Fire-fighting main water pipeline mounting equipment and mounting method

By designing the installation equipment of fire main water pipes, using the unit water pipe feeding and pushing mechanism to install layer by layer, combining floating pipe sleeves to achieve sealing and movable support, the problems of complex installation and maintenance of fire water pipes in high-rise buildings are solved, and the installation efficiency is improved and maintenance ease.

CN119042405APending Publication Date: 2024-11-29CHINA MCC17 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411075468.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing fire water pipes are complex in high-rise buildings, low in construction, difficult to maintain, and high labor costs. They need to cut the floor slabs during later repairs and replacement, which is a large workload and is prone to pipe explosion problems due to foundation settlement.

Method used

A fire main water pipe installation equipment is designed, including unit water pipe feeding mechanism, pushing mechanism, rotary clamping mechanism and rotating mechanism. By installing unit water pipes layer by layer, sealing connection and movable support are achieved using floating pipe sleeves to simplify installation. process and reduce maintenance costs.

Benefits of technology

It significantly improves the degree of automation and efficiency of the installation of the fire main water pipe, simplifies the construction process, reduces maintenance costs, avoids the problem of pipe bursting caused by foundation settlement, and facilitates the replacement of water pipes in each layer of units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119042405A_ABST
    Figure CN119042405A_ABST
Patent Text Reader

Abstract

The invention discloses fire-fighting main water pipe installation equipment and an installation method, and belongs to the technical field of building electromechanical pipeline installation. The device comprises a unit water pipe feeding mechanism, a pushing mechanism, a rotation stopping clamping mechanism and a rotating mechanism, the unit water pipe feeding mechanism comprises a feeding sliding frame used for vertically arranging a plurality of unit water pipes, and a discharging opening of the unit water pipe feeding mechanism is formed in the upper portion of the pushing mechanism; the pushing mechanism is used for driving the single unit water pipe to vertically lift upwards so as to extend out of each floor of the building; a rotation stopping clamping mechanism is arranged above the pushing mechanism and used for clamping and fixing the unit water pipe inserted into the rotation stopping clamping mechanism. The rotating mechanism is arranged on the pushing mechanism and used for driving the unit water pipe to rotate. By the adoption of the technical scheme, installation construction of the main fire-fighting water pipe can be remarkably simplified, the automation degree and the installation efficiency of installation of the main fire-fighting water pipe are improved, and the main fire-fighting water pipe arranged through the installation method is convenient and fast to maintain in the later period and low in cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building electromechanical pipeline installation, and in particular to a fire-fighting main water pipe installation device and an installation method. Background Art

[0002] In high-rise residential or commercial buildings, the fire main water pipe is arranged in the suspended ceiling of the basement. The part of the fire main water pipe extending from the basement is vertically distributed along the height direction of the building, and branch pipes are respectively provided on the fire main water pipe along the height direction of the building. The branch pipes are connected to the hoses in the fire hydrants on each floor of the building for fire fighting on each floor.

[0003] In the prior art, most of the fire water pipes are arranged by manually pouring the fire water pipes and the floor slab of the building into one during the construction process. In the actual construction process, there are problems such as cumbersome and inconvenient construction and low construction efficiency. In addition, once the fire water pipes directly poured on the floor slab leak, or burst due to the settlement of the building foundation, it is troublesome to repair and replace the fire water pipes. The problematic pipes need to be cut off and then new pipes need to be welded. The maintenance operation is relatively complicated. In particular, if the fire water pipes combined with the floor slab leak, the entire floor slab needs to be cut open to repair and replace the fire water pipes buried therein, which is more labor-intensive and troublesome.

[0004] After searching, the Chinese patent application number is: 202110708193.6, the application date is June 24, 2021, and the name of the invention is: A fire-fighting pipe installation device. The installation device provided in this application includes a fixed plate, two vertical plates are fixedly connected to the fixed plate, a top plate is fixed between the two vertical plates, a first motor is fixed to the top plate, the first motor is fixedly connected to the first bevel gear, the fixed plate is rotatably connected to a threaded rod, a second bevel gear is fixed to the upper end of the threaded rod, and a lifting block is threadedly connected to the threaded rod. Two cross plates are fixed to the top plate, and active rollers and driven rollers are rotatably connected between the cross plates, one of the cross plates is fixedly provided with a second motor fixedly connected to the active roller, and a number of parallel transmission rollers are provided between the active roller and the driven roller, and a ladder is fixed to the vertical plate close to the first motor. This application optimizes the design of the structure of the installation equipment so that the fire-fighting pipes can be automatically transported to the ceiling without manual transportation, thereby facilitating the subsequent installation of the fire-fighting pipes and improving the transportation and construction efficiency to a certain extent. However, this application only involves improving the efficiency of fire-fighting pipe transportation, and its technical solution is difficult to solve the problem of difficult and inefficient installation of fire-fighting water pipes. Summary of the invention

[0005] 1. Problem to be solved

[0006] The purpose of the present invention is to solve the problems of complex installation and construction, low efficiency, high labor cost and difficulty in later maintenance of existing building fire water pipes, and provide a fire main water pipe installation device and installation method. The technical solution of the present invention can significantly simplify the installation and construction of the fire main water pipe, improve the degree of automation and installation efficiency of the fire main water pipe installation, and the fire main water pipe arranged by the installation method of the present invention is convenient and easy to maintain in the later stage with low cost.

[0007] 2. Technical solution

[0008] In order to solve the above problems, the technical solution adopted by the present invention is as follows:

[0009] First, a fire main water pipe installation device of the present invention comprises a unit water pipe feeding mechanism, a pushing mechanism, a rotation-stopping clamping mechanism and a rotating mechanism, wherein:

[0010] The unit water pipe feeding mechanism comprises a feeding slide, on which a plurality of unit water pipes are vertically arranged, and a discharge port of the feeding slide is arranged above the pushing mechanism;

[0011] The pushing mechanism is used to drive a single unit water pipe to lift vertically upward, so that the unit water pipe extends from bottom to top out of each floor slab of the building;

[0012] A rotation-stopping clamping mechanism is provided above the pushing mechanism, and the rotation-stopping clamping mechanism is used to clamp and fix the unit water pipe inserted therein;

[0013] The rotating mechanism is arranged on the pushing mechanism and is used for driving the unit water pipes on the pushing mechanism to rotate.

[0014] As a preferred embodiment of the present invention, the pushing mechanism includes a pushing plate, a vertical track and a lifting plate, wherein:

[0015] The outer side wall of the pushing plate can be slidably mounted on the vertical track, and the pushing plate is also slidably connected to the lifting plate through a vertical guide slide rod;

[0016] The vertical guide slide bar is sleeved with a lifting spring, and the two ends of the lifting spring are respectively against the lower disk surface of the pushing disk and the upper disk surface of the lifting disk;

[0017] The lifting plate can be slidably mounted on the vertical track through a screw rod and nut structure;

[0018] The rotating mechanism comprises a rotating disk rotatably arranged on the upper disk surface of the pushing disk, and a clamping mechanism is arranged on the upper disk surface of the rotating disk for clamping the unit water pipe.

