Forming and casting process for alloy shell of high-pressure water pump
Through the system's high-pressure water pump alloy shell molding and casting process, including shape design, alloy material selection, smelting and heat treatment, the shell strength and life problems are solved, and the density and corrosion resistance of the shell are improved.
Patent Information
- Application Number
- CN202411246035.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-03
AI Technical Summary
The existing high-pressure water pump alloy shell molding and casting process is complex, the strength is not high, the service life is short, and the shrinkage during solidification of the alloy leads to a decrease in density and strength, which may cause inclusion defects to affect performance.
By determining the shape, size and internal structure of the shell, selecting suitable alloy materials and smelting and casting, controlling the solidification and cooling process, performing demolding, heat treatment, inspection, processing and surface treatment, ensuring the strength and corrosion resistance of the shell .
It improves the strength of the high-pressure water pump housing, extends the service life, avoids the problem of inclusion defects affecting performance, and improves the overall performance.
Abstract
Description
Technical Field
[0001] The invention relates to a casting process, in particular to a high-pressure water pump alloy shell molding casting process. Background Art
[0002] A high-pressure water pump is a device that can generate a high-pressure water flow. It is usually driven by a power device such as an electric motor or a diesel engine, so that the impeller in the pump rotates at a high speed. The rotation of the impeller generates centrifugal force, sucking water into the pump and accelerating it, and then discharging the water at high pressure. Its working principle is similar to that of an ordinary water pump, but it can generate higher pressure. The high-pressure water pump housing is one of the essential parts of the high-pressure water pump. It can not only effectively protect the parts in the water pump, but also be easy to install and have a certain heat dissipation function. The existing high-pressure water pump alloy housing molding casting is not only complex in process, but also has low strength and short service life. At the same time, the shrinkage of the alloy during solidification will produce shrinkage cavities or shrinkage inside the housing, which will reduce the density and strength of the housing. In addition, impurities may be mixed into the molten metal to form inclusion defects, affecting the performance of the housing.
[0003] Therefore, those skilled in the art are committed to providing a high-pressure water pump alloy housing forming casting process that can effectively solve the above-mentioned technical problems. Summary of the invention
[0004] In view of the above-mentioned defects in the prior art, the technical problem to be solved by the present invention is to provide a high-pressure water pump alloy casing forming casting process which can effectively solve the above-mentioned technical problems.
[0005] To achieve the above object, the present invention provides a high-pressure water pump alloy housing forming casting process, comprising the following steps: Step 1) Determine the shape, size and internal structure of the shell and prepare the raw materials; Step 2) melting and pouring the alloy material; Step 3) solidification and cooling after pouring; Step 4) demoulding the shell after solidification and cooling; Step 5) heat treating the cast shell; Step 6) inspecting the shell after heat treatment; Step 7) Processing the shell that has passed the inspection; Step 8) Surface treatment is performed on the processed shell.
[0006] Furthermore, in step 1, the shape, size and internal structure of the housing need to be designed according to the use requirements and performance indicators of the high-pressure water pump alloy housing; the prepared raw materials are alloy materials, and the selection of alloy materials includes: 1) First, you need to determine the working conditions of the water pump when it is in use, including the following points: Analyze the characteristics of the medium, confirm whether the medium being transported is clean water, corrosive liquid, liquid containing solid particles or other special media, and select materials with corresponding properties according to the medium being transported; confirm the temperature range of the medium. High-temperature media require high-temperature resistant alloy materials; evaluate the pH value of the medium. Strong acidic or alkaline media have specific requirements for the corrosion resistance of materials; determine the working pressure and confirm the working pressure range of the water pump. High-pressure water pumps need to use high-strength alloy materials to ensure that the shell can withstand the pressure without deformation or rupture; confirm the working environment. According to the working environment of the water pump, select the corresponding properties of the material such as weather resistance, corrosion resistance, toughness and fatigue resistance; 2) The selected materials need to be tested, including mechanical properties test, corrosion resistance test and simulation test; Mechanical properties test: tensile test, impact test, hardness test, etc., to evaluate the strength, toughness and hardness of materials; Corrosion resistance test: salt spray test, immersion test, etc., to determine the corrosion resistance of materials in specific media; Simulation test: Establish a test device that simulates the actual working environment, conduct long-term operation tests on the materials, observe the performance changes and durability of the materials, and also conduct accelerated corrosion tests, pressure cycle tests, etc. to more quickly evaluate the reliability of the materials.
[0007] 3) Consider the purchase cost, processing cost, maintenance cost, etc. of the materials. Although high-performance alloy materials may have advantages in performance, they may also be more expensive, so it is necessary to comprehensively weigh the cost and performance; Analyze the service life and reliability of materials. In the long run, high-quality materials may reduce maintenance costs and downtime, and improve economic benefits.
