Steel pipe pile sinking positioning frame and positioning method thereof
By integrating leveling, positioning, detection and deviation correction components on the steel pipe pile positioning frame, the problems of low positioning accuracy and complex operation in the existing technology are solved, and the precise positioning and flexible deviation correction of steel pipe piles are realized, and the construction efficiency is improved and monitoring accuracy.
Patent Information
- Application Number
- CN202411482582.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-10-23
AI Technical Summary
The existing steel pipe pile positioning frame has a simple structure and cannot perform buffer positioning and correction and detection during lifting, resulting in low positioning accuracy of steel pipe piles, complex operation and low efficiency.
A steel pipe pile sinking pile positioning frame including leveling, positioning, detection and deviation correction components is designed. By adjusting the verticality of the frame body, the positioning component provides elastic support, and the detection component monitors the posture of the steel pipe pile in real time and corrects the deviation. The components are adjusted with an adjustable clamping structure to achieve precise positioning and deviation correction.
It improves the accuracy and efficiency of steel pipe pile positioning, simplifies operating steps, provides convenient construction conditions, and ensures multi-angle and multi-directional monitoring accuracy and angular deviation correction range.
Smart Images

Figure CN119061893A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile driving positioning in bridge engineering, and in particular to a steel pipe pile driving positioning frame and a positioning method thereof. Background Art
[0002] During the construction of bridge projects, the fishing method is generally used for steel pipe pile construction. The fishing method generally includes the following contents during the construction process: leveling the site, construction preparation, and advancing the construction from the end of the bridge to the head of the bridge; constructing the first span of steel pipe piles, pier caps and steel cap beams (including bearing pads, etc.) and the tail platform, and then constructing the main body of the bridge; using the first span as the construction platform, constructing the steel pipe piles and steel cap beams (including bearings, etc.) of the next span, and then carrying out the corresponding main bridge construction in sequence.
[0003] When the fishing method is used for steel pipe pile construction, the steel pipe pile is operated in the water. The current positioning frame is generally a steel structure body, which is placed in the water by hoisting, and part of the body is exposed to facilitate the lowering of the steel pipe pile.
[0004] In the prior art, a pile gripper is also used to position the steel pipe pile, so that the steel pipe pile can have a stable positioning effect on the positioning frame.
[0005] The conventional steel pipe pile positioning construction process usually includes a series of delicate steps. First, the center line of the pile position is accurately determined using professional measuring instruments, which is the basis for ensuring the stability and accuracy of the entire structure. Subsequently, the steel pipe pile is smoothly hoisted to the predetermined position by the hoisting equipment. Next, the center deviation and inclination of the steel pipe pile are carefully detected using measuring tools. Once a deviation is found, it is adjusted immediately until all parameters meet the design requirements. This process requires a high degree of accuracy and professionalism, because any slight deviation may have a significant impact on subsequent construction and the overall structural safety.
[0006] However, in actual operation, although the preliminary measurement work has been as accurate as possible, some unavoidable minor deviations may still be found after the steel pipe piles are in place. In the face of this situation, the method usually adopted at the construction site is to start the pile driver and use it to fine-tune the position of the pile driver. However, due to the large size of the pile driver and the limited operating space, it is often difficult to make such fine adjustments. Not only is the operation complicated, but the efficiency is also low. Sometimes, the final positioning accuracy of the steel pipe pile may even be affected due to inadequate fine adjustments. Therefore, how to improve the efficiency and accuracy of fine adjustments while ensuring safety has become an important issue that needs to be solved in the current steel pipe pile positioning construction. Based on this, it is necessary to study a steel pipe pile sinking positioning frame and its positioning method. Summary of the invention
[0007] In view of this, the purpose of the present invention is to provide a steel pipe pile positioning frame and a positioning method thereof, which effectively solves the problem that the existing positioning frame has a simple structure and is unable to perform buffering positioning of the steel pipe pile and correction and detection during the lifting process.
