Power distribution network planning method and device considering regional comprehensive energy multi-element interaction
By considering the distribution network planning method of regional comprehensive energy interaction in the park, optimizing the number and operating status of distribution equipment, the problem that the distribution network is difficult to adapt to changes in the energy Internet is solved, and efficient utilization of energy resources and cost reduction are achieved. .
Patent Information
- Application Number
- CN202410944435.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-29
AI Technical Summary
At this stage, the comprehensive energy system of the park lacks systematic theoretical support in the planning and operational aspects, which makes it difficult for the distribution network to adapt to changes in urban areas' energy Internet in real time, and cannot effectively utilize diversified energy interactions, which increases the pressure on grid investment.
A distribution network planning method considering regional comprehensive energy multi-interaction, and by solving the pre-constructed distribution network planning model and operation model, the number of distribution equipment, the rated capacity and operating status are optimized, and the dynamic planning of the distribution network is realized. and run optimization.
This method can support the construction of a smart energy service system, reduce the overall energy consumption cost of users, improve the level of clean and efficient energy utilization, and promote the optimal utilization of regional energy resources.
Smart Images

Figure CN119047726A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of regional energy internet optimization and planning, and in particular to a distribution network planning method and device taking into account the multi-dimensional interaction of regional comprehensive energy. Background Art
[0002] At the regional, park and community levels, integrated energy systems have become an energy supply solution that covers the efficient conversion and utilization of electricity, cold, heat and gas. However, at present, about 70% of parks still utilize energy separately, and there is still a lack of systematic theoretical support at the planning and operation levels.
[0003] The construction of urban area energy Internet utilizes a lot of renewable energy and other fossil energy. At the same time, each integrated energy system can serve as a source to supply power to the region at different times, or it can serve as a load-side power supply to the power grid. When serving as a source, it can help the power grid to absorb part of the electrical load, so it can delay the investment in the power grid to a certain extent. However, due to the plug-and-play characteristics of the integrated energy system, the distribution network structure is required to adapt to changes in the system in real time. Therefore, there is an urgent need for a power grid planning method that can adapt to changes in the urban area energy Internet at any time. Summary of the invention
[0004] In order to overcome the above-mentioned defects, the present invention proposes a distribution network planning method and device that considers the multi-dimensional interaction of regional comprehensive energy.
[0005] In a first aspect, a distribution network planning method considering the multi-interaction of regional comprehensive energy is provided, and the distribution network planning method considering the multi-interaction of regional comprehensive energy includes:
[0006] Solving a pre-built distribution network planning model to obtain a first optimization result;
[0007] Substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result;
[0008] Using the first optimization result as a distribution network planning solution and the second optimization result as a distribution network operation solution;
[0009] Among them, the first optimization result includes at least one of the following: the number of each power distribution equipment and the rated capacity of each power distribution equipment; the second optimization result includes at least one of the following: the operating status of each power distribution equipment and the output power of each power distribution equipment.
[0010] Preferably, the power distribution equipment includes at least one of the following: a distributed power source, a gas turbine, an internal combustion engine, a gas boiler, an electric heat pump, and an electric refrigerator.
[0011] Preferably, the pre-constructed distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraints.
[0012] Furthermore, the objective function is as follows:
[0013]
[0014] In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
[0015] Furthermore, the daily operating cost of the integrated energy system is as follows:
[0016] C op =C om +C pd
[0017] The total investment cost of the line within the planning period is as follows:
[0018]
[0019] In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Line is the line unit price, L Line,w is the length of line w.
[0020] Furthermore, the operation and maintenance costs of each device in the energy system are as follows:
[0021]
[0022] The pollutant emission costs of the energy system are as follows:
[0023]
[0024] In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, cei,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0025] Furthermore, the cost of energy system i selling electricity to the grid at time t is as follows:
[0026]
[0027] The cost of the power grid selling electricity to energy system i at time t is as follows:
[0028]
[0029] In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0030] Furthermore, the planning layer constraints are as follows:
[0031]
[0032] In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
[0033] Furthermore, the pre-constructed distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
[0034] Furthermore, the operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, flow constraints, and line / pipeline capacity constraints.
[0035] Furthermore, the operating conditions are constrained as follows:
[0036] S u ∈{0,1}
[0037] The output power constraints are as follows:
[0038]
[0039] The energy balance constraints are as follows:
[0040]
[0041] The energy storage device constraints are as follows:
[0042]
[0043] A s (t1) = A s (t1+T)=A s.L
[0044] The load energy supply reliability constraints are as follows:
[0045]
[0046] The power flow constraints are as follows:
[0047]
[0048] The line / pipeline capacity constraints are as follows:
[0049] δ ab,d,t +δ ba,d,t ≤x ab
[0050]
[0051] In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.L is the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ ab is the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, xab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
[0052] In a second aspect, a distribution network planning device considering the multi-element interaction of regional comprehensive energy is provided, wherein the distribution network planning device considering the multi-element interaction of regional comprehensive energy comprises:
[0053] A first analysis module is used to solve a pre-built distribution network planning model to obtain a first optimization result;
[0054] A second analysis module, used for substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result;
[0055] A third analysis module, configured to use the first optimization result as a distribution network planning solution and the second optimization result as a distribution network operation solution;
[0056] Among them, the first optimization result includes at least one of the following: the number of each power distribution equipment and the rated capacity of each power distribution equipment; the second optimization result includes at least one of the following: the operating status of each power distribution equipment and the output power of each power distribution equipment.
