Upward access and sublevel filling combined mining method

Through the joint mining method of upward approach and segmented filling, the safety risks and economic efficiency problems of medium-sized ore solid ore bodies of the upper plate surrounding rock crushed ore bodies are solved, and safe and efficient ore recycling and production capacity are achieved.

CN119041910AActive Publication Date: 2024-11-29ZIJIN MINING GROUP CO LTD +1

Patent Information

Application Number
CN202411408399.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-29
Estimated Expiration
2044-10-10

AI Technical Summary

Technical Problem

When existing mining technology mines ore bodies with a crushing rock and medium-stable ore body, the roof collapses easily, resulting in high safety risks, high support costs, high ore depletion rate and loss rate. It is difficult to achieve safe, economical and efficient mining.

Method used

The upper approach and segmented filling joint mining method is adopted. The ore body close to the lower plate is mined by the segmented filling method without revealing the upper plate surrounding rock, and then the upper plate close to the upper plate is mined by the upper path filling method. The ore body of the surrounding rock ensures the safety of the mining site and maximizes the recovery of ore resources.

Benefits of technology

It has achieved safe, economical and efficient mining of ore bodies above the upper plate surrounding rock crushing and medium-sloping ore bodies, reduced support costs, improved production capacity, and maximized ore resources recovery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041910A_ABST
    Figure CN119041910A_ABST
Patent Text Reader

Abstract

The invention discloses an upward drift and sublevel filling combined mining method. Comprising the steps that an upward drift filling mining method area, a sublevel filling mining method area, an upward drift filling method stope, a sublevel filling method stope, a sublevel filling method stope filling body, an upward drift filling method stope filling body, a footwall vein outside mining roadway, a hanging wall vein outside mining roadway, a panel ore body boundary, a hanging wall ore body boundary and a footwall ore body boundary are arranged; the method has the advantages that the hanging wall broken surrounding rock does not need to be exposed, and it can be guaranteed that a large-capacity stope with the sectional filling method is located in a medium and stable ore body during stope mining with the large-capacity sectional filling method, and the large-capacity stope with the large-capacity sectional filling method is located in a large-capacity stope with the large-capacity stope with the large-capacity stope with the large-capacity stope with the large-capacity stope with the large-capacity sectional filling method; meanwhile, an upward drift filling method is adopted when hanging wall surrounding rock needs to be exposed, so that the method has the advantages of being high in controllability, low in dilution and loss, small in newly-added project amount, low in supporting cost, capable of guaranteeing the safety of stoping, capable of recycling ore resources to the maximum extent, capable of greatly improving the comprehensive production capacity of a stope and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mining, and in particular to a mining method combining upward approach and segmented filling. Background Art

[0002] For inclined medium-thick or thicker ore bodies with broken upper surrounding rock and moderately stable ore bodies, once the upper surrounding rock is exposed in the mining area, roof collapse often occurs, and may even collapse continuously upward to the middle section of the upper mining or directly to the surface, seriously threatening the safety of mining personnel and equipment and causing loss and waste of ore.

[0003] In order to solve the mining problem of this type of ore body, the layered filling method or the upward approach filling method is often used at home and abroad. Some people also use the segmented filling method for mining after long anchor cable support on the upper wall. However, the above known single mining methods have the following problems: first, the mining capacity is low and the safety risk is high; second, the support cost is high; third, the ore depletion rate and loss rate are high, which is not conducive to the safety, economy and efficient mining of the mine.

[0004] Therefore, it is of great significance for our research group to develop an efficient and safe mining method for inclined medium-thick or thicker ore bodies with broken upper wall surrounding rock and moderately stable ore bodies. Summary of the invention

[0005] The task of the present invention is to overcome the deficiencies of the prior art and provide a combined mining method of upward approach and segmented filling, which preferentially adopts the segmented filling method to mine the ore body near the lower plate, mines most of the ore body without exposing the surrounding rock of the upper plate, and then fills the mining area, and then adopts the upward approach filling method to mine the ore body near the broken surrounding rock of the upper plate, which can not only ensure the safety of the medium-stable inclined medium-thick or above ore body with broken surrounding rock of the upper plate, but also can be mined economically and efficiently. This method can realize the safe, economical and efficient mining of the medium-stable inclined medium-thick or above ore body with broken surrounding rock of the upper plate, and can recover ore resources to the maximum extent while ensuring the safety of the mining site, while achieving a higher production capacity.

