Intelligent box girder bridge rainwater collecting and spraying device and implementation method thereof
Through the design of the intelligent box girder bridge rainwater collection and spray device, the built-in water storage device and underground water storage device are used, combined with the intelligent control system, the problems of rainwater collection and utilization of bridges are solved, and water storage on rainy days, water use on sunny days and automation are realized Irrigation reduces dust, meets environmental protection requirements and adapts to different bridge sizes.
Patent Information
- Application Number
- CN202411316683.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-29
AI Technical Summary
The existing bridge rainwater collection device has the problem of rainwater not being effectively utilized, especially the inability to irrigate and road dust reduction on sunny days, and the water collection box needs to be customized and fixed, which limits the amount of water storage and use range.
An intelligent box girder bridge rainwater collection and spraying device was designed, using built-in beam internal water storage device and underground water storage device, combined with an intelligent comprehensive control box to realize water storage on rainy days and water use on sunny days, and to control green plants under the bridge through automated control Irrigation and road dust reduction.
It realizes the effective collection and utilization of rainwater, meets environmental protection requirements, saves human resources, and adapts to different bridge sizes through modular design, maximizing rainwater storage and full coverage of spray range.
Smart Images

Figure CN119041291A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of bridge accessory construction, and in particular relates to an intelligent box girder bridge rainwater collection and spraying device and an implementation method thereof. Background Art
[0002] With the development of economy and society, the construction mileage of highway, municipal and subway viaducts is increasing, which is of great significance to alleviate urban traffic congestion and promote urban development. At present, rainwater on viaducts is usually discharged directly into municipal pipes, and rainwater, as an important water resource, has not been effectively utilized.
[0003] After investigation, relevant patents have proposed solutions to the above problems. For example, in the patent document with announcement number CN206721669U, a bridge rainwater collection device is disclosed, which mainly filters and collects rainwater and has no rainwater utilization function; in the patent document with announcement number CN106894336B, a rainwater collection system and its construction method for elevated bridges are disclosed, which mainly rely on the floating plate set in the water collection box to control the switch of the water drop hole to achieve the function of cleaning the green belt under the bridge, but it has the following shortcomings: 1. The water collection box needs to be customized; 2. The water collection box is fixed with an L-shaped card plate, which restricts the water storage capacity of the water collection box; 3. The buoyancy control is used, and the green belt under the bridge can only be cleaned on rainy days, and it is impossible to store water on rainy days and irrigate on sunny days.
[0004] In summary, the existing related patents disclosed either have only rainwater collection function but no rainwater utilization function; or the rainwater utilization function is insufficient. Summary of the invention
[0005] The purpose of the present invention is to provide an intelligent box girder bridge rainwater collection and spraying device and its implementation method to solve the problem of rainwater collection and rainwater recycling on the bridge deck and meet environmental protection requirements. Through the built-in water storage device in the beam body and the underground water storage device, water can be stored on rainy days and used on sunny days. At the same time, the application of intelligent means realizes the automatic control of irrigation of green plants under the bridge and road dust reduction, saving human resources.
[0006] An intelligent box girder bridge rainwater collection and spraying device, comprising a bridge box girder segment, a water collecting pipe, a water storage tank, a water guide pipe, a spraying device, a water level monitoring device in the water storage tank, a rainwater filtering device, an underground water storage device, an intelligent integrated control box, and an underground water level monitoring device;
[0007] One end of the water collecting pipe is placed on the flange plate of the bridge box girder segment, with the edge 60cm from the top, vertically passing through the flange plate, and after being arranged along the bottom edge of the flange plate and the outer edge of the web of the bridge box girder segment, vertically passing through the web of the bridge box girder segment, and the other end of the water collecting pipe is connected to the reserved interface of the water storage tank; the rainwater filtering device is placed on the water collecting pipe port; the water storage tank is located in the box chamber of the bridge box girder segment; the water level monitoring device in the water storage tank is embedded in the water storage tank; the spraying device is led out from the water storage tank and installed at the lower edge of the bottom plate of the bridge box girder segment; the groundwater level monitoring device is embedded in the underground water storage device; the water level monitoring device in the water storage tank and the groundwater level monitoring device feed back the water level monitoring situation to the intelligent integrated control box; the water storage tank and the underground water storage device are connected through the water guide pipe.
[0008] Furthermore, the water storage tank is a PVC hard water tank or a PVC soft water bag.