[0057] Preferably, the power distribution equipment includes at least one of the following: a distributed power source, a gas turbine, an internal combustion engine, a gas boiler, an electric heat pump, and an electric refrigerator.
[0058] Preferably, the pre-constructed distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraints.
[0059] Furthermore, the objective function is as follows:
[0060]
[0061] In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
[0062] Furthermore, the daily operating cost of the integrated energy system is as follows:
[0063] C op =C om +C pd
[0064] The total investment cost of the line within the planning period is as follows:
[0065]
[0066] In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Line is the line unit price, L Line,w is the length of line w.
[0067] Furthermore, the operation and maintenance costs of each device in the energy system are as follows:
[0068]
[0069] The pollutant emission costs of the energy system are as follows:
[0070]
[0071] In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, ce i,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0072] Furthermore, the cost of energy system i selling electricity to the grid at time t is as follows:
[0073]
[0074] The cost of the power grid selling electricity to energy system i at time t is as follows:
[0075]
[0076] In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0077] Furthermore, the planning layer constraints are as follows:
[0078]
[0079] In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
[0080] Furthermore, the pre-constructed distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
[0081] Furthermore, the operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, flow constraints, and line / pipeline capacity constraints.
[0082] Furthermore, the operating conditions are constrained as follows:
[0083] S u ∈{0,1}
[0084] The output power constraints are as follows:
[0085]
[0086] The energy balance constraints are as follows:
[0087]
[0088] The energy storage device constraints are as follows:
[0089]
[0090] A s (t1) = A s (t1+T)=A s.L
[0091] The load energy supply reliability constraints are as follows:
[0092]
[0093] The power flow constraints are as follows:
[0094]
[0095] The line / pipeline capacity constraints are as follows:
[0096] δ ab,d,t +δ ba,d,t ≤x ab
[0097]
[0098] In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.Lis the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ ab is the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, x ab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
[0099] In a third aspect, a computer device is provided, comprising: one or more processors;
[0100] The processor is configured to execute one or more programs;
[0101] When the one or more programs are executed by the one or more processors, the distribution network planning method considering the multi-dimensional interaction of regional comprehensive energy is implemented.
[0102] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed, the distribution network planning method considering the multi-dimensional interaction of regional comprehensive energy is implemented.
[0103] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:
[0104] The present invention provides a distribution network planning method and device that considers the multi-element interaction of regional comprehensive energy, including: solving a pre-constructed distribution network planning model to obtain a first optimization result; substituting the first optimization result into a pre-constructed distribution network operation model to obtain a second optimization result; using the first optimization result as a distribution network planning scheme, and the second optimization result as a distribution network operation scheme; wherein the first optimization result includes at least one of the following: the number of each distribution device and the rated capacity of each distribution device, and the second optimization result includes at least one of the following: the operating status of each distribution device and the output power of each distribution device. The technical solution provided by the present invention has a certain reference value for the research on the planning problem of the new distribution system, can support the construction of a smart energy service system, reduce the overall energy cost of users, promote the optimal utilization of regional energy resources, and improve the level of clean and efficient energy utilization. BRIEF DESCRIPTION OF THE DRAWINGS
[0105] Figure 1 This is a flow chart of the main steps of a distribution network planning method considering multi-element interaction of regional comprehensive energy sources according to an embodiment of the present invention;
[0106] Figure 2 is a diagram of a system coupling structure before optimization according to an embodiment of the present invention;
[0107] Figure 3 is a typical daily load curve diagram of an embodiment of the present invention;
[0108] Figure 4 is an iterative convergence curve diagram of an embodiment of the present invention;
[0109] Figure 5 It is a planning cost change curve diagram of an embodiment of the present invention. DETAILED DESCRIPTION
[0110] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0111] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0112] As disclosed in the background technology, at the regional, park and community levels, the integrated energy system has become an energy supply solution that covers the efficient conversion and utilization of multiple energies such as electricity, cold, heat and gas. However, at present, about 70% of parks still use energy separately, and there is still a lack of systematic theoretical support at the planning and operation levels.
[0113] The construction of urban area energy Internet utilizes a lot of renewable energy and other fossil energy. At the same time, each integrated energy system can serve as a source to supply power to the region at different times, or it can serve as a load-side power supply to the power grid. When serving as a source, it can help the power grid to absorb part of the electrical load, so it can delay the investment in the power grid to a certain extent. However, due to the plug-and-play characteristics of the integrated energy system, the distribution network structure is required to adapt to changes in the system in real time. Therefore, there is an urgent need for a power grid planning method that can adapt to changes in the urban area energy Internet at any time.
