Height-variable bridge local leveling incremental launching construction system and construction method

By setting up local leveling structures and temporary pier components at intervals in the push-up direction, combined with step-type jacks and pad support, the problems of low efficiency and large space occupation in traditional push-up construction are solved, and a more efficient and safe construction method is achieved .

CN119041314APending Publication Date: 2024-11-29ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411252795.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The welding efficiency of the leveling structure and steel box girders in traditional overhead construction is low, which increases construction time and cost, and the temporary support occupies a large space, affecting navigation and driving safety.

Method used

The local leveling structure is arranged at intervals along the thrust direction, and the temporary pier assembly and slide beam are arranged to reduce the space occupied by temporary support. The steel box beam is supported by step-type jacks and pads to realize the local leveling structure's top push device. .

Benefits of technology

It reduces construction costs, reduces environmental interference, improves construction efficiency, reduces the space occupied by temporary support, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041314A_ABST
    Figure CN119041314A_ABST
Patent Text Reader

Abstract

The invention relates to a variable-height bridge local leveling pushing construction system which comprises local leveling structures arranged at the bottom of a steel box girder at intervals in the pushing direction, temporary pier assemblies stretching across the adjacent local leveling structures, temporary pier bearing beams arranged at the tops of the temporary pier assemblies and slide way beams arranged at the tops of the temporary pier bearing beams. And a pushing device for pushing the local leveling structure is arranged at the top of the slideway beam, so that compared with a traditional coherent leveling structure, the temporary support occupied space between the temporary pier assemblies is reduced on the whole, and the interference to the environment can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge construction, and in particular to the technical field of a local leveling and pushing construction system and a construction method for a variable-height bridge. Background Art

[0002] In the traditional jacking construction process, the leveling structure usually requires a lot of welding with the steel box girder, which leads to inefficient installation and removal, and increases construction time and cost.

[0003] In this regard, China CN215714693U discloses a leveling structure for jacking of variable-section bridges, which connects all the leveling units into a whole through the I-beams on the lower end faces of the leveling units, and guides the sliding of the I-beams through slideways fixed to the bridge piers.

[0004] Although the overall design of the structure can improve the ability to resist deformation and thus reduce weight, what is more important in the jacking construction is that during the jacking construction, the temporary piers set up to support the steel box girder and the leveling structure occupy a large space, seriously affecting the navigation and driving safety below. These problems limit the construction efficiency and also bring inconvenience to the surrounding traffic.

[0005] Therefore, it is particularly necessary to develop a new construction method that can simplify leveling costs and reduce the space occupied by temporary supports. Summary of the invention

[0006] In summary, the present invention aims at the deficiencies of the prior art and proposes a local leveling and pushing construction system and method for a variable height bridge, aiming to reduce construction costs while reducing interference with the environment.

[0007] To achieve the above object, the present invention adopts the following technical solutions:

[0008] A local leveling and pushing construction system for a variable height bridge, comprising local leveling structures arranged at intervals along a pushing direction at the bottom of a steel box beam, temporary pier assemblies spanning adjacent local leveling structures, temporary pier bearing beams arranged on top of the temporary pier assemblies, and slideway beams arranged on top of the temporary pier bearing beams;

[0009] A pushing device for pushing the local leveling structure is provided on the top of the slideway beam.

[0010] Compared with the prior art, in this case, local leveling structures are arranged at intervals along the pushing direction, and temporary pier components are arranged at the bottom thereof to cross the leveling structure. Compared with the traditional continuous leveling structure, the space occupied by temporary supports between the temporary pier components is reduced as a whole, thereby reducing interference with the environment.

[0011] In some embodiments, it also includes a pad disposed below the steel box beam and between the slideway beam.

[0012] In some embodiments, there is one cushion block, which is arranged on the outside of the pushing device.

[0013] In a preferred embodiment, there are two cushion blocks, which are respectively arranged on the inner and outer sides of the pushing device.