[0008] 4) Evaluate the feasibility of the selected material in the production process, including casting process, machining performance, welding performance, etc. Ensure that the material can meet the requirements of the production process and is easy to process and manufacture; consider the supply stability and availability of the material to avoid affecting the production schedule due to material shortages.
[0009] Furthermore, before step 2, the selection of the mold includes: Heat resistance: According to the melting point and pouring temperature of the alloy, select mold materials with sufficient heat resistance to ensure that they will not deform or be damaged at high temperatures; Thermal conductivity: Good thermal conductivity helps to transfer heat quickly and evenly, promoting the solidification of the alloy liquid; Strength and hardness: The mold material should have a certain strength and hardness to withstand the pressure of the alloy liquid without deformation; Cost, processing performance and reusability: Select mold materials considering factors such as cost, processing performance and reusability.
[0010] Furthermore, in step 2, the specific steps of melting and pouring the alloy material include: 304 stainless steel: The melting temperature is usually 1450℃-1550℃, and the melting time is 9-15 hours; 316 stainless steel: melting temperature is 1500℃-1650℃, melting time is 9-15 hours; Monel alloy: melting temperature is 1550℃-1750℃, melting time is 11-18 hours; In order to ensure uniform alloy composition and remove impurities, the following measures need to be taken during the smelting process: Full stirring: Use mechanical stirring or electromagnetic stirring to fully mix the molten metal during the smelting process to promote uniform composition; Refining treatment: using refining agents, such as slag-making agents, deoxidizers, etc., to remove impurities and gases in the molten metal; Control the melting atmosphere: According to the characteristics of the alloy material, select a suitable melting atmosphere, such as oxidizing atmosphere, reducing atmosphere or inert atmosphere to reduce oxidation and the generation of impurities; Strictly control the melting temperature and time: avoid burning of alloy elements or other adverse effects caused by excessively high temperature or long time.
[0011] Furthermore, the specific steps of solidification and cooling in step 3) are: after pouring, the alloy liquid is allowed to solidify naturally in the mold; at the same time, attention is paid to and the cooling rate is strictly controlled to avoid excessive internal stress.
[0012] Furthermore, in step 4), the specific step of demoulding includes, after the water pump alloy shell is completely solidified and cooled, by detecting the shell temperature and observing the solidification state, the demoulding operation can be performed only when the shell temperature drops to a point where the internal structure is stable; When demoulding, remove the connectors that fix the mold to make the parts of the mold slightly loose, then use the demoulding equipment to slowly push the water pump housing out of the mold. Keep it steady during the pushing process to avoid deformation or damage to the housing due to excessive force. When a part of the housing is pushed out, use tools to carefully remove the housing from the mold. During the removal process, pay attention to keep the balance of the housing to prevent it from tilting or falling. Then clean the demoulding housing to remove residual sand, scale and other impurities on the surface to make the housing surface smooth and flat.
[0013] Furthermore, the specific method of heat treatment in step 5) is that during heat treatment, a suitable heat treatment process can be determined according to the characteristics and requirements of the water pump alloy material, including annealing, normalizing, quenching and tempering; Place the demoulded water pump housing into a heat treatment furnace for heating. The heating speed should be properly controlled to avoid overly fast or overly slow heating that may cause thermal stress or uneven structure in the housing. The heating speed should be determined according to the type, size and heat treatment process of the alloy material. When the shell reaches the predetermined heat treatment temperature, it is kept warm; the insulation time depends on the size, material and heat treatment process requirements of the shell; the purpose of insulation is to make the temperature inside the shell uniform and ensure that the material structure is fully transformed; after the insulation is completed, it is cooled according to the requirements of the heat treatment process.
[0014] Furthermore, the step 6) inspecting the shell after the heat treatment specifically includes appearance inspection, size inspection and hole position inspection; The appearance inspection includes visual inspection or inspection with the aid of tools: The visual inspection: First, use the naked eye to observe whether there are obvious defects such as cracks, sand holes, pores, slag inclusions, etc. on the shell surface; check whether the surface is flat, whether there are obvious unevenness or deformation; check whether the color of the shell is uniform, whether there is local discoloration or oxidation; Inspection with the help of tools: Use a magnifying glass or microscope to further check the tiny defects on the shell surface; use a roughness tester to check whether the roughness of the shell surface meets the requirements; size measurement According to the size and accuracy requirements of the shell, select appropriate measuring tools, such as calipers, micrometers, three-coordinate measuring machines, etc.; measure the outer diameter, inner diameter, length, thickness and other key dimensions of the shell to ensure that they are within the tolerance range required by the design; Hole position inspection: Check whether the dimensions of the mounting holes, connecting threads, etc. on the housing are accurate.
[0015] Furthermore, the step 7) of processing the qualified shell specifically includes: drilling, tapping, milling, etc. the shell according to the assembly requirements of the high-pressure water pump, so that the size and precision of the shell meet the design requirements.
[0016] Furthermore, the machined shell is subjected to surface treatment, which includes grinding, spraying and electroplating, so as to improve the corrosion resistance and aesthetics of the shell.
