Pilot tunnel excavation method for shallow-buried excavation of large-section tunnel in inclined stratum
By using the combined technology of surface rock formation reinforcement anchor cables and rock formation reinforcement anchor rods in the cave in the inclined rock formation, combined with the sequential excavation and support methods of eight excavation surfaces, the bias problem in tunnel construction in the inclined rock formation is solved. Improve construction safety and efficiency, and achieve more natural arching effect and better stress conditions.
Patent Information
- Application Number
- CN202411176245.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-26
AI Technical Summary
When excavating tunnels in inclined rock layers, the existing technology is difficult to effectively deal with bias loads, resulting in unstable tunnel construction and high cost. Especially, the construction of shallow buried and hidden large-section tunnels has great challenges.
Using the combination technology of surface rock formation reinforcement anchor cables and rock formation reinforcement anchor rods in the cave, the sequential excavation of eight excavation surfaces forms an approximately elliptical guide pit section, combining permanent and temporary support to reduce the impact of bias and Prevent surrounding rock collapse.
It improves the safety and efficiency of tunnel construction, reduces stress concentration, avoids sinking of the vault, reduces the impact of bias, and achieves a more natural arch formation effect and better stress conditions.
Smart Images

Figure CN119041931A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel construction, and in particular to a method for excavating a shallowly buried, darkly excavated, large-section tunnel in an inclined stratum using a special-shaped side wall pilot pit method. Background Art
[0002] Inclined rock strata refer to rock strata with a certain angle between the layer and the horizontal plane and with basically the same inclination. Most inclined rock strata are originally horizontal rock strata that have undergone structural changes and are components of various structural deformations. When tunnels are excavated in such rock strata, the layered rock mass will tend to slide or slide relatively along the structural surface of the rock strata, which will generate a bias load on the entire tunnel and the supporting structure. The value of this load is related to factors such as rock strata characteristics, rock strata inclination, groundwater development, and weak rock strata structural surface.
[0003] In recent years, with the construction of more and more tunnels, the bias pressure of inclined rock strata has also emerged in an endless stream. After the tunnel is excavated, the surrounding rock is lacking in integrity, and the bias pressure of the tunnel causes excessive local deformation. The general construction method is difficult to meet the excavation construction requirements or the investment cost is too high. The existing tunnel excavation methods and processes are basically aimed at the excavation of general geological rock strata, and rarely involve the geological conditions of tunnel bias pressure, especially for the construction of shallow buried large-section tunnels in inclined rock strata. Summary of the invention
[0004] In view of the defects of the above-mentioned prior art, the technical problem to be solved by the present invention is to provide a comprehensive surrounding rock reinforcement technology consisting of advance reinforcement of surface rock reinforcement anchor cables and local rock reinforcement anchor rods in the tunnel, and to excavate eight excavation faces in sequence, so as to achieve a special-shaped side wall pilot pit excavation method for a shallowly buried large-section tunnel in an inclined stratum with natural arch formation, good stress and little bias pressure effect.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solution: a pilot pit excavation method for a shallow buried dark excavation large cross-section tunnel in an inclined stratum, comprising the following steps:
[0006] Step 1: Carry out construction preparation, make advance predictions of surrounding rock and stratum conditions, and measure and stake out before excavation;
[0007] Step 2: Install rock reinforcement anchor cables. On the inclined side of the excavated tunnel, a number of parallel boreholes are arranged from far to near, and rock reinforcement anchor cables are installed in the boreholes. The rock reinforcement anchor cables are perpendicular to the rock structure surface, and the nearest rock reinforcement anchor cable is 2 to 3 meters away from the tunnel contour line. The driving depth of the rock reinforcement anchor cables should ensure that the tunnel to be excavated is covered along the rock formation.
