic door; each first protective plate is slidably connected to the cage; a second protective plate for blocking another gap is fixed to the lower side of the electric telescopic door; the first protective plate is also slidably connected to the cage.

[0012] As an improvement to the above solution, the second protective plate is arranged to be low in the middle and high on the left and right sides.

[0013] As an improvement of the above scheme, it also includes friction bumps; a plurality of friction bumps are fixedly connected to the left and right sides of the second protective plate, and the volume of the friction bumps gradually increases from the middle of the second protective plate to the outside.

[0014] As an improvement of the above solution, a warning light is also included; a warning light is installed on the upper side of each reinforcement block.

[0015] As an improvement of the above scheme, it also includes elastic blocks, springs and anti-collision blocks; the reinforcement blocks are made of alloy; each reinforcement block is connected to an anti-collision block on the side facing the cage; a spring is fixedly connected between each anti-collision block and the corresponding reinforcement block; an elastic block is also fixedly connected between each anti-collision block and the corresponding reinforcement block; all the springs on the reinforcement blocks are located in the corresponding elastic blocks.

[0016] Beneficial effects: The present invention realizes that the first upper protective window and the connecting plate perfectly replace the connecting plate in the prior art. At the same time, when the worker walks on the new connecting plate composed of the first upper protective window and the connecting plate, the connecting plate is connected and supported with the cage and the elevator protective door, which greatly improves the stability and safety of the new connecting plate composed of the first upper protective window and the connecting plate; at the same time, it avoids the disadvantage that the existing connecting plate occupies the cage space;

[0017] When encountering some special pier structures, the distance between the electric telescopic door and the elevator protective door is far, the electric telescopic door is pushed toward the elevator protective door through the third electric telescopic rod, so that the electric telescopic door is close to the elevator protective door, and the first electric telescopic block is connected with the elevator protective door, and at the same time, the first protective plate and the second protective plate are extended to facilitate the passage of workers, which has a good protective effect;

[0018] At the same time, the second protective plate and friction protrusions inclined from the middle to the left and right sides increase the resistance of the electric cart to the left and right sides of the second protective plate, slowing down the displacement speed of the electric cart after it loses control and deflects, so that the operator has enough reaction time to adjust the moving direction of the electric cart, preventing the electric cart from colliding with the two sides of the electric telescopic door during movement, and playing a certain preventive and protective effect on the electric telescopic door;

[0019] The reinforcement block is used to improve the fixing effect of the first lower protective window and the first upper protective window in the closed state, thereby improving the safety of the cage; and the reinforcing block is used to limit the entry and exit position of the electric trolley, thereby reserving a safe space for both sides of the electric trolley and the electric telescopic door;

[0020] When the electric cart collides with the reinforcement block, most of the impact force is absorbed by the elastic block, the spring and the anti-collision block, thereby reducing the impact force of the electric cart and reducing the reverse force exerted by the reinforcement block on the wheels of the electric cart, thereby protecting the electric cart and the reinforcement block. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the bridge construction hoist of the present invention;

[0022] Figure 2 It is a schematic diagram of the combined three-dimensional structure of the cage and the electric telescopic door of the present invention;

[0023] Figure 3 It is a cross-sectional view of the electric telescopic door of the present invention;

[0024] Figure 4 A cross-sectional view of an elevator protective door according to the present invention;

[0025] Figure 5 For the present invention Figure 4 A magnified image of the area in the middle;

[0026] Figure 6 This is a diagram showing the electric telescopic door of the present invention and the elevator protective door in an open state after being docked;

[0027] Figure 7 This is a diagram of the third electric telescopic block of the present invention in an extended state;

[0028] Figure 8 It is a schematic diagram of the combined three-dimensional structure of the cage, the electric telescopic door, the elevator protective door, the third electric telescopic block, the first protective plate and the second protective plate of the present invention;

[0029] Fig. 9 This is a diagram showing the combined state of the first lower protective window, the reinforcement block and the warning light of the present invention;

[0030] Fig.10 It is an exploded view of the reinforcement block, elastic block, spring and anti-collision block of the present invention;

[0031] Fig.11 It is a schematic diagram of the three-dimensional structure of the second protective plate and the friction protrusion combination of the present invention.