[0009] Furthermore, there are multiple water tanks in the box chamber of the box girder segment of the bridge, and the multiple water tanks are interconnected through water pipes; there are multiple underground water storage devices, which are interconnected through water pipes.
[0010] The present invention also discloses an implementation method of an intelligent box girder bridge rainwater collection and spraying device, comprising the following steps:
[0011] Step 1: Select a water tank;
[0012] Step 2: Measure the longitudinal, transverse and vertical dimensions of the box girder segment of the bridge, and make a quotient with the corresponding dimension data of the water tank, take an integer and select the minimum value, which is the number of water tanks to be installed and then install; measure the longitudinal and transverse dimensions under the bridge, and make a quotient with the corresponding dimension data of the underground water storage device, take an integer and select the minimum value, which is the number of underground water storage devices that can be installed and then install; measure the longitudinal and transverse dimensions of the bottom of the bridge box girder segment and the distance to the ground, and select the number of longitudinal bridge-direction arrangements according to the longitudinal length of the bottom and the length modulus of the spray device, and select the number of transverse bridge-direction arrangements according to the transverse dimension of the bottom and the distance to the ground, and the spray range of the spray device nozzle;
[0013] Step 3: Install the water collecting pipe;
[0014] Step 4: Install the water level monitoring device in the water tank into the water tank, and the water tanks are interconnected by water pipes; install the underground water level monitoring device into the underground water storage device, and the underground water storage devices are interconnected by water pipes;
[0015] Step 5: Install the spray device on the lower edge of the bottom plate of the bridge box girder segment;
[0016] Step 6: Install an intelligent integrated control box to receive water level monitoring information from the water level monitoring device and the underground water level monitoring device, as well as weather conditions and preset spraying plans via Bluetooth, so as to control whether the underground water storage device and the spraying device are turned on.
[0017] Furthermore, in step 1, if the bridge box girder section is a newly built structure, a PVC hard water tank is selected as the water storage tank; if the bridge box girder section is an existing structure, a PVC soft water bag is selected as the water storage tank.
[0018] Furthermore, in step 3, if the bridge box girder segment is a newly built structure, a water collecting pipe is pre-buried; if the bridge box girder segment is an existing structure, the existing drainage facilities are modified and replaced with a water collecting pipe, and a rainwater filtration device is installed at the bridge deck end of the water collecting pipe, and the other end of the water collecting pipe is connected to a water storage tank.
[0019] Furthermore, in step 6, when the water level in the water storage tank reaches the maximum value, the intelligent integrated control box controls the rainwater to be stored in the underground water storage device through the water pipe. When the water level drops to the minimum value due to water consumption due to spraying, the intelligent integrated control box pumps the rainwater in the underground water storage device to the water storage tank through the water pipe; when the water level in the underground water storage device reaches the preset maximum value, the intelligent integrated control box drains the excess rainwater to the roadside drainage ditch.
[0020] Furthermore, in step 6, when the weather is continuously cloudy and rainy, no spraying operation is carried out, and when the weather is hot, green plant irrigation and road spraying for dust prevention are carried out; the intelligent integrated control box turns on the spraying device to spray the green plants and roads under the bridge.
[0021] The intelligent box girder bridge rainwater collection and spraying device and implementation method thereof of the present invention have the following advantages:
[0022] 1. The built-in water storage device in the beam and the underground water storage device can store water on rainy days and use it on sunny days. At the same time, the application of intelligent means can realize the automatic control of the irrigation of green plants under the bridge and the dust reduction on the road, saving human resources, solving the problem of rainwater collection and recycling on the bridge deck, and meeting environmental protection requirements.
[0023] 2. Taking full account of existing elevated bridges and newly built elevated bridges, modular design is adopted. Water storage tanks, sprinkler devices, and underground water storage devices are all modularly designed to meet the different bridge spans and lateral dimensions, maximizing rainwater storage and fully covering the spraying range.
[0024] 3. Intelligent control. The intelligent integrated control box mainly includes a controller, a water pump, a distribution valve, etc. It monitors the water level and rationally allocates rainwater resources in the water storage tank and underground water storage device. The intelligent integrated control box can store water on rainy days and irrigate green plants under the bridge and reduce road dust on sunny days according to the weather conditions obtained from the network. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of an intelligent box girder bridge rainwater collection and spraying device of the present invention;
[0026] Figure 2This is a schematic diagram of the rainwater filtration device of the present invention installed in a water collection pipe.
