Basic operation service method and system
By introducing load operation mechanism module and operation service optimization module into the air conditioning system of subway and high-speed rail stations, combining PID control and neural network model, the high energy consumption problem caused by variable factors of the ventilation and air conditioning system is solved, and the energy efficiency of the system is achieved Improve and satisfy user comfort.
Patent Information
- Application Number
- CN202411078813.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-29
AI Technical Summary
The ventilation and air conditioning systems of public facilities such as subways and high-speed rail stations are complex due to variable factors, which leads to high energy consumption. The existing control methods lack flexibility and adaptability, and cannot add or subtract loads in real time according to changes in terminal load, resulting in an increase in energy consumption.
Design a basic operation service system, including load operation mechanism module, load analysis control module and operation service optimization module, to predict load changes, optimize air conditioning system control, combined with PID control and neural network model, meet the minimum energy consumption and user comfort Requirements.
It effectively reduces the energy consumption of the ventilation and air conditioning system, improves the energy efficiency of the system, and adjusts the operating frequency of the air conditioning according to changes in passenger flow without changing the air quality, achieving the energy saving and comfort of the system while reducing operational energy consumption.
Smart Images

Figure CN119042756A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of air-conditioning system operation of public facilities including subways and high-speed railways, and specifically to a basic operation service method and system. Background Art
[0002] In the actual operation process of various basic subsystems of public facilities such as subway stations and high-speed railway stations, the energy consumed by such public facilities is mainly electric energy, among which the electric energy consumption of ventilation and air-conditioning subsystem accounts for 40%-50% of the total energy consumption. Since there are many variable factors in the ventilation and air-conditioning systems of such public facilities and the analysis is very complicated, it is often necessary to rely on experience to design a control method for the ventilation and air-conditioning system suitable for a specific line or station, or rely on manual control of the system, which requires high professional experience of the operator. Classical control and modern control achieve the purpose of controlling the controlled object by constructing an accurate model of the controlled object to enable it to complete the specified task, lacking flexibility and adaptability. The air-conditioning system of such public facilities has been in an intermittent operation state. During the operation of such public facilities, the cold source equipment needs to bear all the cooling capacity of the public area and non-public area, and only needs to serve the non-public area during the shutdown period. Because the chiller cannot be added or subtracted at any time according to the change of the terminal load, it leads to an increase in the energy consumption of the air-conditioning system. Therefore, it is very necessary to design a basic operation service method and system to optimize the energy-saving control strategy and reduce the operating energy consumption of public facilities including subways and high-speed railways. Summary of the invention
[0003] The purpose of the present invention is to provide a basic operation service method and system to solve the problems raised in the above background technology.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: a basic operation service system, including a load operation mechanism module, for selecting factors affecting air conditioning and ventilation operation in the air conditioning coverage area according to the load operation mechanism of the station air conditioning system coverage area of public facilities including subways and high-speed railways;
[0005] Load analysis control module, used to optimize the operation control of large and small air-conditioning systems and cold source stations according to load changes caused by load differences at different working hours;
[0006] The operation service optimization module is used to introduce the comfort level of service users as a control variable to meet the operation service with the lowest energy consumption and the most comfortable state for users.
[0007] According to the above technical solution, the basic operation service system executes a basic operation service method, including the following steps:
[0008] Step 1: Based on the load operation mechanism of the air-conditioning system coverage area of public facilities including subways and high-speed railways, select the factors affecting the air-conditioning and ventilation operation in the air-conditioning coverage area, and predict the load of the air-conditioning and ventilation operation of public facilities including subways and high-speed railways at fixed times;
[0009] Step 2: Calculate the forecast loads of public facilities;
[0010] Step 3: By analyzing the load conditions of public facilities, optimize the operation control of large and small air-conditioning systems and cold source stations according to the load changes caused by load differences at different working hours;
[0011] Step 4: When public facilities including subways and high-speed railways are in operation, the comfort level of service users is introduced as a control variable. That is, after the ventilation and air-conditioning system completes the specified action, it must not only meet the minimum energy consumption but also meet the requirement that users are in the most comfortable state in the public facility environment.
[0012] According to the above technical solution, the step of selecting influencing factors based on the load operation mechanism of the air conditioning system coverage area of public facilities including subways and high-speed railways includes:
[0013] The air-conditioning system of public facilities including subways and high-speed railways mainly meets the cooling supply of two areas, namely: the public area of the public facility station and the equipment operation area of the public facility station. The main influencing factors for the operation of air conditioning and ventilation in the public area of the public facility station are the real-time flow of people and the real-time ambient temperature. For the equipment operation area, since the lighting equipment inside the platform of the public facility is a normally open device and cannot have a significant impact on the load change, the influencing factors involved are also the temperature and humidity of the area where the equipment is located and the power consumption of the equipment operation. The personnel load and equipment load related to the load prediction of the public area of the public facility station are selected, and the characteristic data related to the load are extracted from the database. The characteristic connection is performed according to the time series to construct a characteristic data set, and then the relevant parameters are used as the load input for calculation, that is, the original data is converted into linearly independent data of each dimension through linear transformation. By extracting the main characteristic components between the data, the data is reduced in dimension, and the cold load and wet load of each regional sampling point are calculated. The characteristic parameters of a single working condition moment are connected with the cold load and wet load of the air-conditioning system of the public facility at the next working condition sampling moment, and the load of the air-conditioning and ventilation operation of the public facility at a fixed time is predicted.