[0032] The reference numbers in the figure are: 1-cage, 2-electric telescopic door, 2001-first lower protective window, 2002-first upper protective window, 3-elevator protective door, 3001-second lower protective window, 3002-second upper protective window, 3003-docking groove, 3004-fixing groove, 101-reinforcement block, 102-connecting plate, 103-buffer block, 104-first electric telescopic block, 105-trigger block, 106-second electric telescopic block, 107-warning light, 108-elastic block, 109-spring, 110-anti-collision block, 111-bearing plate, 201-third electric telescopic block, 202-first protective plate, 203-second protective plate, 204-friction bump. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the embodiments shown in the accompanying drawings.

[0034] Example 1

[0035] A hoist for bridge construction, such as Figure 1-Figure 8 and Fig.11 As shown, it includes a cage 1 and an elevator protection door 3; a control system is installed in the cage 1; an elevator protection door 3 is installed on each functional area of ​​the integrated intelligent tower building machine, and the cage 1 corresponds to the position of the elevator protection door 3 after reaching the designated functional area;

[0036] It also includes an electric telescopic door 2, a connecting plate 102, a bearing plate 111 and a linkage component; an electric telescopic door 2 is installed at the exit of the cage 1, and a first lower protective window 2001 and a first upper protective window 2002 are slidably connected to the electric telescopic door 2; the first lower protective window 2001 is located at the lower side of the first upper protective window 2002; the first lower protective window 2001 is installed with two front-to-back symmetrical connecting plates 102; a second lower protective window 3001 and a second upper protective window 3002 are slidably connected to the elevator protection door 3; the second lower protective window 3001 is located at the lower side of the second upper protective window 3002; the second lower protective window 3001 is fixedly connected to the bearing plate 111, and when the electric telescopic door 2 is docked with the elevator protection door 3, the connecting plate 102 located at the front side of the first lower protective window 2001 is mounted on the upper side of the bearing plate 111; the connecting plate 102 located at the rear side of the first lower protective window 2001 is mounted on the lower side of the cage 1 exit; a linkage component is arranged on the electric telescopic door 2.

[0037] The linkage assembly includes a first electric telescopic block 104, a trigger block 105 and a second electric telescopic block 106; two first electric telescopic blocks 104 are installed on the upper side of the first lower protective window 2001 and the lower side of the first upper protective window 2002; a plurality of docking grooves 3003 are provided on the second lower protective window 3001 and the second upper protective window 3002; a trigger block 105 is fixedly connected in each docking groove 3003, and after the cage 1 reaches the designated functional area, each first electric telescopic block 104 corresponds to the position of the corresponding docking groove 3003; a plurality of left-right symmetrical fixing grooves 3004 are provided on the second lower protective window 3001 and the second upper protective window 3002; a plurality of second electric telescopic blocks 106 are slidably connected to the elevator protective door 3, and in the initial state, the output end of each second electric telescopic block 106 is located in the corresponding fixing groove 3004, thereby fixing the second lower protective window 3001 and the second upper protective window 3002.

[0038] Each protective window is equipped with two layers of protective nets.

[0039] It also includes a reinforcement block 101; a plurality of two left-right symmetrical reinforcement blocks 101 are installed on the upper side of the first upper protective window 2002.

[0040] It also includes a buffer block 103; two buffer blocks 103 are installed on the first upper protective window 2002 and the contact surface of the first upper protective window 2002, and the buffer blocks 103 are rubber blocks.