[0006] The task of the present invention is accomplished by the following technical solutions:

[0007] A combined mining method of upward approach and segmented filling, comprising setting an upward approach filling mining method area, a segmented filling mining method area, an upward approach filling method stope, a segmented filling method stope, a segmented filling method stope filling body, an upward approach filling method stope filling body, a lower plate vein out-mine tunnel, an upper plate vein out-mine tunnel, a plate area ore body boundary, an upper plate ore body boundary, a lower plate ore body boundary, an upward approach method second layered connecting road, an upward approach method third layered connecting road, a segmented filling method out-mine tunnel connecting road, and upper plate crushed surrounding rock; the upward approach filling mining method area is an area mined by the upward approach filling method, and the ore body in this area is close to the upper plate crushed surrounding rock. Broken surrounding rock; The segmented filling mining method area is an area where the segmented filling method is used for mining. The ore body in this area is close to the lower plate and is located in the ore body with better stability, and the broken surrounding rock of the upper plate is not exposed; the upward approach filling method stope is arranged along the direction of the ore body, and the approach stope section is 5m×5m and the length is about 60m; the segmented filling method stope is arranged along the direction of the vertical ore body, and the short boundary of the stope is adjacent to the upward approach method stope, the segment height is about 15m, the length is 30~45m, and the width is 12~15m; the filling body of the segmented filling method stope is the material used to fill the goaf after the ore body of the segmented filling method stope is mined, which can limit the deformation of the stope And maintain its own stability; the filling body of the upward approach filling method stope is the material used to fill the goaf after the ore body of the upward approach filling method stope is mined, which can limit the deformation of the stope and maintain its own stability; the mining tunnel outside the lower plate vein is the ore discharge and transportation channel of the segmented filling method stope, which is 15 to 25 meters away from the lower plate boundary of the ore body; the mining tunnel outside the upper plate vein can be used as the ore discharge and transportation channel of the upward approach filling method stope and the segmented filling method stope at the same time, and is 25 to 30 meters away from the upper plate ore body boundary; the panel ore body boundary is the boundary of the ore body in one panel area, and also includes the ore body in the upward approach filling mining method area and the segmented filling mining The method is for a regional ore body, with a panel area of ​​about 60m long along the strike of the ore body, a width equal to the thickness of the ore body, about 45m, and a height of 15m; the upper plate ore body boundary is the ore body boundary close to the upper plate in the panel area, and is the boundary between the broken surrounding rock of the upper plate and the ore body; the lower plate ore body boundary is the maximum mining range boundary of the ore body close to the lower plate area; the second layer connection road of the upward approach method is the mining and mining channel of the second layer ore body; the third layer connection road of the upward approach method is the mining and mining channel of the third layer ore body; the segmented filling method mining channel connection road is the main channel for rock drilling and mining, connecting the mining channels outside the upper plate and lower plate veins and the segmented filling method stope.

[0008] Compared with the prior art, the present invention has the following advantages or effects:

[0009] Because the segmented filling method is located in a medium-stable ore body during mining, there is no need to expose the broken surrounding rock in the upper plate, so it can ensure that the large-capacity segmented filling method is located in a medium-stable ore body during mining; at the same time, because the upward approach filling method is adopted when it is necessary to expose the surrounding rock in the upper plate, it has strong controllability, and small depletion and loss; in addition, when the upward approach method is used for mining, only two layered connecting roads need to be added in a plate area, so the additional engineering volume is small and the support cost is low, which not only ensures the safety of mining, but also recovers the ore resources to the maximum extent and greatly improves the comprehensive production capacity of the mine. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 The diagram is a top view of a stope in the AA direction according to a combined upward approach and segmented filling mining method proposed by the present invention.