[0014] According to the above technical solution, the step of calculating each predicted load of the subway station includes:
[0015] When calculating the air conditioning system load of public facilities including subways and high-speed railways, the system load is divided into latent heat load and sensible heat load, and the latent heat ratio of the load is calculated hourly. The calculation is performed based on the change in personnel load, and the total number of people in the air conditioning operation area, that is, the platform of the public facility, is N. Among them, θ is the maximum number of people approved for the platform of the public facility, x1 is the number of people entering the platform of the public facility, x2 is the number of people leaving the platform of the public facility, y1 is the dwelling time of the people entering the station, y2 is the dwelling time of the people leaving the station, and the air-conditioning personnel apparent load related to the load forecast of the public area of the public facility is Q, Q=μ*N*k1*τ, where μ is a reduction coefficient set with a fixed value, N is the total number of people in the air-conditioning operation area, i.e. the platform of the public facility, k1 is the apparent heat dissipation of one person per hour, τ is the human sensible heat dissipation cooling load coefficient at the time when the specific person enters the public facility, and μ is a reduction coefficient considered based on the heat dissipation and moisture dissipation of adult men as the air-conditioning system of the public facility, according to different conditions such as the age, gender composition and density of the personnel. , When the age and gender of the personnel are different, their heat dissipation and moisture dissipation are different. For example, the heat dissipation and moisture dissipation of adult women are about 85% of that of adult men, and the heat dissipation and moisture dissipation of children are about 75% of that of adult men. The clustering coefficient is the main factor that determines the personnel load, so the clustering coefficient = (number of adult men + number of adult women * 85% + number of children * 75%) / total number of people. When riding the subway, people dissipate heat to the passenger compartment in the form of sensible heat and latent heat, which is one of the factors that form the cooling load of the passenger car. For the equipment load of related equipment of public facilities including subways and high-speed railways, the equipment load of the public area of the public facilities station is directly calculated based on the loads of various equipment and the efficiency of each equipment, and is calculated through the actual power of various power facilities. The equipment load is W, E1 is the hourly cooling load formed by the equipment heat dissipation, ω is the equipment cooling load coefficient, which has a specific value according to the specification, and E2 is the heat dissipation of the equipment. is the equipment correction factor.
[0016] According to the above technical solution, the step of optimizing large-scale operation control according to the load changes caused by the load differences at different working hours includes:
[0017] Based on the real-time passenger flow, which is the main influencing factor on the operation of air conditioning and ventilation in public areas of public facilities including subways and high-speed railways, for the platforms and halls where the air conditioning systems in subway stations and high-speed railway stations are mainly operated, the real-time passenger flow detected by multiple video detection points is used as the control quantity input of the air volume operation control end of the air conditioning system. The controller predicts and calculates the cooling capacity or heating capacity required by the terminal air conditioning load, as well as the optimal values of the supply and return water temperature, temperature difference, pressure difference and flow rate of each chilled water according to the collected real-time data and the historical operation data of the system, and adjusts the output frequency of each inverter, controls the speed of the chilled water pump, changes the valve, and controls its flow rate, so that the supply and return water temperature, flow rate, pressure difference and temperature difference of the chilled water system operate within the optimal value range given under the optimization control of the controller. Under the premise of ensuring air quality, as the air conditioning terminal load decreases, the heat exchange from the chilled water to the main air conditioning evaporator is also reduced accordingly, that is, through the PID control strategy adjustment, the ventilation units inside the air conditioning system are all operated with variable frequency, which effectively reduces the corresponding input power, thereby changing the operating frequency according to the change of passenger flow, effectively improving the energy efficiency of the ventilation and air conditioning system, and realizing system energy saving;
[0018] In the operation of the air conditioning system of public facilities including subways and high-speed railways, the real-time detected population in the station is used as the input of the PID controller, the temperature value is set to a fixed value, and the flow information obtained by the monitoring equipment is converted into the heat dissipation load of the heat body and the fresh air load required by the current population. After real-time calculation, the real-time changing heat load is obtained. When the outdoor air enters the direct evaporative cooling unit, the blower sends the treated air to the area that needs to be cooled, and the corresponding ventilation and cooling capacity are calculated. When the indoor load is full heat and cooling load, the calculation formula for the cooling air volume E is: Among them, F is the total heat and cooling load of the entire air-conditioning system, Δμ is the calculated enthalpy difference between the inside and outside of the area, and the refrigeration efficiency in the area is used to measure the adequacy of the air heat and moisture exchange process. The larger the value, the more sufficient the heat and moisture exchange in the area. The central controller regulates the supply and exhaust fans and refrigeration units, and finally controls the temperature value in the station to maintain a more stable value that does not change with the flow of people. By directly calculating the change in heat load, it is more suitable for the air-conditioning system in the station of public facilities including subways and high-speed railways to adjust and control it in time with the irregular changes in heat load. During the period of low air-conditioning load, it effectively reduces the air-conditioning energy consumption in the station and maximizes the use of energy.