[0008] Step 3: Prepare for excavation, divide the excavation surface into three guide tunnels: left, middle and right. The right guide tunnel is a side guide tunnel. The widths of the left, middle and right guide tunnels decrease in sequence, and the vertex of the excavation line between the left and middle guide tunnels is set at the vertex of the tunnel; the right guide tunnel is divided into two upper and lower excavation surfaces, and the middle guide tunnel and the left guide tunnel are divided into three upper, middle and lower excavation surfaces. The eight excavation surfaces are excavated in sequence from the right guide tunnel to the middle guide tunnel, and then to the left guide tunnel and from top to bottom. During the excavation, the initial support of the tunnel wall, the temporary invert and the initial support of the invert are carried out. Temporary support of partition walls are set up between the right guide tunnel and the middle guide tunnel, and between the middle guide tunnel and the left guide tunnel. The temporary invert and the temporary support of the partition wall divide the large-section tunnel into several small closed support units;
[0009] When the right pilot tunnel is excavated, rock reinforcement anchor rods parallel to the rock reinforcement anchor cables are driven into the rock strata on the right side of tunnels ① and ②, and temporary partition wall support is set up on the left side of tunnels ① and ②; the temporary partition wall support on the left side of tunnels ① and ② is arched to the left, making the cross section of the right pilot tunnel approximately elliptical and the surrounding contour smooth;
[0010] When the middle guide tunnel is excavated, rock reinforcement anchor rods parallel to the rock reinforcement anchor cables are driven into the top rock layer of tunnel ③; the temporary support of the partition wall on the left side of tunnels ③, ④ and ⑤ arches to the left, making the overall cross-section of the right middle guide tunnel approximately elliptical, with a smooth surrounding contour;
[0011] When the left pilot tunnel is excavated, rock reinforcement anchor rods parallel to the rock reinforcement anchor cables are driven into the top rock layer of tunnel ⑥; the excavation of this section of the left pilot tunnel is completed, that is, the section of the tunnel is closed;
[0012] Step 4: After the initial support structure strength and tunnel deformation reach initial stability, remove the temporary inverts and temporary partition wall supports for the excavated tunnel section, and cast the secondary wall supports for the initial supports of each tunnel wall on the tunnel wall, and cast the secondary arch supports for the initial supports of each invert to complete the construction of the tunnel section.
[0013] Preferably, in step 2, the rock reinforcement anchor cables are evenly arranged at intervals of 3 to 5 m.
[0014] Preferably, the rock reinforcement anchor cable adopts a shear-resistant anchor cable, which is composed of an anchor cable steel strand, a smooth casing, shear-resistant steel bars and an anchor cable anchor head; after the rock reinforcement anchor cable is driven into a hole drilled on the stratum surface, it is fixed to the anchor cable hole wall by an anchor cable adhesive, and the anchor cable adhesive includes cement, sand and water.
[0015] Preferably, in step three, the bottom widths of the left, middle and right guide tunnels are 0.4, 0.35 and 0.25 times the tunnel span, respectively. A smaller section is excavated first, and after the excavated section is arched and stable, the excavation area is gradually expanded to prevent large-scale collapse of the surrounding rock of the face.
[0016] Preferably, in step three, right guide tunnel No. ② is excavated 3 to 5 meters after excavation of Tunnel No. ①; middle guide tunnel No. ③ is excavated 6 to 10 meters after excavation of Tunnel No. ②; middle guide tunnel No. ④ is excavated 3 to 5 meters after excavation of Tunnel No. ③; middle guide tunnel No. ⑤ is excavated 3 to 5 meters after excavation of Tunnel No. ④; left guide tunnel No. ⑥ is excavated 6 to 10 meters after excavation of Tunnel No. ⑤; left guide tunnel No. ⑦ is excavated 3 to 5 meters after excavation of Tunnel No. ⑥; left guide tunnel No. ⑦ is excavated 3 to 5 meters after excavation of Tunnel No. ⑥; left guide tunnel No. ⑧ is excavated 3 to 5 meters after excavation of Tunnel No. ⑦.