[0041] It also includes a third electric telescopic block 201, a first protective plate 202 and a second protective plate 203; four third electric telescopic blocks 201 distributed in a rectangular shape are installed at the exit of the cage 1; the output ends of all the third electric telescopic blocks 201 are fixedly connected to the electric telescopic door 2; two left-right symmetrical first protective plates 202 are fixedly connected to the electric telescopic door 2; each first protective plate 202 is slidably connected to the cage 1; a second protective plate 203 is fixedly connected to the lower side of the electric telescopic door 2; the first protective plate 202 is also slidably connected to the cage 1.

[0042] The second protection plate 203 is configured to be low in the middle and high on the left and right sides.

[0043] It also includes friction bumps 204; a plurality of friction bumps 204 are fixedly connected to the left and right sides of the second protective plate 203, and the volume of the friction bumps 204 gradually increases from the middle of the second protective plate 203 to the outside.

[0044] When the cage 1 moves up and down, Figure 2 As shown: the electric telescopic door 2 retracts the first lower protective window 2001 and the first upper protective window 2002. At this time, each reinforcement block 101 passes through the corresponding through slot on the first upper protective window 2002, and the electric telescopic door 2 is in a closed state. The reinforcement block 101 improves the fixing effect of the first lower protective window 2001 and the first upper protective window 2002 in the closed state. At the same time, a double-layer protective net is installed on each protective window, which greatly improves the safety of the cage 1; at the same time, the output end of each second electric telescopic block 106 is located in the corresponding fixing slot 3004, and the second lower protective window 3001 and the second upper protective window 3002 are in a fixed state. At this time, the elevator protection door 3 is in a closed state, and the second lower protective window 3001 and the second upper protective window 3002 are fixed by the second electric telescopic block 106 to prevent manual opening or closing of the elevator protection door 3, reduce safety hazards, and ensure the safety of workers riding the construction elevator;

[0045] When the elevator reaches the designated functional area, the control system in the cage 1 controls the output end of the first electric telescopic block 104 to extend, so that the output end of the first electric telescopic block 104 enters the corresponding docking groove 3003, so that the first lower protective window 2001 is docked with the second lower protective window 3001, and the first upper protective window 2002 is docked with the second upper protective window 3002, and the output end of the first electric telescopic block 104 squeezes the trigger block 105 in the docking groove 3003. After being squeezed, the trigger block 105 sends a signal to each second electric telescopic block 106. At this time, the output end of the second electric telescopic block 106 retracts and exits the corresponding fixing groove 3004, thereby releasing the second electric telescopic block 106 from fixing the second lower protective window 3001 and the second upper protective window 3002. At this time, the connecting plate 102 located on the front side of the first upper protective window 2002 has been mounted on the upper side of the bearing plate 111; then The worker sends a command to the electric telescopic door 2 through the controller in the cage 1, so that the electric telescopic door 2 pushes the first lower protective window 2001 downward and pushes the first upper protective window 2002 upward, thereby opening the electric telescopic door 2. During this process, the first lower protective window 2001 will drive the second lower protective window 3001 to move downward through the first electric telescopic block 104, and the first upper protective window 2002 will also drive the second upper protective window 3002 to move upward through the first electric telescopic block 104, thereby opening the elevator protection door 3. When the connecting plate 102 located at the rear side of the first upper protective window 2002 contacts the lower side of the cage 1 exit, the electric telescopic door 2 and the elevator protection door 3 are also fully opened. By this method, the elevator protection door 3 is linked with the construction elevator, and the elevator protection door 3 can only be opened by the construction elevator, avoiding manual opening or closing of the elevator protection door 3 of each functional area, thereby eliminating safety hazards.