[0017] The beneficial effects of the present invention are: through the high-pressure water pump alloy shell molding casting process of the present invention, the strength of the high-pressure water pump shell is effectively improved, the reduction of density and strength due to process defects is avoided, the service life is extended, and at the same time, the inclusion of substances that affects the overall performance of the shell is avoided. DETAILED DESCRIPTION
[0018] The present invention will be further described below in conjunction with embodiments: In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0019] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0020] Example 1 A high-pressure water pump alloy casing forming casting process comprises the following steps: Step 1) determine the shape, size and internal structure of the shell and prepare the raw materials; Step 2) melting and pouring the alloy material; Step 3) solidification and cooling after pouring; Step 4) demoulding the shell after solidification and cooling; Step 5) heat treating the cast shell; Step 6) inspecting the shell after heat treatment; Step 7) Processing the shell that has passed the inspection; Step 8) Surface treatment is performed on the processed shell.
[0021] Example 2 A high-pressure water pump alloy casing forming casting process comprises the following steps: Step 1) Determine the shape, size and internal structure of the shell, and prepare raw materials; the shape, size and internal structure of the shell need to be designed according to the use requirements and performance indicators of the high-pressure water pump alloy shell; the prepared raw materials are alloy materials, and the selection of alloy materials includes: 1) First, you need to determine the working conditions of the water pump when it is in use, including the following points: Analyze the characteristics of the medium, confirm whether the medium being transported is clean water, corrosive liquid, liquid containing solid particles or other special media, and select materials with corresponding properties according to the medium being transported; For example, if it is seawater, you need to consider the material's resistance to seawater corrosion; if it is a chemical liquid, you need to understand its chemical composition to determine the required corrosion resistance.
[0022] Confirm the temperature range of the medium. High-temperature medium requires the selection of high-temperature resistant alloy materials.
[0023] Evaluate the pH of the medium. Strong acidic or alkaline media have specific requirements for the corrosion resistance of materials. Determine the working pressure and confirm the working pressure range of the water pump. The high-pressure water pump needs to use high-strength alloy materials to ensure that the shell can withstand the pressure without deformation or cracking; Confirm the working environment and select the corresponding properties of the material such as weather resistance, corrosion resistance, toughness and fatigue resistance according to the working environment of the water pump; If the water pump works in a humid, corrosive gas or harsh outdoor environment, the material should have good weather resistance and corrosion resistance. For occasions that may be subject to impact or vibration, the material needs to have a certain toughness and fatigue resistance.
[0024] 2) The selected materials need to be tested, including mechanical properties test, corrosion resistance test and simulation test; Mechanical properties test: tensile test, impact test, hardness test, etc., to evaluate the strength, toughness and hardness of materials; Corrosion resistance test: salt spray test, immersion test, etc., to determine the corrosion resistance of materials in specific media; Simulation test: Establish a test device that simulates the actual working environment, conduct long-term operation tests on the materials, observe the performance changes and durability of the materials, and also conduct accelerated corrosion tests, pressure cycle tests, etc. to more quickly evaluate the reliability of the materials.
[0025] The mold selection includes: Heat resistance: According to the melting point and pouring temperature of the alloy, select the mold material with sufficient heat resistance to ensure that it will not deform or be damaged at high temperatures. For example, for high-temperature alloy shell casting, heat-resistant alloy steel molds can be selected.
[0026] Thermal conductivity: Good thermal conductivity helps to transfer heat quickly and evenly, promoting the solidification of the alloy liquid; copper alloy mold materials usually have good thermal conductivity.
[0027] Strength and hardness: The mold material should have a certain strength and hardness to withstand the pressure of the alloy liquid without deformation; Cost, processing performance and reusability: Select mold materials considering factors such as cost, processing performance and reusability.
[0028] 3) Consider the purchase cost, processing cost, maintenance cost, etc. of the materials. Although high-performance alloy materials may have advantages in performance, they may also be more expensive, so it is necessary to comprehensively weigh the cost and performance; Analyze the service life and reliability of materials. In the long run, high-quality materials may reduce maintenance costs and downtime, and improve economic benefits.
[0029] 4) Evaluate the feasibility of the selected material in the production process, including casting process, machining performance, welding performance, etc. Ensure that the material can meet the requirements of the production process and is easy to process and manufacture; consider the supply stability and availability of the material to avoid affecting the production schedule due to material shortages.