[0019] As a preferred embodiment of the present invention, the clamping mechanism comprises a plurality of groups of clamping claws and rotating clamping arms arranged at intervals along the circumferential direction of the rotating disk, the rotating clamping arms are arranged outside the clamping claws, and the gap between each group of clamping claws and the rotating clamping arms constitutes a clamping opening for clamping the pipe wall of the unit water pipe;

[0020] The clamping claw can be slidably mounted on the upper disk surface of the rotating disk, and the sliding direction of the clamping claw is the radial direction of the rotating disk.

[0021] As a preferred embodiment of the present invention, the side of the clamping claw away from the wall of the unit water pipe is processed with an inclined surface, and a clamping cone is provided on the side close to the inclined surface, and the outer wall of the clamping cone abuts against the inclined surface;

[0022] The clamping cone is vertically slidably arranged on the rotating disk through a vertical rod, and a clamping spring is sleeved on the vertical rod, and two ends of the clamping spring are respectively against the upper disk surface of the rotating disk and the rod end of the vertical rod.

[0023] As a preferred embodiment of the present invention, the anti-rotation clamping mechanism includes a anti-rotation tube of a tubular structure, which is concentrically arranged with a pushing disk provided on the pushing mechanism, and the inner wall of the anti-rotation tube is processed with a guide groove arranged along the length direction of the anti-rotation tube; the guide groove is vertically slidably connected to the support block provided on the outer wall of the unit water pipe.

[0024] As a preferred embodiment of the present invention, the upper end pipe mouth of the anti-rotation pipe is slidably set on the frame through a supporting slide rod, and a supporting spring is sleeved on the supporting slide rod, and the two ends of the supporting spring are respectively abutted against the frame and the upper end pipe mouth of the anti-rotation pipe; the upper end pipe mouth of the anti-rotation pipe is used to support the lower plate surface of the support block on the outer wall of the unit water pipe.

[0025] As a preferred embodiment of the present invention, it also includes a horizontal pushing mechanism, which is arranged between the feeding slide and the pushing mechanism and moves back and forth, and is used to horizontally push the unit water pipe to above the pushing disk of the pushing mechanism.

[0026] As a preferred embodiment of the present invention, the horizontal pushing mechanism includes an upper plug-in joint and a lower support plate, the upper plug-in joint is connected to the telescopic motor, and the upper plug-in joint moves in the vertical direction to implement the connection of the upper end of the unit water pipe; the lower support plate is arranged on a first track, and the first track is installed on a second track, and the first track and the second track are separately driven by different motors to move horizontally.

[0027] As a preferred embodiment of the present invention, the unit water pipe feeding mechanism also includes a frame, and the feeding slide is vertically slidably installed on the frame through a screw nut structure, and guard frames are provided on both sides of the feeding slide, and the guard frames include multiple groups of horizontally arranged sliding bars, and the sliding bars are arranged at intervals in the upper and lower directions.

[0028] Secondly, the present invention also provides a method for installing a fire main water pipe, comprising the following steps:

[0029] Step 1: transport the installation equipment to the overhead floor below the building, and make the pushing mechanism directly below the fire unit water pipe installation position on the floor;

[0030] Step 2: Arrange the unit water pipes one by one in a vertical state on the feeding slide. During installation, the unit water pipes are led out from the outlet of the feeding slide to the pushing mechanism;

[0031] Step 3: Start the pushing mechanism to drive the unit water pipe on the pushing mechanism to move upward until the unit water pipe is inserted into the floating pipe sleeve pre-installed in the floor slab, and the lower end of the unit water pipe at the bottom is clamped in the anti-rotation clamping mechanism;

[0032] Step 4: transport the next unit water pipe to be installed to the bottom of the anti-rotation clamping mechanism, align the upper end of the unit water pipe with the lower end of the previous unit water pipe, and then start the rotating mechanism to complete the sealing connection between the rotating unit water pipe and the previous unit water pipe to form a whole;

[0033] Step 5: Continue to start the pushing mechanism to drive the spliced ​​unit water pipes to move upward, and make the unit water pipe located at the bottom be clamped in the anti-rotation clamping mechanism;

[0034] Step 6. Repeat steps 4 and 5, and install all unit water pipes layer by layer from bottom to top, so that the unit water pipes are laid out along the height direction of the entire building, completing the arrangement of the vertical fire main water pipes, and then installing the horizontal fire main water pipes and the vertical fire main water pipes.

[0035] 3. Beneficial effects

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] The present invention provides a method for installing a fire main water pipe. When the fire water pipe is actually arranged, the unit water pipes are installed layer by layer from the bottom layer of the building. The unit water pipes located at the bottom layer are inserted from the lower end of the floating pipe sleeve and extended from the upper end of the floating pipe sleeve, and the unit water pipes are installed from the bottom layer to the highest layer, so that the pipe openings of adjacent unit water pipes are sealed and combined, and the multiple unit water pipes of the building form an integral fire main water pipe.

[0038] During the actual installation and construction, the unit water pipes are arranged by the unit water pipe feeding mechanism in the lowest overhead layer of the building so that the unit water pipes remain arranged vertically one by one. The single unit water pipe guided out from the unit water pipe feeding mechanism is pushed vertically to the fire water pipe installation position on the floor through the pushing mechanism, and the rotation between two adjacent unit water pipes can be implemented through the rotating mechanism to ensure the connection between the two unit water pipes. Therefore, the installation equipment of the present invention can implement the installation of unit water pipes from bottom to top layer by layer, and can implement the installation of fire water pipes from bottom to top, ensuring the convenience of installation of fire main water pipes, and facilitating the subsequent inspection or replacement of fire main water pipes, thereby reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the planar structure of the fire main water pipe installation equipment in the present invention;

[0040] Figure 2 It is a structural schematic diagram of the unit water pipe feeding mechanism in the present invention;

[0041] Figure 3 A schematic diagram of the structure of the anti-rotation tube in one viewing angle of the present invention;

[0042] Figure 4 It is a structural schematic diagram of the anti-rotation tube in another viewing angle of the present invention;

[0043] Figure 5 It is a schematic diagram of the structure of the unit water pipe in the present invention;

[0044] Figure 6 It is a schematic diagram of the structure after the two unit water pipes in the present invention are installed;

[0045] Figure 7 It is a schematic diagram of the overall structure of the pushing mechanism in the present invention;

[0046] Figure 8 It is a partial structural schematic diagram of the pushing mechanism in the present invention;

[0047] Fig. 9 It is a partial cross-sectional structural schematic diagram of the pushing mechanism in the present invention;

[0048] Fig.10 This is a schematic diagram of the plane layout of the fire main water pipe after installation in the present invention;

[0049] Fig.11 It is a schematic diagram of the structure of the elastic support body in the present invention;

[0050] Fig.12 It is a schematic diagram of the assembly structure of the unit water pipe, floating sleeve and floor slab of the present invention;

[0051] Fig.13It is a schematic diagram of the cross-section structure after the floor slab and the floating pipe sleeve are assembled in the present invention;

[0052] In the figure:

[0053] 100, unit water pipe feeding mechanism; 110, feeding carriage; 120, vehicle frame;

[0054] 200, pushing mechanism; 210, pushing plate; 211, vertical guide slide bar; 212, lifting spring; 220, clamping claw; 221, inclined plane; 222, clamping cone; 223, clamping spring; 230, vertical track; 240, driving screw; 241, driven gear; 242, driving gear; 243, driving motor; 250, lifting plate; 251, driving nut; 260, rotating plate; 261, gear ring; 262, rotating gear; 263, rotating motor; 270, rotating clamp arm;