[0019] According to the above technical scheme, the optimization control method that meets the minimum energy consumption requirement includes: the user's comfort control index in the environment of public facilities including subways and high-speed railways is determined by the index obtained by the temperature, humidity and wind speed sensors in the operating environment, which is used to measure the user's feeling of comfort in the environment. The ventilation and air-conditioning energy consumption of public facilities including subways and high-speed railways is the total value of the cooling load of the operation process of the public facilities within the set value range when the cooling capacity of the ventilation and air-conditioning system exceeds the set value range. When calculating the cooling load, when the set value range is exceeded, it is based on the equipment heat generation data in the air-conditioning operation environment of the public facilities and the number of staff in the specific air-conditioning coverage area. The calculation of the cooling load generated by the equipment is ignored, and the cooling load generated by the station staff is input according to the specific station. Within the set comfort index range, the real-time parameters of the air-conditioning coverage area are collected to calculate the optimized set value range of the air-conditioning supply and return air temperatures; the optimal combination of the supply and return air temperatures during the air-conditioning operation of public facilities including subways and high-speed railways is calculated, and the minimum operating energy consumption requirement of the air-conditioning system is met through optimization control.
[0020] According to the above technical solution, the calculation step of the user's most comfortable state includes: using a neural network model to optimize the user's comfort control variable to obtain the optimal control sequence of the control quantity and the change trajectory of the state variable, setting the passenger comfort parameter, and determining the input value of the neural network controller as the influencing index of the air-conditioning operating environment of public facilities including subways and high-speed railways at the current moment, the disturbance variable that interferes with the platform environment of public facilities, and the set threshold. The output value is the optimal control quantity that needs to be achieved at the current moment. The input layer parameters of the neural network controller are: the set value of the air-conditioning supply air temperature in the air-conditioning coverage area, the state value of the air-conditioning temperature at the current moment, The platform temperature setting value of public facilities, the current state value of the platform temperature of public facilities, the platform humidity setting value of public facilities, the current state value of the platform humidity content, and the disturbance variables that change with time including the platform cooling load and the platform wet load; the output layer parameter is the air supply volume of the air-conditioning operation at the current moment. The three-layer neural network structure is used to analyze the system status and control quantity at different times to output the optimal solution to determine whether the set user comfort requirements are met. If so, the parameter setting set is used as the public area environmental control parameter of the public facilities including subways and high-speed railways in the next working period. If not, the iteration should continue to search for the parameter set until the conditions are met.
[0021] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, through PID control strategy adjustment, is based on the real-time flow of people among the main influencing factors on the operation of air conditioning and ventilation in the public areas of public facilities including subways and high-speed railways. For the platforms and station halls where the air conditioning systems in the stations of public facilities including subways and high-speed railways are mainly operated, the real-time flow of people detected by multiple video detection points is used as the control quantity input of the air volume operation control terminal of the air conditioning system. The controller predicts and calculates the cooling capacity or heating capacity required by the terminal air conditioning load, as well as the optimal values of the supply and return water temperature, temperature difference, pressure difference and flow rate of each chilled water line in real time according to the collected real-time data and the historical operation data of the system. The ventilation units inside the air-conditioning system are all operated with variable frequency to effectively reduce the corresponding input electrical energy. The operating frequency is changed according to the change of passenger flow, which effectively improves the energy efficiency of the ventilation and air-conditioning system and realizes system energy saving. The three-layer neural network structure is used to analyze the system status and control quantity at different times to output the optimal solution to determine whether the set user comfort requirements are met. If they are met, the parameter setting set is used as the station public area environmental control parameters for public facilities including subways and high-speed railways in the next operating period. If they are not met, the iteration continues to search for the parameter set until the conditions are met. The energy-saving control strategy is optimized while reducing the operating energy consumption of public facilities including subways and high-speed railways. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0023] Figure 1 A flowchart of a basic operation service method provided in Embodiment 1 of the present invention;
