Concrete pouring device for house building project and using method

By designing guide components and linkage components in the concrete pouring device, the uniform movement of the vibrating rod during concrete pouring is achieved, the problem of uneven vibration effect is solved, and the density and structural quality of the concrete are improved.

CN119041693APending Publication Date: 2024-11-29SINOHYDRO BUREAU 1 CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411452277.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In building construction projects, when concrete is poured, the scope of action of the vibrator is limited, resulting in uneven vibration effect of concrete in large-volume structures such as columns and piles, which poses hidden dangers of compactness and durability.

Method used

A concrete pouring device including a boom pump truck, a casting pipe and a vibrator was designed. The vibrator rod is uniformly moved on the concrete pouring section by guiding components and linking components, combining the rotation and lifting mechanism of the boom pump truck. Achieve uniform vibration and dispersion of concrete.

Benefits of technology

The compactness and casting quality of concrete are improved, the vibration dead corners are reduced, the uniformity and structural strength of concrete are enhanced, and the chance of generating holes and voids is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041693A_ABST
    Figure CN119041693A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of concrete pouring equipment, in particular to a concrete pouring device for house building engineering and a using method, the concrete pouring device for house building engineering comprises an arm support pump truck, a pouring pipe and a vibrator, and the pouring pipe and the vibrator are both installed on the arm support pump truck; the vibrating device further comprises a guide assembly, and the guide assembly is installed on the boom pump truck and used for controlling the movement route of the vibrating rod. By arranging the guide assembly, in the concrete pouring process, the position of the vibrating rod is guided through the guide assembly, so that the vibrating rod moves on the concrete pouring section, the effect uniformity degree of the vibrating rod on concrete is increased, and meanwhile, due to the movement of the vibrating rod, the concrete pouring efficiency is improved. And the concrete pushed by the vibrating rod is dispersed on the plane, the flowing speed is increased, and the effects of dispersing and flattening the concrete can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of concrete pouring equipment, and specifically to a concrete pouring device for building construction engineering and a use method thereof. Background Art

[0002] Building construction projects refer to house construction projects. In building construction projects, concrete pouring is one of the key links in construction. It not only determines the stability and durability of the building, but also directly affects the construction quality and progress.

[0003] In the concrete pouring process, there are many factors that affect the quality of concrete components, among which the number of cavities and gaps in concrete is one of them. These cavities and gaps will not only reduce the compactness of concrete, but also become channels for the penetration of moisture, air and harmful substances, thereby weakening the durability and bearing capacity of concrete. Especially in the construction process of large-volume concrete, foundations, columns, beams, and thick slabs, the elimination of concrete cavities and gaps is a key link to ensure structural strength and durability. In order to eliminate the probability of cavities and gaps in the construction process, During pouring, an inserted vibrator is usually used to vibrate the concrete to enhance the density of the concrete. However, in actual operation, it is found that when pouring structures such as columns and piles, due to the large pouring depth, the vibrator usually needs to be hoisted into the column or pile to vibrate the poured concrete. Due to the limited range of the vibrator, the vibrator usually needs to be moved in multiple directions. However, due to the size of the openings of the structures such as columns and piles and the height of the columns and piles, when the staff manually control the movement of the vibrator, not only is the operation inconvenient, but there are also great safety hazards.

[0004] A solution is disclosed in the related art, which is named large-scale steel pipe column concrete construction device and construction method, and the application number is CN2013102532323. The solution is to set a floating plate in the steel pipe column and install a vibrator on the floating plate. During the pouring of concrete, the vibrator and the floating plate rise synchronously, thereby enhancing the vibration effect of the vibrator on the concrete. However, in actual application, it is found that only the movement in the vertical direction limits the range of action of the vibrator. When the cross-section of the poured column or pile is large, the vibration effect is limited, which leads to quality risks in the poured concrete.

[0005] In view of this, the present invention proposes a concrete pouring device for building construction and a method of use, which are used to solve the above technical problems. Summary of the invention

[0006] In order to make up for the deficiencies of the prior art and solve the above-mentioned technical problems, the present invention proposes a concrete pouring device for building construction engineering and a method for using the same.