[0027] Explanation of the markings in the figure: 1. Bridge box girder segment; 2. Water collecting pipe; 3. Water storage tank; 4-1. First water pipe; 4-2. Second water pipe; 4-3. Third water pipe; 5. Sprinkler; 6. Water level monitoring device in water tank; 7. Rainwater filtering device; 8. Underground water storage device; 9. Intelligent integrated control box; 10. Underground water level monitoring device. DETAILED DESCRIPTION
[0028] In order to better understand the purpose, structure and function of the present invention, the following is a further detailed description of an intelligent box girder bridge rainwater collection and spraying device and its implementation method in conjunction with the accompanying drawings.
[0029] The intelligent box girder bridge rainwater collection and spraying device of the present invention comprises a bridge box girder segment 1, a water collecting pipe 2, a water storage tank 3, a first water pipe 4-1, a second water pipe 4-2, a third water pipe 4-3, a spraying device 5, a water level monitoring device 6 in the water storage tank, a rainwater filtering device 7, an underground water storage device 8, an intelligent integrated control box 9, and an underground water level monitoring device 10. One end of the water collecting pipe 2 is placed on the flange plate of the bridge box girder segment 1, vertically passes through the flange plate, and is arranged along the bottom edge of the flange plate and the outer edge of the web of the bridge box girder segment 1, and then vertically passes through the web of the bridge box girder segment 1. The other end of the water collecting pipe 2 is connected to the reserved interface of the water storage tank 3; the rainwater filtering device 7 is placed on the port of the water collecting pipe 2; the water storage tank 3 is located in the box chamber of the bridge box girder segment 1; the water level monitoring device 6 in the water storage tank is embedded in the water storage tank 3; the spraying device 5 is led out from the water storage tank 3 and installed at the lower edge of the bottom plate of the bridge box girder segment 1; the groundwater level monitoring device 10 is embedded in the underground water storage device 8; the water level monitoring device 6 in the water storage tank and the groundwater level monitoring device 10 feed back the water level monitoring situation to the intelligent integrated control box 9; the water storage tank 3 and the underground water storage device 8 are connected through the water guide pipe.
[0030] After the rainwater collected on the bridge deck flows to the rainwater filtering device 7, it is collected into the water tank 3 through the water collecting pipe 2. When the water level monitoring device 6 in the water tank 3 detects that the water in the water tank 3 is full, the intelligent integrated control box 9 will store the water in the underground water storage device 8. When the water level monitoring device 6 in the water tank 3 detects that the water in the water tank 3 is short of water, the intelligent integrated control box 9 will extract water from the underground water storage device 8 to replenish the water in the water tank 3 to meet the spraying needs. According to the acquired weather conditions and the preset spraying plan, the intelligent integrated control box 9 controls the spraying device 5 to take water from the water tank 3, and then irrigates the green plants under the bridge to reduce road dust.
[0031] The water tank 3 adopts a modular design, and the number of water tanks 3 can be freely combined according to the longitudinal and transverse dimensions of the box beam. The water level monitoring device 6 in the water tank is embedded in the water tank 3.
[0032] The water storage tank 3 adopts a durable PVC hard water tank or a PVC soft water bag to adapt to a newly built bridge or an existing bridge. A newly built bridge can pre-install a PVC hard water tank during construction, and an existing bridge can install a PVC soft water bag through an inspection channel.
[0033] The spray device 5 adopts a modular design to adapt to the span of the bridge. The spray device 5 can spray water droplets or water mist to meet the different needs of green plant irrigation under the bridge and road dust reduction.
[0034] The underground water storage device 8 adopts a modular design, and the number of installations can be selected according to the ground span of the bridge.
[0035] The intelligent integrated control box 9 has the functions of analyzing the sensor data of the water level monitoring device 6 in the water tank, pumping control, obtaining weather information through networking, and storing irrigation plans.
[0036] The intelligent integrated control box 9 can reasonably allocate water resources through the water conduit 4 according to the water level of the water tank 3 and the underground water storage device 8. When the water level of the water tank 3 reaches the maximum value, the intelligent integrated control box 9 can control the rainwater to be stored in the underground water storage device 8 through the second water conduit 4-2. When the water level of the water tank 3 drops to the minimum value due to water consumption due to spraying, the intelligent integrated control box 9 can pump the rainwater in the underground water storage device 8 to the water tank 3 through the second water conduit 4-2. When the water level in the underground water storage device 8 reaches the preset maximum value, the intelligent integrated control box 9 can drain the excess rainwater to the roadside drainage ditch.