[0011] Figure 2 yes Figure 1 The diagram shown is a front view of the stope BB section of a combined mining method of upward approach and segmented filling.

[0012] Figure 3 yes Figure 1 The schematic diagram of the left view of the stope CC showing the combined upward approach and staged filling mining method.

[0013] The symbols in the accompanying drawings represent:

[0014] 1. Upward approach filling mining method area 2. Segment filling mining method area 3. Upward approach filling method stope 4. Segment filling method stope 5. Segment filling method stope filling body 6. Upward approach filling method stope filling body 7. Lower wall vein out-mine roadway 8. Upper wall vein out-mine roadway 9. Plate area ore body boundary 10. Upper wall ore body boundary 11. Lower wall ore body boundary 12. Upward approach method second layer contact road 13. Upward approach method third layer contact road 14. Segment filling method out-mine roadway contact road 15. Upper wall broken surrounding rock

[0015] The present invention is further described in detail below in conjunction with the accompanying drawings. DETAILED DESCRIPTION

[0016] Reference Figures 1 to 3A mining method combining upward approach and segmented filling, aimed at the mining problem of an inclined medium-thick or thick ore body with broken upper wall surrounding rock and medium-stable ore body, comprising setting an upward approach filling mining method area (1), a segmented filling mining method area (2), an upward approach filling method stope (3), a segmented filling method stope (4), a segmented filling method stope filling body (5), an upward approach filling method stope filling body (6), a lower wall vein out-mine roadway (7), an upper wall vein out-mine roadway (8), a wall area ore body boundary (9), an upper wall ore body boundary (10), a lower wall ore body boundary (11), an upward approach method second layer contact road (12), an upward approach method third layer contact road (13), a segmented filling method out-mine roadway contact road (14), an upper wall broken surrounding rock, a segmented filling method stope filling body (15), an upward approach method stope filling body (1 ... an upward approach method stope filling body (17), an upward approach method stope filling body (18), an upward approach method stope filling body (19), an upward approach method stope filling body (20), an upward approach method stope filling body (21), an upward approach method stope filling body (22), an upward approach method stope filling body (23), an upward approach method stope filling body (24), an upward approach method stope filling body (25), an upward approach method stope filling body (26), an upward approach method stope filling body (27), an upward approach method stope filling body (28), an upward rock (15); the upward approach filling mining method area (1) is an area mined by the upward approach filling method, and the ore body in this area is close to the upper plate crushed surrounding rock (15); the segmented filling mining method area (2) is an area mined by the segmented filling method, and the ore body in this area is close to the lower plate, located in the ore body with better stability, and the upper plate crushed surrounding rock is not exposed; the upward approach filling method stope (3) is arranged along the vertical ore body trend, the approach stope section is 5m×5m, and the length is about 60m; the segmented filling method stope (4) is arranged along the vertical ore body trend, the stope short boundary is adjacent to the upward approach method stope (3), the segment height is about 15m, the length is 30-45m, and the width is 12-15m; the segmented filling method stope filling body (5) is segmented After the ore body of the segment filling method mining field is mined, the material used to fill the goaf can limit the deformation of the mining field and maintain its own stability; the upward approach filling method mining field filling body (6) is the material used to fill the goaf after the ore body of the upward approach filling method mining field is mined, which can limit the deformation of the mining field and maintain its own stability; the lower plate vein out-mining roadway (7) is the ore discharge and transportation channel of the segment filling method mining field, which is 15 to 25 meters away from the lower plate boundary of the ore body; the upper plate vein out-mining roadway (8) can be used as the ore discharge and transportation channel of the upper approach filling method mining field and the segment filling method mining field at the same time, and is 25 to 30 meters away from the upper plate ore body boundary (10); the plate area ore body boundary (9) is the boundary of the ore body in one plate area, and also includes the upward approach filling mining method area (1) Ore body and segmented filling mining method area (2) Ore body, one panel area is about 60m long along the ore body strike, about 45m wide as the thickness of the ore body, and 15m high; the upper plate ore body boundary (10) is the ore body boundary close to the upper plate in the panel area, and is the boundary between the upper plate broken surrounding rock and the ore body; the lower plate ore body boundary (11) is the maximum mining range boundary of the ore body close to the lower plate area; the second layer connecting road (12) of the upward approach method is the mining and mining channel of the second layer ore body; the third layer connecting road (13) of the upward approach method is the mining and mining channel of the third layer ore body; the segmented filling method mining channel connecting road (14) is the main channel for rock drilling and mining connecting the mining channels outside the upper plate and lower plate veins and the segmented filling method mining area (2).