[0008] To achieve the above object, the technical solution adopted by the present invention is: a steel pipe pile sinking positioning frame, comprising a frame body, a positioning component, a deviation correction component, a detection component and a leveling component, wherein a leveling component for leveling the frame body is arranged at the bottom of the frame body; a pile sinking space is arranged inside the frame body; The positioning assembly includes a positioning sleeve, a positioning rod, a locking wire, a push rod, a spring and a push wheel; the positioning sleeve is distributed on the frame and evenly distributed on the circumference of the pile sinking space; the positioning rod is sleeved in the positioning sleeve and can be locked with a locking wire; the push rod is arranged in the positioning sleeve via a spring, so that the push rod is adjustable relative to the positioning rod; a push wheel is arranged at the end of the push rod, so as to form an adjustable elastic positioning surface of the steel pipe pile on the periphery of the pile sinking space; The deviation correction component includes a clamping sleeve, a deviation correction seat, an upper adjustment rod and a lower adjustment rod. The ends of the upper adjustment rod and the lower adjustment rod are hinged on two opposite sides of the frame. The upper adjustment rod and the lower adjustment rod are both telescopically adjustable and lockable structures, and are respectively tilted upward and downward. The deviation correction seat is hinged on the other end of the upper adjustment rod and the lower adjustment rod. The clamping sleeve is arranged on the deviation correction seat. The clamping sleeves on both sides are combined to form an adjustable clamping structure that can press against the steel pipe pile from both sides. The detection assembly includes a fixed seat, a ball seat, a sphere, a detection rod and a distance sensor; the fixed seat is fixed to the side of the frame, the ball seat is fixed to the end of the fixed seat, the sphere is hinged in the ball seat and can be locked by a top screw on the side, the detection rod is fixed to the lower part of the sphere, and a distance sensor is arranged on its side, and the distance sensor faces the center of the pile driving space.
[0009] Furthermore, a center seat is provided at the center of the frame, and the center seat is fixed to the frame via a connecting rod. The center seat is a square structure, and four positioning sleeves are provided and respectively distributed in the middle of the four sides of the center seat, and any positioning sleeve faces the center of the center seat.
[0010] Furthermore, the lower part of the frame is provided with supporting legs, the bottom of the supporting legs is provided with leveling components, and reinforcing rods are arranged between the supporting legs.
[0011] Furthermore, the leveling assembly includes a leveling seat, a cylinder, a lifting seat and a lifting block; there is a lifting cavity inside the leveling seat, a cylinder is arranged in the middle of the lifting cavity, the lifting block is adapted to be mounted in the lifting cavity and extends outward, a lifting seat is fixed at the bottom of the lifting block, and the lifting seat is adapted to be mounted on the outside of the leveling seat.
[0012] Furthermore, the positioning components are provided in at least two groups, and the two groups of positioning components are respectively configured at the upper part and the lower part of the frame.
[0013] Furthermore, the deviation-correcting components are provided in two groups, one above and one below, and the two groups of deviation-correcting components are distributed on the left and right sides and the front and back sides of the frame.
[0014] Furthermore, the detection components are provided in two groups and are arranged corresponding to the deviation correction components; the pile driving spaces are provided in two groups, and positioning components, deviation correction components and detection components are arranged around the two groups of pile driving spaces.
[0015] Furthermore, the clamping sleeve has a conical structure, and the clamping sleeves on both sides form a clamping structure arranged on both sides of the steel pipe pile.
[0016] Furthermore, a water tank is arranged on the frame, and the water tank is connected with a water filling and drainage structure.