[0037] The intelligent integrated control box 9 can carry out irrigation of green plants under the bridge and water spraying for dust prevention on the road according to the weather forecast or the preset plan. When the weather is continuously cloudy and rainy, the spraying operation is not carried out. When the weather is hot, the green plants are irrigated and the road is sprayed for dust prevention. The intelligent integrated control box 9 turns on the spraying device 5 to spray the green plants and roads under the bridge.
[0038] An implementation method of an intelligent box girder bridge rainwater collection and spraying device comprises the following steps:
[0039] Step 1: If the box girder segment 1 is a new structure, the water tank 3 is a PVC hard water tank; if the box girder segment 1 is an existing structure, the water tank 3 is a PVC soft water bag;
[0040] Step 2: Measure the longitudinal, transverse and vertical dimensions of the box girder segment 1, and make a quotient with the corresponding dimension data of the water tank 3, take an integer and select the minimum value, which is the number of water tanks 3 to be installed and then install; measure the longitudinal and transverse dimensions under the bridge, and make a quotient with the corresponding dimension data of the underground water storage device 8, take an integer and select the minimum value, which is the number of underground water storage devices 8 that can be installed and then install; measure the longitudinal and transverse dimensions of the bottom of the box girder segment 1 and the distance to the ground, and select the number of longitudinal bridge arrangements according to the longitudinal length of the bottom and the length modulus of the spray device 5, and select the number of transverse bridge arrangements according to the transverse dimension of the bottom and the distance to the ground, relying on the spray range of the nozzle of the spray device 5, and after determining the number of spray devices 5, install them and connect them using the water pipe 4;
[0041] Step 3: If the box girder segment 1 is a newly built structure, a water collecting pipe 2 is pre-buried; if the box girder segment 1 is an existing structure, the existing drainage facilities are modified and replaced with the water collecting pipe 2, and a rainwater filtering device 7 is installed at the bridge deck end of the water collecting pipe 2, and the other end of the water collecting pipe 2 is connected to the water storage tank 3;
[0042] Step 4: Install the water level monitoring device 6 in the water tank into the water tank 3, and the water tank 3 is interconnected by the first water pipe 4-1; install the underground water level monitoring device 10 into the underground water storage device 8, and the underground water storage device 8 is interconnected by the third water pipe 4-3;
[0043] Step 5: Install the integrated control box 9 in the box, connect it to the water storage tank 3 through the water pipe 4, and connect it to the spray device 5 through the water pipe 4;
[0044] Step 6: Install the intelligent integrated control box 9 under the bridge, which can receive the water level monitoring information of the water level monitoring device 6 in the water tank and the underground water level monitoring device 10, as well as the weather conditions and the preset spraying plan through Bluetooth, so as to control whether the underground water storage device 8 and the spraying device 5 are turned on. It is connected to the integrated control box 9 in the box through a water pipe, connected to the underground water storage device 8 through a water pipe, and connected to the municipal drainage through a water pipe.
[0045] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. An intelligent box girder bridge rainwater collection and spraying device, characterized in that: It comprises a bridge box girder segment (1), a water collecting pipe (2), a water storage tank (3), a water guide pipe, a spray device (5), a water level monitoring device in the water storage tank (6), a rainwater filtering device (7), an underground water storage device (8), an intelligent integrated control box (9), and an underground water level monitoring device (10); One end of the water collecting pipe (2) is placed on the flange plate of the bridge box girder segment (1), vertically passes through the flange plate, is arranged along the bottom edge of the flange plate and the outer edge of the web of the bridge box girder segment (1), and vertically passes through the web of the bridge box girder segment (1). The other end of the water collecting pipe (2) is connected to a reserved interface of the water storage tank (3); a rainwater filtering device (7) is placed at the end of the water collecting pipe (2); the water storage tank (3) is located in the box chamber of the bridge box girder segment (1); the water level in the water storage tank is The monitoring device (6) is embedded in the water storage tank (3); the spray device (5) is led out from the water storage tank (3) and installed at the lower edge of the bottom plate of the bridge box girder segment (1); the underground water level monitoring device (10) is embedded in the underground water storage device (8); the water level monitoring device (6) in the water storage tank and the underground water level monitoring device (10) feed back the water level monitoring situation to the intelligent integrated control box (9); the water storage tank (3) and the underground water storage device (8) are connected through a water pipe.