[0017] The specific process steps and conditions of the present invention can further be

[0018] First, the ore body is divided into disk areas, which are about 60m long, 45m wide and 15m high. The ore body about 35m thick near the lower plate is mined by the segmented filling method, and the ore body about 10m thick near the upper plate is mined by the upward approach filling method.

[0019] In the disk area, the segmented filling mining method area (2) is first mined, and the mining sequence is one or three. After all the segmented filling mining areas in the disk area are mined and filled, the upward access filling mining method area (1) is mined.

[0020] When mining in the area (2) of the segmented filling mining method, the roof and side walls are located in a medium-stable ore body and do not require support. The mining area is about 35m long, 12-15m wide, and 15m high in one segment. The mined ore is shoveled out by a remote-controlled shovel loader through the upper and lower plate mining tunnel connecting tunnels (14) and the upper and lower plate vein mining tunnels (7, 8) to the ore chute; after all the ore in the mining area has been mined, the cemented filling body is immediately used to fill the empty area of ​​the mining area.

[0021] After all the mining areas of the segmented filling mining method area (2) in the plate area have been mined and filled, and the filling body strength has reached the design strength, the upward approach filling mining method area (1) will be mined. The 15m segment height is divided into three layers for mining. The vertical mining order is from bottom to top. The remaining 10m wide ore body thickness is divided into two approach mining areas for mining. The approach mining area close to the lower plate is mined first, and then the upper plate approach mining area is mined. The cross-section of a single approach mining area is 5m×5m and the length is about 60m. The upward approach filling method mining area adopts anchor mesh spraying support.

[0022] The mine tunnel (8) out of the upper wall vein is at least 25m away from the upper wall ore body boundary (10) to ensure the construction of the second and third layered connecting roads (12, 13) of the upper approach method when the upper approach filling method is turned upward.

[0023] The slopes of the second layered connecting road (12) of the upward approach method and the third layered connecting road (13) of the upward approach method are both 8 to 9 degrees.

[0024] In industrial applications, for mining of medium-thick or thicker ore bodies with broken upper wall surrounding rocks and moderately stable ore bodies, it includes but is not limited to the following steps and conditions:

[0025] A. The ore body is divided into panels for mining. The panel ore body boundary (9) includes the ore body of the upward approach filling mining method area (1) and the ore body of the segmented filling mining method area (2). The panel is about 60m long, 45m wide, and 15m high. The upward approach filling mining method area (1) is arranged as the upward approach filling method stope (3) for mining, and the segmented filling mining method area (2) is arranged as the segmented filling method stope (4) for mining.

[0026] B. The sub-level filling method stope (4) is close to the lower wall ore body boundary (11), and the upward approach filling method stope (3) is close to the upper wall ore body boundary (10). Within the range of the plate area ore body boundary (9), the sub-level filling mining method area (2) ore body is first mined, and then the upward approach filling mining method area (1) ore body is mined;

[0027] C. The stope of the segmented filling method (4) is arranged vertically to the direction of the ore body, and the stope is 35m long, 12m wide and 15m high. The stope does not require support, and the segmented filling method stope (4) in the panel area adopts the method of mining every other one or every three.