[0030] Step 2) melting and pouring the alloy material; The specific steps include: 304 stainless steel: The melting temperature is usually 1450℃-1550℃, and the melting time is 9-15 hours; 316 stainless steel: melting temperature is 1500℃-1650℃, melting time is 9-15 hours; Monel alloy: melting temperature is 1550℃-1750℃, melting time is 11-18 hours; In order to ensure uniform alloy composition and remove impurities, the following measures need to be taken during the smelting process: Full stirring: Use mechanical stirring or electromagnetic stirring to fully mix the molten metal during the smelting process to promote uniform composition; Refining treatment: using refining agents, such as slag-making agents, deoxidizers, etc., to remove impurities and gases in the molten metal; Control the melting atmosphere: According to the characteristics of the alloy material, select a suitable melting atmosphere, such as oxidizing atmosphere, reducing atmosphere or inert atmosphere to reduce oxidation and the generation of impurities; Strictly control the melting temperature and time: avoid burning of alloy elements or other adverse effects caused by excessively high temperature or long time.
[0031] Step 3) solidification and cooling after pouring; Step 4) demoulding the shell after solidification and cooling; Step 5) heat treating the cast shell; Step 6) inspecting the shell after heat treatment; Step 7) Processing the shell that has passed the inspection; Step 8) Surface treatment is performed on the processed shell.
[0032] Example 3 A high-pressure water pump alloy housing forming casting process includes the following steps: Step 1) Determine the shape, size and internal structure of the shell, and prepare raw materials; the shape, size and internal structure of the shell need to be designed according to the use requirements and performance indicators of the high-pressure water pump alloy shell; the prepared raw materials are alloy materials, and the selection of alloy materials includes: 1) First, you need to determine the working conditions of the water pump when it is in use, including the following points: Analyze the characteristics of the medium, confirm whether the medium being transported is clean water, corrosive liquid, liquid containing solid particles or other special media, and select materials with corresponding properties according to the medium being transported; For example, if it is seawater, you need to consider the material's resistance to seawater corrosion; if it is a chemical liquid, you need to understand its chemical composition to determine the required corrosion resistance.
[0033] Confirm the temperature range of the medium. High-temperature medium requires the selection of high-temperature resistant alloy materials.
[0034] Evaluate the pH of the medium. Strong acidic or alkaline media have specific requirements for the corrosion resistance of materials. Determine the working pressure and confirm the working pressure range of the water pump. The high-pressure water pump needs to use high-strength alloy materials to ensure that the shell can withstand the pressure without deformation or cracking; Confirm the working environment and select the corresponding properties of the material such as weather resistance, corrosion resistance, toughness and fatigue resistance according to the working environment of the water pump; If the water pump works in a humid, corrosive gas or harsh outdoor environment, the material should have good weather resistance and corrosion resistance. For occasions that may be subject to impact or vibration, the material needs to have a certain toughness and fatigue resistance.
[0035] 2) The selected materials need to be tested, including mechanical properties test, corrosion resistance test and simulation test; Mechanical properties test: tensile test, impact test, hardness test, etc., to evaluate the strength, toughness and hardness of materials; Corrosion resistance test: salt spray test, immersion test, etc., to determine the corrosion resistance of materials in specific media; Simulation test: Establish a test device that simulates the actual working environment, conduct long-term operation tests on the materials, observe the performance changes and durability of the materials, and also conduct accelerated corrosion tests, pressure cycle tests, etc. to more quickly evaluate the reliability of the materials.
[0036] The mold selection includes: Heat resistance: According to the melting point and pouring temperature of the alloy, select the mold material with sufficient heat resistance to ensure that it will not deform or be damaged at high temperatures. For example, for high-temperature alloy shell casting, heat-resistant alloy steel molds can be selected.
[0037] Thermal conductivity: Good thermal conductivity helps to transfer heat quickly and evenly, promoting the solidification of the alloy liquid; copper alloy mold materials usually have good thermal conductivity.
[0038] Strength and hardness: The mold material should have a certain strength and hardness to withstand the pressure of the alloy liquid without deformation; Cost, processing performance and reusability: Select mold materials considering factors such as cost, processing performance and reusability.
[0039] 3) Consider the purchase cost, processing cost, maintenance cost, etc. of the materials. Although high-performance alloy materials may have advantages in performance, they may also be more expensive, so it is necessary to comprehensively weigh the cost and performance; Analyze the service life and reliability of materials. In the long run, high-quality materials may reduce maintenance costs and downtime, and improve economic benefits.
[0040] 4) Evaluate the feasibility of the selected material in the production process, including casting process, machining performance, welding performance, etc. Ensure that the material can meet the requirements of the production process and is easy to process and manufacture; consider the supply stability and availability of the material to avoid affecting the production schedule due to material shortages.
[0041] Step 2) melting and pouring the alloy material; The specific steps include: 304 stainless steel: The melting temperature is usually 1450℃-1550℃, and the melting time is 9-15 hours; 316 stainless steel: melting temperature is 1500℃-1650℃, melting time is 9-15 hours; Monel alloy: melting temperature is 1550℃-1750℃, melting time is 11-18 hours; In order to ensure uniform alloy composition and remove impurities, the following measures need to be taken during the smelting process: Full stirring: Use mechanical stirring or electromagnetic stirring to fully mix the molten metal during the smelting process to promote uniform composition; Refining treatment: using refining agents, such as slag-making agents, deoxidizers, etc., to remove impurities and gases in the molten metal; Control the melting atmosphere: According to the characteristics of the alloy material, select a suitable melting atmosphere, such as oxidizing atmosphere, reducing atmosphere or inert atmosphere to reduce oxidation and the generation of impurities; Strictly control the melting temperature and time: avoid burning of alloy elements or other adverse effects caused by excessively high temperature or long time.
