Supplementary water preheating device for flue gas utilization of gas-fired hot water boiler
By designing a combined structure of modular flue assembly and flue diameter connecting pipe, using flue gas preheating to replenish water, the problems of waste heat waste and water temperature drop in gas hot water boilers are solved, and waste heat recovery and water preheating are achieved. Achieve energy-saving effects.
Patent Information
- Application Number
- CN202411412734.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-29
AI Technical Summary
The high smoke exhaust temperature of the gas hot water boiler leads to waste of waste heat, and cold water directly enters the system during water replenishment, causing the water temperature to drop, increasing the load of the burner, and failing to effectively utilize waste heat and save energy.
Design a water replenishment preheating device for flue gas utilization of gas hot water boiler, including a modular flue assembly and a flue diameter connecting pipe. Through a combined structure of flue assembly and connecting pipe, flue gas preheating is used to replenish water to achieve waste heat Recycling and water temperature increase.
Effectively reduce the smoke exhaust temperature, realize the reuse of waste heat and preheating of water, reduce gas energy consumption, achieve energy saving effect, and the device structure is easy to assemble and repair.
Smart Images

Figure CN119042805A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of centralized heating, and in particular to a water replenishment preheating device utilizing flue gas from a gas-fired hot water boiler. Background Art
[0002] The central heating system consists of three parts: heat source, heating network and heat users. When the heat source is a gas hot water boiler, the exhaust gas temperature is usually high, resulting in a large amount of waste heat energy waste; at the same time, when the boiler needs to be replenished with water, cold water will be directly replenished into the primary system pipeline, causing a direct drop in water temperature, which will indirectly increase the burner load. Therefore, this gas hot water boiler replenishment preheating device solves the problems of both at the same time, which can achieve the effect of reducing gas energy consumption and saving energy. Summary of the invention
[0003] The purpose of the present invention is to provide a water replenishment preheating device for utilizing flue gas of a gas hot water boiler, aiming to solve the problems of reducing the exhaust gas temperature and recovering and reusing the waste heat.
[0004] In order to achieve the above object, the present invention adopts the following technical solution:
[0005] A water replenishment preheating device for utilizing flue gas of a gas-fired hot water boiler, the device comprising: a flue assembly formed by assembling a plurality of modular flues and a flue diameter-changing connecting pipe located at the end of the flue assembly;
[0006] The modular flue has a rectangular cross section and comprises a first plate, a second plate, a third plate and a fourth plate. A water pipe joint is clamped in the middle of the upper end of the first plate, and a water pipe joint is clamped in the middle of the lower end of the third plate. A hollow plate-shaped connecting part is connected between the two water pipe joints. The plate-shaped connecting part is inclined in the modular flue and is provided with a plurality of ventilation holes. When a plurality of modular flues are assembled, the water pipe joints of two adjacent modular flues are assembled.
[0007] The flue reducer connecting pipe includes a rectangular flue section and a barrel-shaped flue section, and the end of the rectangular flue section is inserted into the end of the flue assembly; the inner wall of the rectangular flue section is clamped with a curved water pipe joint, one end of the curved water pipe joint is assembled with the water pipe joint of the assembled modular flue, and the other end passes through the rectangular flue section and is assembled with the water supply pipe of the external water tank.
[0008] Preferably, a protruding plug-in is provided at one end of the modular flue, and a groove slot is provided at the other end, and the protruding plug-in and groove slot of adjacent modular flues are plugged together.
[0009] Preferably, the bottom of the rectangular flue section has a groove slot, and the groove slot of the rectangular flue section is plugged together with the groove slot of the assembled modular flue.
[0010] The advantages of the present invention are:
[0011] The water replenishment preheating device for utilizing flue gas of a gas hot water boiler provided by the present invention can effectively utilize flue waste heat to increase the water temperature in the water replenishment tank, can achieve waste heat recovery and utilization, and can also achieve the effect of energy saving in water replenishment preheating. In addition, the device can be quickly assembled and formed, and is easy to disassemble and repair. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 is a schematic structural diagram of a modular flue in an embodiment of the present invention;
[0013] Figure 2 is a front view structural schematic diagram of a modular flue in an embodiment of the present invention;
[0014] Figure 3 is a schematic diagram of a top view of a modular flue in an embodiment of the present invention;
[0015] Figure 4 It is a structural schematic diagram of a flue variable diameter connecting pipe in an embodiment of the present invention;
[0016] Figure 5 2 is a front view structural diagram of a flue variable diameter connecting pipe according to an embodiment of the present invention;
[0017] Figure 6 It is a schematic diagram of the top view of the structure of a flue variable diameter connecting pipe in an embodiment of the present invention. DETAILED DESCRIPTION
[0018] The present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0019] The present embodiment provides a water replenishment preheating device for utilizing flue gas of a gas-fired hot water boiler, the device comprising: a flue assembly formed by assembling a plurality of modular flues 10 and a flue variable diameter connecting pipe 20 located at the end of the flue assembly.