[0007] The technical solution adopted by the present invention to solve the technical problem is: a concrete pouring device for building construction engineering described in the present invention comprises a boom pump truck, a pouring pipe and a vibrator, wherein the pouring pipe and the vibrator are both installed on the boom pump truck;

[0008] The vibrator consists of a driving body and a vibrating rod, and the vibrating rod is connected to the driving body through a transmission hose;

[0009] It also includes a guide assembly, which is installed on the boom pump truck and is used to control the movement path of the vibrating rod;

[0010] The guide assembly includes a connecting cable, a mounting seat and a transverse plate;

[0011] The connecting cable is installed at the end of the boom pump truck, a mounting seat is fixedly installed at the bottom of the connecting cable, a driving motor is fixedly installed on the mounting seat, and a transverse plate is fixedly installed at the output end of the driving motor;

[0012] The transverse plate is provided with a sliding groove, a sliding block is slidably installed in the sliding groove, and the vibrating rod is installed on the sliding block;

[0013] It also includes a linkage component, which is installed on the transverse plate. The linkage component is used to make the drive motor and the slider work in a linkage manner, and push the slider to move in the sliding groove during the rotation of the transverse plate.

[0014] Preferably, the linkage assembly comprises a gear ring, a transmission wheel set and a transmission belt;

[0015] A gear ring is fixedly mounted on the mounting seat, and the gear ring is coaxially arranged with the output end of the driving motor;

[0016] A transmission wheel set is rotatably mounted on the transverse plate, the transmission wheel set is meshed and connected with the gear ring, and the transmission wheel set extends into the sliding groove;

[0017] The sliding groove is designed as a whole in an annular shape, a transmission belt is rotatably installed in the sliding groove, one end of the transmission belt is sleeved on the transmission wheel group, and the transmission belt is transmission-connected with the transmission wheel group, and the sliding block is detachably fixed on the transmission belt.

[0018] Preferably, the transverse moving plate consists of a fixed end, a movable end and a telescopic end, the fixed end, the telescopic end and the movable end are fixedly connected in sequence, the fixed end is fixedly connected to the output end of the driving motor, the telescopic end is made of a spring telescopic rod, and the transmission belt is made of an elastic belt.

[0019] Preferably, a connecting plate and a tensioning plate are installed on the transmission belt, and the connecting plate and the tensioning plate are elastically connected by a supporting spring, and the connecting plate and the tensioning plate are both U-shaped structures. The middle part of the transmission belt extends to the connecting plate and the tensioning plate, and the connecting plate and the tensioning plate are used to enhance the transmission belt's length extension and retraction capability.

[0020] Preferably, the slider consists of a connecting end and a rotating end, the connecting end is rotatably connected to the rotating end, the connecting end is detachably fixed on the transmission belt, a limiting groove is provided on the rotating end, a connecting spring is fixedly installed in the limiting groove, and the vibrating rod is fixedly connected to the connecting spring.

[0021] Preferably, an arc plate is fixedly mounted on one end of the transverse plate away from the driving motor.

[0022] Preferably, a winding motor is installed on the boom pump truck, a winding shaft is fixedly installed on the output end of the winding motor, and one end of the connecting cable away from the mounting seat is fixedly installed on the winding shaft.

[0023] Preferably, a workbench is hingedly mounted at the end of the boom pump truck, the winding motor is fixedly mounted on the workbench, a through groove is provided at the bottom of the workbench, and the connecting cable passes through the workbench through the through groove.

[0024] Preferably, a support rod is fixedly mounted on the workbench, a dynamometer is fixedly mounted on the support rod, the middle portion of the connecting cable extends to the measuring end of the dynamometer, a floating plate is fixedly mounted on the transverse plate, and the floating plate is a hemispherical hollow structure.