[0024] Figure 2 A schematic diagram of the module composition of a basic operation service system provided in Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] Embodiment 1: Figure 1 This is a flowchart of a basic operation service method provided in Embodiment 1 of the present invention. This embodiment can be applied to the scenario of optimizing the energy consumption of air conditioning operation in public facilities including subways and high-speed railways. This method can be executed by a basic operation service system provided in this embodiment, such as Figure 1 As shown, the method specifically comprises the following steps:
[0027] Step 1: Based on the load operation mechanism of the air-conditioning system coverage area of public facilities including subways and high-speed railways, select the factors affecting the air-conditioning and ventilation operation in the air-conditioning coverage area, and predict the load of the air-conditioning and ventilation operation of public facilities including subways and high-speed railways at fixed times;
[0028] In the embodiment of the present invention, the air-conditioning system of the public facilities including the subway and the high-speed railway mainly meets the cooling supply of two areas, namely: the public area in the public facilities and the equipment operation area in the public facilities. The main influencing factors for the operation of air-conditioning and ventilation in the public area of the public facilities including the subway and the high-speed railway are the real-time flow of people and the real-time ambient temperature. For the equipment operation area, since the lighting equipment inside the platform of the public facilities including the subway and the high-speed railway is a normally open device and cannot have a significant impact on the load change, the influencing factors involved are also the temperature and humidity of the area where the equipment is located and the power consumption of the equipment operation. The personnel load and equipment load related to the load prediction of public areas of shared facilities are extracted through the database. The characteristic data related to the load are connected according to the time series to construct a characteristic data set. Then, the relevant parameters are used as the load input for calculation, that is, the original data is converted into linearly independent data of each dimension through linear transformation. The main characteristic components between the data are extracted, the data is reduced in dimension, and the cooling load and wet load of each regional sampling point are calculated. The characteristic parameters of a single working condition are connected and corresponded with the cooling load and wet load of the subway air-conditioning system at the next working condition sampling time, and the load of the air-conditioning and ventilation operation of public facilities including subways and high-speed railways at fixed times is predicted.
[0029] Step 2: Calculate the forecast loads of public facilities including subways and high-speed railways;
[0030] In this embodiment, when calculating the air conditioning system load of public facilities including subways and high-speed railways, the system load is divided into latent heat load and sensible heat load, and the latent heat ratio of the load is calculated hourly. The calculation is performed based on the change of the personnel load, and the total number of people on the platform of the public facilities including subways and high-speed railways in the air conditioning operation area is N, Among them, θ is the maximum number of people approved for the platform of the public facility, x1 is the number of people entering the platform of the public facility, x2 is the number of people leaving the platform of the public facility, y1 is the dwelling time of the people entering the station, y2 is the dwelling time of the people leaving the station, and the obvious load of air-conditioning personnel related to the load forecast of the public area of the public facility is Q, Q=μ*N*k1*τ, among which μ is a reduction coefficient with a fixed value, N is the total number of people in the air-conditioning operation area, i.e., the subway platform, k1 is the obvious heat dissipation of one person per hour, τ is the human sensible heat dissipation cooling load coefficient at the time when the specific person enters the public facility, and μ is the reduction factor considered based on the heat dissipation and moisture dissipation of adult men for the air-conditioning system of the public facility according to different conditions such as the age, gender composition and density of the personnel. Subtraction coefficient, when the age and gender of the personnel are different, their heat dissipation and moisture dissipation are different. For example, the heat dissipation and moisture dissipation of adult women are about 85% of that of adult men, and the heat dissipation and moisture dissipation of children are about 75% of that of adult men. The clustering coefficient is the main factor that determines the personnel load, so the clustering coefficient = (number of adult men + number of adult women * 85% + number of children * 75%) / total number of people. When riding the subway, people dissipate heat to the passenger compartment in the form of sensible heat and latent heat, which is one of the factors that form the cooling load of the passenger car. For the equipment load of related equipment of public facilities, the equipment load of the public area of public facilities is directly calculated based on the load of various equipment and the efficiency of each equipment, and is calculated through the actual power of various power facilities. The equipment load is W, E1 is the hourly cooling load formed by the equipment heat dissipation, ω is the equipment cooling load coefficient, which has a specific value according to the specification, and E2 is the heat dissipation of the equipment. is the equipment correction factor.