2. The intelligent box girder bridge rainwater collection and spraying device according to claim 1 is characterized in that: The water storage tank (3) is a PVC hard water tank or a PVC soft water bag.
3. The intelligent box girder bridge rainwater collection and spraying device according to claim 1 is characterized in that: A plurality of water storage tanks (3) are provided in the box chamber of the bridge box girder segment (1), and the plurality of water storage tanks (3) are interconnected via water pipes; and a plurality of underground water storage devices (8) are interconnected via water pipes.
4. An implementation method of an intelligent box girder bridge rainwater collection and spraying device, characterized in that: Using the intelligent box girder bridge rainwater collection and spraying device as claimed in claim 1, the implementation method comprises the following steps: Step 1: Select a water tank (3); Step 2: Measure the longitudinal, transverse and vertical dimensions of the box girder segment (1) of the bridge, and make a quotient with the corresponding dimension data of the water tank (3), take an integer and select the minimum value, which is the number of water tanks (3) to be installed and then proceed with the installation; measure the longitudinal and transverse dimensions under the bridge, and make a quotient with the corresponding dimension data of the underground water storage device (8), take an integer and select the minimum value, which is the number of underground water storage devices (8) that can be installed and then proceed with the installation; measure the longitudinal and transverse dimensions of the bottom of the bridge box girder segment (1) and the distance to the ground, and select the number of longitudinal bridge arrangement according to the longitudinal length of the bottom and the length modulus of the spray device (5); and select the number of transverse bridge arrangement according to the transverse dimension of the bottom and the distance to the ground and the spray range of the nozzle of the spray device (5); Step 3: Install the water collecting pipe (2); Step 4: installing the water level monitoring device (6) in the water tank into the water tank (3), and the water tanks (3) are interconnected by water pipes; installing the underground water level monitoring device (10) into the underground water storage device (8), and the underground water storage devices (8) are interconnected by water pipes; Step 5: Install the spray device (5) at the lower edge of the bottom plate of the bridge box girder segment (1); Step 6: Install an intelligent integrated control box (9) to receive water level monitoring information from the water level monitoring device (6) and the underground water level monitoring device (10), weather conditions, and a preset spraying plan via Bluetooth, thereby controlling whether the underground water storage device (8) and the spraying device (5) are turned on.
5. The implementation method of the intelligent box girder bridge rainwater collection and spraying device according to claim 4 is characterized in that: In step 1, if the bridge box girder segment (1) is a newly built structure, a PVC hard water tank is selected as the water storage tank (3); if the bridge box girder segment (1) is an existing structure, a PVC soft water bag is selected as the water storage tank (3).
6. The implementation method of the intelligent box girder bridge rainwater collection and spraying device according to claim 4 is characterized in that: In step 3, if the bridge box girder segment (1) is a newly built structure, a water collecting pipe (2) is pre-buried; if the bridge box girder segment (1) is an existing structure, the existing drainage facilities are modified and replaced with the water collecting pipe (2), and a rainwater filtering device (7) is installed at the bridge deck end of the water collecting pipe (2), and the other end of the water collecting pipe (2) is connected to the water storage tank (3).
7. The implementation method of the intelligent box girder bridge rainwater collection and spraying device according to claim 4 is characterized in that: In step 6, when the water level in the water storage tank (3) reaches a maximum value, the intelligent integrated control box (9) controls rainwater to be stored in the underground water storage device (8) through the water conduit; when the water level in the water storage tank (3) drops to a minimum value due to water consumption due to spraying, the intelligent integrated control box (9) pumps rainwater in the underground water storage device (8) to the water storage tank (3) through the water conduit; when the water level in the underground water storage device (8) reaches a preset maximum value, the intelligent integrated control box (9) drains excess rainwater into a roadside drainage ditch.
8. The implementation method of the intelligent box girder bridge rainwater collection and spraying device according to claim 4 is characterized in that: In step 6, when the weather is continuously cloudy and rainy, the spraying operation is not performed. When the weather is hot, green plant irrigation and road spraying for dust prevention are performed. The intelligent integrated control box (9) turns on the spraying device (5) to spray the green plants and roads under the bridge.