[0025] A method for using a concrete pouring device for a building construction project, the method comprising the following steps:

[0026] S1, Positioning and hovering: A worker enters the workbench, and other workers start the boom pump truck, causing the end of the boom pump truck to hover at the top of the concrete pouring mold;

[0027] S2, unwinding and landing: the staff on the workbench starts the winding motor, causing the connecting rope to gradually unfold and the guide assembly to gradually move to the bottom of the concrete casting mold;

[0028] S3, stirring and vibrating: The boom pump truck pumps the concrete into the pouring pipe and drops it into the concrete pouring mold. The rotating transverse plate cooperates with the vibrating rod to stir and vibrate the concrete;

[0029] S4. Step-by-step pouring: With the cooperation of the dynamometer, the winding motor is used to lift the guide assembly step by step until the pouring operation is completed.

[0030] The beneficial effects of the present invention are as follows:

[0031] 1. The concrete pouring device and use method for building construction projects described in the present invention, by setting a guide component, guides the position of the vibrating rod through the guide component during the concrete pouring process, so that the vibrating rod moves on the concrete pouring section, thereby increasing the uniformity of the action of the vibrating rod on the concrete. At the same time, due to the movement of the vibrating rod, the concrete pushed by the vibrating rod is dispersed on the plane, and the flow rate is accelerated, which can also achieve the effect of dispersing and flattening the concrete.

[0032] 2. The present invention relates to a concrete pouring device and method for use in building construction projects. By suspending a workbench above the top opening of a concrete pouring mold, and extending a mounting base into the casting mold, a worker can observe the actual concrete pouring situation on the workbench, thereby facilitating real-time manual intervention in the concrete pouring process. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The present invention will be further described below in conjunction with the accompanying drawings.

[0034] Figure 1 is a stereogram of the present invention;

[0035] Figure 2 is a three-dimensional diagram of the guide assembly of the present invention;

[0036] Figure 3 It is a stereoscopic diagram of the assembly of the transverse plate and the vibrating rod;

[0037] Figure 4 It is a three-dimensional diagram of the assembly of the transmission belt and the transmission wheel set;

[0038] Figure 5 yes Figure 4 A partial enlarged view of the middle part;

[0039] Figure 6 It is a three-dimensional diagram of the transverse plate;

[0040] Figure 7 It is a stereoscopic diagram of the assembly of the slider and the vibrator;

[0041] Figure 8 is a partial cross-sectional view of the slider;

[0042] Fig. 9 It is a three-dimensional picture of the workbench;

[0043] Fig.10 is a flow chart of the method of the present invention;

[0044] In the figure: 1. boom pump truck; 11. pouring pipe; 12. driving body; 13. vibrating rod; 2. connecting cable; 21. mounting seat; 22. driving motor; 23. fixed end; 24. telescopic end; 25. moving end; 26. sliding groove; 27. connecting plate; 28. tensioning plate; 29. ​​supporting spring; 3. gear ring; 31. driving wheel set; 32. driving belt; 4. connecting end; 41. rotating end; 42. limiting groove; 43. connecting spring; 44. arc plate; 5. winding motor; 51. winding shaft; 52. working table; 53. through groove; 6. supporting rod; 61. dynamometer; 62. floating plate. DETAILED DESCRIPTION

[0045] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0046] like Figures 1 to 9 As shown, a concrete pouring device for building construction engineering described in the present invention comprises a boom pump truck 1, a pouring pipe 11 and a vibrator, wherein the pouring pipe 11 and the vibrator are both installed on the boom pump truck 1;

[0047] The vibrator comprises a driving body 12 and a vibrating rod 13, and the vibrating rod 13 is connected to the driving body 12 via a transmission hose;

[0048] It also includes a guide assembly, which is installed on the boom pump truck 1 and is used to control the movement path of the vibrating rod 13;

[0049] The guide assembly includes a connecting cable 2, a mounting seat 21 and a transverse plate;

[0050] The connecting cable 2 is installed at the end of the boom pump truck 1, a mounting seat 21 is fixedly installed at the bottom of the connecting cable 2, a driving motor 22 is fixedly installed on the mounting seat 21, and a transverse plate is fixedly installed at the output end of the driving motor 22;

[0051] The transverse plate is provided with a sliding groove 26, a sliding block is slidably mounted in the sliding groove 26, and the vibrating rod 13 is mounted on the sliding block;

[0052] It also includes a linkage component, which is installed on the transverse plate. The linkage component is used to make the drive motor 22 and the slider move in a linkage manner, and push the slider to move in the sliding groove 26 during the rotation of the transverse plate.