[0055] 300, anti-rotation tube; 310, trumpet tube; 320, guide slide groove; 330, support slide rod; 331, support spring; 340, frame;

[0056] 400, horizontal push mechanism; 410, upper plug connector; 420, lower support plate; 430, first track; 440, second track;

[0057] A, unit water pipe; A10, support block; A20, connection hole;

[0058] B, floating sleeve; B10, floating flange; B20, guide horn; B30, through opening;

[0059] C, floor; C10, circular opening; C20, support flange; C30, support ring frame; C31, movable opening; C40, center support roller; C41, center slide bar; C42, center spring;

[0060] D, elastic support body; D10, supporting circular plate; D20, supporting sliding rod; D21, supporting spring. DETAILED DESCRIPTION

[0061] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, many specific details are set forth in the following description to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0062] It should be noted that, in the description of the present invention, the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0063] At the same time, in the description of the present invention, unless otherwise clearly stipulated and limited, terms such as "installation", "setting", "connection", "fixation", and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the present invention according to the specific circumstances.

[0064] Furthermore, it should be understood that for the sake of ease of description, the sizes of the various components shown in the drawings are not drawn according to actual proportions. For example, the thickness or width of certain layers may be exaggerated relative to other layers.

[0065] First, the fire main water pipe of the present invention is explained. The fire main water pipe in the present invention includes a unit water pipe A, a floor C and a floating pipe sleeve B. The unit water pipe A is provided in plurality, and the plurality of unit water pipes A are spliced ​​and sealed. Compared with the existing fire water pipe design with an integral structure, when the fire water pipe of the present invention is damaged, the unit water pipe A arranged on the problematic floor can be directly replaced. When the fire water pipe of the existing building has a problem, since the fire water pipe is cast as a whole on the floor, once a water leak is found, it is necessary to use a cutting device to cut out the entire floor, and then remove the pipe section buried in the floor, and it is troublesome to restore the fire water pipe and the floor, and the actual construction work is also very inconvenient.

[0066] On the other hand, the fire water pipe arrangement system of the present invention realizes the installation of the floor C and the unit water pipe A by setting a floating sleeve B. The floating sleeve B can be located on each floor C and can be active, so that the fire main water pipe (formed by sealing and splicing multiple unit water pipes A) can be in a floating state. Once there are diseases such as foundation settlement or disasters such as earthquakes, the entire fire water pipe can be located on the building and can be active, thereby avoiding the problem of fire water pipe bursting. Moreover, the upper end pipe mouth of the floating sleeve B on each floor constitutes a support for the pipe body of the unit water pipe A on the floor, thereby ensuring the support of the unit water pipe A on the entire floor, and also facilitating the replacement of the unit water pipe A on the corresponding floor.

[0067] Therefore, the structural design of the fire main water pipe of the present invention can effectively eliminate the pipe burst problem caused by foundation settlement, and the replacement of the fire water pipes on each floor is more convenient and the construction is simpler.

[0068] The following is a detailed introduction to the components of the fire main water pipe and the connection relationship between the various components.

[0069] Unit water pipe A:

[0070] like Figure 5-6 As shown, the unit water pipe A of the present invention is a pipe body structure, the upper end pipe mouth of the unit water pipe A is provided with a plug, a sealing ring is sleeved on the plug, the outer wall of the plug is provided with a thread, and the lower end pipe mouth of the unit water pipe A is provided with a corresponding connecting reaming hole, and the inner wall of the connecting reaming hole is processed with an internal thread matching the thread of the outer wall of the plug. When two adjacent unit water pipes A are installed, the plug at the upper end pipe mouth of the unit water pipe A located at the lower position is screwed into the connecting reaming hole at the lower end of the unit water pipe A located at the upper position, and the sealing ring is abutted against the step position of the connecting reaming hole, thereby realizing the sealed connection of the adjacent unit water pipes A.

[0071] In addition, the present invention also provides another structural design of the unit water pipe A. Specifically, the upper end of the unit water pipe A is provided with an annular groove, a sealing gasket is provided in the annular groove, and the lower end of the unit water pipe A is provided with a plug-in pipe correspondingly, and the plug-in pipe is inserted in the annular groove. When two adjacent unit water pipes A are installed, the plug-in pipe of the unit water pipe A arranged at the upper end is inserted in the annular groove of the unit water pipe A arranged at the lower end, and the adjacent unit water pipes A can be squeezed to ensure the sealing of the adjacent unit water pipes A.

[0072] The unit water pipe A is provided with corresponding connection holes A20 on its wall. The connection hole A20 is located inside the unit water pipe A and is provided with a connection pipe. The inner wall of the connection pipe is a threaded pipe. An annular groove is provided at the opening of the outer end of the connection hole A20. A sealing gasket is provided on the annular groove. A threaded connection pipe is provided at one end of the fire hose of the fire hydrant on each floor. The threaded connection pipe is threadedly connected to the connection pipe and is sealed by a sealing gasket.

[0073] The fire main water pipe of the present invention is mainly composed of a plurality of vertically arranged unit water pipes A, and each unit water pipe A is movably installed on the floor slab C of the corresponding floor through a separately arranged floating pipe sleeve B. During installation, the unit water pipe A is inserted upward from the lower end of the floating pipe sleeve B and extends from the upper end of the floating pipe sleeve B. A circumferentially arranged support block A10 is provided near the upper part of the pipe wall of the unit water pipe A, and the support block A10 abuts against the upper end pipe opening of the floating pipe sleeve B to support the pipe body of the unit water pipe A.

[0074] The unit water pipe A is movably installed on the floor C through a movably arranged floating sleeve B, so as to cope with the shear force exerted on the fire water pipe from the outside of the building. It should be noted that the unit water pipe A is arranged between two floor slabs 20, and the floating sleeve B is not arranged on the lowest and highest floor slabs C.

[0075] Floating casing B and floor slab C

[0076] like Fig.10 , Figure 12-13 As shown, the floating sleeve B of the present invention is pre-embedded and arranged on the floor C. According to the actual position of the fire main water pipe, the floating sleeve B is pre-installed on the template of the floor C during the construction of the building floor. When the template is removed, the floating sleeve B can be reserved on the formed floor C. The floating sleeve B can be located on the floor C and present an active state with adjustable position. Therefore, when the unit water pipe A on each floor is inserted into the floating sleeve B, the unit water pipe A can be active on the floor C, thereby avoiding the shearing of the unit water pipe A caused by the deformation of the floor C, thereby avoiding the problem of fire pipe burst.

[0077] like Fig.13 As shown, a circular opening C10 is reserved on the floor C, a supporting flange C20 is arranged in the circular opening C10, a supporting ring frame C30 is also rotatably arranged in the circular opening C10, a movable opening C31 is arranged in the middle of the supporting ring frame C30, the movable opening C31 is circular, and its diameter is larger than the outer diameter of the pipe wall of the floating pipe sleeve B, and the floating pipe sleeve B is movably arranged in the movable opening C31 as a whole, so that the floating pipe sleeve B is easy to move in the movable opening C31. In order to achieve the supporting effect on the floating pipe sleeve B. The top of the pipe wall of the floating pipe sleeve B is extended outwardly and provided with a floating flange B10, and the floating flange B10 is abutted against the upper plate surface of the supporting ring frame C30, so that the floor C can achieve stable support for the floating pipe sleeve B, thereby ensuring that the installed unit water pipe A can be located on the floor C and present an active state.