[0017] Preferably, in step three, the initial support of the cave wall includes a steel mesh, an initial support anchor rod and initial sprayed concrete. After drilling and installing the rock reinforcement anchor rod, the concrete is sprayed again to the designed thickness, and the rock reinforcement anchor rod is installed perpendicular to the rock structure surface. The rock reinforcement anchor rod includes an anchor end, a smooth casing, an anchor rod body and an anchor rod anchor head. After the rock reinforcement anchor rod is driven into the rock formation, it is fixed to the anchor rod hole wall by anchor rod glue.
[0018] Preferably, in step three, the initial support of the invert is initial spraying of concrete, installation of steel mesh and re-spraying of concrete to the designed thickness until the initial support construction of the invert of the left pilot tunnel is completed, and the initial support of the tunnel is closed.
[0019] Preferably, in step 4, the second-stage support of the tunnel wall and the second-stage support of the invert arch are constructed, and a layer of form-cast reinforced concrete is constructed on the initial support of each tunnel wall and the initial support of each invert arch.
[0020] Beneficial effects of the present invention:
[0021] 1) The tunnel cross section is divided into several blocks and divided into three guide tunnels, left, middle and right, along the width direction. The tunnel is excavated step by step from the inclined side to the other side, and the widths of the three guide tunnels, left, middle and right, are reduced in sequence. The smaller section is excavated first. After the excavated section is arched and stable, the excavation area is gradually expanded. Eight excavation faces are set on the premise of ensuring the excavation space, so that the main sliding surface and the main layer combination surface are less exposed in the excavation space, which increases the safety of tunnel construction. Further, support and expansion are carried out by combining permanent support with temporary support, which prevents large-scale collapse of the surrounding rock of the face. The vertex of the excavation line between the left and middle guide tunnels is set at the vertex of the tunnel, so that the angle between the excavation line and the tunnel contour line is small, the tangency is natural and smooth, and the influence of stress concentration is reduced;
[0022] 2) The pilot pit is divided into eight excavation surfaces, with a cross section that is approximately elliptical and a smooth perimeter contour, which can make the arch more natural, better stressed, less affected by bias pressure, and avoid stress concentration, which is conducive to controlling the sinking of the arch. Moreover, after excavation, each section forms a closed arch with the excavated part, which is more conducive to controlling deformation;
[0023] 3) A comprehensive surrounding rock reinforcement technology consisting of surface rock reinforcement anchor cables for advance reinforcement and local rock reinforcement anchor rods in the tunnel is used. The rock reinforcement anchor cables are perpendicular to the rock structure surface. At the same time, the driving depth of the rock reinforcement anchor cables should ensure that the tunnel to be excavated is covered along the rock formation. The rock reinforcement anchor cables combine the rock formation into a whole before tunnel excavation to reduce the influence of bias pressure.
[0024] 4) During the initial support setting after excavation, rock reinforcement anchor rods are installed. The rock reinforcement anchor rods are parallel to the rock reinforcement anchor cables, that is, the rock reinforcement anchor rods are perpendicular to the rock structure surface, which can form the rock formation around the tunnel into a combined beam form, reducing the local bias pressure or deformation caused by the influence of the inclined rock structure surface; and the nearest rock reinforcement anchor cable is 2 to 3 meters away from the tunnel contour line, which can act as an anchor rod to reinforce the rock formation when the rock reinforcement anchor rod in the cave cannot be driven perpendicular to the rock structure surface. Both the anchor cable and the anchor rod are conducive to reducing the influence of the rock formation bias pressure on the large-section tunnel;
[0025] 5) Compared with the traditional large-section tunnel excavation method, it has fewer excavation steps, reduces tunnel excavation disturbance, and has a larger tunnel section, which is more conducive to full-section mechanical construction, thereby improving excavation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a construction schematic diagram of the present invention;
[0027] Figure 2 Schematic diagram of the structure of anchor cables for rock reinforcement;
[0028] Figure 3 The schematic diagram of the structure of the rock reinforcement anchor is shown in FIG.