[0114] In order to improve the above problems, the present invention provides a distribution network planning method and device that considers the multi-dimensional interaction of regional comprehensive energy, including: solving a pre-constructed distribution network planning model to obtain a first optimization result; substituting the first optimization result into a pre-constructed distribution network operation model to obtain a second optimization result; using the first optimization result as a distribution network planning scheme, and the second optimization result as a distribution network operation scheme; wherein the first optimization result includes at least one of the following: the number of each distribution device and the rated capacity of each distribution device, and the second optimization result includes at least one of the following: the operating status of each distribution device and the output power of each distribution device. The technical solution provided by the present invention has a certain reference value for the research on the planning problem of the new distribution system, can support the construction of a smart energy service system, reduce the overall energy cost of users, promote the optimal utilization of regional energy resources, and improve the level of clean and efficient energy utilization.
[0115] The above scheme is described in detail below.
[0116] Example 1
[0117] See attached Figure 1 , Figure 1 FIG. 1 is a flow chart of the main steps of a distribution network planning method considering the multi-element interaction of regional comprehensive energy sources according to an embodiment of the present invention. Figure 1 As shown, the distribution network planning method considering the multi-element interaction of regional comprehensive energy in the embodiment of the present invention mainly includes the following steps:
[0118] Step S101: solving a pre-built distribution network planning model to obtain a first optimization result;
[0119] Step S102: Substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result;
[0120] Step S103: using the first optimization result as a distribution network planning solution, and using the second optimization result as a distribution network operation solution;
[0121] The first optimization result includes at least one of the following: the number of each power distribution device and the rated capacity of each power distribution device, and the second optimization result includes at least one of the following: the operating status of each power distribution device and the output power of each power distribution device. The power distribution device includes at least one of the following: distributed power source, gas turbine, internal combustion engine, gas boiler, electric heat pump, electric refrigerator.
[0122] The power grid structure planning model established by the present invention is a two-stage planning model. In the first stage, based on the traditional distribution network expansion planning, combined with the operating characteristics of the urban area energy Internet system, a two-stage distribution network expansion planning model that considers the dynamic operation of the grid structure is established. In the process of optimizing the distribution network planning scheme, the operating results of the planning scheme under the dynamic operation of the grid structure are converted into a part of its optimization fitness function, thereby improving the planning scheme. The planning scheme generated in the first stage is passed to the operating layer model of the second stage as its initial parameters. The second stage model is based on the first stage planning decision-making scheme, simulates a variety of actual operating scenarios of energy output and load fluctuations, and considers the operating results under distribution network control means such as grid dynamic operation, and returns its quantified economic data to the upper layer as part of the fitness calculation of the scheme to improve the selection of the optimal scheme.
[0123] The planning process is divided into main problem and sub-problem modules for iterative optimization. The optimization of the main problem is to optimize the grid structure of the urban regional energy Internet. According to the predicted values of electricity, heat / cold, and gas loads in the planning area and the multi-energy flow energy supply network of heat, cold, and gas networks, the supporting distribution network is expanded. After obtaining the structural optimization scheme of the system, the operation verification of the system is carried out. First, it is necessary to verify whether the topology of the multi-energy flow distribution network meets the structural constraints. The distribution network needs to maintain a radial structure. Secondly, considering the operation constraints such as the system's mixed power flow, verify whether the multi-energy flow system of the planning scheme can operate normally. Then, according to the optimal power flow of the multi-energy flow system, the operating cost of the multi-energy flow power flow is calculated. Because the optimal power flow of multi-energy flow in the energy consumption link is easily affected by the price-type demand-side response, users may change their energy consumption strategies according to the price of energy, affecting the power flow of the multi-energy flow system. Therefore, when calculating the operating cost of the planning scheme, the price-type demand-side response of users is considered, different typical operation modes of the system are set, and the operating costs are calculated separately to ensure that the operating cost of energy transmission is within the feasible range.
[0124] Specifically, the pre-built distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraint conditions.
[0125] In one embodiment, since the transformation area is mainly an upgrade of the original power grid structure, the present invention is mainly aimed at newly built areas, which require new wiring and the power grid structure needs to be replanned. The objective function is as follows:
[0126]
[0127] In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
[0128] In one embodiment, the daily operating cost of the integrated energy system is as follows:
[0129] C op =C om +C pd
[0130] The total investment cost of the line within the planning period is as follows:
[0131]
[0132] In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Line is the line unit price, L Line,w is the length of line w.
[0133] In one embodiment, the operation and maintenance costs of each device in the energy system are as follows:
[0134]
[0135] The pollutant emission costs of the energy system are as follows:
[0136]
[0137] In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, ce i,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0138] In one embodiment, the cost of energy system i selling electricity to the grid at time t is as follows:
[0139]
[0140] The cost of the power grid selling electricity to energy system i at time t is as follows:
[0141]
[0142] In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0143] In one embodiment, the planning layer constraints are as follows:
[0144]
[0145] In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
[0146] In one embodiment, the pre-constructed distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
[0147] In one embodiment, the operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, power flow constraints, and line / pipeline capacity constraints.