[0053] The linkage assembly includes a gear ring 3, a transmission wheel set 31 and a transmission belt 32;

[0054] A gear ring 3 is fixedly mounted on the mounting seat 21, and the gear ring 3 is coaxially arranged with the output end of the driving motor 22;

[0055] A transmission wheel set 31 is rotatably mounted on the transverse plate, the transmission wheel set 31 is meshed and connected with the gear ring 3, and the transmission wheel set 31 extends into the sliding groove 26;

[0056] The sliding groove 26 is designed as a whole in an annular shape. A transmission belt 32 is rotatably installed in the sliding groove 26. One end of the transmission belt 32 is sleeved on the transmission wheel group 31, and the transmission belt 32 is transmission-connected to the transmission wheel group 31. The slider is detachably fixed on the transmission belt 32.

[0057] In the concrete pouring process of building construction projects, when pouring columns and pile structures with larger cross-sections, in order to reduce the probability of cavities and gaps during the concrete pouring process, an inserted vibrator is used to vibrate the concrete, and then the concrete is vibrated, which can effectively enhance the density of the concrete. In actual operation, a guide component is provided in the present invention, which guides the action position of the vibrator so that the vibration effect of the vibrator on the concrete is uniform, thereby reducing the dead angle of the vibrator and enhancing the uniformity of the concrete.

[0058] Specifically, during concrete pouring, the staff adjusts the boom pump truck 1 to move the top of the boom pump truck 1 to the top of the concrete pouring mold to be poured. At this time, under the action of gravity, the vibrator, the pouring pipe 11 and the guide assembly are all located at the top of the pouring mold, and the boom pump truck 1 gradually descends, so that the guide assembly gradually moves to the bottom of the pouring mold. At this time, the bottom opening of the pouring pipe 11 is located in the pouring mold, and the boom pump truck 1 pours the concrete into the concrete pouring mold through the pouring pipe 11, and starts the guide assembly synchronously. During the pouring process, the concrete entering the pouring mold gradually flows in the pouring mold under the action of gravity, and at the same time, the drive motor 22 in the guide assembly is started. When the output end of the drive motor 22 rotates, the transverse plate is mobilized to rotate synchronously. Since the transmission wheel group 31 rotatably installed on the transverse plate is meshed with the gear ring 3 fixedly installed on the mounting seat 21, the transverse plate rotates around the mounting seat 21. During the process, relative motion occurs between the transmission wheel set 31 and the gear ring 3, so that the transmission wheel set 31 rotates continuously and drives the transmission belt 32 to move, and the slider fixedly installed on the transmission belt 32 follows the transmission belt 32 to circulate in the sliding groove 26. Therefore, during the concrete pouring process, the vibrating rod 13 is acted upon by the slider and the transverse plate, and not only rotates continuously around the mounting seat 21, but also reciprocates in the diameter direction of the circular motion. Therefore, the motion trajectory of the vibrating rod 13 is spiral, so that the vibrating effect of the vibrating rod 13 on the concrete of the same cross section is more uniform, and the probability of dead angle of the vibrating rod 13 is reduced. At the same time, the concrete is continuously poured, resulting in a gradual increase in the height of the concrete. By raising the end of the boom pump truck 1 or tightening the connecting rope 2, the guide assembly is lifted, and the concrete of different heights can be vibrated step by step, thereby improving the quality of the concrete structure.

[0059] In the present invention, a guide component is provided. During the concrete pouring process, the position of the vibrating rod 13 is guided by the guide component, so that the vibrating rod 13 moves on the concrete pouring section, thereby increasing the uniformity of the effect of the vibrating rod 13 on the concrete. At the same time, due to the movement of the vibrating rod 13, the concrete pushed by the vibrating rod 13 is dispersed and flows faster on the plane, and the effect of dispersing and flattening the concrete can be achieved.

