Load center power grid reconstruction method based on flexible direct current
By combining de-loop technology and MMC-HVDC, the regional division and connection of the load center power grid is optimized, and the problems of large short-circuit current and large power outage risks in the load center power grid are solved, achieving safe and stable operation and efficient utilization of the power grid.
Patent Information
- Application Number
- CN202410984334.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-29
AI Technical Summary
There are problems such as large short-circuit current, uncontrollable current, and complex control measures in the load center power grid. Although the existing loop de-loop technology can reduce the short-circuit current, it increases the risk of large power outages. It is at the expense of the power grid utilization rate and fails to effectively guarantee the load center. The safe and stable operation of the power grid.
Combining the de-ring technology with MMC-HVDC, by dividing the grid area and calculating the margin of each index, if the requirements are not met, decoupling or increasing the connection of MMC-HVDC, optimize the short-circuit current, thermal stability margin and power outage risks, and ensure power generation static stability of the machine.
Effectively reduce short-circuit current, eliminate line overload, reduce the risk of large power outages, ensure the safe and stable operation of the load center power grid, and improve the utilization rate of the power grid.
Smart Images

Figure CN119050986A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a load center power grid reconstruction method based on flexible direct current, belonging to the technical field of power systems. Background Art
[0002] At present, the receiving-end central power grid is connected to a large number of loads, and there are generally problems such as large short-circuit current, uncontrollable power flow, and complex control measures. In order to solve these problems, the widely used solution is to decouple the network, which can effectively reduce the short-circuit current and avoid unwanted load transfer. However, the decoupling technology will increase the risk of major power outages. Therefore, the decoupling technology is only applicable to networks with strong high voltage levels in the load center power grid. The operating boundary of the receiving-end power grid can also be guaranteed to be stable by constraints, but this method achieves stability requirements at the expense of power grid utilization, because the load rate of the high-voltage line usually needs to leave a large margin to prevent the low-voltage line from overloading. Therefore, there is currently no better way to ensure the safe and stable operation of the load center power grid. Summary of the invention
[0003] In order to solve the problems existing in the prior art, the present invention provides a method for reconstructing a receiving-end load center power grid by combining a de-ring technology with MMC-HVDC.
[0004] In order to achieve the above object, the technical solution proposed in the present invention is: a load center power grid reconstruction method based on flexible direct current, characterized in that it includes the following steps:
[0005] Step 1: Divide the load center power grid into several areas and determine the transmission lines and connecting buses between the areas;
[0006] Step 2: Calculate the short-circuit current margin index of each connected busbar and the thermal stability margin index of each transmission line;
[0007] Step 3: If the short-circuit current margin index of a certain connected bus does not meet the requirements, the area to which the connected bus belongs is decoupled from other areas; if the thermal stability margin of the transmission line between the two areas does not meet the requirements, the two areas are decoupled;
[0008] Step 4: Calculate the static stability margin index of each generator in the power grid and the power outage risk index of each area, and check whether the static stability and power outage risk meet the requirements.
[0009] Step 5: If the power outage risk of a certain area does not meet the requirements, add MMC-HVDC to connect the area with other areas;
[0010] If the static stability margin of the decoupled generator does not meet the requirements, MMC-HVDC is added to send the generator output to the load center.
[0011] The margin index of the short-circuit current of the connecting busbar in step 2 is:
[0012]
[0013] Where: I short is the short-circuit current value of a certain bus, I bmax is the maximum allowable short-circuit current value of the bus, K sh It is the short-circuit current margin indicator.
[0014] The thermal stability margin index of the transmission line in step 2 is:
[0015]
[0016] Among them, P load is the maximum load after any N-1 faults occur on the transmission line, P max is the thermal stability limit load of the line, K th It is the thermal stability margin indicator.
