Concrete, concrete processing equipment and processing method

Through the combination of rectangular annular ribs and semicircular grooves and specially designed concrete processing equipment, the problem of unstable connection of traditional concrete prefabricated block steel bars is solved, and a stable support structure and efficient concrete production are achieved.

CN119057923AInactive Publication Date: 2024-12-03赵萍
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411357281.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The steel bar connections of traditional concrete prefabricated blocks are not stable enough, resulting in insufficient support.

Method used

A structure that combines rectangular ring ribs and semicircular grooves is used to insert the semicircular grooves on the outside of the rectangular ring ribs through the semicircular ribs, and a stable support structure is formed after the concrete mortar is coated. Combined with specially designed concrete processing equipment to ensure the stability of the steel bar connection. .

Benefits of technology

The stable connection between steel bars is achieved, the stability of the support structure of concrete is improved, and the efficient production and construction quality of concrete is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057923A_ABST
    Figure CN119057923A_ABST
Patent Text Reader

Abstract

The invention relates to the field of concrete processing, in particular to concrete, concrete processing equipment and a concrete processing method. The concrete comprises a plurality of rectangular ring ribs, semi-circular grooves and semi-circular ribs, the rectangular ring ribs are arranged from left to right, the semi-circular grooves are formed in the four faces of the outer side of each rectangular ring rib, the number of the semi-circular ribs is four, the semi-circular ribs are inserted into the semi-circular grooves in the outer sides of the rectangular ring ribs, and the rectangular ring ribs and the four semi-circular ribs are wrapped by concrete mortar. A concrete processing method comprises the following steps that S1, a plurality of rectangular ring ribs are taken and placed from left to right; s2, four semicircular ribs are inserted into semicircular grooves in the outer sides of the multiple rectangular ring ribs, and a supporting structure is formed; s3, the two ends of the four semicircular ribs are inserted into the two side plates correspondingly, and the two side plates are placed into the groove box; and S4, concrete mortar is poured between the two side plates, the multiple rectangular ring ribs and the four semicircular ribs are wrapped, and the concrete mortar is waited to be solidified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of concrete processing, and more specifically to concrete, concrete processing equipment and a processing method. Background Art

[0002] Precast concrete blocks refer to concrete components that are prefabricated in a factory environment according to certain specifications and standards. These components are transported to the construction site for installation. The use of precast blocks can improve construction efficiency, ensure quality, and reduce the labor intensity of on-site construction.

[0003] The main types are:

[0004] Prefabricated floor slab: used for the floor structure of buildings, common types include solid slabs, hollow slabs, etc.

[0005] Precast beams: used to carry the structure and transfer the upper load to the supporting points.

[0006] Prefabricated walls: including exterior walls and interior walls, often used to quickly build wall structures.

[0007] Traditional precast concrete blocks are tightly made of steel bars, but the connection between the steel bars is not stable enough and the support cannot reach the optimal state. Summary of the invention

[0008] In order to overcome the deficiencies of the prior art, the present invention provides a concrete, concrete processing equipment and a processing method, which have the beneficial effect of being able to produce concrete with a stable supporting structure, and the connection between steel bars is stable.

[0009] A concrete comprises rectangular ring bars, semicircular grooves and semicircular bars, wherein a plurality of rectangular ring bars are arranged from left to right, and semicircular grooves are arranged on four outer sides of each rectangular ring bar, and four semicircular bars are arranged, and the semicircular bars are inserted into the semicircular grooves on the outer sides of the plurality of rectangular ring bars, and the plurality of rectangular ring bars and the four semicircular bars are covered by concrete mortar.

[0010] A concrete processing device comprises a trough box, wherein both left and right ends of the trough box are slidably connected with side plates, and each side plate is provided with semicircular holes in four directions, and the ends of the semicircular ribs can be inserted into the semicircular holes.