[0046] like Figure 8 and Fig. 9 As shown: after the elevator protective door 3, the electric telescopic door 2 and the cage 1 are connected by the connecting plate 102, the first upper protective window 2002 and the connecting plate 102 are used to perfectly replace the receiving plate in the prior art. At the same time, when the workers walk on the new receiving plate composed of the first upper protective window 2002 and the connecting plate 102, the connecting plate 102 is connected and supported with the cage 1 and the elevator protective door 3, which greatly improves the stability and safety of the new receiving plate composed of the first upper protective window 2002 and the connecting plate 102; at the same time, the new receiving plate composed of the first upper protective window 2002 and the connecting plate 102 solves the shortcoming that the existing receiving plate occupies the space of the cage 1; and in the process of the electric telescopic door 2 driving the first lower protective window 2001 and the first upper protective window 2002 to close, the buffer block 103 is used to reduce the impact force when the first lower protective window 2001 and the first upper protective window 2002 are closed to protect the first lower protective window 2001 and the first upper protective window 2002, thereby improving the service life of the equipment.

[0047] However, when encountering some special pier structures or other situations, after the cage 1 reaches the designated functional area, the distance between the electric telescopic door 2 and the elevator protection door 3 is far. At this time, after the electric telescopic door 2 reaches the designated functional area, the first electric telescopic block 104 cannot directly dock with the elevator protection door 3. Figure 7 As shown: at this time, the electric telescopic door 2 is pushed toward the elevator protection door 3 by the third electric telescopic block 201, so that the electric telescopic door 2 is close to the elevator protection door 3, and the first electric telescopic block 104 is connected with the elevator protection door 3; but at this time, the gap between the electric telescopic door 2 and the cage 1 will be too large, which poses a safety hazard;

[0048] Therefore, Figure 8 As shown: when the third electric telescopic block 201 pushes the electric telescopic door 2 toward the elevator protective door 3, the first protective plate 202 and the second protective plate 203 will be brought out to cover the gap between the electric telescopic door 2 and the cage 1, which has a good protective effect; and most of the existing construction sites use electric carts to transport goods. When workers use electric carts to transport goods, they usually fill the ground with mud and sand, then take the construction elevator to the designated functional area, and then take the construction elevator back to the ground after unloading. Therefore, workers usually push the electric cart filled with mud and sand out of the cage 1, and push the electric cart without goods into the cage 1. When the electric cart is filled with mud and sand, the electric cart is heavy and it is difficult for workers to control the direction. Just like when driving an electric car, when a heavy object is placed on the pedal of the electric car, the front of the electric car is not easy to control. In addition, there are certain bumps and depressions at the connection between the connecting plate 102 and the cage 1 and the elevator protective door 3. Therefore, when the worker operates the electric cart to push out the cage 1, the electric cart is very likely to deflect due to improper operation and hit the two sides of the electric telescopic door 2. Sliding grooves are provided on both sides of the electric telescopic door 2. If the sliding grooves are greatly impacted, they are very likely to be deformed, resulting in the inability of the electric telescopic door 2 to operate. Figure 8 As shown, when a worker manipulates the electric cart filled with mud and sand to push out the cage 1, the electric cart deflects to the left and right sides. At this time, the second protective plate 203 with a lower middle portion and higher left and right sides increases the resistance when the electric cart moves to the left and right sides, slowing down the displacement speed of the electric cart after it deflects out of control, so that the worker has enough reaction time to adjust the moving direction of the electric cart, preventing the electric cart from hitting the two sides of the electric telescopic door 2 during the movement, and playing a certain preventive protective effect on the electric telescopic door 2;

[0049] At the same time, through the friction protrusion 204 that gradually increases from the middle of the second protective plate 203 to the left and right sides, when the wheel of the electric cart hits the friction protrusion 204, it is blocked by the friction protrusion 204, which greatly increases the resistance of the electric cart to deflect to the left and right sides of the second protective plate 203, further slowing down the displacement speed of the electric cart after losing control and deflecting, thereby enhancing the preventive protection effect of the electric telescopic door 2.

[0050] Example 2

[0051] On the basis of Example 1, Figure 9-10 As shown, a warning light 107 is also included; a warning light 107 is installed on the upper side of each reinforcement block 101.