[0028] D. After all the sub-division filling method stope (4) is mined and the sub-division filling method stope filling body (5) is filled, and the filling body strength reaches above 1MPa, the upward approach filling mining method area (1) stope is mined, and the upward approach filling method stope (3) is arranged along the ore body strike. The stope is 60m long, 5m wide and 5m high. The vertical direction adopts the bottom-up mining sequence. In the horizontal direction, the approach stope close to the sub-division filling method stope (4) is mined first, and then the approach stope close to the upper plate broken surrounding rock (15) is mined. The stope adopts anchor mesh spraying support;

[0029] E. The ore mined in the staged filling method stope (4) is transported to the middle ore chute through the upper wall vein out-mining tunnel (8) and the lower wall vein out-mining tunnel (7), respectively. The upper wall vein out-mining tunnel (8) is 25 to 30 meters away from the upper wall ore body boundary (10), and the lower wall vein out-mining tunnel (7) is 15 to 25 meters away from the lower wall ore body boundary (11);

[0030] F. The upward approach filling method stope (3) is divided into three layers from bottom to top for mining, each layer is 5m high, the ore mined in the first layer stope is directly mined using the existing upper wall vein mining tunnel (8) and upper wall mining tunnel connecting road (14) of the segmented filling method stope (4), the second layer stope needs to construct a second layer connecting road (12) of the upward approach method for mining and transportation, and the third layer stope needs to construct a third layer connecting road (13) of the upward approach method for mining and transportation, and the slope of the layer connecting road is 8-9°;

[0031] G. When the upward approach filling method mining area (3) is mined, the upper plate broken surrounding rock (15) will be exposed and needs to be supported by anchor mesh spraying. Since the span of the upward approach filling method mining area (3) is small, only 5m, the support is convenient and flexible, and the ore body close to the upper plate ore body boundary (10) can be recovered to the maximum extent.

[0032] As described above, the present invention can be better implemented. The above embodiments are only the best implementation methods of the present invention, but the implementation methods of the present invention are not limited by the above embodiments. Other changes, modifications, replacements, combinations, and simplifications made without departing from the spirit and principle of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. A mining method combining upward approach and segmented filling, which is aimed at mining problems of medium-thick or thicker ore bodies with broken surrounding rock and moderately stable ore bodies. It is characterized by The method comprises setting an upward approach filling mining method area (1), a segmented filling mining method area (2), an upward approach filling method stope (3), a segmented filling method stope (4), a segmented filling method stope filling body (5), an upward approach filling method stope filling body (6), a lower plate vein out-mine tunnel (7), an upper plate vein out-mine tunnel (8), a plate area ore body boundary (9), an upper plate ore body boundary (10), a lower plate ore body boundary (11), an upward approach method second layer contact road (12), an upward approach method third layer contact road (13), a segmented filling method out-mine tunnel contact road (14), and upper plate crushed surrounding rock (15); the upward approach filling mining method area (1) is an area for mining using the upward approach filling method. , the ore body in this area is close to the upper plate broken surrounding rock (15); the segmented filling mining method area (2) is an area where the segmented filling method is used for mining, the ore body in this area is close to the lower plate, located in the ore body with better stability, and the upper plate broken surrounding rock is not exposed; the upward approach filling method stope (3) is arranged along the direction of the ore body, the approach stope section is 5m×5m, and the length is about 60m; the segmented filling method stope (4) is arranged along the vertical direction of the ore body, the stope short boundary is adjacent to the upward approach stope (3), the segment height is about 15m, the length is 30-45m, and the width is 12-15m; the segmented filling method stope filling body (5) is the material used to fill the goaf after the segmented filling method stope ore body is mined, which can limit The mining area is deformed and maintains its own stability; the filling body (6) of the upward approach filling method mining area is the material used to fill the goaf after the ore body of the upward approach filling method mining area is mined, which can limit the deformation of the mining area and maintain its own stability; the mining tunnel (7) outside the lower wall vein is the mining and transportation channel of the segmented filling method mining area, which is 15 to 25 meters away from the lower wall boundary of the ore body; the mining tunnel (8) outside the upper wall vein can be used as the mining and transportation channel of the upward approach filling method mining area and the segmented filling method mining area at the same time, and is 25 to 30 meters away from the upper wall ore body boundary (10); the panel ore body boundary (9) is the boundary of the ore body in one panel area, and includes the ore body of the upward approach filling mining method area (1) and the segmented filling mining method. The ore body in the method area (2) is about 60m long along the strike of the ore body, about 45m wide and 15m high, which is the thickness of the ore body; the upper plate ore body boundary (10) is the ore body boundary close to the upper plate in the plate area, and is the boundary between the broken surrounding rock of the upper plate and the ore body; the lower plate ore body boundary (11) is the maximum mining range boundary of the ore body close to the lower plate area; the second layer connecting road (12) of the upward approach method is the mining and mining channel of the second layer ore body; the third layer connecting road (13) of the upward approach method is the mining and mining channel of the third layer ore body; the segmented filling method mining channel connecting road (14) is the main channel for rock drilling and mining, connecting the mining channels outside the upper plate and lower plate veins and the segmented filling method mining area (2).