[0060] As a preferred embodiment of the present invention, the transverse plate consists of a fixed end 23, a movable end 25 and a telescopic end 24, the fixed end 23, the telescopic end 24 and the movable end 25 are fixedly connected in sequence, the fixed end 23 is fixedly connected to the output end of the driving motor 22, the telescopic end 24 is made of a spring telescopic rod, and the transmission belt 32 is made of an elastic belt.

[0061] A connecting plate 27 and a tensioning plate 28 are installed on the transmission belt 32. The connecting plate 27 and the tensioning plate 28 are elastically connected via a supporting spring 29. Both the connecting plate 27 and the tensioning plate 28 are U-shaped structures. The middle part of the transmission belt 32 extends to the connecting plate 27 and the tensioning plate 28. The connecting plate 27 and the tensioning plate 28 are used to enhance the length extension capability of the transmission belt 32.

[0062] An arc plate 44 is fixedly mounted on one end of the transverse plate away from the driving motor 22 .

[0063] In order to further enhance the adaptability of the equipment to columns and piles of different diameters, the transverse plate in the present invention is a length-retractable structure. In actual application, after the guide assembly is hoisted to the top of the concrete casting mold by the boom pump truck 1, the staff adjusts the length of the transverse plate so that the length of the transverse plate is smaller than the radius of the concrete casting mold, and then releases the pressure on the transverse plate. Under the elastic action of the telescopic end 24, the mobile end 25 contacts the inner wall of the concrete casting mold, and when the output end of the drive motor 22 rotates, the fixed end 23, the telescopic end 24 and the mobile end 25 that are fixedly connected in sequence rotate synchronously, and during the rotation process, under the elastic action of the telescopic end 24, the mobile end 25 always abuts against the inner wall of the concrete casting mold, thereby making the rotation area of ​​the transverse plate consistent with the cross-sectional area of ​​the concrete casting mold. In the process of changing the length of the transverse plate, when the overall length of the transverse plate increases, the distance between the connecting plate 27 and the tensioning plate 28 is shortened, and the supporting spring 29 is compressed, thereby increasing the length of the transmission belt 32. When the overall length of the transverse plate is shortened, the distance between the connecting plate 27 and the tensioning plate 28 is increased, and the supporting spring 29 recovers its deformation, thereby reducing the length of the transmission belt 32. The setting of the connecting plate 27 and the tensioning plate 28 not only makes the length of the transmission belt 32 always match the length of the transverse plate, but also makes the transmission belt 32 always connected to the transmission wheel group 31, thereby making the vibrating rod 13 on the slider perform regular straight-line reciprocating motion, and the arc plate 44 installed on the transverse plate contacts the object on the rotation path through the arc surface during rotation, thereby facilitating the automatic adjustment of the length of the transverse plate.

[0064] As a preferred embodiment of the present invention, the slider is composed of a connecting end 4 and a rotating end 41, the connecting end 4 is rotatably connected to the rotating end 41, the connecting end 4 is detachably fixedly mounted on the transmission belt 32, a limiting groove 42 is provided on the rotating end 41, a connecting spring 43 is fixedly installed in the limiting groove 42, and the vibrating rod 13 is fixedly connected to the connecting spring 43.

[0065] In the present invention, the slider consists of a connecting end 4 and a rotating end 41. The connecting end 4 is used to connect to the transmission belt 32, and the rotating end 41 is rotatably installed on the connecting end 4, and the rotating end 41 is connected to the vibrating rod 13 through the limiting groove 42. In the initial state, the vibrating rod 13 moves with the slider under the action of the connecting spring 43. At this time, the vibrating rod 13 is in a vertical state and can stir the concrete during the rotation process. When the vibrating rod 13 encounters an obstacle during the rotational movement, the connecting spring 43 is deformed under the action of external force, thereby causing the vibrating rod 13 to deflect, thereby reducing the probability of damage to the device during use.

[0066] As a preferred embodiment of the present invention, a winding motor 5 is installed on the boom pump truck 1 , a winding shaft 51 is fixedly installed on the output end of the winding motor 5 , and one end of the connecting rope 2 away from the mounting seat 21 is fixedly installed on the winding shaft 51 .

