Dam rear embankment recovery lead wire gabion and construction method thereof

By using support and template reinforcement in the lead wire gabion, and using vibrating motors and vibrating components, the problem of insufficient stability and durability of the traditional lead wire gabion is solved, and the stable repair and reinforcement of the dam body is achieved, which significantly improves the Durability of the dam body.

CN119061837APending Publication Date: 2024-12-03BEIJING TONGCHENGDA WATER AFFAIRS CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411299973.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Traditional lead wire gabions lack stability and durability during construction, especially in areas where flexibly adjusting the protective structure, it is difficult to meet the reinforcement needs of water conservancy projects.

Method used

A cage is made of multiple lead wire mesh plates and reinforced by support and formwork, combined with a vibration motor and a vibration assembly to form a stable support, and mortar is poured outside the dam to enhance structural stability and durability.

Benefits of technology

The stability and durability of the lead wire gabion are improved, and the repair and reinforcement effect of the dam body is ensured. The durability of the dam body after repair is significantly improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061837A_ABST
    Figure CN119061837A_ABST
Patent Text Reader

Abstract

The invention relates to a dam rear embankment recovery lead wire gabion and a construction method thereof, relates to the field of hydraulic engineering, is used for being built on one side of a dam body, and comprises a plurality of gabion bodies, and each gabion body comprises a lead wire frame; the plurality of lead wire net plates are formed by weaving lead wire net lines, the binding lines are used for binding each lead wire net plate on the corresponding side of the lead wire frame, the plurality of cage bodies are arranged to form a cuboid supporting body, a supporting piece is installed on each side face of each supporting body, each supporting piece comprises a transverse rod and a vertical rod, installation ends are arranged at the two ends of each transverse rod, and the installation ends are arranged at the two ends of each vertical rod. Mounting grooves are formed in the same side wall of the two mounting ends of the same cross rod, the mounting groove in each cross rod is connected with the corresponding lead wire frame in a clamped mode, the two ends of each vertical rod are provided with mounting ends provided with mounting grooves, the mounting grooves in the upper ends of the vertical rods are connected with the lead wire frame on the upper side in a clamped mode, and the lower ends of the vertical rods abut against the ground or other adjacent objects. The method has the effect of improving the stability and durability of the lead wire gabion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of water conservancy projects, and in particular to a wire mesh gabion for restoring the masonry behind a dam and a construction method thereof. Background Art

[0002] In water conservancy projects, masonry structures are often used to reinforce shore structures and prevent erosion. Traditional masonry methods include concrete pouring and stone stacking, but these methods are not ideal in some environments, especially for areas where the masonry form needs to be flexibly adjusted. Wire mesh gabions are increasingly favored by engineers as a solution that can quickly build masonry structures according to actual needs.

[0003] The traditional construction method of wire gabions is to put stones into cages woven by wire, and then pile the cages on the embankment or river bank that needs to be reinforced. Although this method is flexible, the stability and durability of wire gabions is an important issue during construction. Summary of the invention

[0004] In order to improve the stability and durability of wire gabions, the present application provides a wire gabion for restoring the masonry behind a dam and a construction method thereof.

[0005] In the first aspect, the wire gabion for restoring the dam back protection provided by the present application adopts the following technical solution: A wire gabion for restoring masonry behind a dam, used for being stacked on one side of a dam body, comprises a plurality of cage bodies, each cage body comprises a wire frame, a plurality of wire mesh panels woven with wire mesh lines, and a tying line for tying each wire mesh panel to a corresponding side of the wire frame, the plurality of cage bodies are arranged into a rectangular support body, each side of each support body is equipped with a support member, each support member comprises a cross bar and a vertical bar, each of the two ends of the cross bar is provided with a mounting end, the same side wall of the two mounting ends on the same cross bar is provided with a mounting groove, the mounting groove on each cross bar is clamped with the corresponding wire frame, and the two ends of each vertical bar are also provided with a mounting end with a mounting groove, the mounting groove at the upper end of the vertical bar is clamped with the wire frame on the upper side, the lower end of the vertical bar contacts the ground or other adjacent objects, and a connecting groove is also provided on a side wall of the vertical bar close to the cage body, and the connecting groove is clamped with an adjacent cross bar.