[0148] In one embodiment, the operating condition constraints are as follows:
[0149] S u ∈{0,1}
[0150] The output power constraints are as follows:
[0151]
[0152] The energy balance constraints are as follows:
[0153]
[0154] The energy storage device constraints are as follows:
[0155]
[0156] A s (t1) = A s (t1+T)=A s.L
[0157] The load energy supply reliability constraints are as follows:
[0158]
[0159] The power flow constraints are as follows:
[0160]
[0161] The line / pipeline capacity constraints are as follows:
[0162] δ ab,d,t +δ ba,d,t ≤x ab
[0163]
[0164] In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.L is the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ abis the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, x ab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
[0165] In a specific implementation, a dynamic central island particle swarm algorithm based on similarity is used in the planning stage to optimize the location where the integrated energy system is connected to the power grid. The specific algorithm flow is as follows:
[0166] (1) The position of the energy system randomly generates n particle positions and their initial velocities, which are taken in this study;
[0167] (2) Calculate the fitness value of each particle;
[0168] (3) Find the individual optimal position and global optimal position of each particle;
[0169] (4) Calculate the similarity s between particle i and the optimal particle j ij , the calculation formula is as follows:
[0170]
[0171] Where: d ij Using Euclidean distance calculation, the more similar it is to the optimal particle, the greater its similarity.
[0172] (5) Arrange the similarities in descending order, and divide the entire group into m subgroups on average. In this example, m = 10. The group where the optimal particle is located is the central island group, and the rest are subgroups;
[0173] (6) Each subgroup updates its position and velocity according to the following formula:
[0174] V i,t+1 =ωV i,t +c1r1(Pbest i,t -X i,t )+c2r2(Gbest m,t -X i,t )
[0175] X i,t+1 =X i,t +V i,t+1
[0176] Where: V i,t 、V i,t+1 are the velocities of particle i at the current moment and the next moment respectively; Pbest i,t is the individual optimal position of particle i; Gbest m,t is the global optimal position of the particle group; X i,t , X i,t+1 are the positions of particle i at the current moment and the next moment respectively; ω is the inertia weight; c1 and c2 are learning factors respectively; r1 and r2 are random numbers uniformly distributed in the interval [0,1].
[0177] (7) After every 20 iterations, the sub-group transmits the global optimal value to the central island group, and the central island updates the global optimal value. The calculation step jumps to (4) and re-updates the central island and sub-group;
[0178] (8) When a certain number of iterations or calculation accuracy is reached, the algorithm terminates and outputs the global optimal value.
[0179] The ant colony algorithm is used for power grid wiring. The optimization process of the ant colony algorithm mainly includes three processes: selection, update and coordination. The entire optimization process will be divided into a rough search process and a fine search process, and different types of ants are set for each process. In the rough search process, the multi-constraint function of the problem to be solved is first converted into a unified objective function through the least squares method and the penalty function method. It can also be processed by a specific subroutine during the ant colony operation process to determine whether the candidate solution meets the constraint conditions. For the standard objective function, the independent variables of the problem to be solved are divided into different equal small units according to different objectives. In particular, for variables with integer values when the final variable value is required in the design, this type of variable is divided into equal integer units so that the optimization result can be directly used without subsequent secondary rounding. This process greatly reduces the search space and improves the search efficiency. The entire rough search is to complete the ants to complete a certain value of all independent variables to form a feasible solution or perform unit refinement, form an initial group with a feasible solution, perform crossover and mutation operations according to a certain probability, and use another type of ants to execute the ant colony algorithm to finally find the global optimal solution of the multivariable optimization problem.
[0180] First, divide the solution space of the function into n small intervals (called regions), and then randomly place m ants on these regions. The ants will search for the optimal solution according to the following rules: In one cycle, first calculate the transfer probability of each ant to each region. If the corresponding transfer conditions are met (that is, the target function value of the new position searched is greater than the target function value of the current ant position), the ant will transfer according to certain rules. If not, the ant will traverse the search in the region. Before the start of a new cycle, update the pheromone of each region. On this basis, calculate the transfer probability of each ant again, and conduct a new round of search according to similar transfer rules.
[0181] The specific process is as follows:
[0182] (1) Set the number of iteration steps or search steps n c = 0, pheromone τ ij and Δτ ij Initialization, place m ants on n vertices;
[0183] (2) Place the initial starting point of each ant in the current solution set, and for each ant k (k = 1, ..., m), Move to the next vertex j and place vertex j in the current solution set.
[0184] (3) Calculate the objective function value Z of each ant k , record the current optimal solution.
[0185] (4) modifying the trajectory intensity according to the update equation;
[0186] (5) For each edge arc (i, j), set Δτ ij =0,n c =n c +1;
[0187] (6) If n c If it is less than the predetermined number of iterations, go to step (2).