[0014] In a preferred embodiment, the pushing device is a walking jack.

[0015] In some embodiments, the walking jack includes two vertical jacks and a horizontal jack, and a lower support for stabilizing the vertical jacks and the horizontal jacks.

[0016] In some embodiments, the walking jack further includes an upper support disposed at the top and abutting against the local leveling structure.

[0017] In some embodiments, it also includes a slideway arranged at the top of the slideway beam and a horizontal connection jack arranged at the front end of the slideway beam, the pushing device is arranged on the slideway, and the horizontal connection jack pulls the pushing device.

[0018] The local leveling and jacking construction method for a variable height bridge includes the construction steps of applying the local leveling and jacking construction system for a variable height bridge as described above to carry out jacking construction of a steel box girder. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the front and rear directions of the local leveling and jacking construction system of this case;

[0020] Figure 2 This is a cross-sectional diagram of the local leveling and jacking construction system of this case;

[0021] Figure 3 Figure 1 A partial enlarged view of the middle part;

[0022] Figure 4 yes Figure 2 A partial enlarged view of point B in the middle;

[0023] Figure 5 It is a cross-sectional schematic diagram of another embodiment of the local leveling and pushing construction system of this case;

[0024] Figure 6 yes Figure 5 A partial enlarged view of point C in the middle;

[0025] Figure 7 It is a flow chart of the construction method of this case;

[0026] Figure 8It is a schematic diagram of the position relationship of the construction system in step S1 of the construction method of this case;

[0027] Fig. 9 It is a schematic diagram of the position relationship of the construction system in step S2 of the construction method of this case;

[0028] Fig.10 It is a schematic diagram of the position relationship of the construction system in step S3 of the construction method of this case;

[0029] Fig.11 It is a schematic diagram of the position relationship of the construction system in step S4 of the construction method of this case;

[0030] Fig.12 It is a schematic diagram of the position relationship of the construction system in step S5 of the construction method of this case;

[0031] Fig.13 It is a schematic diagram of the position relationship of the construction system in step S6 of the construction method of this case;

[0032] Fig.14 It is a schematic diagram of the position relationship of the construction system in step S7 of the construction method of this case. DETAILED DESCRIPTION

[0033] The features of the present invention and other related features are further described in detail below through embodiments to facilitate understanding by those skilled in the art:

[0034] It should be noted that the words "front", "rear", "left", "right", "up" and "down" used in the description of this case refer to the directions in the attached drawings, and the words "bottom", "top", "inside" and "outside" refer to the directions toward or away from the geometric center of a specific component, respectively. In particular, the front-to-back direction is the pushing direction of the steel box girder section during the pushing construction, the front direction is the forward direction, and the reverse direction is the backward direction.

[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] Please refer to Figure 1 and Figure 2In this case, a variable height bridge local leveling and pushing construction system includes a local leveling structure 2 arranged at intervals at the bottom of a steel box girder 1 along the pushing direction. The local leveling structure 2 is designed as a steel box structure and is connected to the steel box girder 1 by bolts. That is, the local leveling structure 2 is different from the traditional continuous leveling structure in that there is a spacing space between them. Two local leveling structures 2 can be set in the cross section of the steel box girder 1, and the number can also be adjusted according to demand, and no specific limitation is made here.

[0037] Furthermore, in the pushing direction, a temporary pier assembly 3 is arranged across the adjacent local leveling structures 2, and the temporary pier assembly 3 can be composed of temporary piers of different numbers allocated according to the distance. At the same time, a temporary pier bearing beam 4 is arranged on the top of the temporary pier assembly 3. Furthermore, a slideway beam 5 is arranged on the top of the temporary pier bearing beam 4. A pushing device 6 for pushing the local leveling structure 2 is arranged on the top of the slideway beam 5.