[0017] A positioning method for a steel pipe pile sinking positioning frame, applied to the above-mentioned steel pipe pile sinking positioning frame, comprises the following steps; Step 1: Pile sinking Determine the center position of the pile, lower the positioning frame according to the pile position, sink the positioning frame into the water, and adjust its position; Step 2: Level adjustment Operate the oil cylinder to adjust the horizontality of the positioning frame from the four corners respectively, and determine the verticality of the positioning frame by using a level or a bubble level gauge; Step 3: Secure the positioning frame Fill the water tank with water to increase the deadweight of the positioning frame; Step 4: Piling Use a crane to lower the steel pipe pile so that it passes through the pile sinking space of the positioning frame; Step 5: Detection Further adjust the verticality of the detection assembly to ensure that the detection rod is in a vertical state, use two sets of distance measuring sensors spaced on the detection rod to obtain the distance between it and the surface of the steel pipe pile, analyze the verticality of the steel pipe pile, and generate a correction plan; Step 6: Correction Extend or shorten the upper and lower adjusting rods to make the clamping sleeves close to the steel pipe pile from both sides, and then synchronously operate the upper and lower adjusting rods on both sides to adjust the posture of the steel pipe pile in the clamping state; Step 7: Firm positioning Operate the positioning rod to slide in the positioning sleeve so that the top wheel rests against the surface of the steel pipe pile, and then lock the positioning rod; Step 8: Continuous monitoring and correction The distance measuring sensor is used to continuously monitor the posture of the steel pipe pile, and the posture information of the steel pipe pile is fed back to the controller, and the controller generates an adjustment strategy based on the posture information.
[0018] The beneficial effect of the above technical solution is: in view of the problems existing in the existing positioning frame structure, the present invention transforms the positioning frame structure, and configures a positioning component, a correction component, a detection component and a leveling component on the positioning frame. The precise positioning and correction of the steel pipe piles are achieved by configuring the above components. That is, a structure that can monitor the posture of the steel pipe piles in real time and adjust the posture is configured on the main body of the positioning frame. It is easy to use and has flexible adjustment operation, which greatly simplifies the operation steps and difficulty of adjusting the position of the steel pipe piles and provides convenience for construction personnel.
[0019] The leveling component is used to adjust the verticality of the positioning frame body so that it can have a better verticality foundation; The positioning assembly is used for providing buffered flexible support for steel pipe piles and has two-stage adjustment, namely, buffered flexible adjustment and free adjustment of adjustable locking wire. Through the two-stage adjustment, the positioning assembly can adapt to different outer diameters of steel pipe piles.
[0020] The detection component is used to detect the verticality of the steel pipe pile in the lowered working state. The vertical state of the detection rod is realized through the ball seat structure, and multiple distance measuring sensors are arranged on the detection rod. The distance measuring sensors are used to monitor the distance between it and the surface of the steel pipe pile, so as to judge the verticality of the steel pipe pile; the controller produces a correction strategy according to the feedback of the verticality of the steel pipe pile, and controls the upper adjustment rod and the lower adjustment rod to extend and shorten, so that the clamping sleeve can clamp the steel pipe pile for corresponding posture adjustment.
[0021] The correction component drives the correction seat to adjust the posture according to the upper adjustment rod and the lower adjustment rod. That is, the correction component can be used to enable the clamping sleeve to clamp the steel pipe pile, and then adjust the posture in the corresponding direction to keep the center of the steel pipe pile on the center line of the pile.
[0022] At the same time, the detection components and the correction components in the present invention are arranged in multiple groups in multiple directions, which can feedback the posture of the steel pipe pile from multiple angles and perform multi-angle positioning adjustments. The monitoring is accurate and the steel pipe pile angle correction adjustment range is large.
[0023] In summary, the present invention transforms the positioning frame structure and configures leveling, positioning, detection and correction components on it, thereby realizing precise positioning and flexible correction of steel pipe piles, simplifying the posture adjustment operation of steel pipe piles, and improving construction efficiency. The multi-angle and multi-directional arrangement ensures the monitoring accuracy and a wide adjustment range of the steel pipe pile angle correction, providing great convenience for construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a schematic diagram of the main structure of the present invention; Figure 3 It is a side view structural schematic diagram of the present invention; Figure 4 It is a schematic diagram of the top view of the structure of the present invention; Figure 5 It is a schematic diagram of the implementation structure of the detection component; Figure 6 It is a schematic diagram of the implementation structure of the positioning component; Figure 7 Schematic diagram of different correction angles for the correction component; Figure 8 It is a schematic diagram of the implementation structure of the leveling component; Fig. 9 Schematic diagram of the implementation structure of the guardrail.
