Concrete pool pilaster and post-pouring construction method thereof
By using the design of the main body and connection section in the concrete pool, and using the micro-expanded concrete and the steel bar structure of different materials, the asynchronous construction of the pool wall and the pilaster is achieved, solving the impact of construction progress and joints in the existing technology. Leakage issues ensure connection strength and sealing.
Patent Information
- Application Number
- CN202411330322.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-29
AI Technical Summary
In the prior art, the concrete pool pilasters and pool walls cannot be constructed asynchronously, resulting in the impact of the construction progress, and the embedded parts plan is high, the construction is difficult, and there is a risk of leakage at the joints.
Adopting a design including a pilaster body and a connecting section, the pilaster body consists of the first and second skeletons and the cast body, the connecting section is embedded in the reserved opening of the pool wall, and synchronous forming is achieved through segmented casting, and the first cast body is The projection area is smaller than the second casting body, and a steel bar structure of micro-expanded concrete and different materials are used to ensure the connection strength and sealing.
Asynchronous construction of pool walls and pilasters is achieved, the connection strength and sealing are ensured, the construction progress impact and joint leakage risk are avoided, and the construction cost and difficulty are reduced.
Smart Images

Figure CN119041631A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction engineering, and in particular relates to a concrete pool wall column and a post-casting construction method thereof. Background Art
[0002] The pilasters of a concrete pool are concrete columns protruding from the pool wall. They are a structure that strengthens the stability of the pool body and are usually used to increase the rigidity of the pool. In the construction of a concrete pool, the setting of pilasters is intended to enhance the stability of the pool, especially in the pool wall part, by setting pilasters to improve the integrity and bearing capacity of the structure.
[0003] According to the existing construction process, the pilasters and the pool wall must be constructed simultaneously to bear various loads together, including their own weight and external pressure. In the case that the pool wall and the pilasters are made of different steel bar materials, the construction of the pilasters and the pool wall must be carried out synchronously after all materials are delivered to the site. However, for projects with design changes during the construction phase, due to different procurement cycles, waiting will inevitably affect the construction progress and cause personnel and machinery to be idle. In the prior art, there are also some solutions for connecting the pilasters and the pool wall through embedded parts. Although this method can achieve asynchronous construction, the above method is costly, difficult to construct, and has the risk of leakage at the joints. Summary of the invention
[0004] The object of the present invention is to provide a concrete pool wall column and a post-casting construction method thereof, which can realize the asynchronous construction of the pool wall and the wall column.
[0005] The present invention provides the following technical solutions:
[0006] In a first aspect, a concrete pool wall column is provided, comprising: a wall column body and a connecting section for connecting the wall column body and a pool wall;
[0007] The wall column body comprises a first frame and a first casting body, wherein the first casting body is formed by casting inside and outside the first frame;
[0008] The connecting section includes a second frame and a second casting body, wherein the second casting body is formed by casting inside and outside the second frame; the second frame and the second casting body are embedded in the opening reserved in the pool wall;
[0009] The first frame and the second frame are connected as a whole, and the first casting body and the second casting body are formed synchronously; when the first casting body and the second casting body are projected onto the pool wall, the projection area of the first casting body is smaller than the projection area of the second casting body.
[0010] Optionally, the cross-sectional shape of the connecting section is ladder-shaped, spindle-shaped or elliptical; the concrete used for the first casting body and the second casting body is micro-expansive concrete, and has the same strength grade as the pool wall.
[0011] Optionally, the depth of the connecting section inserted into the pool wall is equal to 1 / 2 of the thickness of the pool wall; when projected perpendicularly to the thickness direction of the pool wall, the gap d between the orthographic projections of the first casting body and the second casting body is 80-120 mm.
[0012] Optionally, the first skeleton includes first longitudinal stress-bearing steel bars and first stirrups; a plurality of the first longitudinal stress-bearing steel bars are arranged upright and enclosed to form a rectangular structure; a plurality of the first stirrups are tied around the periphery of the first longitudinal stress-bearing steel bars to form a steel cage structure;
[0013] The second skeleton includes skeleton steel bars, measure steel bars and second longitudinal stress-bearing steel bars; a plurality of the skeleton steel bars and measure steel bars are connected to each other to form a steel cage structure, the second longitudinal stress-bearing steel bars are connected to the measure steel bars, and a plurality of the second longitudinal stress-bearing steel bars are arranged in the same manner as the longitudinal stress-bearing steel bars of the pool wall;
[0014] When the first frame and the second frame are projected onto the pool wall, the projection area of the first frame is smaller than the projection area of the second frame.