[0017] The static stability margin index of the generator in step 4 is:
[0018]
[0019] Among them, P gmax The output limit of the generator to maintain static stability is usually taken as the value under the condition of generator output channel N-1. g is the output of the generator under normal conditions, K st It is the static stability margin indicator.
[0020] The indicator of power outage risk in step 4 is:
[0021] K bl =P Lmax
[0022] Among them, P Lmax is the maximum load shedding capacity under various N-2 conditions, K bl It is an indicator of the risk of a major power outage.
[0023] In step 5, if the power outage risk in a certain area does not meet the requirements, the added MMC-HVDC will preferentially connect the area with other areas with the strongest power balancing capabilities.
[0024] In step 5, if the static stability margin of the generator after decoupling does not meet the requirement, the capacity of the MMC-HVDC is increased so that the static stability margin of the generator meets the requirement.
[0025] The beneficial effects of the present invention are:
[0026] The load center power grid reconstruction method based on flexible direct current in the present invention combines the advantages of loop decoupling technology and MMC-HVDC, can effectively reduce short-circuit current, eliminate line overload, and reduce the risk of major power outages. It can provide a reference for the planning and operation of the receiving-end power grid and ensure the safe and stable operation of the load center power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is the structural diagram of the two-terminal MMC-HVDC single-pole system.
[0028] Figure 2 The flowchart of the load center power grid reconstruction method is shown in FIG.
[0029] Figure 3 Full wiring diagram for testing the power grid.
[0030] Figure 4 This is the wiring diagram after the loop is decoupled.
[0031] Figure 5 This is the wiring diagram for the final reconstruction solution. DETAILED DESCRIPTION
[0032] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0033] Example
[0034] The load center grid reconstruction method based on flexible DC in this embodiment combines the de-looping technology with MMC-HVDC;
[0035] First, the evaluation indicators of load center power grid operation characteristics are defined.
[0036] In load center power grids, common stability issues include large short-circuit current, line overload, low generator static stability margin, and risk of blackouts. The corresponding evaluation indicators are given below.
[0037] a. Busbar short-circuit current margin;
[0038] As the capacity of the power system increases, the short-circuit current will increase. Excessive short-circuit current will seriously threaten the safe operation of the power system. The evaluation index of a busbar short-circuit current is shown in formula (1).
[0039]
[0040] Where: I short is the short-circuit current value of a certain bus, I bmax is the maximum allowable short-circuit current value of the bus, K sh It is the short-circuit current margin indicator. K sh Should be greater than zero, and the larger the better.
[0041] b. Thermal stability margin index of transmission lines;
[0042] In the load center power grid, the load of the high-voltage tripped line will be transferred to the low-voltage line, which may cause overload of the low-voltage line.
[0043] The thermal stability margin index is shown in formula (2).
[0044]
[0045] Among them, P load is the maximum load after any N-1 faults occur on the line, P max is the thermal stability limit load of the line, K th It is the thermal stability margin index. K th Should be greater than zero, and the larger the better.
[0046] c. Generator static stability margin index;
[0047] In the load center power grid, the generator may be connected to the main grid in a weak connection state. The generator outgoing line channel N-1 failure may cause the generator to reach the static stability limit. The generator static stability margin index is shown in formula (3).
[0048]
[0049] Among them, P gmax The output limit of the generator to maintain static stability is usually taken as the value under the condition of generator output channel N-1. g is the output of the generator under normal conditions, K st K is the static stability margin index. st Should be greater than zero, and the larger the better.
[0050] d. Power outage risk index;
[0051] There are many ways to assess the risk of a blackout. Here we choose China's safety and stability criterion, that is, the load should not be cut after an N-1 fault, and the load can be cut after an N-2 fault. Here, we use the maximum load shedding under the N-2 condition as an indicator of the risk of a blackout.
[0052] K bl =P Lmax (t)
[0053] Among them, P Lmax is the maximum load shedding capacity under various N-2 conditions, K bl K is the power outage risk indicator. bl Always greater than zero, and the smaller the better.