[0042] Step 3) solidification and cooling after pouring; The specific steps are: after pouring, let the alloy liquid solidify naturally in the mold; at the same time, pay attention to and strictly control the cooling speed to avoid excessive internal stress.
[0043] An appropriate cooling method, such as natural cooling, air cooling or water cooling, can be selected according to the specific shape and size of the shell and the characteristics of the alloy material.
[0044] Step 4) demoulding the shell after solidification and cooling; in this embodiment, the specific steps of demoulding include, after the water pump alloy shell is completely solidified and cooled, by detecting the shell temperature and observing the solidification state, the demoulding operation can be performed only when the shell temperature drops to a stable internal structure; When demolding, remove the connectors that fix the mold to loosen the parts of the mold slightly, then use demolding equipment, such as a hydraulic ejector or a mechanical ejection mechanism, to slowly push the water pump housing out of the mold. Keep the ejection process steady to avoid deformation or damage to the housing due to excessive force. When a part of the housing is pushed out, use tools (such as hangers, clamps, etc.) to carefully remove the housing from the mold. During the removal process, pay attention to keeping the balance of the housing to prevent it from tilting or falling. Then clean the demolded housing to remove residual sand, scale and other impurities on the surface to make the housing surface smooth and flat.
[0045] Step 5) heat treating the cast shell; Step 6) inspecting the shell after heat treatment; Step 7) Processing the shell that has passed the inspection; Step 8) Surface treatment is performed on the processed shell.
[0046] Example 4 A high-pressure water pump alloy casing forming casting process comprises the following steps: Step 1) Determine the shape, size and internal structure of the shell, and prepare raw materials; the shape, size and internal structure of the shell need to be designed according to the use requirements and performance indicators of the high-pressure water pump alloy shell; the prepared raw materials are alloy materials, and the selection of alloy materials includes: 1) First, you need to determine the working conditions of the water pump when it is in use, including the following points: Analyze the characteristics of the medium, confirm whether the medium being transported is clean water, corrosive liquid, liquid containing solid particles or other special media, and select materials with corresponding properties according to the medium being transported; For example, if it is seawater, you need to consider the material's resistance to seawater corrosion; if it is a chemical liquid, you need to understand its chemical composition to determine the required corrosion resistance.
[0047] Confirm the temperature range of the medium. High-temperature medium requires the selection of high-temperature resistant alloy materials.
[0048] Evaluate the pH of the medium. Strong acidic or alkaline media have specific requirements for the corrosion resistance of materials. Determine the working pressure and confirm the working pressure range of the water pump. The high-pressure water pump needs to use high-strength alloy materials to ensure that the shell can withstand the pressure without deformation or cracking; Confirm the working environment and select the corresponding properties of the material such as weather resistance, corrosion resistance, toughness and fatigue resistance according to the working environment of the water pump; If the water pump works in a humid, corrosive gas or harsh outdoor environment, the material should have good weather resistance and corrosion resistance. For occasions that may be subject to impact or vibration, the material needs to have a certain toughness and fatigue resistance.
[0049] 2) The selected materials need to be tested, including mechanical properties test, corrosion resistance test and simulation test; Mechanical properties test: tensile test, impact test, hardness test, etc., to evaluate the strength, toughness and hardness of materials; Corrosion resistance test: salt spray test, immersion test, etc., to determine the corrosion resistance of materials in specific media; Simulation test: Establish a test device that simulates the actual working environment, conduct long-term operation tests on the materials, observe the performance changes and durability of the materials, and also conduct accelerated corrosion tests, pressure cycle tests, etc. to more quickly evaluate the reliability of the materials.
[0050] The mold selection includes: Heat resistance: According to the melting point and pouring temperature of the alloy, select the mold material with sufficient heat resistance to ensure that it will not deform or be damaged at high temperatures. For example, for high-temperature alloy shell casting, heat-resistant alloy steel molds can be selected.
[0051] Thermal conductivity: Good thermal conductivity helps to transfer heat quickly and evenly, promoting the solidification of the alloy liquid; copper alloy mold materials usually have good thermal conductivity.
[0052] Strength and hardness: The mold material should have a certain strength and hardness to withstand the pressure of the alloy liquid without deformation; Cost, processing performance and reusability: Select mold materials considering factors such as cost, processing performance and reusability.
[0053] 3) Consider the purchase cost, processing cost, maintenance cost, etc. of the materials. Although high-performance alloy materials may have advantages in performance, they may also be more expensive, so it is necessary to comprehensively weigh the cost and performance; Analyze the service life and reliability of materials. In the long run, high-quality materials may reduce maintenance costs and downtime, and improve economic benefits.