[0067] A workbench 52 is hingedly mounted at the end of the boom pump truck 1 , and the winding motor 5 is fixedly mounted on the workbench 52 . A through slot 53 is provided at the bottom of the workbench 52 , and the connecting rope 2 passes through the workbench 52 through the through slot 53 .

[0068] A workbench 52 is hinged at the end of the boom pump truck 1 to provide an operating place for the staff. At the same time, the mounting seat 21 is connected to the workbench 52 through the winding motor 5, the winding shaft 51 and the connecting rope 2, so that the staff can adjust the distance between the workbench 52 and the mounting seat 21 in real time. In actual application, the workbench 52 is suspended above the top opening of the concrete casting mold, and the mounting seat 21 extends to the inside of the casting mold. The staff observes the actual concrete casting situation on the workbench 52, which is convenient for real-time manual intervention in the concrete casting process.

[0069] As a preferred embodiment of the present invention, a support rod 6 is fixedly installed on the workbench 52, a dynamometer 61 is fixedly installed on the support rod 6, the middle part of the connecting rope 2 extends to the measuring end of the dynamometer 61, and a floating plate 62 is fixedly installed on the transverse plate, and the floating plate 62 is a hemispherical hollow structure.

[0070] During the concrete pouring process, as the concrete falls from the opening of the pouring pipe 11 into the concrete pouring mold and is dispersed inside the mold under the action of gravity and the stirring of the vibrating rod 13, as the concrete pouring height increases, a lifting force is generated on the floating plate 62, so that the tension on the connecting cable 2 is reduced, thereby reducing the value of the tension meter 61, and the winding motor 5 is started to a preset degree or under manual control, and then the workbench 52 is lifted by winding the connecting cable 2, thereby adjusting the position of the workbench 52 in real time.

[0071] like Fig.10As shown, a method for using a concrete pouring device for a building construction project comprises the following steps:

[0072] S1, positioning and hovering: a worker enters the workbench 52, and other workers start the boom pump truck 1, so that the end of the boom pump truck 1 hovers on the top of the concrete pouring mold;

[0073] S2, unwinding and landing: the staff on the workbench 52 starts the winding motor 5, causing the connecting rope 2 to gradually unfold and the guide assembly to gradually move to the bottom of the concrete casting mold;

[0074] S3, stirring and vibrating: the boom pump truck 1 pumps the concrete into the pouring pipe 11 and drops it into the concrete pouring mold. The transverse plate in the rotating process cooperates with the vibrating rod 13 to stir and vibrate the concrete;

[0075] S4, pouring step by step: With the cooperation of the dynamometer 61, the winding motor 5 is used to lift the guide assembly step by step until the pouring operation is completed.

[0076] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A concrete pouring device for building construction, comprising a boom pump truck (1), a pouring pipe (11) and a vibrator, wherein the pouring pipe (11) and the vibrator are both mounted on the boom pump truck (1); The vibrator comprises a driving body (12) and a vibrating rod (13), wherein the vibrating rod (13) is connected to the driving body (12) via a transmission hose; Features: It also includes a guide assembly, which is mounted on the boom pump truck (1) and is used to control the movement path of the vibrating rod (13); The guide assembly comprises a connecting rope (2), a mounting seat (21) and a transverse plate; The connecting cable (2) is mounted on the end of the boom pump truck (1); a mounting seat (21) is fixedly mounted on the bottom of the connecting cable (2); a driving motor (22) is fixedly mounted on the mounting seat (21); and a transverse plate is fixedly mounted on the output end of the driving motor (22); The transverse plate is provided with a sliding groove (26), a sliding block is slidably mounted in the sliding groove (26), and the vibrating rod (13) is mounted on the sliding block; It also includes a linkage component, which is installed on the transverse plate and is used to enable the drive motor (22) to be linked with the slider, so that when the transverse plate rotates, the slider is pushed to move in the sliding groove (26).