[0078] More optimally, as a further structural design of the floor C of the present invention, a central support roller C40 is provided in the movable opening C31 of the circular opening C10. The central support roller C40 is arranged vertically and the roller body is abutted against the outer side of the pipe wall of the floating pipe sleeve B. By providing the central support roller C40, the floating pipe sleeve B can be guaranteed to be centrally supported, and the rolling contact also helps to reduce contact friction.

[0079] More optimally, a centering slide bar C41 is also provided on the roller frame of the centering support roller C40. The centering slide bar C41 is horizontally arranged, and the other end of the centering slide bar C41 forms a sliding fit with the inner wall of the support ring frame C30. In order to facilitate the timely reset of the floating pipe sleeve B after the movement, a centering spring C42 is sleeved on the centering slide bar C41, and the two ends of the centering spring C42 are respectively against the centering support roller C40 and the support ring frame C30. Under normal circumstances, the centering spring C42 is against the centering support roller C40 to support the pipe wall of the floating pipe sleeve B. When subjected to external shear force, the unit water pipe A and the floating pipe sleeve B are offset, which can squeeze the centering spring C42 to adapt to the offset. When the shear force disappears, the center spring C42 returns to drive the unit water pipe A and the floating pipe sleeve B to return, so that the floating pipe sleeve B can be located on the floor C and present an active state. The fire pipe formed by the unit water pipes A of the entire building can float in the floating pipe sleeve B as a whole, thereby avoiding the problem of pipe burst caused by stress concentration in the unit water pipe A. At the same time, during installation, it can also ensure that all unit water pipes A are in a concentric state, so as to facilitate the subsequent installation of the unit water pipes A of each floor from bottom to top, ensuring the convenience of installation.

[0080] In addition, based on the above improvements, the present invention also provides a further improvement: a plurality of the central support rollers C40 are spaced apart and distributed along the circumferential direction of the circular opening C10 , and they play a supporting and restoring role for the floating sleeve B together.

[0081] In addition, the fire-fighting water pipe of the present invention can also be optimized by optimizing the materials of the floating pipe sleeve B and the unit water pipe A. Specifically, the floating pipe sleeve B can be made of a polymer plastic material, which is convenient for replacement and reduces construction costs. The unit water pipe A can be made of a polymer plastic material, so the unit water pipe A can withstand a certain bending deformation. The unit water pipe A of each layer can withstand a certain bending deformation, thereby effectively avoiding the bursting of the fire-fighting water pipe, and the replacement is more convenient and quick.

[0082] In addition, in order to enable the unit water pipe A to penetrate the floating pipe sleeve B and the floating pipe sleeve B to support the unit water pipe A, the pipe wall of the floating pipe sleeve B is provided with vertically distributed through openings B30, and multiple groups of through openings B30 are arranged along the circumference of the pipe wall of the floating pipe sleeve B, dividing the floating pipe sleeve B into multiple unit sleeves, and the central support roller C40 is against the outer wall of the unit sleeve.

[0083] Similarly, if Fig.12 and Fig.13 As shown, the wall of the unit water pipe A is circumferentially provided with a support block A10. Before installation, the support block A10 is arranged corresponding to the through opening B30, and is inserted into the through opening B30; during installation, the support block A10 slides in the through opening B30, from the bottom of the through opening B30 to the top of the through opening B30; after installation, the unit water pipe A is rotated so that the support block A10 is staggered with the through opening B30, and the support block A10 rests against the top of the unit sleeve, and the floating sleeve B provides support for the unit water pipe A. During the installation of the fire water pipes in the entire building, the fire water pipe installation machinery can be used to lift the unit water pipe A from the lowest level of the basement, and lift it up layer by layer. The unit water pipes A are connected and sealed as a whole. When the unit water pipe A is lifted to the highest position, the support block A10 is located above the upper end pipe opening of the floating sleeve B. During this process, the support block A10 abuts against the inner wall of the unit sleeve, and drives the center support roller C40 to compress the center spring C42 until the support block A10 extends out of the upper end of the floating sleeve B. The unit sleeve is reset under the reset force of the center spring C42, and then the unit water pipe A is rotated to make the support block A10 rotate to the upper position of the unit sleeve, and then the unit sleeve can be used to support the unit water pipe A. The unit water pipes A on each floor are supported by the floating sleeves B on each floor to ensure reliable support for the entire vertically arranged fire water pipe.

[0084] More optimally, the lower end of the floating sleeve B is provided with a guide trumpet B20, and the diameter of the guide trumpet B20 increases from top to bottom and is distributed in a trumpet shape. The upper end of the guide trumpet B20 is detachably connected to the lower end of the floating sleeve B. Specifically, the lower end of the floating sleeve B is provided with a mounting threaded opening, and the upper end of the guide trumpet B20 is threadedly connected to the mounting threaded opening, which can ensure the installation between the floating sleeve B and the entire support ring frame C30, and the lower end of the guide trumpet B20 is trumpet-shaped, which can facilitate the guided installation of the unit water pipe A from bottom to top, so that the upper end of the unit water pipe A can be introduced into the floating sleeve B, ensuring that the unit water pipe A can enter the floating sleeve B, and extend from the upper end of the floating sleeve B, which can facilitate the installation of the unit water pipe A from bottom to top, reduce the actual workload, and improve construction efficiency.

[0085] Elastic support body D

[0086] like Fig.11 As shown, in order to further ensure the reliability of the sealed connection between adjacent unit main water pipes A, the fire water pipe arrangement system of this embodiment also includes an elastic support body D, and the upper end of the unit water pipe A located at the top is abutted against the elastic support body D, and the elastic support body D is arranged as a whole on the lower plate surface of the floor C, and the elastic support body D is assembled to enable the unit water pipe A to expand and contract along the pipe length direction.

[0087] Specifically, Figure 1 and Figure 2 As shown, the elastic support body D includes a supporting circular plate D10 and a supporting sliding rod D20. The supporting circular plate D10 is arranged below the lower plate surface of the floor slab C, and the upper end of the unit water pipe A located at the top is a closed end, which abuts against the bottom of the supporting circular plate D10. At least two supporting sliding rods D20 are slidably mounted on the supporting circular plate D10, one end of the supporting sliding rod D20 is slidably connected to the supporting circular plate D10, and the other end of the supporting sliding rod D20 is fixedly connected to the bottom of the floor slab C. At the same time, a supporting spring D21 is also sleeved on the supporting sliding rod D20, and the two ends of the supporting spring D21 abut against the supporting circular plate D10 and the floor slab C respectively.

[0088] During installation, the installation equipment pushes the unit water pipes A located at the bottom layer upward one by one, and at the same time, seals and splices the unit water pipes A until the highest floor of the building is reached. The upper end of the unit water pipe A located at the top is a closed end, and is pushed to abut against the supporting circular plate D10 of the top floor C to compress the supporting spring D21, thereby ensuring the tightening of the pipe mouth parts of the unit water pipes A, so that the adjacent unit water pipes A are combined as one, so as to constrain the upper ends of the unit water pipes A on the top floor, and ensure the sealed connection between the unit water pipes A on all floors. The supporting circular plate D10 can be raised and lowered in the vertical direction, which can further eliminate the assembly errors between the unit water pipes A, thereby reducing the difficulty of assembly and improving assembly efficiency.