[0054] 4) Evaluate the feasibility of the selected material in the production process, including casting process, machining performance, welding performance, etc. Ensure that the material can meet the requirements of the production process and is easy to process and manufacture; consider the supply stability and availability of the material to avoid affecting the production schedule due to material shortages.
[0055] Step 2) melting and pouring the alloy material; The specific steps include: 304 stainless steel: The melting temperature is usually 1450℃-1550℃, and the melting time is 9-15 hours; 316 stainless steel: melting temperature is 1500℃-1650℃, melting time is 9-15 hours; Monel alloy: melting temperature is 1550℃-1750℃, melting time is 11-18 hours; In order to ensure uniform alloy composition and remove impurities, the following measures need to be taken during the smelting process: Full stirring: Use mechanical stirring or electromagnetic stirring to fully mix the molten metal during the smelting process to promote uniform composition; Refining treatment: using refining agents, such as slag-making agents, deoxidizers, etc., to remove impurities and gases in the molten metal; Control the melting atmosphere: According to the characteristics of the alloy material, select a suitable melting atmosphere, such as oxidizing atmosphere, reducing atmosphere or inert atmosphere to reduce oxidation and the generation of impurities; Strictly control the melting temperature and time: avoid burning of alloy elements or other adverse effects caused by excessively high temperature or long time.
[0056] Step 3) solidification and cooling after pouring; The specific steps are: after pouring, let the alloy liquid solidify naturally in the mold; at the same time, pay attention to and strictly control the cooling speed to avoid excessive internal stress.
[0057] An appropriate cooling method, such as natural cooling, air cooling or water cooling, can be selected according to the specific shape and size of the shell and the characteristics of the alloy material.
[0058] Step 4) demoulding the shell after solidification and cooling; in this embodiment, the specific steps of demoulding include, after the water pump alloy shell is completely solidified and cooled, by detecting the shell temperature and observing the solidification state, the demoulding operation can be performed only when the shell temperature drops to a stable internal structure; When demolding, remove the connectors that fix the mold to loosen the parts of the mold slightly, then use demolding equipment, such as a hydraulic ejector or a mechanical ejection mechanism, to slowly push the water pump housing out of the mold. Keep the ejection process steady to avoid deformation or damage to the housing due to excessive force. When a part of the housing is pushed out, use tools (such as hangers, clamps, etc.) to carefully remove the housing from the mold. During the removal process, pay attention to keeping the balance of the housing to prevent it from tilting or falling. Then clean the demolded housing to remove residual sand, scale and other impurities on the surface to make the housing surface smooth and flat.
[0059] Step 5) heat-treating the cast shell; specifically, during the heat treatment, the appropriate heat treatment process can be determined according to the characteristics and requirements of the water pump alloy material, including annealing, normalizing, quenching and tempering; for example, for some alloy materials with higher hardness, the quenching and tempering process can be used to improve its toughness and strength.
[0060] Place the demoulded water pump housing into a heat treatment furnace for heating. The heating speed should be properly controlled to avoid overly fast or overly slow heating that may cause thermal stress or uneven structure in the housing. The heating speed should be determined according to the type, size and heat treatment process of the alloy material. When the shell reaches the predetermined heat treatment temperature, it is kept warm; the holding time depends on the size, material and heat treatment process requirements of the shell; the purpose of the heat preservation is to make the temperature inside the shell uniform and ensure that the material structure is fully transformed; after the heat preservation is completed, it is cooled according to the requirements of the heat treatment process. There are many cooling methods, such as air cooling, oil cooling, water cooling, etc. Different cooling methods will have different effects on the performance of the shell, so the appropriate cooling method should be selected according to the characteristics and requirements of the material.
[0061] Heat treatment precautions Temperature control Strictly control the temperature during the heat treatment process to ensure the accuracy and stability of the temperature. Use high-precision temperature control equipment and calibrate and maintain it regularly. Too high or too low a temperature may cause the performance of the shell to not meet the requirements.
[0062] Time Control Accurately control the time of heating, heat preservation and cooling. Too long or too short a time will affect the effect of heat treatment. The best time parameters can be determined through experiments and experience accumulation according to the characteristics of the material and the requirements of the heat treatment process.
[0063] Atmosphere Control For some alloy materials that need to be heat treated in a specific atmosphere, the atmosphere in the heat treatment furnace must be strictly controlled. For example, when annealing, it may be necessary to carry out the annealing in a reducing atmosphere to prevent oxidation of the material.
[0064] Prevent deformation During the heat treatment process, the shell may be deformed due to thermal stress. To prevent deformation, appropriate support and fixing measures can be adopted, such as using clamps or shims. At the same time, attention should be paid to controlling the speed of heating and cooling to avoid excessive thermal stress.