[0015] Optionally, the second skeleton further comprises beard steel bars and a quick-closing net; one end of a plurality of the beard steel bars are pre-buried in the pool wall; the quick-closing net is connected to the skeleton steel bars and is close to the bottom of a groove with an opening reserved in the pool wall.
[0016] Optionally, the thickness of the quick-closing net is not less than 0.5 mm, the diameter of the beard steel bars is 12 mm-16 mm, and the exposed length is 150 mm-200 mm.
[0017] Optionally, the first longitudinal stress-bearing steel bars, the first stirrups and the measure steel bars are of the same material type, and are different from the material type of the longitudinal stress-bearing steel bars of the pool wall; the skeleton steel bars, the second longitudinal stress-bearing steel bars and the longitudinal stress-bearing steel bars of the pool wall are of the same material type.
[0018] Optionally, the first longitudinal stress-bearing steel bars, the first stirrups and the measure steel bars are all glass fiber composite bars; the skeleton steel bars, the second longitudinal stress-bearing steel bars and the longitudinal stress-bearing steel bars of the pool wall are all carbon steel.
[0019] In a second aspect, a post-casting construction method for a concrete pool wall column is provided, comprising the following steps:
[0020] Clean the openings reserved when pouring the pool wall;
[0021] Assembling the first frame and the second frame respectively, and connecting the first frame and the second frame by binding and overlapping;
[0022] The first frame and the second frame are hoisted into place; the first frame is located in the opening reserved in the pool wall;
[0023] The pilaster templates are installed by using the tension screws pre-buried at the openings, and a plurality of the pilaster templates are enclosed outside the first frame and the second frame to form a template frame consistent with the shape of the pool pilasters;
[0024] Concrete is poured into the formwork frame in a segmented pouring manner to achieve synchronous forming of a first casting body and a second casting body. When the first casting body and the second casting body are projected onto the pool wall after being formed, the projection area of the first casting body is smaller than the projection area of the second casting body.
[0025] Optionally, the second skeleton comprises a plurality of beard steel bars, which are embedded during casting of the pool wall and have an exposed length of 150-200 mm after embedding; the material type of the first skeleton is different from the material type of the longitudinal force-bearing steel bars of the pool wall.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] When the first casting body and the second casting body of the present invention are projected onto the pool wall, the projection area of the first casting body is smaller than the projection area of the second casting body, the second casting body is located in an opening reserved in the pool wall, and the second casting body and the first casting body are formed synchronously. The present invention can ensure the connection strength, integrity and sealing of the wall column and the pool wall when the pool wall and the wall column are formed asynchronously, thereby solving the problem in the prior art that the wall column and the pool wall cannot be constructed synchronously, thus affecting the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall structure of the concrete pool wall column of the present invention;
[0029] Figure 2 It is a flow chart of the post-casting construction method of the concrete pool wall column of the present invention.
[0030] Markings in the figure are: 1 is the pool wall, 2 is the main body of the wall column, 3 is the connecting section, 4 is the first longitudinal stress-bearing steel bar, 5 is the first stirrup, 6 is the measure steel bar, 7 is the quick-closing net, 8 is the longitudinal stress-bearing steel bar, 9 is the skeleton steel bar, 10 is the beard steel bar, and 11 is the second longitudinal stress-bearing steel bar. DETAILED DESCRIPTION
[0031] The present invention will now be described in further detail with reference to the accompanying drawings.
[0032] It should be noted that the terms such as "upper", "lower", "left", "right", "front", "back", etc. cited in the invention are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments in their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.
[0033] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a method or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these methods or devices.
[0034] Example 1
[0035] like Figure 1 As shown, a concrete pool wall column is provided, including a wall column body 2 and a connecting section 3, wherein the connecting section 3 is used to connect the wall column body 2 and the pool wall 1.
[0036] The wall column body 2 includes a first frame and a first casting body, and the first casting body is formed by casting inside and outside the first frame.
[0037] The connecting section 3 includes a second frame and a second cast body, and the second cast body is formed by casting inside and outside the second frame; the second frame and the second cast body are embedded in the opening reserved in the pool wall 1.