[0025] Figure markings: 1-frame, 2-leg, 21-reinforcement rod, 3-leveling assembly, 31-naughty seat, 32-oil cylinder, 33-lifting block, 34-driving block, 35-lifting seat, 4-positioning assembly, 41-center seat, 42-positioning sleeve, 43-positioning rod, 44-top rod, 45-top wheel, 46-spring, 47-spring seat, 48-end cap, 49-top screw, 5-correction assembly, 51-upper adjustment rod, 52-lower adjustment rod, 53-hinge seat, 54-correction seat, 55-clamping sleeve, 56-installation sleeve, 6-detection assembly, 61-fixed seat, 62-ball seat, 63-top screw, 64-ball, 65-detection rod, 66-distance sensor, 7-steel pipe pile, 8-fence, 9-pile center line. DETAILED DESCRIPTION
[0026] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: Embodiment 1. This embodiment aims to provide a steel pipe pile sinking positioning frame and a positioning method thereof, which are mainly used for positioning steel pipe piles during bridge and road construction. In view of the problem that the current positioning frame has a simple structure and is unable to perform buffering positioning of steel pipe piles and correction and detection during the lifting process, this embodiment provides a steel pipe pile sinking positioning frame, which realizes accurate positioning and flexible correction of steel pipe piles by configuring leveling, positioning, detection and correction components.
[0027] In specific structures, such as Figure 1In the figure, a steel pipe pile positioning frame is shown, including a frame 1, a positioning component 4, a correction component 5, a detection component 6 and a leveling component 3. The bottom of the frame 1 is provided with a leveling component 3 for leveling the frame 1; a pile driving space is provided inside the frame 1; in this embodiment, the frame 1 is a frame-like structure, and there are one or more pile driving spaces inside it. For the convenience of explanation, this embodiment is shown by taking two as an example, that is, two groups of pile driving spaces are provided, and positioning components 4, correction components 5 and detection components 6 are arranged around the two groups of pile driving spaces. The two groups of pile driving spaces are suitable for the situation of bridge and road construction, that is, two groups of spaced-apart steel pipe piles 7 structures can be constructed and positioned simultaneously on one positioning frame.
[0028] The positioning assembly 4 includes a positioning sleeve 42, a positioning rod 43, a locking wire, a push rod 44, a spring 46 and a push wheel 45; the positioning sleeves 42 are distributed on the frame 1 and are evenly distributed on the circumference of the pile sinking space; in a specific implementation, a center seat 41 is provided at the center of the frame 1, and the center seat 41 is fixed to the frame 1 via a connecting rod. The center seat 41 is a square structure, and the square structure facilitates the arrangement of the positioning sleeves 42. There are four positioning sleeves 42, which are respectively distributed in the middle of the four sides of the center seat, and any positioning sleeve 42 faces the center of the center seat 41. Of course, during implementation, the center seat can also be configured as other equilateral polygonal structures, such as regular triangular deformation, hexagon, etc., and the positioning assembly 4 is correspondingly configured on each side of the center seat.
[0029] Structurally, in order to achieve the adjustment of the positioning spacing of the positioning assembly 4, the positioning rod 43 is inserted into the positioning sleeve 42 and can be locked with a lock wire 49, thereby achieving free adjustment of the positioning end support spacing; the top rod 44 is arranged in the positioning sleeve via a spring 46, so that the top rod 44 is adjustable relative to the positioning rod 43; a top wheel 45 is provided at the end of the top rod 44, and the top wheel 45 is used to adapt and fit with the steel pipe pile 7, and provide support and positioning in a sliding fit on the contact surface, thereby forming an adjustable elastic positioning surface of the steel pipe pile 7 on the periphery of the pile driving space.
[0030] In specific structures such as Figure 6 As shown in the figure, the positioning rod 43 is sleeved in the positioning sleeve 42, and the push rod 44 is sleeved in the positioning rod 43, that is, a buffer inner cavity is set at the front end of the push rod 44, and a spring seat 47 is provided on the push rod 44. The spring 46 is sleeved on the push rod 44 and is in the buffer inner cavity. The outer end is limited by the spring seat 47. By sleeved an end cap 48 on the outer end of the push rod 44 and threadedly connected to the push rod 44, the elastic telescopic function of the push rod 44 is realized. Through two-stage adjustment, the positioning component 4 can adapt to different outer diameters of the steel pipe pile 7, which can not only provide a certain positioning strength for the steel pipe pile 7, but also adapt to the posture of the steel pipe pile 7.