[0188] The algorithm performs optimization search globally under the guidance of human prior knowledge and heuristic information, and adopts a convenience search strategy locally.
[0189] Considering the grid planning of a 30-node distribution network, there are 3 small thermal power generating units FG, 2 combined heat and power units CHP, and 1 combined cooling, heating and power unit CCHP in the power grid. There are transportation hub nodes on the load nodes, including the power loads of subways and electric vehicle charging piles. In addition, there are electric heating units to supply power to the heat network.
[0190] (1) Grid structure
[0191] The system coupling structure before optimization is as follows Figure 2As shown, it is stipulated that each type of equipment has only one connection line, where ES is energy storage, PV is photovoltaic unit, and WP is wind turbine unit.
[0192] The node types of the distribution network are shown in Table 1. In the table, type 0 represents a thermal power generating unit, type 1 represents a CHP unit, type 2 represents a CCHP unit, type 3 represents a common node load, type 4 represents a contact node, type 5 represents a transportation hub node, type 6 represents an energy storage device node, and type 7 represents a renewable energy photovoltaic wind turbine node.
[0193] Table 1
[0194] node type node type 1 0 16 3 2 0 17 3 3 3 18 3 4 3 19 3 5 0 20 3 6 6,7 21 3 7 4 22 3 8 1 23 3 9 3 24 3 10 5 25 3 11 1 26 3 12 3 27 6,7 13 2 28 1 14 5 29 3 15 2 30 2
[0195] The specific parameters are as follows:
[0196] (2) System equipment parameters
[0197] The optional information of the coupling nodes of various equipment before system optimization is shown in Table 2. The coupling equipment selected in this embodiment includes 3 gas turbines GT, 3 small thermal power generators FG, 1 gas boiler GB, and 1 electric heat pump unit EB. The technical parameters and economic parameters of various equipment are shown in Table 3, including the conversion type, conversion efficiency, unit configuration cost, unit operation and maintenance cost of the equipment, and the life of each equipment. In addition, the distribution line parameters are shown in Table 4.
[0198] Table 2
[0199] element Grid Node Gas network node Heating network node CHP1 8,29 1,5 1,15 CHP2 11,17 10,12 2,19 CHP3 13,18 4 3,20 FG1 1 —— —— FG2 2 —— —— FG3 5 —— —— PV 6 —— ——
[0200] Table 3
[0201]
[0202] Table 4
[0203]
[0204] (3) Typical daily load of urban regional energy internet
[0205] like Figure 3 The figure shows the multi-energy load of a typical day in the system. From the electric load curve, it can be seen that the electric load has obvious peak-valley characteristics. The load peaks at 9:00-13:00 and 19:00-21:00, and the electric load is at its low point at 00:00-7:00. From the gas load curve, it can be seen that the gas load also has obvious peak-valley characteristics. The load peaks at 9:00-12:00 during the day, and the load decreases at different times in other periods. From the heat load curve, it can be seen that the heat load is relatively flat throughout the day, without obvious fluctuations and peaks and valleys, and the demand is lower than that of the electric load and gas load.
[0206] (4) System energy price
[0207] Since electricity is difficult to store and needs to be used immediately upon generation, there is a time-of-use electricity price in the market. Due to the inertia of gas load and heat load, gas and heat energy are easier to store and do not need to be used immediately upon generation. Therefore, gas and heat prices in the current energy market are rarely time-of-use prices, but generally fixed prices. This project selects fixed gas and heat prices, which are 3.5 yuan / m 3 and 0.5 yuan / kW.
[0208] Now make the following assumptions:
[0209] (1) The load level and installed capacity of distributed generation in the region are increasing year by year, and the existing distribution network will soon be unable to withstand this growth trend;
[0210] (2) It is expected that the region’s electricity / heat / gas load will grow by 3% in the next 10 years, the penetration rate of distributed power sources will grow by 5%, and the number of electric vehicles will grow by 5%. It is now planned to build a new distribution network in the region to accommodate this growth.
[0211] The calculation is carried out by the method proposed in this embodiment, and the optimization results are as follows:
[0212] (1) Algorithm convergence analysis
[0213] The two-layer optimization configuration model of the urban regional energy Internet proposed in this embodiment adopts the particle swarm algorithm to solve the upper capacity configuration layer, and the lower layer uses the solver to optimize the operation and solve. The upper layer objective function contains the lower layer objective function, so the upper and lower layers are solved iteratively and interactively. In order to make the results clear and facilitate the observation of the changes in the upper and lower layer objective functions during the particle swarm solution process, the optimal objective function value of each iteration is compared with the optimal objective value at the end of the iteration, that is, in the end, the upper and lower layer objective functions converge to a ratio of 1, so that the upper and lower layer objective functions with orders of magnitude differences can be displayed in the same figure.