[0020] See attached Figures 1 to 3The cross section of the modular flue 10 is rectangular and has a first plate 11, a second plate 12, a third plate 13 and a fourth plate 14. The first plate 11, the second plate 12, the third plate 13 and the fourth plate 14 are respectively the four faces of the modular flue 10. The first plate 11 is parallel to the third plate 13, and the second plate 12 is parallel to the fourth plate 14. A water pipe joint 15 is clamped in the middle of the upper end of the first plate 11, and a water pipe joint 15 is clamped in the middle of the lower end of the third plate 13. The water pipe joints 15 are fixed to the inner wall of the modular flue 10 in parallel by welding clamps 16. A hollow plate-shaped connecting portion 17 is connected between the two water pipe joints 15. The plate-shaped connecting portion 17 is inclined to the inside of the modular flue 10, and the plate-shaped connecting portion 17 is provided with a plurality of ventilation holes. When a plurality of modular flues 10 are assembled, the water pipe joints 15 of two adjacent modular flues 10 are assembled. It is understandable that the plate-shaped connection part 17 is a hollow flat structure, and water can flow through the inside of the plate-shaped connection part 17 through the water pipe joint 15 and then flow out through another water pipe joint 15. The plate-shaped connection part 17 is provided with multiple ventilation holes to allow the smoke in the flue to circulate. A protruding plug-in 18 is provided at one end of the modular flue 10, and a groove slot 19 is provided at the other end. The protruding plug-in 18 and the groove slot 19 of adjacent modular flues 10 are plugged together.
[0021] See attached Figures 4 to 6 The flue reducer connecting pipe 20 includes a rectangular flue section 21 and a barrel-shaped flue section 22. The end of the rectangular flue section 21 is plugged into the end of the flue assembly. The inner wall of the rectangular flue section 21 is clamped with a curved water pipe joint 23. The curved water pipe joint 23 is fixed parallel to the inner wall of the rectangular flue section 21 by a welding clamp 16. The curved water pipe joint 23 is bent at 90 degrees. One end of the curved water pipe joint 23 is assembled with the water pipe joint 15 of the assembled modular flue 10, and the other end passes through the rectangular flue section 21 and is assembled with the water supply pipe of the external water tank. The bottom of the rectangular flue section 21 has a groove slot 19, and the groove slot 19 of the rectangular flue section 21 is plugged together with the groove slot 19 of the assembled modular flue 10.
[0022] It should be noted that the size specifications of the modular flue 10 provided in this embodiment can be specifically manufactured according to the specific boiler tonnage and the external exhaust duct, and its specific size is not limited. The number of ventilation holes provided in the plate-shaped connecting portion 17 can be divided according to the size of the specific modular flue 10, and the number of ventilation holes is not specifically limited.
[0023] The water replenishment preheating device for flue gas of the gas hot water boiler can be used for normal pressure water replenishment from top to bottom of the high-level water tank, and can also be used to connect the water replenishment pump for water replenishment operation. This design not only solves the problem of reducing the exhaust temperature, but also solves the problem of saving energy consumption for waste heat reuse, and effectively avoids the cooling caused by directly replenishing cold water into the system. The present invention adopts the building block principle, and the length can be assembled by itself according to the on-site environment. It is quick and convenient to install and can be easily disassembled during maintenance.
[0024] The above are preferred embodiments of the present invention and the technical principles used therein. For those skilled in the art, any obvious changes such as equivalent transformations, simple replacements, etc. based on the technical solution of the present invention, without departing from the spirit and scope of the present invention, are within the scope of protection of the present invention.
Claims
1. A water preheating device for utilizing flue gas from a gas hot water boiler, characterized in that: The device comprises: a flue assembly formed by assembling a plurality of modular flues and a flue diameter-changing connecting pipe located at the end of the flue assembly; The modular flue has a rectangular cross section and comprises a first plate, a second plate, a third plate and a fourth plate. A water pipe joint is clamped in the middle of the upper end of the first plate, and a water pipe joint is clamped in the middle of the lower end of the third plate. A hollow plate-shaped connecting part is connected between the two water pipe joints. The plate-shaped connecting part is inclined in the modular flue and is provided with a plurality of ventilation holes. When a plurality of modular flues are assembled, the water pipe joints of two adjacent modular flues are assembled. The flue reducer connecting pipe includes a rectangular flue section and a barrel-shaped flue section, and the end of the rectangular flue section is inserted into the end of the flue assembly; the inner wall of the rectangular flue section is clamped with a curved water pipe joint, one end of the curved water pipe joint is assembled with the water pipe joint of the assembled modular flue, and the other end passes through the rectangular flue section and is assembled with the water supply pipe of the external water tank.
2. The water replenishment preheating device for utilizing flue gas of a gas hot water boiler according to claim 1, characterized in that: One end of the modular flue is provided with a protruding plug-in, and the other end is provided with a groove slot, and the protruding plug-ins and groove slots of adjacent modular flues are plugged together.
3. The water replenishment preheating device for utilizing flue gas of a gas hot water boiler according to claim 1, characterized in that: The bottom of the rectangular flue section is provided with a groove slot, and the groove slot of the rectangular flue section is plugged together with the groove slot of the assembled modular flue.