[0011] A concrete processing device is used to process a concrete processing method, comprising the following steps:

[0012] S1: Place several rectangular ring ribs from left to right;

[0013] S2: insert four semicircular ribs into the semicircular grooves outside the multiple rectangular ring ribs to form a supporting structure;

[0014] S3: Insert the two ends of the four semicircular ribs into the two side panels respectively, and put the two side panels into the slot box;

[0015] S4: Pour concrete mortar between the two side plates, cover multiple rectangular ring bars and four semicircular bars, and wait for the concrete mortar to solidify. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0017] Figure 1 A schematic diagram of the structure of a concrete processing equipment Figure 1 ;

[0018] Figure 2 A schematic diagram of the structure of a concrete processing equipment Figure 2 ;

[0019] Figure 3 A schematic diagram of the structure of a concrete processing equipment Figure 3 ;

[0020] Figure 4 A schematic diagram of a concrete structure Figure 1 ;

[0021] Figure 5 A schematic diagram of a concrete structure Figure 2 ;

[0022] Figure 6 The structure of the trough box is shown in Figure 1. Figure 1 ;

[0023] Figure 7 The structure of the trough box is shown in Figure 1. Figure 2 ;

[0024] Figure 8 It is a structural schematic diagram of a portal frame;

[0025] Fig. 9 The structure of the cover plate Figure 1 ;

[0026] Fig.10 The structure of the cover plate Figure 2 .

[0027] In the figure: rectangular annular rib 101; semicircular groove 102; semicircular rib 103;

[0028] Groove box 201; semicircular hole 202; socket 203; side plate 204; ring cylinder 205; stop pin 206; pressure head 207; pressure column 208;

[0029] Door frame 301; protruding piece 302; screw one 303; screw two 304; protruding seat 305; guide rod 306; insert 307; fixing seat 308;

[0030] Cover plate 401; boss 402; screw three 403; L-shaped frame 404; handle 405; upper seat 406; horizontal column 407. DETAILED DESCRIPTION

[0031] like Figure 4-5 As shown, this example can achieve the effect of stabilizing the connection between the steel bars.

[0032] A concrete comprises a rectangular ring reinforcement 101, a semicircular groove 102 and a semicircular reinforcement 103. A plurality of rectangular ring reinforcements 101 are arranged from left to right, and semicircular grooves 102 are arranged on four outer surfaces of each rectangular ring reinforcement 101. Four semicircular reinforcements 103 are arranged, and the semicircular reinforcements 103 are inserted into the semicircular grooves 102 on the outer sides of the plurality of rectangular ring reinforcements 101. The plurality of rectangular ring reinforcements 101 and the four semicircular reinforcements 103 are covered with concrete mortar. Since a plurality of rectangular ring reinforcements 101 are arranged from left to right, support is provided from left to right by the plurality of rectangular ring reinforcements 101, and the semicircular reinforcement 103 can be inserted into the semicircular grooves 102 on the outer sides of the rectangular ring reinforcement 101, so that the connection between the steel bars is stable, and the concrete mortar is covered on the rectangular ring reinforcement 101 and the semicircular reinforcement 103, so as to produce concrete with a stable supporting structure.

[0033] like Figure 4-7 As shown, this example can achieve the effect of suspending the plurality of rectangular ring ribs 101 between the four semicircular ribs 103 in space.

[0034] Since the left and right ends of the trough box 201 are slidably connected with the side panels 204, each side panel 204 is provided with semicircular holes 202 in four directions, and the ends of the semicircular ribs 103 can be inserted into the semicircular holes 202. A space for pouring concrete mortar is made in the trough box 201 through the two side panels 204, and the semicircular ribs 103 are inserted through the semicircular holes 202, so that the four semicircular ribs 103 are suspended in the space, and the multiple rectangular ring ribs 101 between the four semicircular ribs 103 are suspended in the space, and then it is convenient to pour concrete mortar into the space to cover the supporting structure.

[0035] like Figure 6-7 As shown, this example can achieve the effect of preventing the semicircular rib 103 from separating from the side plate 204.

[0036] Since an annular cylinder 205 is welded to the outer side of the side plate 204, four pressure columns 208 are slidably connected to the annular cylinder 205, and a pressure head 207 is welded to the end of each pressure column 208. Each pressure head 207 presses on the end of the corresponding semicircular rib 103. The pressure column 208 can slide on the annular cylinder 205, so that the pressure head 207 is pressed against the end of the semicircular rib 103, thereby preventing the semicircular rib 103 from detaching from the side plate 204.

[0037] like Figure 6-7 As shown, this example can achieve the effect of fixing the end of the semicircular rib 103 on the side plate 204.