[0038] The first casting body and the first frame have the same cross-sectional shape, but different sizes. The second casting body and the second frame also have the same cross-sectional shape, but different sizes. The shape of the second casting body is consistent with the shape of the opening reserved in the pool wall 1.
[0039] The first frame and the second frame are connected as a whole and can be connected by binding. The first casting body and the second casting body are formed synchronously. When the first casting body and the second casting body are projected onto the pool wall 1, the projection area of the first casting body is smaller than the projection area of the second casting body, that is, the first casting body is equivalent to the big head end on one side of the second casting body, thereby ensuring the connection strength and integrity of the wall column and the pool wall 1 when the pool wall 1 and the wall column are formed asynchronously.
[0040] In this embodiment, the cross-sectional shape of the connecting section 3 is trapezoidal, spindle-shaped or elliptical; the concrete used for the first casting body and the second casting body is micro-expansive concrete, and is consistent with the strength grade of the pool wall 1. The material type of the micro-expansive concrete refers to the prior art. The micro-expansive concrete can further ensure the sealing of the first casting body when it is adjacent to the pool wall 1, thereby avoiding water leakage at the joint between the pilaster and the pool wall 1.
[0041] In this embodiment, the depth of the connecting section 3 inserted into the pool wall 1 is equal to 1 / 2 of the thickness of the pool wall 1; when projected in the direction perpendicular to the thickness of the pool wall 1, the gap d between the orthographic projections of the first casting body and the second casting body is 80-120 mm.
[0042] In this embodiment, the first skeleton includes first longitudinal stress-bearing steel bars 4 and first stirrups 5; a plurality of the first longitudinal stress-bearing steel bars 4 are arranged upright and enclosed to form a rectangular structure; a plurality of the first stirrups 5 are tied around the periphery of the first longitudinal stress-bearing steel bars 4 to form a steel cage structure; usually, due to the size of the rectangular structure enclosed by the first longitudinal stress-bearing steel bars 4, the first stirrups 5 cannot surround all the first longitudinal stress-bearing steel bars 4. Therefore, during the specific construction, the first stirrups 5 are tied around the outside of some of the first longitudinal stress-bearing steel bars 4, and all the first longitudinal stress-bearing steel bars 4 are tied within the first height range through multiple first stirrups 5. According to the actual size of the wall column, multiple first stirrups 5 can be tied in the height direction of the first longitudinal stress-bearing steel bars 4.
[0043] The second skeleton includes skeleton steel bars 9, measure steel bars 6 and second longitudinal force-bearing steel bars 11; a number of skeleton steel bars 9 and measure steel bars 6 are interconnected to form a steel cage structure. The connection method of the skeleton steel bars 9 and the measure steel bars 6 can refer to the existing technology. As an optional option, if the cross-sectional shape of the second casting body is a trapezoid, that is, the second casting body is a trumpet shape, the second skeleton is also a trumpet shape. At this time, the measure steel bar 6 should also be set to an open shape, and the end is an "eight" shape.
[0044] The second longitudinal stress-bearing steel bars 11 are connected to the measure steel bars 6, and the arrangement of several second longitudinal stress-bearing steel bars 11 is consistent with the longitudinal stress-bearing steel bars 8 of the pool wall 1; that is, the second longitudinal stress-bearing steel bars 11 and the longitudinal stress-bearing steel bars 8 of the pool wall 1 are arranged in accordance with the design requirements of the pool wall 1, so as to ensure the overall stress strength of the pool wall 1. In this embodiment, the spacing between two adjacent second longitudinal stress-bearing steel bars 11 and between the second longitudinal stress-bearing steel bars 11 and the longitudinal stress-bearing steel bars 8 of the pool wall 1 are consistent with those of the two adjacent longitudinal stress-bearing steel bars 8, and the second longitudinal stress-bearing steel bars 11 and the longitudinal stress-bearing steel bars 8 are located on the same straight line.
[0045] When the first skeleton and the second skeleton are projected onto the pool wall 1 , the projection area of the first skeleton is smaller than the projection area of the second skeleton.