[0214] from Figure 4 It can be seen that the objective functions of the upper and lower layers fluctuate frequently, with multiple large drop points. The final capacity configuration cost reaches the optimal convergence value after the 189th iteration, and the operation optimization cost reaches the optimal convergence value after the 157th iteration. Since the capacity configuration layer is the upper layer, the equipment capacity selection range is relatively scattered. Within the scattered equipment capacity range, the operation optimization layer has a unique optimal solution that can correspond to a variety of different equipment capacity combinations. Therefore, the convergence speed of the capacity configuration layer is slower than that of the operation optimization layer.
[0215] (2) Optimization results analysis
[0216] Through simulation, the convergence of the objective function is as follows Figure 5The distribution line planning results are shown in Table 5.
[0217] It is not difficult to find that the embedded planning model converges quickly and obtains the optimal solution in the 11th generation. This is due to the fact that the model effectively stratifies the comprehensive energy dispatch and distribution network investment decision-making process, greatly reducing the dimension of the single-layer independent variable. It can be seen that this planning idea can effectively give play to the advantages of mathematical algorithms and artificial intelligence algorithms, and can better decompose the linear and nonlinear parts of the model, so as to effectively solve more complex planning models.
[0218] Table 5
[0219]
[0220] After optimization, the optimized connection structure of the system can be obtained, and the connection status of the coupling equipment is shown in Table 6. In the transmission network, 7 is the contact node of the transmission network; in the heat transmission network, 4 nodes are the heat purchase nodes of the heat transmission network.
[0221] Table 6
[0222] element Grid Node Gas network node Heating network node CHP1 8 7 1 CHP2 11 11 2 CHP3 13 14 3 FG1 1 —— —— FG2 2 —— —— FG3 5 —— —— ES1 6 —— —— ES2 27 —— ——
[0223] 1) Utilization rate of renewable energy
[0224] It can be seen from Table 7 that before optimization, the utilization rate of renewable energy was only 81.4%, and 18.6% of renewable energy was abandoned; after optimization, the utilization rate of renewable energy reached 94.3%, and the abandoned renewable energy was reduced by 12.9%.
[0225] Table 7
[0226] Calculate indicator value Before optimization After optimization Renewable energy utilization rate (%) 81.4 94.3 Renewable energy use abandoned (%) 18.6 5.7
[0227] 2) System energy efficiency
[0228] Since the energy efficiency of power-consuming equipment is high, and the energy conversion efficiency of heat-consuming and gas-consuming equipment is low, the energy utilization rate of the system before optimization is 75.37%, and the energy utilization rate of the system after optimization is 87.06%. It can be seen that the urban regional energy Internet can improve energy utilization efficiency through multi-energy complementarity.
[0229] Example 2
[0230] Based on the same inventive concept, the present invention also provides a distribution network planning device considering the multi-element interaction of regional comprehensive energy, and the distribution network planning device considering the multi-element interaction of regional comprehensive energy includes:
[0231] A first analysis module is used to solve a pre-built distribution network planning model to obtain a first optimization result;
[0232] A second analysis module, used for substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result;
[0233] A third analysis module, configured to use the first optimization result as a distribution network planning solution and the second optimization result as a distribution network operation solution;
[0234] Among them, the first optimization result includes at least one of the following: the number of each power distribution equipment and the rated capacity of each power distribution equipment; the second optimization result includes at least one of the following: the operating status of each power distribution equipment and the output power of each power distribution equipment.
[0235] Preferably, the power distribution equipment includes at least one of the following: a distributed power source, a gas turbine, an internal combustion engine, a gas boiler, an electric heat pump, and an electric refrigerator.
[0236] Preferably, the pre-constructed distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraints.
[0237] Furthermore, the objective function is as follows:
[0238]
[0239] In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
[0240] Furthermore, the daily operating cost of the integrated energy system is as follows:
[0241] C op =C om +C pd
[0242] The total investment cost of the line within the planning period is as follows:
[0243]
[0244] In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Lineis the line unit price, L Line,w is the length of line w.
[0245] Furthermore, the operation and maintenance costs of each device in the energy system are as follows:
[0246]
[0247] The pollutant emission costs of the energy system are as follows:
[0248]
[0249] In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, ce i,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0250] Furthermore, the cost of energy system i selling electricity to the grid at time t is as follows:
[0251]
[0252] The cost of the power grid selling electricity to energy system i at time t is as follows:
[0253]
[0254] In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
[0255] Furthermore, the planning layer constraints are as follows:
[0256]
[0257] In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
[0258] Furthermore, the pre-constructed distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
[0259] Furthermore, the operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, flow constraints, and line / pipeline capacity constraints.
[0260] Furthermore, the operating conditions are constrained as follows:
[0261] S u ∈{0,1}
[0262] The output power constraints are as follows:
[0263]
[0264] The energy balance constraints are as follows:
[0265]
[0266] The energy storage device constraints are as follows:
[0267]
[0268] A s (t1) = A s (t1+T)=A s.L
[0269] The load energy supply reliability constraints are as follows:
[0270]
[0271] The power flow constraints are as follows:
[0272]
[0273] The line / pipeline capacity constraints are as follows:
[0274] δ ab,d,t +δ ba,d,t ≤x ab
[0275]
[0276] In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.L is the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ ab is the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, x ab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
[0277] Example 3
[0278] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function, so as to implement the steps of a distribution network planning method considering the multi-interaction of regional comprehensive energy in the above embodiment.