2. The method according to claim 1, characterized in that first The ore body is divided into plate areas, which are about 60m long, 45m wide and 15m high. The ore body about 35m thick near the lower plate is mined by the segmented filling method, and the ore body about 10m thick near the upper plate is mined by the upward approach filling method.

3. The method according to claim 2 is characterized in that within the disk area, the segmented filling mining method area (2) is first mined, and the mining sequence of every other or every three mining areas is adopted. After all the segmented filling mining areas in the disk area are mined and filled, the upward access filling mining method area (1) is mined.

4. The method according to claim 1, characterized in that When mining in the area (2) of the segmented filling mining method, the roof and side walls are located in a medium-stable ore body and do not require support. The mining area is about 35m long, 12-15m wide, and 15m high in one segment. The mined ore is shoveled out by a remote-controlled shovel loader through the upper and lower plate mining tunnel connecting tunnels (14) and the upper and lower plate vein mining tunnels (7, 8) to the ore chute; after all the ore in the mining area has been mined, the cemented filling body is immediately used to fill the empty area of ​​the mining area.

5. The method according to claim 1, 2, 3 or 4, characterized in that After all the mining areas of the segmented filling mining method area (2) in the plate area have been mined and filled, and the filling body strength has reached the design strength, the upward approach filling mining method area (1) will be mined. The 15m segment height is divided into three layers for mining. The vertical mining order is from bottom to top. The remaining 10m wide ore body thickness is divided into two approach mining areas for mining. The approach mining area close to the lower plate is mined first, and then the upper plate approach mining area is mined. The cross-section of a single approach mining area is 5m×5m and the length is about 60m. The upward approach filling method mining area adopts anchor mesh spraying support.

6. The method according to claim 1, characterized in that The mine tunnel (8) out of the upper wall vein is at least 25m away from the upper wall ore body boundary (10) to ensure the construction of the second and third layered connecting roads (12, 13) of the upper approach method when the upper approach filling method is turned upward.

7. The method according to claim 1 or 6, characterized in that The slopes of the second layered connecting road (12) of the upward approach method and the third layered connecting road (13) of the upward approach method are both 8 to 9 degrees.

Citation Information

Patent Citations

  • Non-bottom pillar deep hole falling-back type mining method

    CN101328809A

  • Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel

    CN101818643A

  • House pillar changeable panel upward demix filling mining method

    CN101858217A

  • Combined filling mining method for complex ore body

    CN110905515A

  • Novel ore mining method suitable for multi-stope synchronous mining of large and thick ore body

    WO2022052716A1

Cited By

  • Top height pre-control drift filling mining method for hanging wall extremely broken ore body

    CN121827812A

  • precontrolled top slicing with high level cut and fill stoping of very broken ore

    CN121827812B