[0031] like Figure 7In the structure shown in the figure, the correction component 5 includes a sleeve 55, a correction seat 54, an upper adjusting rod 51 and a lower adjusting rod 52. The ends of the upper adjusting rod 51 and the lower adjusting rod 52 are hinged on two opposite sides of the frame 1. The upper adjusting rod 51 and the lower adjusting rod 52 are both telescopically adjustable and can be locked. They are configured to be tilted upward and downward respectively. During implementation, the upper adjusting rod 51 and the lower adjusting rod 52 can be electric telescopic rods. The electric telescopic rods can be selected from electric telescopic rods with waterproof performance characteristics, which can be used for underwater applications.
[0032] The correcting seat 54 is hinged at the other end of the upper adjusting rod 51 and the lower adjusting rod 52, and the clamping sleeve 55 is arranged on the correcting seat 54. The clamping sleeves 55 on both sides are combined to form an adjustable clamping structure that can lean against the steel pipe pile 7 from both sides; during implementation, one side of the correcting seat 54 is connected with the clamping sleeve 55, and the specific connection method can be a fixed combination of the clamping sleeve 55 connection or an integral fixed connection, and the other side of the correcting seat 54 is provided with an articulated seat 53 at the upper and lower parts, and the upper adjusting rod 51 and the lower adjusting rod 52 are respectively hinged to the upper and lower articulated seats 53, and the ends of the upper adjusting rod 51 and the lower adjusting rod 52 are hinged to the mounting sleeve 56, and the mounting sleeve 56 is fixed on the frame 1, that is, the upper adjusting rod 51 and the lower adjusting rod 52 are both hinged structures at both ends, and the angle of the correcting seat 54 is adjusted when extending or shortening.
[0033] The detection assembly 6 includes a fixing seat 61, a ball seat 62, a sphere 64, a detection rod 65 and a distance sensor 66; the fixing seat 61 is fixed to the side of the frame 1, the ball seat 62 is fixed to the end of the fixing seat 61, the sphere 64 is hinged in the ball seat 62, and can be locked by a top screw 63 on the side, the detection rod 65 is fixed to the lower part of the sphere 64, and a distance sensor 66 is arranged on its side, and the distance sensor 66 faces the center of the pile sinking space, that is, the pile sinking center line 9. In this embodiment, the detection rod 65 is further adjusted in verticality on the basis of the frame 1, and the multi-directional adjustment of the sphere 64 is utilized. A hanging hammer can be arranged at the lower part of the detection rod 65, and the verticality can be adjusted by the dead weight. After the fixing is completed, the sphere 64 is locked from the side by the top screw, so that the vertical detection rod 65 can be further arranged on the basis of the frame 1, so as to ensure the accuracy of the detection data and further correct the verticality of the frame 1.
[0034] In this embodiment, when the structure is leveled, a leg 2 is provided at the lower part of the frame 1, a leveling assembly 3 is provided at the bottom of the leg 2, a reinforcement rod 21 is provided between the legs, and the legs 2 are provided with multiple groups, such as Figure 1 As shown in the structure, this embodiment is provided with 3 groups, which extend downward to support the frame 1 and extend it.
[0035] The leveling assembly 3 includes a leveling seat 31, a cylinder 32, a lifting seat 35 and a lifting block 33; there is a lifting cavity inside the leveling seat 31, and a cylinder 32 is arranged in the middle of the lifting cavity. The lifting block 33 is adapted to be mounted in the lifting cavity and extends outward. A lifting seat 35 is fixed at the bottom of the lifting block 33, and the lifting seat 35 is adapted to be mounted on the outside of the leveling seat 31.