[0031] Step 3: By analyzing the load conditions of public facilities including subways and high-speed railways, the operation control of large and small air-conditioning systems and cold source stations is optimized according to the load changes caused by load differences at different working hours;
[0032] In an embodiment of the present invention, based on the real-time flow of people in the public areas of public facilities including subways and high-speed railways, which is a major influencing factor on the operation of air conditioning and ventilation, for the platform and station hall areas where the air conditioning system in the public facilities is mainly operated, the real-time flow of people detected by multiple video detection points is used as the control quantity input of the air volume operation control end of the air conditioning system. The controller predicts and calculates the cooling capacity or heating capacity required by the terminal air conditioning load, as well as the optimal values of the supply and return water temperature, temperature difference, pressure difference and flow rate of each chilled water according to the collected real-time data and the historical operation data of the system, and adjusts the output frequency of each inverter, controls the speed of the chilled water pump, changes the valve, and controls its flow rate, so that the supply and return water temperature, flow rate, pressure difference and temperature difference of the chilled water system operate within the optimal value range given under the optimization control of the controller. Under the premise of ensuring air quality, as the air conditioning terminal load decreases, the heat exchange from the chilled water to the main air conditioning evaporator is also reduced accordingly, that is, through the PID control strategy adjustment, the ventilation units inside the air conditioning system are all operated in variable frequency, which effectively reduces the corresponding input power, thereby changing the operating frequency according to the change of passenger flow, effectively improving the energy efficiency of the ventilation and air conditioning system, and achieving system energy saving;
[0033] Specifically, in the operation of the public facility air conditioning system, the real-time detected population in the station is used as the input of the PID controller, the temperature value is set to a fixed value, and the flow information obtained by the monitoring equipment is converted into the heat dissipation load of the heat body and the fresh air load required by the current population. After real-time calculation, the real-time changing heat load is obtained. When the outdoor air enters the direct evaporative cooling unit, the blower sends the treated air to the area that needs to be cooled, and the corresponding ventilation and cooling capacity are calculated. When the indoor load is full heat and cooling load, the calculation formula for the cooling air volume E is: Among them, F is the total heat and cooling load of the entire air-conditioning system, Δμ is the calculated enthalpy difference between the inside and outside of the area, and the refrigeration efficiency in the area is used to measure the adequacy of the air heat and moisture exchange process. The larger the value, the more sufficient the heat and moisture exchange in the area. The central controller regulates the supply and exhaust fans and refrigeration units, and finally controls the temperature value in the station to maintain a more stable value that does not change with the flow of people. By directly calculating the change in heat load, it is more suitable for the air-conditioning system in public facilities including subways and high-speed railways to adjust and control it in time with the irregular changes in heat load. During the period of low air-conditioning load, it effectively reduces the air-conditioning energy consumption in the station and maximizes the use of energy.
[0034] Step 4: When public facilities including subways and high-speed railways are in operation, the comfort level of service users is introduced as a control variable. That is, after the ventilation and air-conditioning system completes the specified action, it must not only meet the minimum energy consumption but also meet the requirement that users are in the most comfortable state in the environment of the public facilities.
[0035] In an embodiment of the present invention, the comfort control index of users in the environment of public facilities including subways and high-speed railways is determined by the indexes obtained by the temperature, humidity and wind speed sensors in the operating environment, and is used to measure the user's feeling of comfort in the environment. The ventilation and air-conditioning energy consumption of public facilities is the total value of the cooling load of the operation process of the public facilities within the set value range when the cooling capacity of the ventilation and air-conditioning system is equal to the set value range. When calculating the cooling load, when the set value range is exceeded, it is based on the equipment heat generation data in the air-conditioning operation environment of public facilities including subways and high-speed railways and the number of staff in the specific air-conditioning coverage area, and the calculation of the cooling load generated by the equipment is ignored, while the cooling load generated by the staff of the public facilities is input according to the specific station. Within the set comfort index range, the real-time parameters of the air-conditioning coverage area are collected, and the air-conditioning supply and return air temperature optimization set value range is calculated; the optimal combination of the supply and return air temperatures in the air-conditioning operation process of the public facilities is calculated, and the minimum operating energy consumption requirement of the air-conditioning system is met through optimization control.
[0036] Specifically, the neural network model is used to optimize the control variable of user comfort, obtain the optimal control sequence of the control quantity and the change trajectory of the state variable, set the passenger comfort parameter, and determine the input value of the neural network controller as the influencing index of the air-conditioning operation environment of the public facilities at the current moment, the disturbance variable that interferes with the platform environment of the public facilities, and the set threshold. The output value is the optimal control quantity that needs to be achieved at the current moment. The input layer parameters of the neural network controller are: the set value of the air-conditioning supply air temperature in the air-conditioning coverage area, the state value of the air-conditioning temperature at the current moment, and the platform temperature setting value of the public facilities. value, the current state value of the platform temperature of the public facilities, the set value of the platform humidity content of the public facilities, the current state value of the platform humidity content, and the disturbance variables that change with time including the platform cooling load and the platform wet load; the output layer parameter is the air supply volume of the air-conditioning operation at the current moment. The three-layer neural network structure is used to analyze the system state and control quantity at different times to output the optimal solution to determine whether the set user comfort requirements are met. If so, the parameter setting set is used as the public area environmental control parameter of the public facility in the next operating period. If not, the iteration should continue to search for the parameter set until the conditions are met.