[0029] Figure 4 This is a schematic diagram of excavation support;
[0030] In the figure, 1: rock reinforcement anchor cable, 1-1: anchor cable hole wall, 1-2: anchor cable glue, 1-3: shear steel bar, 1-4: smooth casing, 1-5: anchor cable anchor head, 1-6: anchor cable steel strand, 2: rock reinforcement anchor rod, 2-1 anchor end, 2-2: anchor rod hole wall, 2-3: anchor rod glue, 2-4: smooth casing, 2-5: anchor rod anchor head, 2-6: anchor rod body, 3: initial support of cave wall, 4: temporary invert arch, 5: temporary support of partition wall, 6: initial support of invert arch. DETAILED DESCRIPTION
[0031] In order to better understand the improvements made by the present invention relative to the prior art, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0032] like Figure 1 As shown, a pilot pit excavation method for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum comprises the following steps:
[0033] Step 1: Carry out construction preparation, make advance predictions of surrounding rock and stratum conditions, and conduct surveying and layout before excavation.
[0034] Step 2: Install the rock reinforcement anchor cables 1. On the inclined side of the excavated tunnel, a number of parallel boreholes are arranged from far to near, and the rock reinforcement anchor cables 1 are installed in the boreholes. The rock reinforcement anchor cables 1 are evenly arranged at intervals of 3 to 5 meters.
[0035] like Figure 2 As shown, the rock reinforcement anchor cable 1 adopts a shear anchor cable, which is composed of an anchor cable steel strand 1-6, a smooth casing 1-4, a shear steel bar 1-3 and an anchor cable head 1-5. After the rock reinforcement anchor cable 1 is driven into the surface hole of the formation, it is fixed to the anchor cable hole wall 1-1 through the anchor cable glue 1-2, wherein the anchor cable glue 1-2 is mainly composed of cement, sand and water. The rock reinforcement anchor cable can reinforce the inclined rock formation and provide shear resistance to prevent the rock formation from sliding along the structural surface. The rock reinforcement anchor cable 1 is perpendicular to the rock formation structural surface, and the nearest rock reinforcement anchor cable 1 is 2 to 3 meters away from the tunnel contour line. The driving depth of the rock reinforcement anchor cable 1 should ensure that the tunnel to be excavated is covered along the direction of the rock formation, and the rock formation is combined into a whole before the tunnel is excavated to reduce the influence of bias pressure.
[0036] Step 3: Prepare for excavation, divide the excavation surface into three guide tunnels: left, middle and right. The right guide tunnel is a side guide tunnel. The widths of the left, middle and right guide tunnels decrease in sequence. It is best that the bottom widths of the left, middle and right guide tunnels are 0.4, 0.35 and 0.25 times the tunnel span respectively. First, excavate a smaller section. After the excavated section is arched and stable, gradually expand the excavation area. The vertex of the excavation line between the left and middle guide tunnels is set at the vertex of the tunnel, so that the angle between the excavation line and the tunnel contour line is small, and the tangent is naturally smooth, thereby reducing the influence of stress concentration.
[0037] The right pilot tunnel is divided into two excavation faces, the upper and lower faces, and the middle and left pilot tunnels are divided into three excavation faces, the upper, middle and lower faces. The eight excavation faces are excavated in sequence from the right pilot tunnel to the middle pilot tunnel, then to the left pilot tunnel, and from top to bottom. Figure 4 As shown, during the excavation, the initial support 3 of the tunnel wall, the temporary invert 4 and the initial support 6 of the invert are carried out. The initial support 6 of the invert is the initial spraying of concrete, the erection of steel mesh and the re-spraying of concrete to the designed thickness. Temporary support 5 of the partition wall is set up between the right guide tunnel and the middle guide tunnel, and between the middle guide tunnel and the left guide tunnel. The temporary invert 4 and the temporary support 5 of the partition wall divide the large-section tunnel into several small closed support units.