[0036] In this embodiment, a leveling seat 31 is configured at the bottom of the support leg 2. There is an inner cavity in the leveling seat 31. There is a circular outlet at the lower part of the lifting cavity. The circular outlet is smaller than the inner cavity. The lifting block 33 is in a sealed state in the lifting cavity, similar to a piston structure. A driving block 34 is provided at the bottom of the lifting block 33. The driving block 34 is adapted to be mounted in the circular outlet and is fixedly connected to the lifting seat. The lifting seat 35 is lifted and lowered along the leveling seat 31 by pushing and pulling with the oil cylinder 32, so that the height of the four corners and the middle area of the frame 1 can be adjusted to achieve the vertical adjustment of the frame 1, and the position adjustment of the frame 1 can be assisted by external equipment such as a level meter, coordinate point detection, etc.
[0037] A water tank is arranged on the frame 1, and the water tank is connected to a water injection and drainage structure. The water tank is connected to a water pump, which can extract and discharge the water in the water tank. That is, in the adjustment stage, the buoyancy of the water tank can appropriately reduce the dead weight of the frame 1, which is convenient for position adjustment. After the adjustment is completed, the water tank is used to increase the weight to ensure its stability. In the lifting stage, the water is discharged to reduce the dead weight, which is convenient for the lifting operation of the frame 1.
[0038] In a specific implementation, the clamping sleeve 55 is in a conical structure, and the clamping sleeves 55 on both sides form a clamping structure disposed on both sides of the steel pipe pile 7 .
[0039] During implementation, this embodiment can utilize the structure of the clamping sleeve 55 to use different sizes of steel pipe piles 7. Since the structure is large at the outer end and small at the inner end, in conjunction with the square center frame and the positioning assembly 4 arranged thereon, this embodiment can adapt to the position deviation of the steel pipe pile 7 to a certain extent. Since the upper adjustment rod 51 and the lower adjustment rod 52 are in the plane passing through the center of the pile and are in a fixed state, during movement and adjustment, a certain degree of position correction can be performed with the help of their inclined surfaces.
[0040] This embodiment also provides a positioning method for a steel pipe pile sinking positioning frame, which is applied to the above-mentioned steel pipe pile 7 sinking positioning frame, and comprises the following steps: Step 1: Pile sinking Determine the center position of the pile, lower the positioning frame according to the pile position, sink the positioning frame into the water, and adjust its position; Step 2: Level adjustment Operate the oil cylinder 32 to adjust the horizontality of the positioning frame from the four corners respectively, and determine the verticality of the positioning frame by using a level meter or a level bubble meter; Step 3: Secure the positioning frame Fill the water tank with water to increase the deadweight of the positioning frame; Step 4: Piling Use a crane to lower the steel pipe pile 7 so that it passes through the pile sinking space of the positioning frame; Step 5: Detection Further adjust the verticality of the detection assembly 6 to ensure that the detection rod 65 is in a vertical state, use two sets of distance measuring sensors 66 spaced apart on the detection rod 65 to obtain the distance between it and the surface of the steel pipe pile 7, analyze the verticality of the steel pipe pile 7, and generate a correction plan; Step 6: Correction Extend or shorten the upper adjustment rod 51 and the lower adjustment rod 52 to make the clamping sleeve 55 close to the steel pipe pile 7 from both sides, and then synchronously operate the upper adjustment rod 51 and the lower adjustment rod 52 on both sides to adjust the posture of the steel pipe pile in the clamping state; Step 7: Firm positioning The positioning rod 43 is operated to slide in the positioning sleeve 42, so that the top wheel 45 is pressed against the surface of the steel pipe pile 7, and then the positioning rod 43 is locked; Step 8: Continuous monitoring and correction The distance measuring sensor 66 is used to continuously monitor the posture of the steel pipe pile 7, and the posture information of the steel pipe pile 7 is fed back to the controller, and the controller generates an adjustment strategy according to the posture information.