[0037] Embodiment 2: Embodiment 2 of the present invention provides a basic operation service system. Figure 2 A schematic diagram of the module composition of a basic operation service system provided in Embodiment 2 of the present invention is shown in FIG. Figure 2 As shown, the system includes:
[0038] The load operation mechanism module is used to select the factors affecting the air conditioning and ventilation operation in the air-conditioning coverage area according to the load operation mechanism of the air-conditioning system coverage area of public facilities including subways and high-speed railways;
[0039] Load analysis control module, used to optimize the operation control of large and small air-conditioning systems and cold source stations according to load changes caused by load differences at different working hours;
[0040] The operation service optimization module is used to introduce the comfort level of service users as a control variable to meet the operation service with the lowest energy consumption and the most comfortable state for users.
[0041] In some embodiments of the present invention, the load operation mechanism module includes:
[0042] An influencing factor selection module is used to select the influencing factors on the air conditioning and ventilation operation in the air conditioning coverage area;
[0043] A characteristic data set construction module is used to extract characteristic data related to the load through a database, and to construct a characteristic data set by performing characteristic connection in time sequence;
[0044] The air conditioning operation load prediction module is used to predict the air conditioning and ventilation operation load of public facilities including subways and high-speed railways at fixed times.
[0045] In some embodiments of the present invention, the load operation control analysis module includes:
[0046] The personnel load calculation module is used to calculate the air conditioning personnel load associated with the public area load forecast of public facilities including subways and high-speed railways;
[0047] Equipment load calculation module, used to calculate the equipment load in public areas of public facilities including subways and high-speed railways;
[0048] The PID controller module is used to adjust the ventilation units in the air-conditioning system to operate at variable frequencies through the PID control strategy;
[0049] The operation control optimization module is used to change the operation frequency according to the changes in passenger flow and improve the operating energy consumption of the ventilation and air-conditioning system.
[0050] In some embodiments of the present invention, the operation service optimization module includes:
[0051] User comfort definition module, used to measure the user's feeling of comfort in the environment according to the selected indicators and define the user's comfort;
[0052] Energy consumption requirement optimization module, which is used to calculate the optimal combination of supply and return air temperatures during the air-conditioning operation of public facilities including subways and high-speed railways, and to achieve the lowest operating energy consumption of the air-conditioning system through optimization control;
[0053] The neural network model module is used to use the neural network model to perform optimal calculation on the control variable of user comfort.
[0054] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0055] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A basic operation service system, Features: The system comprises: The load operation mechanism module is used to select the factors affecting the air conditioning and ventilation operation in the air-conditioning coverage area according to the load operation mechanism of the air-conditioning system coverage area of public facilities including subways and high-speed railways; Load analysis control module, used to optimize the operation control of large and small air-conditioning systems and cold source stations according to load changes caused by load differences at different working hours; The operation service optimization module is used to introduce the comfort level of service users as a control variable to meet the operation service with the lowest energy consumption and the most comfortable state for users.
2. A basic operation service system according to claim 1, Features: The load operation mechanism module includes: An influencing factor selection module is used to select the influencing factors on the air conditioning and ventilation operation in the air conditioning coverage area; A characteristic data set construction module is used to extract characteristic data related to the load through a database, and to construct a characteristic data set by performing characteristic connection in time sequence; The air conditioning operation load prediction module is used to predict the air conditioning and ventilation operation load of public facilities including subways and high-speed railways at fixed times.
3. A basic operation service system according to claim 2, Features: The load operation control analysis module includes: The personnel load calculation module is used to calculate the air conditioning personnel load associated with the public area load forecast of public facilities including subways and high-speed railways; Equipment load calculation module, used to calculate the equipment load in public areas of public facilities including subways and high-speed railways; The PID controller module is used to adjust the ventilation units in the air-conditioning system to operate at variable frequencies through the PID control strategy; The operation control optimization module is used to change the operation frequency according to the changes in passenger flow and improve the operating energy consumption of the ventilation and air-conditioning system.
4. A basic operation service system according to claim 3, Features: The operation service optimization module includes: User comfort definition module, used to measure the user's feeling of comfort in the environment according to the selected indicators and define the user's comfort; Energy consumption requirement optimization module is used to calculate the optimal combination of supply and return air temperatures during the air conditioning operation of public facilities, and to meet the lowest energy consumption of the air conditioning system through optimization control; The neural network model module is used to use the neural network model to perform optimal calculation on the control variable of user comfort.
5. A basic operation service system according to claim 4, executing a basic operation service method, Features: The method comprises the following steps: Step 1: Based on the load operation mechanism of the air-conditioning system coverage area of public facilities including subways and high-speed railways, select the factors affecting the air-conditioning and ventilation operation in the air-conditioning coverage area, and predict the load of the air-conditioning and ventilation operation of public facilities at fixed times; Step 2: Calculate the forecast loads of public facilities including subways and high-speed railways; Step 3: By analyzing the load conditions of public facilities, optimize the operation control of large and small air-conditioning systems and cold source stations according to the load changes caused by load differences at different working hours; Step 4: When the public facilities are in operation, the comfort level of the service users is introduced as a control variable. That is, after the ventilation and air-conditioning system completes the specified action, it must not only meet the minimum energy consumption but also meet the requirement that the users are in the most comfortable state in the public facility environment.