[0052] It also includes an elastic block 108, a spring 109 and an anti-collision block 110; the reinforcement block 101 is made of alloy; each reinforcement block 101 is connected to an anti-collision block 110 on the side facing the cage 1; a spring 109 is fixedly connected between each anti-collision block 110 and the corresponding reinforcement block 101; an elastic block 108 is also fixedly connected between each anti-collision block 110 and the corresponding reinforcement block 101, and the elastic block 108 is a rubber block; all the springs 109 on the reinforcement block 101 are located in the corresponding elastic block 108.

[0053] Most of the existing construction sites use electric carts to transport goods. When workers use electric carts to transport goods, they usually fill the ground with mud and sand, then take the construction elevator to the designated functional area, and then take the construction elevator back to the ground after unloading. Therefore, workers usually push the electric cart full of mud and sand out of the cage 1, and push the electric cart without goods into the cage 1. When the electric cart is full of mud and sand, although the second protective plate 203 with a low middle part and high left and right sides and the friction protrusions 204 can increase the resistance of the electric cart to the left and right sides of the second protective plate 203, giving workers time to adjust the electric cart in time, the electric cart moves forward at a fast speed, and it is difficult for workers to control the direction. In addition, workers are more tired at work and easily distracted, resulting in workers not reacting in time and unable to adjust the direction in time. At the same time, some workers will twist and accelerate in panic after reacting. At this time, the electric cart still has the risk of hitting the electric telescopic door 2;

[0054] Therefore, Fig. 9As shown, when the electric telescopic door 2 and the elevator protective door 3 are in a connected state, the reinforcement blocks 101 located on the first upper protective window 2002 are located on both sides of the entrance and exit of the cage 1. Through the two reinforcement blocks 101, when the worker pushes the cart in and out of the cage 1, the entry and exit position of the electric cart is limited. At this time, the worker can only pass through the space between the two reinforcement blocks 101, and a safe space is reserved for the electric cart and the electric telescopic door 2. When the worker's improper operation causes the electric cart to hit the two sides of the electric telescopic door 2, if the worker reacts in the first time, the worker only needs to control the steering of the electric cart to avoid the cart from hitting the reinforcement block 101; if the worker cannot react in the first time, resulting in the electric cart being unable to completely return to the safe route, the electric cart will hit the reinforcement block 101. Because the reinforcement block 101 is made of alloy material, when the impact force of the electric cart is large, although the reinforcement block 101 can withstand the impact of the wheel, the reverse force exerted by the reinforcement block 101 on the wheel is also large at this time, and the car The wheel is also at risk of being damaged by a huge reverse impact force, and the reinforcing block 101 is also easily contracted and bent by repeated huge impacts, resulting in the reinforcing block 101 being unable to fix the first lower protective window 2001 and the first upper protective window 2002. Therefore, when the electric cart collides with the reinforcing block 101, it will first hit the anti-collision block 110. After the anti-collision block 110 is hit, it will squeeze the elastic block 108 and the spring 109. At this time, the elastic block 108 and the spring 109 are compressed and contracted, absorbing most of the impact force, reducing the impact force of the electric cart, and at the same time reducing the reverse force of the reinforcing block 101 on the wheel of the electric cart, protecting the electric cart and also protecting the reinforcing block 101; at the same time, when workers are working at night or in a poorly lit environment, the warning light 107 will warn the workers, improve their safety awareness, inform the workers that the electric cart needs to enter and exit between the two reinforcing blocks 101, and at the same time inform the workers of the position of the reinforcing block 101 to prevent the workers from being tripped by the reinforcing block 101 and causing safety accidents.

[0055] The above embodiments are only preferred embodiments of the present invention and are not intended to limit the scope of implementation of the present invention. Therefore, all equivalent changes made to the contents described in the claims of the present invention should be included in the scope of the claims of the present invention.