[0006] By adopting the above technical solution, the cage is filled with stones, and the cage is laid on one side of the dam body, and multiple adjacent cages are arranged into a cuboid to form a support body. Support members are installed on the outside of each support body. During the installation process, a cross bar is installed on each side wall so that the installation grooves at both ends of the cross bar are respectively engaged with the wire frame. Then take out the vertical bar and set it vertically with the cross bar, and engage the installation groove at the upper end of the vertical bar with the upper end of the corresponding side of the wire frame. Multiple cages form an integral support body, which is convenient for improving the stability and durability of the wire gabion.

[0007] Preferably, the mounting end is plastic and the caliber of the mounting groove is smaller than the inner diameter of the mounting groove, and the diameter of the lead wire frame is equal to the inner diameter of the mounting groove.

[0008] By adopting the above technical solution, the opening of the installation groove is aligned with the lead wire frame, and the horizontal bar or vertical bar is pressed toward the lead wire frame until the lead wire frame is squeezed into the installation groove. In this way, the installation of the horizontal bar or vertical bar is completed, and the installation is simple and stable.

[0009] Preferably, one side wall of the support body is in close contact with the dam body, and a template is provided on the side of each support body that does not contact the dam body. Each template is supported on the bottom surface, and a casting cavity is formed between the three templates and the dam body. Mortar is poured into the casting cavity to form a reinforcement body wrapped around the outside of the support body.

[0010] By adopting the above technical solution, a formwork is provided on the outer side of each supporting body to form a casting cavity between the three formworks and the dam body, and mortar is poured into the casting cavity. After the mortar solidifies, a reinforcement body is formed, which facilitates further improving the stability and durability of the wire mesh gabion.

[0011] Preferably, an outer side wall of one of the templates is fastened with a vibration motor by means of screws.

[0012] By adopting the above technical solution, after the mortar is poured into the pouring cavity, a vibration motor is installed on the outer wall of one of the templates, and then the vibration motor is started, so that the mortar in the pouring cavity can be vibrated.

[0013] Preferably, each outer side wall of the template is installed with a vibrating assembly, and the vibrating assembly includes a fixed plate installed on the template, a side of the fixed plate facing away from the template is fixedly connected to a plurality of springs, one end of the plurality of springs away from the fixed plate is commonly fixedly connected to the vibrating plate, and a side wall of the vibrating plate close to the template is fixedly connected to a vibrating rod.

[0014] By adopting the above technical solution, when the vibration motor is started, the vibration of the vibration motor drives each template to vibrate, the vibration of the template drives each fixed plate and spring to vibrate, and the vibration of the spring reciprocates and extends, thereby driving the vibrating plate and the vibrating rod to reciprocate, and the reciprocating motion of the vibrating rod strikes the corresponding template, thereby improving the vibration effect.

[0015] Preferably, one end of the vibrating rod close to the template is fixedly connected with a rubber block.

[0016] By adopting the above technical solution, the reciprocating motion of the vibrating rod drives the rubber block to reciprocately knock the corresponding template, which makes it easier to knock the template and reduces the situation where the vibrating rod directly contacts the template and causes damage to the template.

[0017] Preferably, the outer side wall of each template is fixedly connected with a reinforcing rib, and the end of the fixing plate facing away from the spring is fixedly connected with a screw, and the screw is threadedly connected to the reinforcing rib.

[0018] By adopting the above technical solution, it is easy to install and disassemble the vibrating assembly on each template, which facilitates the smooth formwork, and the vibrating assembly can be installed relatively smoothly and easily after the formwork is completed.

[0019] In the second aspect, the present application provides a construction method for restoring wire mesh gabions behind a dam by adopting the following technical solution: A construction method for restoring wire gabions behind a dam, comprising the following steps: S1. Clearing and leveling: Before paving, level and compact the slope foot and slope surface; S2. Laying of filter layer: Use geotextile to lay the filter layer to make it flat and uniform; S3. Laying of wire gabions: Lay the cages layer by layer from bottom to top, with three cages in each layer forming a group of supports, and install support members on the outside of the supports; S4, supporting formwork for a single support body in each layer and pouring mortar, or supporting formwork for cage bodies in the same layer and pouring mortar at the same time; S5. Vibration and compaction: vibrate the cage after pouring to make the mortar fully filled and compacted in the cage; S6. Stacking of upper gabions: After the mortar in the lower cage is vibrated and compacted and initially solidified, stack the cages of the next layer on the upper layer of the current cage. Repeat the above steps until the entire wire gabion is completed.