[0041] The present embodiment provides a fully functional steel pipe pile sinking positioning frame and a positioning method thereof, the positioning frame realizes accurate positioning and flexible deviation correction of the steel pipe pile 7 by integrating the leveling, positioning, detection and deviation correction components 5. The positioning frame adopts a frame structure and is provided with multiple pile sinking spaces, which can simultaneously position multiple steel pipe piles 7. The positioning component 4 adapts to different outer diameters of the steel pipe piles 7 through two-stage adjustment and provides elastic support. The deviation correction component 5 utilizes an electric telescopic rod and an adjustable clamping structure to achieve precise adjustment of the posture of the steel pipe pile 7. The detection component 6 ensures the verticality of the positioning frame and the steel pipe pile 7 through a vertical detection rod 65 and a distance measuring sensor 66. In addition, the positioning frame is also equipped with a leveling component 3 and a water tank to adjust the level of the frame 1 and increase stability. The positioning method has clear steps, from pile sinking to continuous monitoring and deviation correction, which ensures the accurate positioning and posture adjustment of the steel pipe pile 7. Embodiment 2: This embodiment further illustrates the positioning frame structure in Embodiment 1.
[0042] In this embodiment, at least two groups of positioning components 4 are provided, and the two groups of positioning components 4 are respectively arranged at the upper part and the lower part of the frame 1 .
[0043] There are two groups of correcting components 5 , one above and one below, which are distributed on the left and right sides and the front and back sides of the frame 1 . There are two groups of detecting components 6 , which are correspondingly arranged with the correcting components 5 .
[0044] During implementation, the positioning component 4 can stabilize the steel pipe pile 7 from the top and bottom. The positioning component 4 can also be added in the middle area as needed to improve the supporting positioning effect. At the same time, the correction component 5 and the detection component 6 are configured from four directions, so that they can be synchronously adjusted from the front and back directions and the left and right directions, ensuring the verticality of the steel pipe pile 7.
[0045] It is worth noting that, in the present embodiment, when the deviation correction operation is performed, the clamping sleeve 55 is first matched with the surface of the steel pipe pile 7 , and then the extension or retraction of each electric push rod is synchronously adjusted to achieve the deviation correction of the posture of the steel pipe pile 7 .
[0046] In a further structure, in this embodiment, a fence 8 can be provided on the upper part of the frame 1, and a floor can be arranged on the upper part of the frame to form a construction platform that is convenient for personnel to operate.
[0047] The above-described embodiments of the present invention do not constitute a limitation on the protection scope of the present invention. The basic concept of the present invention is to modify the positioning frame structure and configure the leveling, positioning, detection and deviation correction components 5 thereon, so as to achieve accurate positioning and flexible deviation correction of the steel pipe pile 7. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the claims of the present invention.
Claims
1. A steel pipe pile sinking positioning frame, characterized in that: It includes a frame, a positioning component, a deviation correction component, a detection component and a leveling component. The bottom of the frame is provided with a leveling component for leveling the frame; a pile sinking space is provided inside the frame; The positioning assembly includes a positioning sleeve, a positioning rod, a locking wire, a push rod, a spring and a push wheel; the positioning sleeve is distributed on the frame and evenly distributed on the circumference of the pile sinking space; the positioning rod is sleeved in the positioning sleeve and can be locked with a locking wire; the push rod is arranged in the positioning sleeve via a spring, so that the push rod is adjustable relative to the positioning rod; a push wheel is arranged at the end of the push rod, so as to form an adjustable elastic positioning surface of the steel pipe pile on the periphery of the pile sinking space; The deviation correction component includes a clamping sleeve, a deviation correction seat, an upper adjustment rod and a lower adjustment rod. The ends of the upper adjustment rod and the lower adjustment rod are hinged on two opposite sides of the frame. The upper adjustment rod and the lower adjustment rod are both telescopically adjustable and lockable structures, and are respectively tilted upward and downward. The deviation correction seat is hinged on the other end of the upper adjustment rod and the lower adjustment rod. The clamping sleeve is arranged on the deviation correction seat. The clamping sleeves on both sides are combined to form an adjustable clamping structure that can press against the steel pipe pile from both sides. The detection assembly includes a fixed seat, a ball seat, a sphere, a detection rod and a distance sensor; the fixed seat is fixed to the side of the frame, the ball seat is fixed to the end of the fixed seat, the sphere is hinged in the ball seat and can be locked by a top screw on the side, the detection rod is fixed to the lower part of the sphere, and a distance sensor is arranged on its side, and the distance sensor faces the center of the pile driving space.
2. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: A center seat is arranged at the center of the frame, and the center seat is fixed on the frame via a connecting rod. The center seat is a square structure. Four positioning sleeves are arranged and respectively distributed in the middle of the four sides of the center seat. Any positioning sleeve faces the center of the center seat.
3. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: The lower part of the frame is provided with supporting legs, the bottom of the supporting legs is provided with leveling components, and reinforcing rods are arranged between the supporting legs.
4. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: The leveling assembly includes a leveling seat, a cylinder, a lifting seat and a lifting block; there is a lifting cavity inside the leveling seat, a cylinder is arranged in the middle of the lifting cavity, the lifting block is adapted to be mounted in the lifting cavity and extends outward, a lifting seat is fixed at the bottom of the lifting block, and the lifting seat is adapted to be mounted on the outside of the leveling seat.
5. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: The positioning components are provided with at least two groups, and the two groups of positioning components are respectively arranged at the upper part and the lower part of the frame.
6. The steel pipe pile driving and positioning frame according to claim 5, characterized in that: The deviation-correcting components are provided in two groups, one above and one below, and the two groups of deviation-correcting components are distributed on the left and right sides and the front and back sides of the frame.
7. The steel pipe pile driving and positioning frame according to claim 6, characterized in that: The detection components are provided in two groups and are arranged corresponding to the deviation correction components; the pile driving spaces are provided in two groups, and positioning components, deviation correction components and detection components are arranged around the two groups of pile driving spaces.
8. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: The clamping sleeve is in a conical structure, and the clamping sleeves on both sides form a clamping structure arranged on both sides of the steel pipe pile.
9. The steel pipe pile driving and positioning frame according to claim 1, characterized in that: The frame is provided with a water tank, which is connected with a water filling and drainage structure.
10. A positioning method for a steel pipe pile driving and positioning frame, applied to the steel pipe pile driving and positioning frame according to any one of claims 1 to 9, characterized in that: The method comprises the following steps: Step 1: Pile sinking Determine the center position of the pile, lower the positioning frame according to the pile position, sink the positioning frame into the water, and adjust its position; Step 2: Level adjustment Operate the oil cylinder to adjust the horizontality of the positioning frame from the four corners respectively, and determine the verticality of the positioning frame by using a level or a bubble level gauge; Step 3: Secure the positioning frame Fill the water tank with water to increase the deadweight of the positioning frame; Step 4: Piling Use a crane to lower the steel pipe pile so that it passes through the pile sinking space of the positioning frame; Step 5: Detection Further adjust the verticality of the detection assembly to ensure that the detection rod is in a vertical state, use two sets of distance measuring sensors spaced apart on the detection rod to obtain the distance between it and the surface of the steel pipe pile, analyze the verticality of the steel pipe pile, and generate a correction plan; Step 6: Correction Extend or shorten the upper and lower adjusting rods to make the clamping sleeves close to the steel pipe pile from both sides, and then synchronously operate the upper and lower adjusting rods on both sides to adjust the posture of the steel pipe pile in the clamping state; Step 7: Firm positioning Operate the positioning rod to slide in the positioning sleeve so that the top wheel rests against the surface of the steel pipe pile, and then lock the positioning rod; Step 8: Continuous monitoring and correction The distance measuring sensor is used to continuously monitor the posture of the steel pipe pile, and the posture information of the steel pipe pile is fed back to the controller, and the controller generates an adjustment strategy based on the posture information.
Citation Information
Patent Citations
Diesel hammer deviation piling rectification construction process and equipment
CN105951832A
Tubular pile perpendicularity real-time monitoring and adjusting integrated construction device and construction method
CN117005472A
Accurate erection method and equipment for steel frame column under ground surface of reverse construction method
JP1996120673A
Pile pressing apparatus with wedge housing and pile anchorage method therewith
KR1020150084258A