[0279] Example 4
[0280] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in a computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by a processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of a distribution network planning method considering the multi-dimensional interaction of regional comprehensive energy in the above embodiment.
[0281] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0282] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0283] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0284] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0285] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A distribution network planning method considering the multi-element interaction of regional comprehensive energy, characterized in that: The method comprises: Solving a pre-built distribution network planning model to obtain a first optimization result; Substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result; Using the first optimization result as a distribution network planning solution and the second optimization result as a distribution network operation solution; Among them, the first optimization result includes at least one of the following: the number of each power distribution equipment and the rated capacity of each power distribution equipment, and the second optimization result includes at least one of the following: the operating status of each power distribution equipment and the output power of each power distribution equipment.
2. The method according to claim 1, characterized in that The power distribution equipment includes at least one of the following: a distributed power source, a gas turbine, an internal combustion engine, a gas boiler, an electric heat pump, and an electric refrigerator.
3. The method according to claim 1, characterized in that The pre-built distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraints.
4. The method according to claim 3, characterized in that The objective function is as follows: In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
5. The method according to claim 4, characterized in that The daily operating cost of the comprehensive energy system is as follows: C op =C om +C pd The total investment cost of the line within the planning period is as follows: In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Line is the line unit price, L Line,w is the length of line w.
6. The method according to claim 5, characterized in that The operation and maintenance costs of each device in the energy system are as follows: The pollutant emission costs of the energy system are as follows: In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, ce i,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
7. The method according to claim 4, characterized in that The cost of energy system i selling electricity to the grid at time t is as follows: The cost of the power grid selling electricity to energy system i at time t is as follows: In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
8. The method according to claim 4, characterized in that The planning layer constraints are as follows: In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
9. The method according to claim 4, characterized in that The pre-built distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
10. The method according to claim 9, characterized in that The operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, flow constraints, and line / pipeline capacity constraints.
11. The method according to claim 10, characterized in that The operating conditions are as follows: S u ∈{0,1} The output power constraints are as follows: The energy balance constraints are as follows: The energy storage device constraints are as follows: From s (t1)=A s (t1+T)=A s.L The load energy supply reliability constraints are as follows: The power flow constraints are as follows: The line / pipeline capacity constraints are as follows: d ab,d,t +d ba,d,t ≤x ab In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.L is the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ ab is the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, x ab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
12. A distribution network planning device considering the multi-element interaction of regional comprehensive energy, characterized in that: The device comprises: A first analysis module is used to solve a pre-built distribution network planning model to obtain a first optimization result; A second analysis module, used for substituting the first optimization result into a pre-built distribution network operation model to obtain a second optimization result; A third analysis module, configured to use the first optimization result as a distribution network planning solution and the second optimization result as a distribution network operation solution; Among them, the first optimization result includes at least one of the following: the number of each power distribution equipment and the rated capacity of each power distribution equipment, and the second optimization result includes at least one of the following: the operating status of each power distribution equipment and the output power of each power distribution equipment.
13. The device according to claim 12, characterized in that The power distribution equipment includes at least one of the following: a distributed power source, a gas turbine, an internal combustion engine, a gas boiler, an electric heat pump, and an electric refrigerator.
14. The device according to claim 12, characterized in that The pre-built distribution network planning model includes: an objective function with the goal of minimizing economic cost and its corresponding planning layer constraints.
15. The device according to claim 14, characterized in that The objective function is as follows: In the above formula, C is the objective function value, α is the annual equal investment conversion coefficient, n is the number of energy systems in the distribution network, and C inv is the total investment cost of the line within the planning period, is the cost of energy system i selling electricity to the grid at time t, is the cost of the power grid selling electricity to energy system i at time t, C op is the daily operating cost of the comprehensive energy system, t is the current time, t n is the unit time interval, and y is the planning period.
16. The device according to claim 15, characterized in that The daily operating cost of the comprehensive energy system is as follows: C op =C om +C pd The total investment cost of the line within the planning period is as follows: In the above formula, C om is the operation and maintenance cost of each equipment in the energy system, C pd is the pollutant emission cost of the energy system, W is the total number of modified or newly built lines, and p Line is the line unit price, L Line,w is the length of line w.
17. The device according to claim 16, characterized in that The operation and maintenance costs of each device in the energy system are as follows: The pollutant emission costs of the energy system are as follows: In the above formula, N p,i is the total number of distribution equipment in energy system i, is the operation and maintenance cost per unit capacity of distribution equipment j in energy system i at time t, is the equipment capacity of distribution equipment j in energy system i at time t, ce i,t is the carbon emission coefficient of electricity conversion of energy system i at time t, Ee i,t is the online power of energy system i at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, ch i,t is the heat-to-carbon emission coefficient of energy system i at time t, SEh i,t is the heat purchased by energy system i at time t, cg i,t is the gas-to-carbon emission coefficient of energy system i at time t, SV i,t is the gas purchase volume of energy system i at time t.