[0020] By adopting the above technical solution, it is easy to repair and reinforce the dam body, and the repaired dam body has greater durability.

[0021] Preferably, the vibration compaction also includes: installing a vibration component on the outer wall of each template, installing a vibration motor on one of the templates, starting the vibration motor, the vibration motor drives each template to vibrate so as to vibrate the mortar, and at the same time the vibration motor drives each vibration component to knock the corresponding template.

[0022] By adopting the above technical solution, it is convenient to vibrate the poured mortar, thereby exhausting the mortar, making the mortar more compact after solidification.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Multiple cages form an integral support body, which is convenient for improving the stability and durability of the wire gabion; 2. When the vibration motor is started, the vibrating rod reciprocates to knock on the corresponding template, thus improving the vibration effect; 3. It is easy to repair and reinforce the dam body, and the repaired dam body has stronger durability. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of an embodiment of the present application showing wire mesh gabions being built on one side of a dam body.

[0025] Figure 2 It is a schematic diagram of the structure of the support member according to an embodiment of the present application.

[0026] Figure 3 It is a schematic diagram of the structure of the template embodied in the embodiment of the present application.

[0027] Figure 4 It is a schematic diagram of the structure of the vibrating assembly according to an embodiment of the present application.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. dam body; 2. cage body; 21. wire frame; 22. wire mesh; 3. support body; 4. support member; 41. cross bar; 42. vertical bar; 421. connecting groove; 43. mounting end; 431. mounting groove; 5. template; 51. reinforcing rib; 6. casting cavity; 7. vibration motor; 8. vibrating assembly; 81. fixing plate; 82. spring; 83. vibrating plate; 84. vibrating rod; 85. rubber block; 86. screw. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-Figure 4 This application is described in further detail.

[0030] The present application embodiment discloses a wire gabion for restoring the dam back protection masonry. Figure 1 and Figure 2, used to be stacked on one side of the dam body 1 to improve the stability and durability of the dam body 1. The dam body 1 can be in different shapes, such as sloped, stepped, etc. The dam body 1 of the embodiment of the present application is stepped. The wire gabion for restoring the dam's rear masonry includes a plurality of cages 2, each of which includes a wire frame 21, a wire mesh panel 22 woven with wire mesh wire, and a binding wire for fixing the wire mesh panel 22 to the wire frame 21. The wire frame 21 is the supporting structure of the cage 2 and has good toughness and strength. The wire mesh panel 22 is filled inside the wire frame 21, and the binding wire is used to tightly bind the wire mesh panel 22 to the wire frame 21 to ensure the structural stability of the cage 2.

[0031] Every three cage bodies 2 form a rectangular support body 3. A support member 4 is installed on each side of the support body 3 to enhance the stability of the entire structure. Each support member 4 includes four cross bars 41 and four vertical bars 42. Both ends of the cross bar 41 are provided with mounting ends 43, and the mounting ends 43 have mounting grooves 431. These mounting grooves 431 are clamped with the wire frame 21, so as to fix the cross bar 41 on the side of the support body 3.

[0032] The upper end of the vertical rod 42 is also provided with a mounting end 43, and the mounting end 43 on the vertical rod 42 is also provided with a mounting groove 431, and the mounting groove 431 on the vertical rod 42 is engaged with the upper wire frame 21. A connecting groove 421 is also provided on the side of the vertical rod 42 close to the support body 3, and the vertical rod 42 is located on the outside of the cross bar 41 and the connecting groove 421 is engaged with the cross bar 41. The lower end of the vertical rod 42 directly contacts the ground or other adjacent objects. In this embodiment, after the multi-layer cage bodies 2 are stacked, the vertical rods 42 in the upper cage bodies 2 are close to the lower cage bodies 2.

[0033] The mounting end 43 has a certain plasticity, the diameter of the mounting groove 431 is slightly smaller than its inner diameter, and the diameter of the wire frame 21 is larger than the diameter of the mounting groove 431 and equal to the inner diameter of the mounting groove 431. When the mounting groove 431 is engaged with the wire frame 21, a tighter and more stable connection can be formed. In addition, the mounting end 43 can also be made of other deformable materials, such as rubber, silicone, or plastic with a certain elasticity, which can also achieve a stable engagement effect.