[0065] Safe Operation The heat treatment process involves high-temperature operations, so you must strictly abide by the safety operating procedures and wear necessary protective equipment, such as high-temperature gloves, protective glasses, etc. At the same time, you must ensure the safety and reliability of the heat treatment equipment and conduct regular inspections and maintenance.
[0066] Step 6) Inspect the shell after heat treatment; the inspection of the shell after heat treatment specifically includes appearance inspection, size inspection and hole position inspection; The appearance inspection includes visual inspection or inspection with the aid of tools. The visual inspection: First, use the naked eye to observe whether there are obvious defects such as cracks, sand holes, pores, slag inclusions, etc. on the shell surface; check whether the surface is flat, whether there are obvious unevenness or deformation; check whether the color of the shell is uniform, whether there is local discoloration or oxidation; Inspection with the help of tools: Use a magnifying glass or microscope to further check the tiny defects on the shell surface; use a roughness tester to check whether the roughness of the shell surface meets the requirements; size measurement According to the size and accuracy requirements of the shell, select appropriate measuring tools, such as calipers, micrometers, three-coordinate measuring machines, etc.; measure the outer diameter, inner diameter, length, thickness and other key dimensions of the shell to ensure that they are within the tolerance range required by the design; Hole position inspection: Check whether the dimensions of the mounting holes, connecting threads, etc. on the housing are accurate.
[0067] Step 7) Processing the qualified shell; specifically, processing the qualified shell includes: according to the assembly requirements of the high-pressure water pump, drilling, tapping, milling, etc., the shell so that the size and accuracy of the shell meet the design requirements.
[0068] Step 8) performing surface treatment on the machined shell, specifically including performing surface treatment on the machined shell, wherein the surface treatment includes grinding, spraying and electroplating to improve the corrosion resistance and aesthetics of the shell.
[0069] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A high-pressure water pump alloy shell forming casting process, characterized in that: The following steps are involved: Step 1) determine the shape, size and internal structure of the shell and prepare the raw materials; Step 2) melting and pouring the alloy material; Step 3) solidification and cooling after pouring; Step 4) demoulding the shell after solidification and cooling; Step 5) heat treating the cast shell; Step 6) inspecting the shell after heat treatment; Step 7) Processing the shell that has passed the inspection; Step 8) Surface treatment is performed on the processed shell.
2. The high-pressure water pump alloy housing forming casting process according to claim 1, characterized in that: In step 1, the shape, size and internal structure of the housing need to be designed according to the use requirements and performance indicators of the high-pressure water pump alloy housing; the prepared raw materials are alloy materials, and the selection of alloy materials includes: 1) First, you need to determine the working conditions of the water pump when it is in use, including the following points: Analyze the characteristics of the medium, confirm whether the medium being transported is clean water, corrosive liquid, liquid containing solid particles or other special media, and select materials with corresponding properties according to the medium being transported; confirm the temperature range of the medium. High-temperature media require high-temperature resistant alloy materials; evaluate the pH of the medium. Strong acidic or alkaline media have specific requirements for the corrosion resistance of materials; determine the working pressure and confirm the working pressure range of the water pump. High-pressure water pumps need to use high-strength alloy materials to ensure that the shell can withstand pressure without deformation or cracking; confirm the working environment. According to the working environment of the water pump, select the corresponding properties of the material such as weather resistance, corrosion resistance, toughness and fatigue resistance; 2) The selected materials need to be tested, including mechanical properties test, corrosion resistance test and simulation test; Mechanical properties test: tensile test, impact test, hardness test, etc., to evaluate the strength, toughness and hardness of materials; Corrosion resistance test: salt spray test, immersion test, etc., to determine the corrosion resistance of materials in specific media; Simulation test: Establish a test device that simulates the actual working environment, conduct long-term operation tests on the materials, observe the performance changes and durability of the materials, and also conduct accelerated corrosion tests, pressure cycle tests, etc. to more quickly evaluate the reliability of the materials; 3) Consider the purchase cost, processing cost, maintenance cost, etc. of the materials. Although high-performance alloy materials may have advantages in performance, they may also be more expensive, so it is necessary to comprehensively weigh the cost and performance; Analyze the service life and reliability of materials. In the long run, high-quality materials may reduce maintenance costs and downtime, and improve economic benefits; 4) Evaluate the feasibility of the selected material in the production process, including casting process, machining performance, welding performance, etc. Ensure that the material can meet the requirements of the production process and is easy to process and manufacture; consider the supply stability and availability of the material to avoid affecting the production schedule due to material shortages.
3. The high-pressure water pump alloy housing forming casting process as claimed in claim 2, characterized in that: Before step 2, the selection of molds includes: Heat resistance: According to the melting point and pouring temperature of the alloy, select mold materials with sufficient heat resistance to ensure that they will not deform or be damaged at high temperatures; Thermal conductivity: Good thermal conductivity helps to transfer heat quickly and evenly, promoting the solidification of the alloy liquid; Strength and hardness: The mold material should have a certain strength and hardness to withstand the pressure of the alloy liquid without deformation; Cost, processing performance and reusability: Select mold materials considering factors such as cost, processing performance and reusability.