Claims

1. A bridge construction hoist, comprising a cage (1) and an elevator protection door (3); a control system is installed in the cage (1); an elevator protection door (3) is installed on each functional area of ​​the integrated intelligent tower construction machine; wherein: The invention also comprises an electric telescopic door (2), a connecting plate (102), a bearing plate (111) and a linkage assembly; the electric telescopic door (2) is installed at the exit of the cage (1); a first lower protective window (2001) and a first upper protective window (2002) are slidably connected to the electric telescopic door (2); the first lower protective window (2001) is located at the lower side of the first upper protective window (2002); two front-to-rear symmetrical connecting plates (102) are installed on the upper side of the first lower protective window (2001); a second lower protective window (3001) and a second upper protective window (3002) are slidably connected to the elevator protection door (3); the second lower protective window (3001) is located at the lower side of the second upper protective window (3002); the bearing plate (111) is fixedly connected to the upper side of the second lower protective window (3001); and a linkage assembly for connecting the electric telescopic door (2) and the elevator protection door (3) is provided on the electric telescopic door (2).

2. A bridge construction hoist according to claim 1, characterized in that: The linkage assembly comprises a first electric telescopic block (104), a trigger block (105) and a second electric telescopic block (106); a plurality of first electric telescopic blocks (104) are installed on the upper side of the first lower protective window (2001) and the lower side of the first upper protective window (2002); a plurality of two docking grooves (3003) are provided on the second lower protective window (3001) and the second upper protective window (3002); a trigger block (105) is fixedly connected in each docking groove (3003); a plurality of left-right symmetrical fixing grooves (3004) are provided on the second lower protective window (3001) and the second upper protective window (3002); and a plurality of second electric telescopic blocks (106) are slidably connected to the elevator protective door (3).

3. A bridge construction hoist according to claim 2, characterized in that: Two layers of protection nets are arranged on the upper side of the first lower protection window (2001), the first upper protection window (2002), the second lower protection window (3001) and the second upper protection window (3002).

4. A bridge construction hoist according to claim 3, characterized in that: It also includes a reinforcement block (101); a plurality of two left-right symmetrical reinforcement blocks (101) are installed on the upper side of the first upper protective window (2002).

5. A bridge construction hoist according to claim 4, characterized in that: It also includes a buffer block (103); a plurality of buffer blocks (103) are installed on the first upper protective window (2002) and the contact surface of the first upper protective window (2002).

6. A bridge construction hoist according to any one of claims 1 to 5, characterized in that: The invention also comprises a third electric telescopic block (201), a first protective plate (202) and a second protective plate (203); a plurality of third electric telescopic blocks (201) are installed at the exit of the cage (1); the output ends of all the third electric telescopic blocks (201) are fixedly connected to the electric telescopic door (2); a plurality of left-right symmetrical first protective plates (202) for shielding gaps are fixedly connected to the electric telescopic door (2); each first protective plate (202) is slidably connected to the cage (1); a second protective plate (203) for shielding another gap is fixedly connected to the lower side of the electric telescopic door (2); and the first protective plate (202) is also slidably connected to the cage (1).

7. A bridge construction hoist according to claim 6, characterized in that: The second protection plate (203) is arranged to be low in the middle and high on the left and right sides.

8. A bridge construction hoist according to claim 7, characterized in that: It also includes friction protrusions (204); a plurality of friction protrusions (204) are fixedly connected to the left and right sides of the second protective plate (203), and the volume of the friction protrusions (204) gradually increases from the middle of the second protective plate (203) to the outside.

9. A bridge construction hoist according to claim 8, characterized in that: It also includes a warning light (107); a warning light (107) is installed on the upper side of each reinforcement block (101).

10. A bridge construction hoist according to claim 9, characterized in that: It also includes an elastic block (108), a spring (109) and an anti-collision block (110); the reinforcement block (101) is made of alloy material; each reinforcement block (101) is connected to an anti-collision block (110) on the side facing the cage (1); a spring (109) is fixedly connected between each anti-collision block (110) and the corresponding reinforcement block (101); an elastic block (108) is also fixedly connected between each anti-collision block (110) and the corresponding reinforcement block (101); all the springs (109) on the reinforcement block (101) are located in the corresponding elastic block (108).