[0034] Reference Figure 1 and Figure 3 , one side of the wire gabion is closely attached to the dam body 1. Templates 5 are provided on the other sides that are not in contact with the dam body 1. These templates 5 are supported on the ground and form a casting cavity 6 together with the dam body 1. Mortar will be poured into this casting cavity 6. When the mortar solidifies, a reinforcement body will be formed, which can further improve the stability and durability of the wire gabion.

[0035] Reference Figure 3 and Figure 4 In order to improve the pouring quality, a vibration motor 7 is also fastened to the outer wall of one of the templates 5. After the mortar is poured into the pouring cavity 6, the vibration motor 7 can be started. The vibration generated by the motor can help the mortar to better fill the entire pouring cavity 6, and can also discharge the bubbles therein, so that the reinforced body after pouring is more compact.

[0036] A vibrating assembly 8 is installed on the outer side wall of each template 5. Each vibrating assembly 8 includes a fixed plate 81 installed on the template 5, a plurality of springs 82, a vibrating plate 83 and two vibrating rods 84. The plurality of springs 82 are fixedly connected between the fixed plate 81 and the vibrating plate 83, and each vibrating rod 84 is fixedly connected to a side wall of the vibrating plate 83 close to the template 5.

[0037] When the vibration motor 7 is started, the vibration of the vibration motor 7 will be transmitted to the template 5, and then to the fixed plate 81 and the spring 82. The spring 82 will reciprocate under the action of vibration, driving the vibrating plate 83 and the vibrating rod 84 to reciprocate. The vibrating rod 84 will knock on the template 5 during movement, and this knocking can further improve the vibration effect, making the mortar more uniform and dense.

[0038] A rubber block 85 is fixedly connected to one end of each vibrating rod 84 close to the template 5 . The rubber block 85 can act as a buffer when the vibrating rod 84 hits the template 5 , and can also protect the template 5 from being directly damaged by the vibrating rod 84 .

[0039] In addition, in order to facilitate the installation of the vibrating assembly 8 on the template 5, a reinforcing rib 51 is fixedly connected to the outer wall of each template 5, and a fixing plate 81 is fixedly connected to a side wall of the template 5 close to a screw 86. The fixing plate 81 is threadedly connected to the reinforcing rib 51 through the screw 86, thereby facilitating the rapid installation and disassembly of the vibrating assembly 8.

[0040] The present application also discloses a construction method for restoring wire gabions behind a dam, comprising the following steps: S1. Clearing and leveling: Before construction, the slope foot and slope surface need to be leveled and compacted to prepare for subsequent paving work.

[0041] S2. Laying of filter layer: Lay the filter layer on the leveled foundation. The filter layer is generally laid with geotextile, and ensure that it is laid flat and evenly.

[0042] S3. Laying of wire gabions: Lay cages 2 layer by layer from bottom to top, and follow a certain rule, for example, three cages 2 in each layer form a group to form a support body 3. Install support members 4 on the outside of the support body 3 to enhance the stability of the structure.

[0043] S4. After each layer of support body 3 is assembled, a template 5 is set up on the outside of each support body 3, and mortar is poured to form a reinforcement body. The reinforcement body can further improve the stability and durability of the wire mesh gabion. It is also possible to choose to perform formwork and pouring operations on the cage body 2 of the same layer at the same time to improve construction efficiency.

[0044] S5. Vibration and compaction: The vibration operation is then performed until the cavity is fully filled with the slurry and the slurry is compacted to expel the bubbles therein and ensure the compactness of the reinforced body. In order to ensure the vibration effect, a vibration assembly 8 can be installed on the outside of each template 5, and a vibration motor 7 can be installed on one of the templates 5. After the vibration motor 7 is started, the motor will drive the template 5 to vibrate, and at the same time drive the vibration assembly 8 to knock the template 5.

[0045] S7. Stacking of upper gabions: After the mortar in the lower cage body 2 is vibrated and compacted and initially solidified, the stacking of the next layer of cage bodies 2 can be continued on the upper layer of the cage body 2. Repeat the above steps until the entire wire gabion masonry work is completed.