[0038] First, excavate the right guide tunnel No. ①. While excavating No. ①, carry out the initial support 3 of the tunnel wall and the temporary invert 4. Set up the partition wall temporary support 5 on the left side of No. ①, and drive the rock reinforcement anchor 2 into the right rock layer of No. ①. After excavating No. ① for 3 to 5 meters, excavate the right guide tunnel No. ②. While excavating No. ②, carry out the initial support 3 of the tunnel wall and the initial support 6 of the invert. Set up the partition wall temporary support 5 on the left side of No. ②, and drive the rock reinforcement anchor 2 into the right rock layer of No. ②. The rock reinforcement anchor 2 on the right rock layer of No. ① and No. ② is parallel to the rock reinforcement anchor cable 1. The rock reinforcement anchor 2 cannot be driven into the top of No. ① due to the angle problem, and the rock layer is reinforced by the rock reinforcement anchor cable 1 driven in advance. The temporary support 5 of the partition wall on the left side of tunnels ① and ② is arched to the left, making the cross-section of the right guide tunnel approximately elliptical and the surrounding contour smooth.
[0039] After the excavation of hole ② for 6 to 10 meters, the excavation of hole ③ of the middle guide hole is carried out. While the excavation of hole ③, the initial support 3 of the cave wall and the temporary invert 4 are carried out, and the temporary support 5 of the partition wall is set up on the left side of hole ③, and the rock reinforcement anchor 2 is driven into the top rock layer of hole ③. After the excavation of hole ③ for 3 to 5 meters, the excavation of hole ④ of the middle guide hole is carried out. While the excavation of hole ④ is carried out, the temporary invert 4 is carried out, and the temporary support 5 of the partition wall is set up on the left side of hole ④. After the excavation of hole ④ for 3 to 5 meters, the excavation of hole ⑤ of the middle guide hole is carried out. While the excavation of hole ⑤ is carried out, the initial support 6 of the invert is carried out, and the temporary support 5 of the partition wall is set up on the left side of hole ⑤. The rock reinforcement anchor 2 driven into the top rock layer of hole ③ is parallel to the rock reinforcement anchor cable. The temporary support 5 of the partition wall on the left side of holes ③, ④ and ⑤ is arched to the left, so that the overall cross-section formed by the right middle guide hole is approximately elliptical, and the surrounding contour is smooth.
[0040] After the excavation of hole ⑤ for 6 to 10 meters, the excavation of hole ⑥ of the left guide tunnel was carried out. While the excavation of hole ⑥ was carried out, the initial support 3 of the tunnel wall and the temporary invert 4 were carried out, and the rock reinforcement anchor rod 2 was driven into the rock layer on the left side of hole ⑥. After the excavation of hole ⑥ for 3 to 5 meters, the excavation of hole ⑦ of the left guide tunnel was carried out. While the excavation of hole ⑦ was carried out, the initial support 3 of the tunnel wall and the temporary invert 4 were carried out. After the excavation of hole ⑦ for 3 to 5 meters, the excavation of hole ⑧ of the left guide tunnel was carried out. While the excavation of hole ⑧ was carried out, the initial support 3 of the tunnel wall and the initial support 6 of the invert were carried out. The rock reinforcement anchor rod 2 driven into the top rock layer of hole ⑥ is parallel to the rock reinforcement anchor cable 1. Because the rock layer will slide to the left when it slips, there is no need to drive the rock reinforcement anchor rod 2 into the left side of holes ⑦ and ⑧.
[0041] Until the construction of the initial support 6 of the left pilot tunnel is completed, the initial support of the tunnel is closed and the excavation of this section of the left pilot tunnel is completed.
[0042] The above-mentioned initial support 3 of the tunnel wall mainly consists of a steel mesh, an initial support anchor rod and initial sprayed concrete. After drilling and driving the rock reinforcement anchor rod 2, the concrete is sprayed to the designed thickness. The rock reinforcement anchor rod 2 is driven perpendicular to the rock structure surface. In addition to reinforcing the surrounding rock, it can also combine the rock strata around the tunnel into a whole, reducing the impact caused by the structural surface, such as Figure 3 As shown, the rock reinforcement anchor 2 is mainly composed of an anchor end 2-1, a smooth casing 2-4, an anchor body 2-6 and an anchor head 2-5. After the rock reinforcement anchor 2 is driven into the rock formation, it is fixed to the anchor hole wall 2-2 by an anchor glue 2-3.