[0089] In order to realize the convenient installation of the fire main water pipe of the above structure, the present invention also provides a specific pipeline installation equipment, which can significantly simplify the installation and construction of the above fire main water pipe, thereby improving the degree of automation and installation efficiency of the fire main water pipe installation, and the installed fire main water pipe is more convenient for later maintenance and replacement, and the maintenance cost is low.

[0090] The specific structural design of the pipeline installation equipment of the present invention is described in detail below in conjunction with specific embodiments.

[0091] Example 1

[0092] like Figure 1As shown, a fire main water pipe installation device provided in this embodiment includes a unit water pipe feeding mechanism 100, a pushing mechanism 200, a stop clamping mechanism and a rotating mechanism. The unit water pipe feeding mechanism 100 is movably arranged at the bottom mezzanine layer of the building. The unit water pipe feeding mechanism 100 includes a feeding slide 110. A plurality of unit water pipes A are vertically arranged on the feeding slide 110. Through the setting of the feeding slide 110, the unit water pipes A are kept in a vertically arranged state.

[0093] The pushing mechanism 200 is arranged at the outlet position of the feeding slide 110 on the unit water pipe feeding mechanism 100, and is used to drive the unit water pipe A to be lifted vertically upward, so that the unit water pipe A extends from the bottom to the top of each floor C of the building. At the same time, a rotation-stopping clamping mechanism is arranged above the pushing mechanism 200, and the rotation-stopping clamping mechanism is used to clamp and fix the unit water pipe A inserted therein, and the rotating mechanism is arranged on the pushing mechanism 200, and is used to drive the unit water pipe A on the pushing mechanism 200 to rotate, and cooperate with the rotation-stopping clamping mechanism to clamp and stop the unit water pipe A located above, and start the rotating mechanism to drive the unit water pipe A located below to rotate, so that the pipe openings of the two unit water pipes A are screwed into one, sealed and connected, which is convenient for realizing the automatic assembly of two adjacent unit water pipes A, and the assembly efficiency is high.

[0094] When the fire main water pipe of the present invention is actually arranged, the unit water pipes A are installed layer by layer from the bottom floor of the building. The unit water pipe A located at the bottom floor is inserted from the lower end of the floating pipe sleeve B and extends from the upper end of the floating pipe sleeve B. The unit water pipes A are installed from the bottom floor to the highest floor. The pipe openings of adjacent unit water pipes A are sealed and combined, so that the multiple unit water pipes A of the building form an integral fire main water pipe.

[0095] During the actual installation and construction, the unit water pipe feeding mechanism 100 in the lowest overhead layer of the building arranges the unit water pipes A so that the unit water pipes A are arranged vertically one by one. The pushing mechanism 200 pushes the single unit water pipe A guided from the unit water pipe feeding mechanism 100 vertically into the floating pipe sleeve B pre-installed on the floor C, and the rotating mechanism and the anti-rotation clamping mechanism can be used to implement the rotational installation between two adjacent unit water pipes A to ensure the connection between the two unit water pipes A. Therefore, the installation equipment can implement the installation of the unit water pipes A from bottom to top layer by layer, ensure the convenience of the installation of the fire main water pipe, and facilitate the subsequent inspection or replacement of the fire main water pipe, reducing the construction cost.

[0096] Example 2

[0097] like Figure 7-9As shown, this embodiment provides a fire main water pipe installation device, and its main structure is basically the same as that of embodiment 1. The main difference between this embodiment and embodiment 1 is that: in order to implement the vertical drive of the unit water pipe A, so as to implement the installation of the unit water pipe A and the floating pipe sleeve B of the floor C, the pushing mechanism 200 includes a pushing plate 210, a vertical track 230 and a lifting plate 250. The pushing plate 210 is horizontally arranged, and the outer wall of the pushing plate 210 can be slidably installed on the vertical track 230. The lifting plate 250 can be slidably installed on the vertical track 230 through a screw nut structure, and the pushing plate 210 is also slidably connected to the lifting plate 250 through a vertical guide slide rod 211. Figure 7 As shown, a rotating disk 260 is concentrically and rotatably arranged on the upper disk surface of the pushing disk 210 , and a clamping mechanism for clamping the unit water pipe A is provided on the upper disk surface of the rotating disk 260 .

[0098] In order to realize the rotation effect of the rotating disk 260 on the unit water pipe A, a gear ring 261 is provided on the lower disk surface of the rotating disk 260, and the gear ring 261 is meshed with a rotating gear 262, and the rotating gear 262 is connected to a rotating motor 263, and the rotating motor 263 is installed on the upper disk surface of the pushing disk 210. When the rotating motor 263 is started, the rotating disk 260 and the unit water pipe A clamped thereon can be rotated together.

[0099] In addition, in order to achieve the clamping effect on the unit water pipe A, the clamping mechanism in this embodiment includes multiple groups of clamping claws 220 and rotating clamping arms 270 arranged at intervals along the circumferential direction of the rotating disk 260, which can be arranged according to actual conditions, and is specifically arranged as 3 groups in this embodiment. The rotating clamping arm 270 is arranged outside the clamping claw 220, and the gap between each group of clamping claws 220 and the rotating clamping arm 270 constitutes a clamping opening for clamping the pipe wall of the unit water pipe A.

[0100] The clamping claws 220 can be installed by sliding along the upper disk surface of the rotating disk 260. The sliding direction of the clamping claws 220 is along the radial direction of the rotating disk 260. All the clamping claws 22 move synchronously and abut against or separate from the inner wall of the lower end of the unit water pipe A to achieve clamping or loosening of the unit water pipe A. During the specific installation, the unit water pipe feeding mechanism 100 is used to push the unit water pipe A onto the rotating disk 260 set above the pushing disk 210, and the pipe wall of the unit water pipe A is inserted into the clamping opening formed between the clamping claws 220 and the rotating clamp arm 270. In the process of lifting the unit water pipe A, the rotating clamp arm 270 is fixed, and all the clamping claws 220 will slide synchronously along the upper disk surface of the rotating disk 260, move together to the rotating clamp arm 270, and abut against the inner wall of the unit water pipe A, so that the clamping claws 220 can be used to support the lower end of the unit water pipe A.

[0101] Specifically, in order to realize the slidable design of the clamping claw 220, the following solutions are provided in this embodiment:

[0102] The clamping claw 220 is in the shape of a wedge as a whole, and a slope 221 is processed on the side away from the pipe wall of the unit water pipe A, forming a shape with a small top and a large bottom, which is convenient for the plugging operation of the unit water pipe A. At the same time, a clamping cone 222 is provided on the side of the clamping claw 220 close to the slope 221 (that is, the clamping cone 222 is provided at the center of the rotating disk 260, and the clamping cone 222 circumferentially surrounds the clamping claw 220), and the outer wall of the clamping cone 222 abuts against the slope 221.