[0046] In some other embodiments, the second skeleton also includes beard steel bars 10 and a quick-closing net 7; one end of several beard steel bars 10 are pre-buried in the pool wall 1; the quick-closing net 7 is connected to the skeleton steel bars 9, and is close to the bottom of the groove with an opening reserved in the pool wall 1; the quick-closing net 7 is used to divide concrete, and the thickness of the quick-closing net 7 is not less than 0.5mm. The beard steel bars 10 are threaded steel bars, and the diameter of the beard steel bars 10 is 12mm-16mm, and the exposed length is 150mm-200mm. The quick-closing net 7 must be close to the skeleton steel bars 9 and tied firmly with 20# binding wire; as an option, three 300mm long beard steel bars 10 can be set on each side of the opening of the pool wall 1, and the two beard steel bars 10 on the same side are spaced 450mm apart.
[0047] In this embodiment, the material type of the first longitudinal stress-bearing steel bar 4, the first stirrup 5 and the measure steel bar 6 is the same, and is different from the material type of the longitudinal stress-bearing steel bar 8 of the pool wall 1; the material type of the skeleton steel bar 9, the second longitudinal stress-bearing steel bar 11 and the longitudinal stress-bearing steel bar 8 of the pool wall 1 is the same; specifically, the first longitudinal stress-bearing steel bar 4, the first stirrup 5 and the measure steel bar 6 are all glass fiber composite bars (GFRP composite bars); the skeleton steel bar 9, the second longitudinal stress-bearing steel bar 11 and the longitudinal stress-bearing steel bar 8 of the pool wall 1 are all carbon steel.
[0048] The raw materials of composite steel bars for pool wall columns shall comply with the "Technical Standards for Engineering Application of Fiber-Reinforced Composite Materials" GB50608-2020, "Glass Fiber Reinforced Bars for Civil Engineering" JG / T406-2013, and "Fiber-Reinforced Composite Material Bars" JG / T351-2012, and the construction preparation shall refer to the relevant concrete acceptance standards.
[0049] Of course, in some other embodiments, the material of the steel bars used for the pilasters and the pool wall 1 is the same, but when the pilasters and the pool wall 1 are not constructed synchronously due to project requirements, the structure of the present invention can also be used.
[0050] Example 2
[0051] like Figure 2 As shown, a post-casting construction method for a concrete pool wall column is provided, comprising the following steps:
[0052] Step 1: Clean the opening reserved when pouring the pool wall 1.
[0053] The shape of the reserved opening is adapted to the shape and size of the connecting section 3; specifically, the loose concrete in the opening is chiseled, and at the same time, the laitance and flaky old rust on the reserved beard steel bars 10 are cleaned.
[0054] Step 2: Assemble the first frame and the second frame separately, and connect the first frame and the second frame by binding and overlapping.
[0055] Specifically, a plurality of first longitudinal stress-bearing steel bars 4 and first stirrups 5 are bundled to form a first skeleton, a plurality of second longitudinal stress-bearing steel bars 11, skeleton steel bars 9 and measure steel bars 6 are bundled to form a second skeleton, and the first skeleton and the second skeleton are connected as a whole by bundling.
[0056] Step 3: hoist the first frame and the second frame into place; the first frame is located in the opening reserved in the pool wall 1.
[0057] Step 4: Install the pilaster formwork using the tension screws pre-buried at the opening. Multiple pilaster formworks are enclosed on the outside of the first frame and the second frame to form a formwork frame consistent with the shape of the pool pilasters.
[0058] Step 5: Pour concrete into the formwork frame in a segmented pouring manner to achieve simultaneous forming of the first casting body and the second casting body. When the first casting body and the second casting body are projected onto the pool wall 1 after being formed, the projection area of the first casting body is smaller than the projection area of the second casting body.
[0059] The post-casting construction method of the present invention can solve the problem in the prior art that the pilaster and the pool wall 1 cannot be constructed synchronously, which affects the construction progress. At the same time, the construction method of the present invention is very beneficial to the control of the accuracy of the embedded parts when installing the embedded parts on the pilaster.
[0060] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0061] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.
Claims
1. A concrete pool pilaster, It is characterized in that include: A pilaster body (2) and a connecting section (3) for connecting the pilaster body (2) and a pool wall (1); The wall column body (2) comprises a first frame and a first casting body, wherein the first casting body is formed by casting inside and outside the first frame; The connecting section (3) comprises a second frame and a second cast body, wherein the second cast body is formed by casting inside and outside the second frame; the second frame and the second cast body are embedded in an opening reserved in the pool wall (1); The first frame and the second frame are connected as a whole, and the first casting body and the second casting body are formed synchronously; when the first casting body and the second casting body are projected onto the pool wall (1), the projection area of the first casting body is smaller than the projection area of the second casting body.