[0038] Furthermore, a cushion block 7 is provided below the steel box beam 1 and between the slideway beam 5. The cushion block 7 acts as a support cushion after the jacking device 6 pushes the steel box beam 1. For its preferred implementation, please refer to Figure 4 There are two cushion blocks 7, which are respectively arranged on the inner and outer sides of the pushing device 6. In some embodiments, please refer to Figure 5 and Figure 6 According to the requirements, a cushion block 7 can also be selected. In this case, the cushion block 7 is preferably arranged on the outside of the displacement device 6. In order to better display the displacement device 6, Figure 1 The middle is a state where the cushion block 7 is missing.

[0039] In a preferred embodiment, the pushing device 6 is a walking jack. Figure 3 Specifically, the walking jack includes at least one vertical jack 61 and a horizontal jack 62. The vertical jacks 61 are preferably two, and when working, they can be located on both sides of the top pushing direction of the local leveling structure 2.

[0040] Specifically, it also includes a lower support 63 for stabilizing the vertical jack 61 and the horizontal jack 62. An upper support 64 abutting against the local leveling structure 2 is also provided on the top.

[0041] For further information, please refer to Figure 1 A slideway is provided at the top of the slideway beam 5, and the jacking device 6 is provided on the slideway and moves along the slideway. The slideway is arranged front and back along the jacking direction, which is not shown in this figure. At the same time, a horizontal connection jack 8 is provided at the front end of the slideway beam 5, and the horizontal connection jack 8 is used to pull the jacking device 6.

[0042] Please refer to Figure 7The variable height bridge local leveling and pushing construction method includes the following steps of using the variable height bridge local leveling and pushing construction system as described above to carry out the pushing construction of the steel box girder 1:

[0043] Step S1: The vertical jack 61 of the walking type jacking device jacks up and supports the steel box girder 1; its working state is referred to in conjunction with Figure 8 The walking-type jacking equipment lifts up the local leveling structure 2, and then supports the steel box girder 1. In the figure, a is a schematic diagram of its jacking direction, b and c are schematic diagrams of the support of the local leveling structure 2 and the steel box girder 1, and d is a schematic diagram of the movement of the horizontal jack 62. When the same position description will be given later, it will not be repeated in detail.

[0044] Step S2: Turn on the horizontal jack 62 of the walking type jacking device, and the steel box girder 1 moves forward by one stroke; please refer to the working state of Fig. 9 , the horizontal jack 62 in d will move in the pushing direction, and at this time the steel box girder 1 will also move forward to form a.

[0045] Step S3: The vertical jack 61 of the walking type jacking equipment returns oil and descends, and the steel box beam 1 is supported on the pad 7; please refer to the working state of Fig.10 , the vertical jack 61 descends, and the local leveling structure 2 is supported by the pad 7, that is, the steel box girder 1. In order to better describe the formation of the walking type jacking device in d, the pad 7 is not shown, and its position relationship is referred to b and c. Hydraulic jacks are commonly used in the construction field, so their descending method is to return oil to descend.

[0046] Step S4: Turn on the horizontal jack 62 of the walking jacking device to move the lower support 63 of the walking jack forward and back to its original position; Fig.11 At this time, the lower support 63 of the walking jack moves forward, and the horizontal jack 61 has space to push the local leveling structure 2 and the steel box girder 1 forward.

[0047] Step S5: Repeat steps S1 to S4 until the steel box girder 1 completes the predetermined jacking stroke; please refer to Fig.12 , is the state after the entire top push formation is completed.

[0048] Please continue to refer to Figure 7 The variable height bridge local leveling jacking construction method also includes the construction steps of returning the jacking device 6 to its original position:

[0049] Step S6: The steel box girder 1 is supported on the pad 7, and the walking jacking device returns to its original position, pulled by the horizontal contact jack 8; please refer to Fig.13 , the jacking device 6, that is, the walking jacking device, is pulled back by the horizontal connection jack 8. At this time, the pad 7 is supported at the original position of the local leveling structure 2.