[0054] This embodiment analyzes the impact of MMC-HVDC on the load center power grid.
[0055] Power electronic devices such as fault current limiter (FCL), unified power flow controller (UPFC) and modular multilevel converter (MMC)-HVDC based on modular multilevel converter (MMC) are applied in power grids. MMC-based flexible DC transmission technology has strong advantages in operation performance, mainly in terms of no commutation failure and reactive power compensation problems, power supply for passive systems, simultaneous regulation of active power and reactive power, long-distance large-capacity transmission, and asynchronous networking. MMC-HVDC can also be used for the reconstruction of the receiving-end power grid to improve the operation characteristics of the load center power grid.
[0056] The structure of the two-terminal MMC-HVDC single-pole system is as follows Figure 1 As shown. MMC can independently adjust active power and reactive power at the same time, so that MMC-HVDC can flexibly adjust the size and direction of power transmission. Before applying MMC-HVDC to the load center power grid, the impact of MMC-HVDC on the load center power grid is analyzed.
[0057] a. Impact on short-circuit current. The main reason for the excessive short-circuit current is that the short-circuit current provided by the synchronous generator is much greater than the normal operating current, while the short-circuit current provided by the MMC-HVDC is the same as the normal operating current. The short-circuit current provided by the MMC-HVDC is much smaller than that of the synchronous generator. Therefore, using MMC-HVDC to replace the AC line can effectively reduce the short-circuit current.
[0058] b. Impact on line overload. In the load center power grid, after the high-voltage line trips, the low-voltage line is prone to overload. The transmission power of MMC-HVDC is controlled at a reference value, and the transmission power will not change after other lines trip. Therefore, using MMC-HVDC to replace the original overloaded line can solve the overload problem.
[0059] c. Impact on the static stability of the generator: MMC-HVDC can share the transmission power of the generator AC outgoing line channel, which can improve the static stability without increasing the short-circuit current.
[0060] d. Generally speaking, de-circuiting technology can reduce short-circuit current and eliminate line overload, but it will reduce the static stability margin of the generator and increase the risk of blackouts. MMC-HVDC can effectively solve various problems in the load center power grid, but the cost of MMC-HVDC is relatively high. Therefore, the comprehensive use of de-circuiting and MMC-HVDC can reduce costs while ensuring the safe operation of the power system.
[0061] The method of this embodiment reconstructs the load center grid according to the evaluation index of the load center grid operation characteristics and the analysis of the impact of MMC-HVDC on the load center grid. The specific method flow is as follows: Figure 2 As shown:
[0062] Step 1: Divide the load center power grid into several areas, and determine the transmission lines (including high-voltage interconnection lines and low-voltage lines, etc.) and connecting busbars between the various areas.
[0063] Step 2: Calculate the short-circuit current margin index of each connected busbar and set the threshold range of the short-circuit current margin index; calculate the thermal stability margin index of each transmission line and set the threshold range of the thermal stability margin index.
[0064] Step 3: The goal of loop decoupling is to reduce short-circuit current and eliminate overload. If the short-circuit current margin index of a bus does not meet the requirements, the area to which the bus belongs should be decoupled from other areas. The principle of decoupling is to decouple as few areas as possible while ensuring that the short-circuit current is within the normal range. If the thermal stability margin of the transmission line does not meet the requirements, specifically a high-voltage tie line between two areas trips, resulting in a low-voltage line with insufficient thermal stability margin, the two areas need to be decoupled.
[0065] Step 4: Calculate the static stability margin index of each generator and set the threshold range; calculate the power outage risk index of each area and set the threshold range. Check whether the static stability and power outage risk meet the requirements.
[0066] Step 5: Site selection and capacity determination of MMC-HVDC. The goal of MMC-HVDC is to reduce the risk of major power outages and improve the static stability of generators. If the risk of power outages in a certain area is unacceptable, an MMC-HVDC line should be added to connect the area to other areas, giving priority to connecting to other areas with strong power balancing capabilities.