6. A basic operation service method according to claim 5, Features: The step of selecting influencing factors based on the load operation mechanism of the air conditioning system coverage area of public facilities including subways and high-speed railways includes: The air conditioning system of public facilities including subways and high-speed railways mainly meets the cooling supply of two areas, namely: the public area of public facilities and the equipment operation area of public facilities. The main influencing factors for air conditioning and ventilation operation in the public area of public facilities are real-time human flow and real-time ambient temperature. For the equipment operation area, since the lighting equipment inside the platform of public facilities is a normally open device, it cannot have a significant impact on the load change. Therefore, the influencing factors involved are also the temperature and humidity of the area where the equipment is located and the power consumption of the equipment operation. The personnel load and equipment load related to the load prediction of the public area of public facilities are selected, and the characteristic data related to the load are extracted from the database. The characteristic connection is constructed according to the time series to construct a characteristic data set, and then the relevant parameters are used as the load input for calculation, that is, the original data is converted into linearly independent data of each dimension through linear transformation. By extracting the main characteristic components between the data, the data is reduced in dimension, and the cold load and wet load of each regional sampling point are calculated. The characteristic parameters of a single working condition are connected with the cold load and wet load of the air conditioning system of the public facility at the next working condition sampling time, and the load of the air conditioning and ventilation operation of the public facility at a fixed time is predicted.
7. A basic operation service method according to claim 6, Features: The step of calculating the predicted loads of public facilities including subways and high-speed railways includes: When calculating the air conditioning system load of public facilities including subways and high-speed railways, the system load is divided into latent heat load and sensible heat load, and the latent heat ratio of the load is calculated hourly. The calculation is performed based on the change in personnel load, and the total number of people in the air conditioning operation area, that is, the public facilities, is N. Where θ is the maximum number of people approved for the public facility, x 1 is the number of people entering the public facility, x 2 is the number of people leaving the public facility, y 1 is the dwelling time of the person entering the station, y 2 is the dwell time of the exiting person, and the load of the air-conditioning personnel related to the public area load forecast of the public facilities is obviously Q, Q = μ*N*k 1 *τ, where μ is a fixed reduction factor, N is the total number of people in the air-conditioning operation area, i.e., the public facilities, and k 1 is the apparent heat dissipation per person per hour, τ is the human sensible heat dissipation cooling load coefficient when a specific person enters a public facility, μ is the reduction coefficient for the air-conditioning system of a public facility based on the heat dissipation and moisture dissipation of an adult male, and is considered according to the age, gender composition, and density of the personnel. When the age and gender of the personnel are different, their heat dissipation and moisture dissipation are different. For example, the heat dissipation and moisture dissipation of an adult female is about 85% of that of an adult male, and the heat dissipation and moisture dissipation of a child is about 75% of that of an adult male. The clustering coefficient is the main factor determining the personnel load, so the clustering coefficient = (number of adult males + number of adult females * 85% + number of children * 75%) / total number of personnel. When riding in a public facility, personnel dissipate heat to the passenger compartment in the form of sensible heat and latent heat, which is one of the factors that form the cooling load of the shunting car. For the equipment load of the relevant equipment of the public facility, the equipment load of the public area of the station of the public facility is directly calculated based on the load of various equipment and the efficiency of each equipment, and is calculated through the actual power of various power facilities. The equipment load is W, E 1 is the hourly cooling load formed by the equipment heat dissipation, ω is the equipment cooling load coefficient, which has a specific value according to the specification, E 2 Heat dissipation for the device, is the equipment correction factor.