[0103] The bottom of the clamping cone 222 is vertically slidably arranged on the rotating disk 260 through a vertical rod, and a clamping spring 223 is sleeved on the vertical rod, and the two ends of the clamping spring 223 are respectively against the upper disk surface of the rotating disk 260 and the rod end of the vertical rod. When the driving unit drives the lifting disk 250 to link the pushing disk 210, the rotating disk 260 and the unit water pipe A arranged above it to lift, the elastic force of the clamping spring 223 will make the clamping claw 220 and the rotating clamping arm 270 close to each other, thereby clamping the lower end of the unit water pipe A.

[0104] It should be noted that, in this embodiment, the driving unit includes a driving motor 243, which is mounted on the base of the pushing mechanism 200, and the output shaft of the driving motor 243 is arranged vertically and fixedly connected to the driving gear 242. A driving screw 240 is arranged beside the vertical track 230, and the driving gear 242 is meshed with a driven gear 241 mounted on the driving screw 240. The driving screw 240 is arranged vertically as a whole and can be rotatably mounted on the base of the pushing mechanism 200.

[0105] A driving nut 251 is fixedly installed on the outer wall of the lifting plate 250, and the driving nut 251 is sleeved on the driving screw 240. When the driving motor 243 rotates, it drives the driving gear 242 to rotate, and the meshing driven gear 241 drives the driving screw 240 to rotate in conjunction with it. Through thread matching, the driving nut 251 drives the lifting plate 250 to move in the vertical direction, so that the lifting plate 250 drives the unit water pipe A arranged above it to be lifted.

[0106] More optimally, in this embodiment, knurling can be provided on the opposite surfaces of the clamping claw 220 and the rotating clamp arm 270, so as to increase the friction force on the tube wall of the lower end of the unit water pipe A, and with the rotation of the rotating disk 260, the unit water pipe A can be smoothly rotated as a whole. When the upper end of a certain unit water pipe A located on the rotating disk 260 is combined with the lower end of another unit water pipe A located above it, by starting the rotating mechanism, the driving motor 243 at this time keeps stopping the rotation, and with the rotation of the rotating mechanism, the unit water pipe A located at the lower position can be screwed into the unit water pipe A at the upper position, and the rotating disk 260, the pushing disk 210 and its accessories can slide vertically along the lifting disk 250 through the vertical guide slide bar 211 to avoid motion interference and ensure the screwing installation between the unit water pipes A.

[0107] As a further improvement of this embodiment, in order to ensure the elastic installation between adjacent unit water pipes A and avoid damage to the ends of the unit water pipes A due to rigid extrusion, a vertical guide slide bar 211 is arranged on the lower disk surface of the pushing disk 210. The vertical guide slide bar 211 is vertically slidably arranged on the lifting disk 250, and a lifting spring 212 is sleeved on the vertical guide slide bar 211. The two ends of the lifting spring 212 are respectively abutted against the pushing disk 210 and the lifting disk 250.

[0108] The lifting plate 250 is slidably set on the vertical track 230, and three groups of vertical guide slide bars 211 are set, and a lifting spring 212 is set between the pushing plate 210 and the lifting plate 250. When the driving motor 243 is started, the driving screw 240 is rotated, and then the lifting plate 250 is linked to slide along the vertical track 230, so that the unit water pipe A located on the rotating plate 260 moves vertically upward to vertically lift the unit water pipe A, and when the unit water pipe A is combined with the unit water pipe A located above it, the lifting spring 212 can be compressed to make the unit water pipes A elastically combined to avoid the pipe mouth damage caused by rigid extrusion of the pipe end of the unit water pipe A.

[0109] Example 3

[0110] like Figure 1 , Figure 3-4As shown, this embodiment provides a fire main water pipe installation device, whose main structure is basically the same as that of Embodiment 2, and the main difference between it and Embodiment 2 is that: the anti-rotation clamping mechanism includes a tubular anti-rotation tube 300, the anti-rotation tube 300 is concentrically arranged with the pushing disk 210 provided on the pushing mechanism 200, and the inner wall of the anti-rotation tube 300 is processed with a guide groove 320 arranged along the length direction of the anti-rotation tube 300, the support block A10 provided on the outer wall of the unit water pipe A can be vertically slidably installed in the guide groove 320, and the guide groove 320 constitutes an aisle for the support block A10 on the outer wall of the unit water pipe A to pass through, and the aisle forms a channel for adjacent unit water pipes A to be screwed together.

[0111] More optimally, in order to facilitate the smooth introduction of the unit water pipe A into the anti-rotation pipe 300, a trumpet pipe 310 is provided at the lower end of the anti-rotation pipe 300. During installation, as the driving motor 243 is started, the unit water pipe A located on the rotating disk 260 moves vertically upward, and then the upper end of the unit water pipe A is introduced by the trumpet pipe 310 at the lower end of the anti-rotation pipe 300. As the driving motor 243 is started, the elastic compression of the lifting spring 212 is implemented, and then when the driving motor 243 stops, the rotating motor 263 is started to implement the slow rotation of the unit water pipe A, until the support block A10 on the unit water pipe A is just located at the lower end position of the guide chute 320, under the reset force of the lifting spring 212, the unit water pipe A can be moved upward along the anti-rotation pipe 300, so as to implement the pushing of the unit water pipe A, and when the support block A10 on the unit water pipe A is stuck in the guide chute 320, the unit water pipe A is stopped.

[0112] At the same time, when two adjacent unit water pipes A are assembled, the specific construction process is as follows:

[0113] Drive unit water pipe A to continue moving upward until it slides out of the guide groove 320 and reaches the top of the pipe mouth of the anti-rotation tube 300. Then, the unit water pipe A can be rotated so that the support block A10 on the unit water pipe A is staggered with the guide groove 320. The lower plate surface of the support block A10 on the unit water pipe A rests on the pipe mouth of the anti-rotation tube 300, thereby temporarily supporting the unit water pipe A so that the pushing mechanism 200 can continue to lift the new unit water pipe A.

[0114] When the pushing mechanism 200 continues to lift the new unit water pipe A to just below the anti-rotation pipe 300, the upper end of the new unit water pipe A is pre-inserted into the lower tube end of the unit water pipe A above it, so that the two unit water pipes A are first put together to form a whole; then the rotating mechanism is started to reset the support block A10 on the upper unit water pipe A to the guide groove 320 and then stop rotating; then the unit water pipe A that is formed as a whole after insertion is slightly moved downward, so that the support block A10 of the unit water pipe A located above is stuck in the guide groove 320 to stop rotating, and the rotating mechanism is started again to drive the new unit water pipe A below to rotate, so that the upper end of the new unit water pipe A (that is, the unit water pipe A located below to be assembled) is screwed with the lower end of the unit water pipe A arranged above it, so as to achieve a sealed connection between the two unit water pipes A.

[0115] During actual construction, the above process is repeated to complete the sealed splicing of all the unit water pipes A in the entire building. After each unit water pipe A is installed, the formed overall water pipe is pushed vertically to make the unit water pipe A rise and insert it into the floating sleeve B on the building floor C, until the entire water pipe assembly is completed to form the entire fire main water pipe, ensuring that the assembled unit water pipes A are respectively inserted into the floating sleeve B of their corresponding floor C, and the support blocks A10 on each unit water pipe A are located at the pipe opening of the floating sleeve B; then the entire fire main water pipe is rotated, so that the support blocks A10 on each unit water pipe A are staggered with the through openings B30 of their corresponding floating sleeves B, and the lower plate surface of the support block A10 abuts against the upper end of the pipe opening of the floating pipe sleeve B, thereby achieving the support and installation of the entire fire main water pipe.