[0067] The location of the converter station can be selected to be the same as the decoupling location. The capacity of the MMC-HVDC should ensure that the power outage range after the expected accident is within an acceptable range. If the static stability margin of the generator after decoupling is too low, the MMC-HVDC can be added to send the generator output directly to the load center. The capacity of the MMC-HVDC should ensure that the static stability margin of the generator meets the requirements.
[0068] Test Examples
[0069] This example will verify the correctness of the method proposed in the present invention through simulation in a test power grid system. The simulation software is PSD-BPA. The full wiring diagram before the test power grid transformation is as follows: Figure 3 shown. Figure 3In the figure, 750kV nodes (connecting busbars) are blue, including B1, B2, B3, and B4. The rest are 220kV nodes. Figure 3 The test grid is divided into four areas according to the four 750KV buses B1, B2, B3, and B4, which are marked as Area 1, Area 2, Area 3, and Area 4. The connection parts between the 220kV nodes in different areas are red.
[0070] The test grid is in the process of transitioning from 220kV voltage level to 750kV voltage level. The 750kV test grid is a weak grid, and the 220kV test grid is a strong grid. Therefore, the main problem of the test grid is that the short-circuit current margin index of some 220kV busbars is too small. For the overload problem, the load transfer caused by the tripping of the 750kV line is acceptable for the 220kV network. Therefore, we only need to consider the short-circuit current problem. The buses whose short-circuit current margin index does not meet the requirements are shown in Table 1.
[0071] Table 1 Short-circuit current margin indicators that do not meet the requirements
[0072]
[0073] As shown in Table 1, there is a problem of excessive short-circuit current in area 2 and area 3. According to the simulation results, in order to reduce the short-circuit current in area 2 to the normal range, area 2 needs to be disconnected from area 4 and area 3. In order to reduce the short-circuit current in area 3, area 3 needs to be disconnected from area 2 and area 4. Therefore, the loop decoupling solution is as follows:
[0074] a. Change the four buses B14, B19, G8, and G14 and the generators to partition operation mode.
[0075] b. Unlock the 220kV G14-B21 single-circuit line, the 220kV B26-B27 double-circuit line and the 220kV B18-B3 double-circuit line.
[0076] The wiring diagram after loop decoupling is as follows Figure 4 shown. Figure 4 In the diagram, the busbars that are switched to zoned operation are shown in red.
[0077] After the loop is released, the short-circuit current of each node returns to the normal range, as shown in Table 2. And the static stability margin indicators of all generators meet the requirements. However, the risk of blackout increases. After analysis, the test grid has the following problems:
[0078] a. During the maintenance of the 750kV B1-B4 single-circuit line, after an N-1 fault occurs on the 750kV B3-B4 single-circuit line, a power outage will occur in Area 4.
[0079] b. During the maintenance of the 750kV B3-B4 single-circuit line, a power outage will occur in area 4 after the fault of 750kV B1-B4 single-circuit line N-1.
[0080] c. During the maintenance of one 750kV / 220kV B2 transformer, another 750kV / 220kV B2 transformer N-1 fails, resulting in a power outage in Area 2.
[0081] d. During the maintenance of one 750kV / 220kVB4 transformer, another 750kV / 220kVB4 transformer N-1 fails and a power outage will occur in area 4.
[0082] Table 2 Short-circuit current margin index
[0083]
[0084] Table 3 Power outage risk index for regions 2 and 4
[0085]
[0086] The blackout risk index after the ring is opened is shown in Table 3. As can be seen from Table 3, the blackout risk increases sharply after the ring is opened. In order to reduce the risk of blackouts, MMC-HVDC needs to be closed. Among the three areas of area 2, area 3 and area 4, area 3 has the lowest blackout risk, so it can be selected to connect area 2 and area 4 to area 3 respectively. The location and capacity of MMC-HVDC are shown in Table 4. And it is assumed that MMC-HVDC has a long-term overload capacity of 1.2 times the rated capacity.