8. A basic operation service method according to claim 7, Features: The step of optimizing large-scale operation control according to load changes caused by load differences at different working hours includes: Based on the real-time flow of people, which is the main influencing factor on the operation of air conditioning and ventilation in the public areas of public facilities, for the platforms and station halls where the air conditioning systems in public facilities are mainly operated, the real-time flow of people detected by multiple video detection points is used as the control quantity input of the air volume operation control end of the air conditioning system. The controller predicts and calculates the cooling capacity or heating capacity required by the terminal air conditioning load, as well as the optimal values of the supply and return water temperature, temperature difference, pressure difference and flow rate of each chilled water according to the collected real-time data and the historical operation data of the system, and adjusts the output frequency of each inverter, controls the speed of the chilled water pump, changes the valve, and controls its flow rate, so that the supply and return water temperature, flow rate, pressure difference and temperature difference of the chilled water system operate within the optimal value range given by the optimization control of the controller. Under the premise of ensuring air quality, as the air conditioning terminal load decreases, the heat exchange from the chilled water to the main air conditioning evaporator is also reduced accordingly, that is, through the PID control strategy adjustment, the ventilation units inside the air conditioning system are all operated with variable frequency, which effectively reduces the corresponding input power, thereby changing the operating frequency according to the change of passenger flow, effectively improving the energy efficiency of the ventilation and air conditioning system, and realizing system energy saving; In the operation of the air conditioning system of public facilities including subways and high-speed railways, the real-time detected population in the station is used as the input of the PID controller, the temperature value is set to a fixed value, and the flow information obtained by the monitoring equipment is converted into the heat dissipation load of the heat body and the fresh air load required by the current population. After real-time calculation, the real-time changing heat load is obtained. When the outdoor air enters the direct evaporative cooling unit, the blower sends the treated air to the area that needs to be cooled, and the corresponding ventilation and cooling capacity are calculated. When the indoor load is full heat and cooling load, the calculation formula for the cooling air volume E is: Among them, F is the total heat and cooling load of the entire air-conditioning system, Δμ is the calculated enthalpy difference between the inside and outside of the area, and the refrigeration efficiency in the area is used to measure the adequacy of the air heat and moisture exchange process. The larger the value, the more sufficient the heat and moisture exchange in the area. The central controller regulates the supply and exhaust fans and refrigeration units, and finally controls the temperature value in the station to maintain a more stable value that does not change with the flow of people. The method of directly calculating the change in heat load is more suitable for timely regulation of the air-conditioning system in public facilities as the heat load changes irregularly. During the period of low air-conditioning load, it effectively reduces the air-conditioning energy consumption in the station and maximizes the use of energy.
9. A basic operation service method according to claim 8, Features: The optimization control method that meets the minimum energy consumption requirement includes: the user's comfort control index in the environment of public facilities including subways and high-speed railways is determined by the index obtained by the temperature, humidity and wind speed sensors in the operating environment, which is used to measure the user's feeling of comfort in the environment; the ventilation and air-conditioning energy consumption of public facilities including subways and high-speed railways is the total value of the cooling load of the operation process of the public facilities including subways and high-speed railways that exceeds the set value range when the cooling capacity of the ventilation and air-conditioning system is equal to the set value range; when calculating the cooling load, when the set value range is exceeded, it is based on the equipment heat generation data in the air-conditioning operation environment of the public facilities including subways and high-speed railways and the number of staff in the specific air-conditioning coverage area, and the calculation of the cooling load generated by the equipment is ignored, while the cooling load generated by the station staff is input according to the specific station; within the set comfort index range, the real-time parameters of the air-conditioning coverage area are collected, and the air-conditioning supply and return air temperature optimization set value range is calculated; the optimal combination of the supply and return air temperatures in the air-conditioning operation process of the public facilities including subways and high-speed railways is calculated, and the minimum operating energy consumption requirement of the air-conditioning system is met through optimization control.
10. A basic operation service method and system according to claim 9, Features: The calculation step of the user's most comfortable state includes: using a neural network model to perform optimal calculation on the user's comfort control variable to obtain the optimal control sequence of the control quantity and the change trajectory of the state variable, setting the passenger comfort parameter, and determining the input value of the neural network controller as the impact index of the air-conditioning operation environment of the public facilities including the subway and the high-speed railway at the current moment, the disturbance variable that interferes with the platform environment of the public facilities including the subway and the high-speed railway, and the set threshold value, and the output value is the optimal control quantity that needs to be achieved at the current moment. The input layer parameters of the neural network controller are: the air-conditioning supply air temperature setting value of the air-conditioning coverage area, the state value of the air-conditioning temperature at the current moment, the public facilities including the subway and the high-speed railway The platform temperature setting value, the current state value of the platform temperature of public facilities including subways and high-speed railways, the platform humidity setting value of public facilities including subways and high-speed railways, the current state value of the platform humidity content, and the disturbance variables that change with time including the platform cooling load and the platform wet load; the output layer parameter is the air supply volume of the air-conditioning operation at the current moment. The three-layer neural network structure is used to analyze the system state and control quantity at different times to output the optimal solution to determine whether the set user comfort requirements are met. If so, the parameter setting set is used as the station public area environmental control parameter for the public facilities including subways and high-speed railways in the next operating period. If not, the iteration should continue to search for the parameter set until the conditions are met.
Citation Information
Patent Citations
Load prediction-based subway station ventilating and air conditioning energy saving system and method
CN111076378A
Subway platform HVAC control method based on multi-agent deep reinforcement learning
CN115289619A
Energy-saving method for improving subway station air conditioner operating parameters according to meteorological data
CN115342484A
Air conditioner control method, air conditioner control device, air conditioner and storage medium
CN115388520A
Control method of ventilation system in rail transit field based on load prediction
CN116263267A