4. The high-pressure water pump alloy housing forming casting process as claimed in claim 3 is characterized in that: In step 2, the specific steps of melting and pouring the alloy material include: 304 stainless steel: The melting temperature is usually 1450℃-1550℃, and the melting time is 9-15 hours; 316 stainless steel: melting temperature is 1500℃-1650℃, melting time is 9-15 hours; Monel alloy: melting temperature is 1550℃-1750℃, melting time is 11-18 hours; In order to ensure uniform alloy composition and remove impurities, the following measures need to be taken during the smelting process: Full stirring: Use mechanical stirring or electromagnetic stirring to fully mix the molten metal during the smelting process to promote uniform composition; Refining treatment: using refining agents, such as slag-making agents, deoxidizers, etc., to remove impurities and gases in the molten metal; Control the melting atmosphere: According to the characteristics of the alloy material, select a suitable melting atmosphere, such as oxidizing atmosphere, reducing atmosphere or inert atmosphere to reduce oxidation and the generation of impurities; Strictly control the melting temperature and time: avoid burning of alloy elements or other adverse effects caused by excessively high temperature or long time.
5. The high-pressure water pump alloy housing forming casting process as claimed in claim 4, characterized in that: The specific steps of solidification and cooling in step 3) are: after pouring, let the alloy liquid solidify naturally in the mold; at the same time, pay attention to and strictly control the cooling speed to avoid excessive internal stress.
6. The high-pressure water pump alloy housing forming casting process as claimed in claim 5, characterized in that: In the step 4), the specific step of demoulding includes, after the water pump alloy shell is solidified and cooled completely, by detecting the shell temperature and observing the solidification state, the demoulding operation can be performed only when the shell temperature drops to a stable internal structure; When demoulding, remove the connectors that fix the mold to make the parts of the mold slightly loose, then use the demoulding equipment to slowly push the water pump housing out of the mold. Keep it steady during the pushing process to avoid deformation or damage to the housing due to excessive force. When a part of the housing is pushed out, use tools to carefully remove the housing from the mold. During the removal process, pay attention to keep the balance of the housing to prevent it from tilting or falling. Then clean the demoulding housing to remove residual sand, scale and other impurities on the surface to make the housing surface smooth and flat.
7. The high-pressure water pump alloy housing forming casting process as claimed in claim 6, characterized in that: The specific method of heat treatment in step 5) is that during heat treatment, a suitable heat treatment process can be determined according to the characteristics and requirements of the water pump alloy material, including annealing, normalizing, quenching and tempering; Place the demoulded water pump housing into a heat treatment furnace for heating. The heating speed should be properly controlled to avoid overly fast or overly slow heating that may cause thermal stress or uneven structure in the housing. The heating rate should be determined according to the type, size and heat treatment process of the alloy material; When the shell reaches the predetermined heat treatment temperature, it is kept warm. The holding time depends on the size, material and heat treatment process requirements of the shell. The purpose of the heat preservation is to make the temperature inside the shell uniform and ensure that the material structure is fully transformed. After the insulation is completed, cooling is carried out according to the requirements of the heat treatment process.
8. The high-pressure water pump alloy housing forming casting process as claimed in claim 7, characterized in that: The step 6) inspecting the shell after heat treatment specifically includes appearance inspection, size inspection and hole position inspection; The appearance inspection includes visual inspection or inspection with the aid of tools: The visual inspection: First, use the naked eye to observe whether there are obvious defects such as cracks, sand holes, pores, slag inclusions, etc. on the shell surface; check whether the surface is flat, whether there are obvious unevenness or deformation; check whether the color of the shell is uniform, whether there is local discoloration or oxidation; Inspection with the help of tools: Use a magnifying glass or microscope to further check the tiny defects on the shell surface; use a roughness tester to check whether the roughness of the shell surface meets the requirements; size measurement According to the size and accuracy requirements of the shell, select appropriate measuring tools, such as calipers, micrometers, three-coordinate measuring machines, etc.; measure the outer diameter, inner diameter, length, thickness and other key dimensions of the shell to ensure that they are within the tolerance range required by the design; Hole position inspection: Check whether the dimensions of the mounting holes, connecting threads, etc. on the housing are accurate.
9. The high-pressure water pump alloy casing forming casting process as claimed in claim 8, characterized in that: The step 7) of processing the qualified shell specifically includes: according to the assembly requirements of the high-pressure water pump, drilling, tapping, milling, etc. are performed on the shell to make the size and precision of the shell meet the design requirements.
10. The high-pressure water pump alloy housing forming casting process according to claim 9, characterized in that: The machined shell is subjected to surface treatment, which includes grinding, spraying and electroplating to improve the corrosion resistance and aesthetics of the shell.