[0050] Step S7: The vertical jack 61 of the walking type jacking device lifts the steel box girder 1, and the support pad 7 returns to its original position, and is pulled by the horizontal contact jack 8; please refer to Fig.14 , the local leveling structure 2 of the walking jacking equipment is lifted, and the original supporting pad 7 is returned to its original position.

[0051] As mentioned above, this case protects a variable-height bridge local leveling and pushing construction system and construction method. All technical solutions that are the same or similar to this case should be deemed to fall within the protection scope of this case.

Claims

1. A local leveling and pushing construction system for variable height bridges. It is characterized in that It comprises a local leveling structure (2) arranged at intervals at the bottom of a steel box beam (1) along a jacking direction, a temporary pier assembly (3) spanning adjacent local leveling structures (2), a temporary pier load-bearing beam (4) arranged on the top of the temporary pier assembly (3), and a slideway beam (5) arranged on the top of the temporary pier load-bearing beam (4); A pushing device (6) for pushing the local leveling structure (2) is provided on the top of the slideway beam (5).

2. A variable height bridge local leveling and pushing construction system as claimed in claim 1, It is characterized in that It also includes a cushion block (7) arranged below the steel box beam (1) and between the slideway beam (5).

3. A variable height bridge local leveling and pushing construction system as claimed in claim 2, It is characterized in that There is one cushion block (7) which is arranged on the outside of the pushing device (6).

4. A variable height bridge local leveling and pushing construction system as claimed in claim 2, It is characterized in that There are two cushion blocks (7), which are respectively arranged on the inner and outer sides of the pushing device (6).

5. A variable height bridge local leveling and pushing construction system as claimed in claim 2, It is characterized in that The pushing device (6) is a walking jack.

6. A variable height bridge local leveling and pushing construction system as claimed in claim 5, It is characterized in that The walking jack comprises two vertical jacks (61) and a horizontal jack (62), and a lower support (63) for stabilizing the vertical jacks (61) and the horizontal jack (62).

7. A variable height bridge local leveling and pushing construction system as claimed in claim 6, It is characterized in that The walking jack also includes an upper support (64) arranged at the top and abutting against the local leveling structure (2).

8. A variable height bridge local leveling and pushing construction system according to any one of claims 1 to 7, It is characterized in that It also includes a slideway arranged at the top of the slideway beam (5) and a horizontal connection jack (8) arranged at the front end of the slideway beam (5); the jacking device (6) is arranged on the slideway, and the horizontal connection jack (8) pulls the jacking device (6).

9. A method for local leveling and top-pushing construction of a variable height bridge. It is characterized in that The method comprises the following steps of applying the variable height bridge local leveling and jacking construction system as claimed in claim 8 to carry out jacking construction of a steel box girder (1): Step S1: The vertical jack (61) of the walking type jacking device lifts up and supports the steel box girder (1); Step S2: turning on the horizontal jack (62) of the walking type jacking device, and the steel box girder (1) moves forward by one stroke; Step S3: the vertical jack (61) of the walking type jacking equipment returns oil and descends, and the steel box girder (1) is supported on the cushion block (7); Step S4: Turn on the horizontal jack (62) of the walking jacking device to move the lower support (63) of the walking jack forward and back to its original position; Step S5: Repeat steps S1 to S4 until the steel box girder (1) completes the predetermined jacking stroke.

10. A method for local leveling and pushing construction of a variable height bridge as claimed in claim 9, It is characterized in that The construction step of returning the pushing device (6) to its original position is also included: Step S6: The steel box girder (1) is supported on the pad (7), and the walking jacking device returns to its original position and is pulled by the horizontal connection jack (8); Step S7: The vertical jack (61) of the walking type jacking device lifts the jack, supports the steel box girder (1), and the support pad (7) returns to its original position, and is pulled by the horizontal connection jack (8).