[0087] Table 4 Location and capacity of MMC-HVDC
[0088]
[0089] The final reconstruction scheme after adding MMC-HVDC is as follows Figure 5 The short-circuit current margin index under the final reconstruction scheme is shown in Table 2. As can be seen from Table 2, the short-circuit current has returned to the normal range. The blackout risk index under the final transformation scheme is shown in Table 3. After adding MMC-HVDC, the blackout risk is basically the same as the full connection case. After the transformation, the problem of excessive short-circuit current in the tested power grid has been effectively solved, eliminating the risk of blackouts caused by ring decoupling.
[0090] The technical solutions of the present invention are not limited to the above-mentioned embodiments, and any technical solutions obtained by equivalent replacement methods fall within the scope of protection required by the present invention.
Claims
1. A load center power grid reconstruction method based on flexible direct current, characterized in that: The steps include: Step 1: Divide the load center power grid into several areas and determine the transmission lines and connecting buses between the areas; Step 2: Calculate the short-circuit current margin index of each connected busbar and the thermal stability margin index of each transmission line; Step 3: If the short-circuit current margin index of a certain connected bus does not meet the requirements, the area to which the connected bus belongs is decoupled from other areas; if the thermal stability margin of the transmission line between the two areas does not meet the requirements, the two areas are decoupled; Step 4: Calculate the static stability margin index of each generator in the power grid and the power outage risk index of each area, and check whether the static stability and power outage risk meet the requirements; Step 5: If the power outage risk of a certain area does not meet the requirements, add MMC-HVDC to connect the area with other areas; If the static stability margin of the decoupled generator does not meet the requirements, MMC-HVDC is added to send the generator output to the load center.
2. The load center power grid reconstruction method based on flexible direct current according to claim 1 is characterized by: The margin index of the short-circuit current of the busbar connected in step 2 is: Where: I short is the short-circuit current value of a certain bus, I bmax is the maximum allowable short-circuit current value of the busbar, K sh It is the short-circuit current margin indicator.
3. The load center power grid reconstruction method based on flexible DC according to claim 2 is characterized by: The thermal stability margin index of the transmission line in step 2 is: Among them, P load is the maximum load after any N-1 faults occur on the transmission line, P max is the thermal stability limit load of the line, K th It is the thermal stability margin indicator.
4. The load center power grid reconstruction method based on flexible DC according to claim 3 is characterized by: The static stability margin index of the generator in step 4 is: Among them, P gmax The output limit of the generator to maintain static stability is usually taken as the value under the condition of generator output channel N-1. g is the output of the generator under normal conditions, K st It is the static stability margin index.
5. The load center power grid reconstruction method based on flexible DC according to claim 4 is characterized in that: The indicator of power outage risk in step 4 is: K bl =P Lmax Among them, P Lmax is the maximum load shedding capacity under various N-2 conditions, K bl It is an indicator of the risk of a major power outage.
6. The load center power grid reconstruction method based on flexible DC according to claim 5 is characterized by: In step 5, if the power outage risk of a certain area does not meet the requirements, the added MMC-HVDC will preferentially connect the area with other areas with the strongest power balancing capabilities.
7. The load center power grid reconstruction method based on flexible DC according to claim 6 is characterized by: In step 5, if the static stability margin of the generator after decoupling does not meet the requirement, the capacity of the MMC-HVDC is increased so that the static stability margin of the generator meets the requirement.
Citation Information
Cited By
Receiving end power grid flexible direct back-to-back engineering demand judgment method and system for inter-provincial power grid loop opening
CN121461438A
Demand Determination Method and System for Receiving-End Flexible DC Back-to-Back Projects for Inter-Provincial Power Grid Loop Breaking
CN121461438B