[0038] Since the pressure column 208 is plugged with a stop pin 206, the stop pin 206 is located on the inner side of the ring tube 205, and the pressure column 208 is sleeved with a compression spring, which is located between the ring tube 205 and the pressure head 207. The compression spring always gives an outward force to the pressure head 207, so that the pressure head 207 can be pressed on the end of the semicircular rib 103, and then the end of the semicircular rib 103 is fixed on the side plate 204. The stop pin 206 can prevent the pressure column 208 from detaching from the ring tube 205.

[0039] like Figure 9-10 As shown, this example can achieve the effect of smoothing the upper side of the concrete.

[0040] Since the upper side of the tank box 201 is provided with a cover plate 401. After the concrete mortar is poured, the cover plate 4011 is covered on the upper sides of the two side plates 204, and then the upper side of the concrete is smoothed.

[0041] like Figure 9-10 As shown, this example can achieve the effect of conveniently controlling the cover plate 401 to smooth the concrete.

[0042] Since an upper seat 406 is welded to the upper side of the cover plate 401 and a handle 405 is welded to the upper side of the upper seat 406 , the cover plate 401 can be conveniently controlled to smooth the concrete through the handle 405 .

[0043] like Figure 9-10 As shown, this example can achieve the effect of controlling the cover plate 401 to move left and right on the upper side of the concrete.

[0044] Since the upper seat 406 is slidably connected to the middle of the horizontal column 407, the horizontal column 407 is fixed to the upper part of the L-shaped frame 404, the left and right ends of the horizontal column 407 are sleeved with compression springs, and the two compression springs are respectively located on both sides of the upper seat 406. Two protruding columns 402 are fixed to the rear side of the slot box 201, and the L-shaped frame 404 is vertically slidably connected to the two protruding columns 402. Each protruding column 402 is threadedly connected with a screw three 403, and the screw three 403 is pressed on the L-shaped frame 404. The L-shaped frame 404 slides vertically on the two protruding columns 402 to control the height of the cover plate 401. The L-shaped frame 404 can be fixed on the protruding column 402 by rotating the screw 403. When the cover plate 401 is pressed on the upper side of the concrete, the upper seat 406 is driven to slide left and right on the horizontal column 407, thereby controlling the cover plate 401 to move left and right on the upper side of the concrete, and then smoothing the upper side of the concrete. Two compression springs can help the cover plate 401 and the upper seat 406 to return to their original positions.

[0045] like Figure 6-8 As shown, this example can achieve the effect of fixing the portal frame 301 at the required position on the trough box 201.

[0046] Since the front and rear sides of the trough box 201 are fixed with fixed seats 308, the middle parts of the two guide rods 306 are respectively fixed on the two fixed seats 308, and the two portal frames 301 are arranged left and right. The front and rear sides of the portal frame 301 are fixed with protrusions 302, and the two protrusions 302 are respectively slidably connected to the ends of the two guide rods 306, and each protrusion 302 is threadedly connected with a screw 303, and the screw 303 is pressed on the corresponding guide rod 306. The portal frame 301 can move left and right on the two guide rods 306 through the two protrusions 302, thereby controlling the left and right movement of the portal frame 301, and fixing the portal frame 301 at the required position on the trough box 201.

[0047] like Figure 6-8 As shown, this example can achieve the effect of locking the side panel 204 at the required left and right positions on the slot box 201.

[0048] Since sockets 203 are fixed on the front and rear sides of the outer side of the side panel 204, two plug-ins 307 are slidably connected to the portal frame 301, and the two plug-ins 307 can be respectively inserted into the two sockets 203. Two protrusions 305 are fixed to the portal frame 301, and each protrusion 305 is threadedly connected with a screw 2 304. The two screws 2 304 are respectively pressed on the two plug-ins 307. The two plug-ins 307 can slide on the portal frame 301, so that the two plug-ins 307 can be respectively inserted into the two sockets 203, and then the side panel 204 is locked at the required left and right positions on the trough box 201, so as to make concrete of different lengths. The screw 2 304 is rotated to press on the plug-in 307, so that the plug-in 307 is fixed to the portal frame 301 to prevent the plug-in 307 from sliding at will.

[0049] A concrete processing device is used to process a concrete processing method, comprising the following steps:

[0050] S1: Place multiple rectangular ring ribs 101 from left to right;

[0051] S2: inserting four semicircular ribs 103 into the semicircular grooves 102 outside the plurality of rectangular annular ribs 101 to form a support structure;

[0052] S3: Insert the two ends of the four semicircular ribs 103 into the two side plates 204 respectively, and put the two side plates 204 into the slot box 201;

[0053] S4: Concrete mortar is poured between the two side plates 204 to cover the plurality of rectangular ring reinforcements 101 and the four semicircular reinforcements 103 , and the concrete mortar is waited to solidify.