18. The device according to claim 15, characterized in that The cost of energy system i selling electricity to the grid at time t is as follows: The cost of the power grid selling electricity to energy system i at time t is as follows: In the above formula, p e,t is the on-grid electricity price of the energy system at time t, Ee i,t is the online power of energy system i at time t, sp e,t is the electricity purchase price of the energy system at time t, SEe i,t is the amount of electricity purchased by energy system i at time t, sp h,t is the heat purchase price of the energy system at time t, SEh i,t is the heat purchased by energy system i at time t, sp g,t is the gas purchase price of the energy system at time t, SV i,t is the gas purchase volume of energy system i at time t.
19. The device according to claim 15, characterized in that The planning layer constraints are as follows: In the above formula, N u is the number of the u-th type of power distribution equipment, N u,max is the maximum number of u-th type distribution equipment, is the minimum rated capacity of the u-th type distribution equipment, is the rated capacity of the u-type distribution equipment, It is the maximum rated capacity of the u-th category distribution equipment.
20. The device according to claim 15, characterized in that The pre-built distribution network operation model includes: an objective function with the goal of minimizing economic cost and its corresponding operation layer constraints.
21. The device according to claim 20, characterized in that The operating layer constraints include: operating condition constraints, output power constraints, energy balance constraints, energy storage equipment constraints, load energy supply reliability constraints, flow constraints, and line / pipeline capacity constraints.
22. The device according to claim 21, characterized in that The operating conditions are as follows: S u ∈{0,1} The output power constraints are as follows: The energy balance constraints are as follows: The energy storage device constraints are as follows: From s (t1)=A s (t1+T)=A s.L The load energy supply reliability constraints are as follows: The power flow constraints are as follows: The line / pipeline capacity constraints are as follows: d ab,d,t +d ba,d,t ≤x ab In the above formula, S u is the operating status of the u-type power distribution equipment, is the minimum output power of the power distribution equipment n, P n,t is the output power of power distribution equipment n at time t, P n max is the maximum output power of power distribution equipment n, I is the total number of power distribution equipment, is the output power of the power distribution equipment n, is the input power of the power distribution equipment n, For the user's electrical load demand, is the output thermal power of the power distribution equipment n, is the input thermal power of the power distribution equipment n, For the user's heat load demand, is the output cooling power of the power distribution equipment n, is the input cooling power of the power distribution equipment n, For the user's cooling load demand, is the charging power of the energy storage device at time t, is the energy release power of the energy storage device at time t, is the maximum charging power of the energy storage device, is the maximum energy discharging power of the energy storage device, X is the charging state of the energy storage device, and its value range is 0 or 1, Y is the discharging state of the energy storage device, and its value range is 0 or 1, t1 is the starting time of the current working cycle, and A s (t1) is the storage capacity of the energy storage device at time t1, A s (t1+T) is the storage capacity of the energy storage device at time t1+T, A s.L is the amount of energy stored at the end of the operation cycle, T is the working cycle, I elec,B ,I hot,B ,I cold,B are the number of electric energy storage, thermal energy storage, and cold energy storage devices in energy system i, respectively. elec,DG ,I hot,G ,I cold,G are the number of distributed power sources, thermal equipment, and cooling equipment of energy system i, are the electrical load, thermal load, and cooling load of energy system i at time t, are the power generated by the electric energy storage, thermal energy storage, and cold energy storage equipment of energy system i at time t, are the power generated by the distributed power source, thermal equipment, and cooling equipment of energy system i at time t, P Ga , Q Ga is the active and reactive power of distribution network node a, P La , Q La is the active and reactive load of the distribution network node a, V a 、V b is the voltage of the distribution network nodes a and b, G ab , B ab ,θ ab is the conductance, susceptance and voltage phase angle difference between distribution network nodes a and b, A is the total number of distribution network nodes, δ ab,d,t is the operating variable of the power flow from a to b of the electric line / heat pipe / cold pipe, δ ba,d,t is the operating variable of the power flow from b to a of the electric line / heat pipe / cold pipe, x ab For the 0-1 programming variable between distribution network nodes a and b, f ab,d,t is the electrical / heating / cooling power flowing from a to b at time t, is the maximum capacity of the electric line / heat pipe / cold pipe between distribution network nodes a and b.
23. A computer device, characterized in that: include: one or more processors; The processor is configured to execute one or more programs; When the one or more programs are executed by the one or more processors, the distribution network planning method considering the multi-dimensional interaction of regional comprehensive energy as described in any one of claims 1 to 11 is implemented.
24. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, it implements the distribution network planning method considering the multi-dimensional interaction of regional comprehensive energy as described in any one of claims 1 to 11.