[0046] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A wire gabion for restoring the dam's back protection, used for being stacked on one side of a dam body (1), characterized in that: The invention comprises a plurality of cage bodies (2), each cage body (2) comprising a wire frame (21), a plurality of wire mesh panels (22) woven with wire mesh wires, and a tying wire for tying each wire mesh panel (22) to a corresponding side of the wire frame (21); the plurality of cage bodies (2) are arranged into a rectangular support body (3); each side of each support body (3) is provided with a support member (4); each support member (4) comprises a cross bar (41) and a vertical bar (42); both ends of each cross bar (41) are provided with mounting ends (43); the two mounting ends (43) on the same cross bar (41) are provided with mounting ends (44); The same side wall of the cage body (3) is provided with a mounting groove (431), the mounting groove (431) on each of the cross bars (41) is clamped with the corresponding wire frame (21), and both ends of each of the vertical bars (42) are provided with mounting ends (43) with mounting grooves (431), the mounting grooves (431) at the upper ends of the vertical bars (42) are clamped with the wire frame (21) on the upper side, the lower ends of the vertical bars (42) are in contact with the ground or other adjacent objects, and a connecting groove (421) is further provided on a side wall of the vertical bars (42) close to the cage body (2), and the connecting groove (421) is clamped with the adjacent cross bars (41).

2. A wire gabion for restoring the dam back protection according to claim 1, characterized in that: The mounting end (43) is plastic and the caliber of the mounting groove (431) is smaller than the diameter inside the mounting groove (431), and the diameter of the lead wire frame (21) is equal to the diameter inside the mounting groove (431).

3. The wire gabion for restoring the dam back protection masonry according to claim 1 is characterized in that: One side wall of the support body (3) is in close contact with the dam body (1); a template (5) is provided on the side of each support body (3) that is not in contact with the dam body (1); each template (5) is supported on the bottom surface; a casting cavity (6) is formed between the three templates (5) and the dam body (1); mortar is poured into the casting cavity (6) to form a reinforcement body wrapped around the outside of the support body (3).

4. A wire gabion for restoring the dam back protection according to claim 3, characterized in that: The outer side wall of one of the templates (5) is fastened to a vibration motor (7) via screws (86).

5. A wire gabion for restoring the dam back protection according to claim 4, characterized in that: The outer side wall of each template (5) is installed with a vibrating assembly (8), the vibrating assembly (8) comprising a fixing plate (81) installed on the template (5), a side of the fixing plate (81) facing away from the template (5) being fixedly connected to a plurality of springs (82), ends of the plurality of springs (82) away from the fixing plate (81) being commonly fixedly connected to a vibrating plate (83), and a side wall of the vibrating plate (83) close to the template (5) being fixedly connected to a vibrating rod (84).

6. A wire gabion for restoring the dam back protection according to claim 5, characterized in that: One end of the vibrating rod (84) close to the template (5) is fixedly connected to a rubber block (85).

7. The wire gabion for restoring the dam back protection masonry according to claim 5, characterized in that: The outer side wall of each template (5) is fixedly connected to a reinforcing rib (51), and one end of the fixing plate (81) facing away from the spring (82) is fixedly connected to a screw (86), and the screw (86) is threadedly connected to the reinforcing rib (51).

8. A construction method for restoring wire gabions behind a dam according to any one of claims 1 to 7, characterized in that: The steps include: S1. Clearing and leveling: Before paving, level and compact the slope foot and slope surface; S2. Laying of filter layer: Use geotextile to lay the filter layer to make it flat and uniform; S3. Laying of wire gabions: Laying the cage bodies (2) layer by layer from bottom to top, with three cage bodies (3) in each layer forming a group of support bodies, and installing support members (4) on the outer sides of the support bodies (3); S4, supporting the formwork and pouring mortar for a single support body (3) in each layer, or supporting the formwork and pouring mortar for the cage bodies (2) in the same layer at the same time; S5, vibrating and compacting: vibrating the poured cage (2) to ensure that the mortar is fully filled and compacted in the cage (2); S6. Stacking of the upper gabions: After the mortar in the lower cage body (2) is vibrated and compacted and initially solidified, the cage body (2) of the next layer is stacked on the upper layer of the cage body (2). The above steps are repeated until the entire wire gabion is built.

9. A construction method for restoring wire gabions behind a dam according to claim 8, characterized in that: The vibrating and compacting process further comprises: installing a vibrating assembly (8) on the outer wall of each template (5), installing a vibration motor (7) on one of the templates (5), starting the vibration motor (7), and the vibration motor (7) drives each template (5) to vibrate so as to vibrate the mortar, and at the same time the vibration motor (7) drives each vibrating assembly (8) to strike the corresponding template (5).