[0043] Step 4: After the initial support structure strength and tunnel deformation reach initial stability, the temporary inverts 4 and partition wall temporary supports 5 of the excavated tunnel section are removed, and the tunnel wall secondary supports are cast for each tunnel wall initial support 3 on the tunnel wall, and the invert arch secondary supports are cast for each invert arch initial support 6 to complete the construction of the tunnel section. After the tunnel wall secondary support and invert arch secondary support are constructed, a layer of molded reinforced concrete is constructed on each tunnel wall initial support and each invert arch initial support.
[0044] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A method for excavating a pilot pit for a shallowly buried, dark-dug, large-section tunnel in an inclined stratum, characterized in that: The following steps are involved: Step 1: Carry out construction preparation, make advance predictions of surrounding rock and stratum conditions, and measure and stake out before excavation; Step 2: Install rock reinforcement anchor cables (1). A number of parallel boreholes are arranged from far to near on the inclined side of the excavated tunnel, and rock reinforcement anchor cables (1) are installed in the boreholes. The rock reinforcement anchor cables (1) are perpendicular to the rock structure surface, and the nearest rock reinforcement anchor cable (1) is 2 to 3 meters away from the tunnel contour line. The driving depth of the rock reinforcement anchor cables (1) should ensure that the tunnel to be excavated is covered along the rock formation. Step 3: Prepare for excavation, divide the excavation surface into three guide tunnels, namely, left, middle and right. The right guide tunnel is a side guide tunnel. The widths of the three guide tunnels decrease in sequence, and the vertex of the excavation line between the left and middle guide tunnels is set at the vertex of the tunnel; the right guide tunnel is divided into two upper and lower excavation surfaces, and the middle guide tunnel and the left guide tunnel are divided into three upper, middle and lower excavation surfaces. The eight excavation surfaces are excavated in sequence from the right guide tunnel to the middle guide tunnel, and then to the left guide tunnel from top to bottom. During the excavation, initial support (3) of the tunnel wall, temporary invert (4) and initial support (6) of the invert are carried out. Temporary support (5) of the partition wall is set between the right guide tunnel and the middle guide tunnel, and between the middle guide tunnel and the left guide tunnel. The temporary invert (4) and the temporary support (5) of the partition wall divide the large-section tunnel into several small closed support units; When the right pilot tunnel is excavated, a rock reinforcement anchor rod (2) parallel to the rock reinforcement anchor cable (1) is driven into the rock layer on the right side of the No. 1 tunnel and the No. 2 tunnel, and a partition wall temporary support (5) is set up on the left side of the No. 1 tunnel and the No. 2 tunnel; the partition wall temporary support (5) on the left side of the No. 1 tunnel and the No. 2 tunnel is arched to the left side, so that the cross section of the right pilot tunnel is approximately elliptical and the peripheral contour is smooth; When the middle guide tunnel is excavated, a rock reinforcement anchor rod (2) parallel to the rock reinforcement anchor cable (1) is driven into the top rock layer of the No. ③ tunnel; the temporary support wall (5) on the left side of the No. ③ tunnel, the No. ④ tunnel and the No. ⑤ tunnel is arched to the left, so that the overall cross-section formed by the right middle guide tunnel is approximately elliptical, and the peripheral contour is rounded; When the left pilot tunnel is excavated, a rock reinforcement anchor rod (2) parallel to the rock reinforcement anchor cable (1) is driven into the top rock layer of the No. ⑥ tunnel; the excavation of this section of the left pilot tunnel is completed, that is, the section of the tunnel is closed; Step 4: After the initial support structure strength and tunnel deformation reach preliminary stability, the temporary inverts (4) and partition wall temporary supports (5) of the tunnel section that has been excavated are removed, and the secondary wall supports are cast for the initial wall supports (3) on the tunnel wall, and the secondary invert supports are cast for the initial invert supports (6), thereby completing the construction of the tunnel section.
2. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step 2, the rock reinforcement anchor cables (1) are evenly arranged at intervals of 3 to 5 m.
3. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: The rock reinforcement anchor cable (1) is a shear-resistant anchor cable, which is composed of an anchor cable steel strand (1-6), a smooth casing (1-4), a shear-resistant steel bar (1-3) and an anchor cable anchor head (1-5); the rock reinforcement anchor cable (1) is driven into a hole drilled on the surface of the formation and then fixed to the anchor cable hole wall (1-1) by an anchor cable adhesive (1-2), and the anchor cable adhesive (1-2) includes cement, sand and water.
4. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step three, the bottom widths of the left, middle and right pilot tunnels are 0.4, 0.35 and 0.25 times the tunnel span respectively.
5. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step three, after excavating Tunnel No. ① for 3 to 5 meters, the right guide tunnel Tunnel No. ② is excavated; after excavating Tunnel No. ② for 6 to 10 meters, the middle guide tunnel Tunnel No. ③ is excavated; after excavating Tunnel No. ③ for 3 to 5 meters, the middle guide tunnel Tunnel No. ④ is excavated; after excavating Tunnel No. ④ for 3 to 5 meters, the middle guide tunnel Tunnel No. ⑤ is excavated; after excavating Tunnel No. ⑤ for 6 to 10 meters, the left guide tunnel Tunnel No. ⑥ is excavated; after excavating Tunnel No. ⑥ for 3 to 5 meters, the left guide tunnel Tunnel No. ⑦ is excavated; after excavating Tunnel No. ⑦ for 3 to 5 meters, the left guide tunnel Tunnel No. ⑧ is excavated.
6. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step three, the initial support (3) of the cave wall includes a steel mesh, an initial support anchor rod and initial sprayed concrete. After drilling and installing the rock reinforcement anchor rod (2), the concrete is sprayed again to the designed thickness. The rock reinforcement anchor rod (2) is installed perpendicular to the rock structure surface. The rock reinforcement anchor rod (2) includes an anchor end (2-1), a smooth casing (2-4), an anchor rod body (2-6) and an anchor rod anchor head (2-5). After the rock reinforcement anchor rod (2) is driven into the rock layer, it is fixed to the anchor rod hole wall (2-2) by the anchor rod glue (2-3).
7. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step three, the initial support (6) of the invert is initial spraying of concrete, installation of steel mesh and re-spraying of concrete to the designed thickness, until the initial support (6) of the invert of the left pilot tunnel is completed, and the initial support of the tunnel is closed.
8. The method for excavating a pilot pit for a shallowly buried, dark-excavated, large-section tunnel in an inclined stratum according to claim 1, characterized in that: In step 4, the second-stage support of the tunnel wall and the second-stage support of the invert are constructed, and a layer of form-cast reinforced concrete is constructed on the initial support of each tunnel wall and each invert.
Citation Information
Patent Citations
Portal structure of highway tunnel and one-way portal exiting method of tunnel
CN109882186A
Micro-step reserved core soil construction structure and method for shallow-buried unsymmetrically loading tunnel under phyllite geological condition
CN110685714A
City middle-drift-free branch tunnel U-turn construction method
CN111810187A
Tunnel asymmetric support construction method suitable for inclined upper-soft lower-hard stratum
CN118030143A
Down-the-hole drill coring and splitting excavation construction method for shallow-buried explosion-prohibited hard rock large-section tunnel
CN118148659A
Cited By
Large-span pumped storage power station tunnel construction geological risk safety control method
CN120384745A
Safety prevention and control method for geological risks in large-span pumped storage power station tunnel construction
CN120384745B
Safe construction and deformation monitoring method for pumped storage power station forward penetrating inclined rock stratum tunnel
CN120426078A