Claims

1. A concrete comprising a rectangular ring rib (101), a semicircular groove (102) and a semicircular rib (103), characterized in that: The rectangular ring reinforcement (101) is provided with a plurality of them from left to right, and the four outer surfaces of each rectangular ring reinforcement (101) are provided with semicircular grooves (102), and four semicircular reinforcements (103) are provided. The semicircular reinforcements (103) are inserted into the semicircular grooves (102) on the outer sides of the plurality of rectangular ring reinforcements (101), and the plurality of rectangular ring reinforcements (101) and the four semicircular reinforcements (103) are covered with concrete mortar.

2. A concrete processing device, comprising a trough box (201), characterized in that: The left and right ends of the trough box (201) are slidably connected to side plates (204), and semicircular holes (202) are arranged in four directions on each side plate (204), and the ends of the semicircular ribs (103) can be inserted into the semicircular holes (202).

3. A concrete processing equipment according to claim 2, characterized in that: An annular cylinder (205) is fixed on the outer side of the side plate (204), and four pressing columns (208) are slidably connected to the annular cylinder (205). A pressing head (207) is fixed at the end of each pressing column (208), and each pressing head (207) presses on the end of a corresponding semicircular rib (103).

4. A concrete processing equipment according to claim 3, characterized in that: A stop pin (206) is fixed on the pressure column (208), and the stop pin (206) is located on the inner side of the annular tube (205). A compression spring is sleeved on the pressure column (208), and the compression spring is located between the annular tube (205) and the pressure head (207).

5. A concrete processing equipment according to claim 4, characterized in that: A cover plate (401) is provided on the upper side of the tank box (201).

6. A concrete processing equipment according to claim 5, characterized in that: An upper seat (406) is fixed on the upper side of the cover plate (401), and a handle (405) is fixed on the upper side of the upper seat (406).

7. A concrete processing equipment according to claim 6, characterized in that: The upper seat (406) is laterally slidably connected to the middle part of the cross column (407), the cross column (407) is fixed to the upper part of the L-shaped frame (404), the left and right ends of the cross column (407) are sleeved with compression springs, the two compression springs are respectively located on both sides of the upper seat (406), the rear side of the slot box (201) is fixed with two convex columns (402), the L-shaped frame (404) is vertically slidably connected to the two convex columns (402), each convex column (402) is threadedly connected with a screw three (403), and the screw three (403) is pressed on the L-shaped frame (404).

8. A concrete processing equipment according to claim 7, characterized in that: The front and rear sides of the trough box (201) are both fixed with fixed seats (308), the middle parts of the two guide rods (306) are respectively fixed on the two fixed seats (308), the two door-shaped frames (301) are arranged on the left and right, and the front and rear sides of the door-shaped frames (301) are both fixed with protruding pieces (302), the two protruding pieces (302) are respectively slidably connected to the ends of the two guide rods (306), each protruding piece (302) is threadedly connected with a screw (303), and the screw (303) is pressed on the corresponding guide rod (306).

9. A concrete processing equipment according to claim 8, characterized in that: Sockets (203) are fixed on both the front and rear sides of the outer side of the side plate (204); two plugs (307) are slidably connected to the door frame (301); the two plugs (307) can be respectively inserted into the two sockets (203); the door frame (301) is fixed with two convex seats (305); each convex seat (305) is threadedly connected with a second screw (304); the two second screws (304) are respectively pressed on the two plugs (307).

10. A method for processing concrete using the concrete processing equipment according to claim 9, characterized in that: The following steps are involved: S1: Take a plurality of rectangular ring ribs (101) and place them from left to right; S2: inserting four semicircular ribs (103) into the semicircular grooves (102) outside the plurality of rectangular annular ribs (101) to form a support structure; S3: inserting two ends of the four semicircular ribs (103) into the two side plates (204) respectively, and placing the two side plates (204) into the slot box (201); S4: Concrete mortar is poured between the two side plates (204) to cover the plurality of rectangular ring reinforcements (101) and the four semicircular reinforcements (103), and the concrete mortar is waited to solidify.