2. The concrete pool wall column according to claim 1, It is characterized in that The cross-sectional shape of the connecting section (3) is ladder-shaped, spindle-shaped or elliptical; the concrete used in the first cast body and the second cast body is micro-expansive concrete, and has the same strength grade as the pool wall (1).
3. The concrete pool wall column according to claim 1, It is characterized in that The depth of the connecting section (3) inserted into the pool wall (1) is equal to 1 / 2 of the thickness of the pool wall (1); when projected perpendicularly to the thickness direction of the pool wall (1), the gap d between the orthographic projections of the first casting body and the second casting body is 80-120 mm.
4. The concrete pool wall column according to claim 1, It is characterized in that The first skeleton comprises first longitudinal stress-bearing steel bars (4) and first stirrups (5); a plurality of the first longitudinal stress-bearing steel bars (4) are arranged upright and enclosed to form a rectangular structure; a plurality of the first stirrups (5) are tied around the periphery of the first longitudinal stress-bearing steel bars (4) to form a steel cage structure; The second skeleton comprises skeleton steel bars (9), measure steel bars (6) and second longitudinal stress-bearing steel bars (11); a plurality of the skeleton steel bars (9) and the measure steel bars (6) are connected to each other to form a steel cage structure, the second longitudinal stress-bearing steel bars (11) are connected to the measure steel bars (6), and the arrangement of the plurality of the second longitudinal stress-bearing steel bars (11) is consistent with the arrangement of the longitudinal stress-bearing steel bars (8) of the pool wall (1); When the first skeleton and the second skeleton are projected onto the pool wall (1), the projection area of the first skeleton is smaller than the projection area of the second skeleton.
5. The concrete pool wall column according to claim 4, It is characterized in that The second frame also includes beard steel bars (10) and a quick-closing net (7); one end of a plurality of the beard steel bars (10) is pre-buried in the pool wall (1); the quick-closing net (7) is connected to the frame steel bars (9) and is close to the bottom of the groove with an opening reserved in the pool wall (1).
6. The concrete pool wall column according to claim 5, It is characterized in that The thickness of the quick-closing net (7) is not less than 0.5 mm, the diameter of the beard steel bar (10) is 12 mm-16 mm, and the exposed length is 150 mm-200 mm.
7. The concrete pool wall column according to claim 4, It is characterized in that The first longitudinal stress-bearing steel bars (4), the first stirrups (5) and the measure steel bars (6) are made of the same material type, and are different from the material type of the longitudinal stress-bearing steel bars (8) of the pool wall (1); the skeleton steel bars (9), the second longitudinal stress-bearing steel bars (11) and the longitudinal stress-bearing steel bars (8) of the pool wall (1) are made of the same material type.
8. The concrete pool wall column according to claim 7, It is characterized in that The first longitudinal stress-bearing steel bars (4), the first stirrups (5) and the reinforcement bars (6) are all glass fiber composite bars; the skeleton steel bars (9), the second longitudinal stress-bearing steel bars (11) and the longitudinal stress-bearing steel bars (8) of the pool wall (1) are all carbon steel.
9. A post-casting construction method for a concrete pool wall column, It is characterized in that The following steps are involved: Clean the openings reserved during the pouring of the pool wall (1); Assembling the first frame and the second frame respectively, and connecting the first frame and the second frame by binding and overlapping; The first frame and the second frame are hoisted into place; the first frame is located in the opening reserved in the pool wall (1); The pilaster templates are installed by using the tension screws pre-buried in the openings, and a plurality of the pilaster templates are enclosed outside the first frame and the second frame to form a template frame consistent with the shape of the pool pilasters; Concrete is poured into the formwork frame in a segmented pouring manner to achieve synchronous forming of a first pouring body and a second pouring body. After the first pouring body and the second pouring body are formed and projected onto the pool wall (1), the projected area of the first pouring body is smaller than the projected area of the second pouring body.
10. The post-casting construction method of the concrete pool wall column according to claim 9, It is characterized in that The second framework comprises a plurality of beard steel bars (10), which are embedded during the pouring of the pool wall (1) and have an exposed length of 150-200 mm after embedding; the material type of the first framework is different from the material type of the longitudinal force-bearing steel bars (8) of the pool wall (1).