[0116] In addition, the upper end of the anti-rotation tube 300 is slidably set on the frame 340 through a support slide rod 330, and a support spring 331 is sleeved on the support slide rod 330. The two ends of the support spring 331 are respectively against the frame 340 and the upper end of the anti-rotation tube 300, and the upper end of the anti-rotation tube 300 can support the lower plate surface of the support block A10 on the outer wall of the unit water pipe A.

[0117] When the unit water pipe A moves upward and abuts against the lower end of the anti-rotation pipe 300, the support spring 331 can be squeezed, so that the anti-rotation pipe 300 moves slightly upward, avoiding damage caused by the rigid collision between the pipe opening of the unit water pipe A and the pipe opening of the anti-rotation pipe 300. At the same time, when the rotating mechanism is started to rotate the unit water pipe A, until the support block A10 on the outer wall of the unit water pipe A is inserted into the guide groove 320, the restoring force of the support spring 331 can be used to make the anti-rotation pipe 300 move slightly downward, so that the support block A10 of the unit water pipe A can be smoothly inserted into the guide groove 320 to complete the limit.

[0118] Example 4

[0119] like Figure 1-2As shown, the fire main water pipe installation equipment provided in this embodiment has a main structure basically the same as that of embodiment 3, and the main difference between it and embodiment 3 is: A10

[0120] The horizontal pushing mechanism 400 drives the unit water pipe A on the unit water pipe feeding mechanism 100 to move horizontally and reciprocate between the discharge port of the unit water pipe feeding mechanism 100 and the pushing mechanism 200;

[0121] Specifically, the horizontal pushing mechanism 400 is arranged between the feeding slide 110 and the pushing mechanism 200, and moves back and forth, and is used to horizontally push the unit water pipe A to the top of the pushing disk 210 of the pushing mechanism 200. When the unit water pipe A falls, it can fall on the upper disk surface of the rotating disk 260 set above the pushing disk 210 to support the unit water pipe A. At the same time, the unit water pipe A is clamped in the clamping mechanism set on the upper disk surface of the rotating disk 260 to achieve stable clamping of the unit water pipe A.

[0122] More optimally, in order to ensure the stability of the horizontal transportation of the unit water pipe A, the horizontal pushing mechanism 400 of this implementation also includes an upper plug connector 410 and a lower support plate 420. The upper plug connector 410 is vertically slidably arranged on the vertical track. The upper end of the upper plug connector 410 is connected to the piston rod (or telescopic motor) of the driving electric cylinder. The driving electric cylinder is vertical and the cylinder body (or telescopic motor) is fixed on the frame. The upper plug connector 410 is driven up and down by starting the driving electric cylinder (or telescopic motor) to implement the plugging of the upper end of the vertically arranged unit water pipe A. At the same time, the driving electric cylinder (or telescopic motor) can be slidably installed on the first track 430 as a whole.

[0123] The lower support plate 420 is used to support the unit water pipe A, and the lower support plate 420 is arranged on the first track 430, and the first track 430 is slidably mounted on the second track 440, and the first track 430 can be driven by the electric cylinder to move horizontally along the second track 440. The first track 430 and the second track 440 are driven by different motors to move horizontally. When transporting, the electric cylinder (for the convenience of description, referred to as the first electric cylinder) that drives the first track 430 to move horizontally is started, so that the lower support plate 420 and the upper plug connector 410 move synchronously along the length direction of the first track 430 to implement the horizontal translation of the unit water pipe A, and translate it to the upper position of the clamping claw 220; then the electric cylinder (for the convenience of description, referred to as the second electric cylinder) that drives the second track 440 to move horizontally is started, so that the lower support plate 420 slides along the second track 440, so that the lower support plate 420 deviates from the upper plug connector 410, thereby facilitating the lower end of the unit water pipe A on the upper plug connector 410 to fall into the clamping claw 220, and then the first electric cylinder and the second electric cylinder are reset in sequence, and the lower support plate 420 and the upper plug connector 410 are aligned and reset to implement the acceptance and transportation of the new unit water pipe A.

[0124] As a further improvement of this embodiment, when discharging the unit water pipe A, the unit water pipe feeding mechanism 100 further includes a frame 120, and the feeding slide 110 is slidably mounted on the frame 120 through a height adjustment unit, which is used to adjust the height of the feeding slide 110. Specifically, in this embodiment, the feeding slide 110 is vertically slidably mounted on the frame 120 through a screw nut structure, an adjustment nut is provided on the frame 120, a slide bar and an adjustment screw are provided below the feeding slide 110, the slide bar is vertically slidably arranged on the frame 120, the adjustment screw cooperates with the adjustment nut, and the height of the feeding slide 110 can be adjusted in real time by rotating the adjustment nut, so that the height of the lower end of the single unit water pipe A is located above the clamping claw 220, ensuring that the lower end of the unit water pipe A can be inserted into the clamping claw 220.

[0125] Furthermore, guards are provided on both sides of the feeding slide 110, and the guards include multiple groups of horizontally arranged slide bars, which are arranged at intervals in the vertical direction. The guards implement lateral constraints on the vertically arranged unit water pipes A, so that the unit water pipes A are arranged vertically one by one, and when the unit water pipes A are actually pushed to the horizontal pushing mechanism 400, they can be pushed manually.

[0126] This embodiment also provides a method for installing a fire main water pipe using the above-mentioned pipeline installation equipment, which specifically includes the following steps:

[0127] Step 1: transport the installation equipment to the lower overhead layer of the building, and make the pushing mechanism 200 be located directly below the fire unit water pipe installation position on the floor;

[0128] Step 2: Arrange the unit water pipes A one by one in a vertical state on the feeding slide 110. During installation, the unit water pipes A are led out from the outlet of the feeding slide 110 to the horizontal pushing mechanism 400, and the driving electric cylinder of the horizontal pushing mechanism 400 is started to drive the unit on the lower support plate 420 to be horizontally transferred to the upper position of the pushing mechanism 200. Then, the driving electric cylinder of the horizontal pushing mechanism 400 is reset, so that the lower support plate 420 is first away from the upper plug joint 410, and the lower end of the unit water pipe A falls on the pushing mechanism 200. Then, the upper plug joint 410 is driven away from the upper end of the unit water pipe A, and finally, the lower support plate 420 and the upper plug joint 410 are reset to keep them concentric, and the next unit water pipe A is received and transferred.

[0129] Step 3: Start the pushing mechanism 200 to drive the unit water pipe A on the pushing mechanism 200 to move upward until the unit water pipe A is inserted into the floating pipe sleeve B pre-installed in the floor slab C, and the lower end of the unit water pipe A located at the bottom is clamped in the anti-rotation clamping mechanism;

[0130] Step 4: transport the next unit water pipe A to be installed to the bottom of the anti-rotation clamping mechanism, align the upper end of the unit water pipe A with the lower end of the previous unit water pipe A, and then start the rotating mechanism to complete the sealing connection between the rotating unit water pipe A and the previous unit water pipe A to form a whole;

[0131] Step 5: Continue to start the pushing mechanism 200 to drive the spliced ​​unit water pipes A to move upward, so that the unit water pipe A located at the bottom is clamped in the anti-rotation clamping mechanism;

[0132] Step 6. Repeat steps 4 and 5, and install all new unit water pipes A layer by layer from bottom to top, so that the unit water pipes A are laid out along the height direction of the entire building, completing the arrangement of the vertical fire main water pipes, and then installing the horizontal fire main water pipes and the vertical fire main water pipes.