2. A concrete pouring device for building construction according to claim 1, characterized in that: The linkage assembly comprises a gear ring (3), a transmission wheel set (31) and a transmission belt (32); A gear ring (3) is fixedly mounted on the mounting seat (21), and the gear ring (3) is coaxially arranged with an output end of the driving motor (22); A transmission wheel set (31) is rotatably mounted on the transverse plate, the transmission wheel set (31) is meshedly connected with the gear ring (3), and the transmission wheel set (31) extends into the sliding groove (26); The sliding groove (26) is designed to be annular as a whole. A transmission belt (32) is rotatably installed in the sliding groove (26). One end of the transmission belt (32) is sleeved on the transmission wheel group (31), and the transmission belt (32) is transmission-connected to the transmission wheel group (31). The sliding block is detachably fixedly installed on the transmission belt (32).

3. A concrete pouring device for building construction according to claim 2, characterized in that: The transverse moving plate comprises a fixed end (23), a movable end (25) and a telescopic end (24); the fixed end (23), the telescopic end (24) and the movable end (25) are fixedly connected in sequence; the fixed end (23) is fixedly connected to the output end of the driving motor (22); the telescopic end (24) is made of a spring telescopic rod; and the transmission belt (32) is made of an elastic belt.

4. A concrete pouring device for building construction according to claim 3, characterized in that: A connecting plate (27) and a tensioning plate (28) are installed on the transmission belt (32); the connecting plate (27) and the tensioning plate (28) are elastically connected via a supporting spring (29); the connecting plate (27) and the tensioning plate (28) are both "Y"-shaped structures; the middle part of the transmission belt (32) extends to the connecting plate (27) and the tensioning plate (28); the connecting plate (27) and the tensioning plate (28) are used to enhance the length extension capability of the transmission belt (32).

5. A concrete pouring device for building construction according to claim 4, characterized in that: The slider consists of a connecting end (4) and a rotating end (41); the connecting end (4) is rotatably connected to the rotating end (41); the connecting end (4) is detachably fixedly mounted on a transmission belt (32); a limiting groove (42) is provided on the rotating end (41); a connecting spring (43) is fixedly mounted in the limiting groove (42); and the vibrating rod (13) is fixedly connected to the connecting spring (43).

6. A concrete pouring device for building construction according to claim 5, characterized in that: An arc plate (44) is fixedly mounted on one end of the transverse shifting plate away from the driving motor (22).

7. A concrete pouring device for building construction according to claim 1 or 6, characterized in that: The boom pump truck (1) is provided with a winding motor (5), the output end of the winding motor (5) is fixedly provided with a winding shaft (51), and one end of the connecting rope (2) away from the mounting seat (21) is fixedly provided on the winding shaft (51).

8. A concrete pouring device for building construction according to claim 7, characterized in that: A workbench (52) is hingedly mounted at the end of the boom pump truck (1), the winding motor (5) is fixedly mounted on the workbench (52), a through groove (53) is provided at the bottom of the workbench (52), and the connecting rope (2) passes through the workbench (52) through the through groove (53).

9. A concrete pouring device for building construction according to claim 8, characterized in that: A support rod (6) is fixedly mounted on the workbench (52), a dynamometer (61) is fixedly mounted on the support rod (6), the middle portion of the connecting cable (2) extends to the measuring end of the dynamometer (61), a floating plate (62) is fixedly mounted on the transverse plate, and the floating plate (62) is a hemispherical hollow structure.

10. A method for using a concrete pouring device for building construction, characterized in that: The method uses a concrete pouring device for building construction engineering as claimed in claim 9, and the method of use comprises the following steps: S1, positioning and hovering: a worker enters the workbench (52), and other workers start the boom pump truck (1), so that the end of the boom pump truck (1) hovers on the top of the concrete pouring mold; S2, unwinding and lowering: the staff on the workbench (52) starts the winding motor (5), causing the connecting rope (2) to gradually unfold and the guide assembly to gradually move to the bottom of the concrete casting mold; S3, stirring and vibrating: the boom pump truck (1) pumps the concrete into the pouring pipe (11), and drops it into the concrete pouring mold. The rotating transverse plate cooperates with the vibrating rod (13) to stir and vibrate the concrete; S4, pouring step by step: With the cooperation of the dynamometer (61), the winding motor (5) is used to lift the guide assembly step by step until the pouring operation is completed.