[0133] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A fire main water pipe installation device, characterized in that: It comprises a unit water pipe feeding mechanism (100), a pushing mechanism (200), a rotation-stopping clamping mechanism and a rotating mechanism, wherein: The unit water pipe feeding mechanism (100) comprises a feeding slide (110), a plurality of unit water pipes (A) are arranged vertically on the feeding slide (110), and a discharge port of the feeding slide (110) is arranged above the pushing mechanism (200); The pushing mechanism (200) is used to drive a single unit water pipe (A) to lift vertically upward, so that the unit water pipe (A) extends from bottom to top out of each floor slab (C) of the building; A rotation-stopping clamping mechanism is provided above the pushing mechanism (200), and the rotation-stopping clamping mechanism is used to clamp and fix the unit water pipe (A) inserted therein; The rotating mechanism is arranged on the pushing mechanism (200) and is used to drive the unit water pipe (A) on the pushing mechanism (200) to rotate.

2. The pipeline installation device according to claim 1, characterized in that: The pushing mechanism (200) comprises a pushing plate (210), a vertical track (230) and a lifting plate (250), wherein: The outer side wall of the pushing plate (210) can be slidably mounted on the vertical track (230), and the pushing plate (210) is also slidably connected to the lifting plate (250) via a vertical guide slide rod (211); The vertical guide slide bar (211) is sleeved with a lifting spring (212), and the two ends of the lifting spring (212) are respectively against the lower surface of the pushing plate (210) and the upper surface of the lifting plate (250); The lifting plate (250) is slidably mounted on the vertical track (230) via a screw rod and nut structure; The rotating mechanism comprises a rotating disk (260) rotatably arranged on the upper disk surface of the pushing disk (210), and a clamping mechanism is provided on the upper disk surface of the rotating disk (260) for clamping the unit water pipe (A).

3. The pipeline installation device according to claim 2, characterized in that: The clamping mechanism comprises a plurality of groups of clamping claws (220) and rotating clamping arms (270) arranged at intervals along the circumferential direction of the rotating disk (260); the rotating clamping arms (270) are arranged outside the clamping claws (220); and the gap between each group of clamping claws (220) and the rotating clamping arms (270) constitutes a clamping opening for clamping the pipe wall of the unit water pipe (A); The clamping claw (220) can be slidably mounted on the upper disk surface of the rotating disk (260), and the sliding direction of the clamping claw (220) is the radial direction of the rotating disk (260).

4. The pipeline installation device according to claim 3, characterized in that: The side of the clamping claw (220) away from the pipe wall of the unit water pipe (A) is processed with an inclined surface (221), and the side close to the inclined surface (221) is provided with a clamping cone cylinder (222), and the outer wall of the clamping cone cylinder (222) abuts against the inclined surface (221); The clamping cone (222) is vertically slidably arranged on the rotating disk (260) via a vertical rod, and a clamping spring (223) is sleeved on the vertical rod, and two ends of the clamping spring (223) respectively abut against the upper disk surface of the rotating disk (260) and the rod end of the vertical rod.

5. The pipeline installation device according to any one of claims 1 to 4, characterized in that: The anti-rotation clamping mechanism comprises an anti-rotation tube (300) of a tubular structure, the anti-rotation tube (300) is arranged concentrically with a pushing disk (210) provided on the pushing mechanism (200), and the inner wall of the anti-rotation tube (300) is processed with a guide groove (320) arranged along the length direction of the anti-rotation tube (300); the guide groove (320) is vertically slidably connected to a support block (A10) provided on the outer wall of the unit water pipe (A).

6. The pipeline installation device according to claim 5, characterized in that: The upper end pipe mouth of the anti-rotation pipe (300) is slidably arranged on the frame (340) through a support slide bar (330), and a support spring (331) is sleeved on the support slide bar (330). The two ends of the support spring (331) are respectively abutted against the frame (340) and the upper end pipe mouth of the anti-rotation pipe (300); the upper end pipe mouth of the anti-rotation pipe (300) is used to support the lower plate surface of the support block (A10) on the outer wall of the unit water pipe (A).

7. The pipeline installation device according to any one of claims 1 to 4, characterized in that: It also includes a horizontal pushing mechanism (400), which is arranged between the feeding slide (110) and the pushing mechanism (200) and reciprocates to push the unit water pipe (A) horizontally to the top of the pushing plate (210) of the pushing mechanism (200).

8. The pipeline installation device according to claim 7, characterized in that: The horizontal pushing mechanism (400) comprises an upper plug connector (410) and a lower support plate (420), wherein the upper plug connector (410) is connected to a telescopic motor, and the upper plug connector (410) moves in a vertical direction to plug in the upper end of the unit water pipe (A); the lower support plate (420) is arranged on a first track (430), and the first track (430) is installed on a second track (440), and the first track (430) and the second track (440) are driven by different motors to move horizontally.

9. The pipeline installation device according to any one of claims 1 to 4, characterized in that: The unit water pipe feeding mechanism (100) further comprises a frame (120), on which a feeding slide (110) is vertically slidably mounted via a screw nut structure, and guard frames are provided on both sides of the feeding slide (110), the guard frames comprising a plurality of groups of horizontally arranged sliding bars, which are arranged at intervals in the vertical direction.

10. A method for installing a fire main water pipe, characterized in that: The fire main water pipe installation device according to any one of claims 1 to 9 is used for installation, and specifically comprises the following steps: Step 1: transport the installation equipment to the overhead floor below the building, and place the pushing mechanism (200) directly below the fire protection unit water pipe installation position on the floor; Step 2: Arrange the unit water pipes (A) one by one in a vertical state on the feeding slide (110); during installation, the unit water pipes (A) are led out from the outlet of the feeding slide (110) to the pushing mechanism (200); Step 3: Start the pushing mechanism (200) to drive the unit water pipe (A) on the pushing mechanism (200) to move upward until the unit water pipe (A) is inserted into the floating pipe sleeve (B) pre-installed in the floor slab (C), and the lower end of the unit water pipe (A) located at the bottom is clamped in the anti-rotation clamping mechanism; Step 4: transport the next unit water pipe (A) to be installed to the bottom of the anti-rotation clamping mechanism, align the upper end of the unit water pipe (A) with the lower end of the previous unit water pipe (A), and then start the rotating mechanism to complete the sealing connection between the rotating unit water pipe (A) and the previous unit water pipe (A) to form a whole; Step 5: Continue to start the pushing mechanism (200) to drive the spliced ​​unit water pipes (A) to move upward, and make the unit water pipe (A) located at the bottom be clamped in the anti-rotation clamping mechanism; Step 6. Repeat steps 4 and 5, and install all unit water pipes (A) layer by layer from bottom to top, so that the unit water pipes (A) are laid out along the height direction of the entire building, completing the arrangement of the vertical fire main water pipes, and then installing the horizontal fire main water pipes and the vertical fire main water pipes.