Cofferdam prestress inner supporting system based on tidal influence and application
By designing a prestressed internal support system based on tidal influence in the construction of a bridge cofferdam, using the jack linkage structure of the inner core tube and the outer casing to apply pretension and pre-top force, the cofferdam deformation control in the prior art is solved. The poor problem has achieved the effect of structural stress optimization and construction cost reduction.
Patent Information
- Application Number
- CN202411264944.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-12-03
AI Technical Summary
In the existing bridge cofferdam construction technology, the internal support system of the steel pipe cannot apply pre-top and pre-tension forces, resulting in poor deformation control effect of the cofferdam, structural stress exceeds the limit, and safety hazards and economic losses.
Design a cofferdam prestressed internal support system based on tidal influence, adopting coaxially arranged two inner core tubes and outer sleeves. By linking the support jack and the pulling jack, pretension and pre-top force are applied, and the hydraulic pump station is used. The control system synchronously drives the jack to balance the external water pressure of the cofferdam and the concrete side pressure.
Effectively control the deformation of the cofferdam structure, optimize the structural stress, reduce stress, save materials and costs, and improve construction safety and economy.
Smart Images

Figure CN119061918A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge cofferdam construction, and in particular relates to a prestressed inner support system of a cofferdam under tidal influence and its application. Background Art
[0002] At present, the design method of using steel pipes as both internal supports and tension systems is widely used in domestic bridge cofferdams. Due to the fixed length of the steel pipes, this method cannot apply pre-load and pre-tension, and is a passive force structure. After the water is pumped out from the cofferdam, the tide rises under the influence of the tide. Under the action of water pressure, the pressure generated by the axial compression deformation of the steel pipe internal support balances the water pressure outside the cofferdam. After the concrete is poured inside the cofferdam, the tide drops under the influence of the tide. Under the action of the concrete side pressure, the tension generated by the axial tensile deformation of the steel pipe internal support balances the side pressure of the concrete inside the cofferdam. This design method has a poor effect on the control of cofferdam deformation, and often causes the cofferdam structure to exceed the stress limit due to the large deformation of the cofferdam, causing certain safety hazards and economic losses. Therefore, it is necessary to improve the existing cofferdam prestressed internal support system. Summary of the invention
[0003] In view of this, the present invention aims to overcome the defects in the prior art and proposes a prestressed internal support system and application of a cofferdam under the influence of tides.
[0004] To achieve the above object, the technical solution created by the present invention is implemented as follows:
[0005] A prestressed inner support system for a cofferdam under the influence of tides comprises two inner core tubes arranged coaxially, a support jack is arranged at the joint of the two inner core tubes, a reaction seat is arranged on each inner core tube, and a tension jack is arranged between the reaction seats on the two inner core tubes; an outer sleeve is arranged on the outer side of the support jack, and the two ends of the outer sleeve are respectively sleeved on the outer side of the corresponding inner core tube, and the outer sleeve is restricted by the reaction seats on both sides and is confined between the two reaction seats, the tension jack is linked with the support jack, when the tension jack applies pre-tension to the inner core tubes on both sides, the support jack is retracted, and when the support jack applies pre-tension to the inner core tubes on both sides, the tension jack is released.
[0006] Furthermore, the support jack is installed and fixed in the outer sleeve.
[0007] Furthermore, the outer sleeve and the inner core tube are slidably matched.
[0008] Furthermore, 2-4 groups of pulling jacks are arranged between the reaction seats on the two inner core tubes, each pulling jack is evenly distributed along the outer circumference of the inner core tube, and each pulling jack is synchronously driven by a hydraulic pump station.
[0009] Furthermore, the control system on the hydraulic pump station controls the supporting jacks and each pulling jack at the same time.
[0010] A method for controlling the deformation of a cofferdam structure under the influence of tides using the internal support system comprises the following steps:
[0011] S1, pre-install the support jack in the outer tube, then install the core tube, so that the support jack forms a support between the two inner core tubes, and then install the tension jack between the reaction seats of the two inner core tubes;
[0012] S2, respectively connect the ends of the two inner core tubes away from the supporting jacks to the cofferdam;
[0013] S3. After the water is pumped out from the cofferdam and before the tide rises, a pre-load is applied to the supporting jacks and the tensioning jacks are released simultaneously to balance the water pressure outside the cofferdam;
[0014] S4. After pouring concrete in the cofferdam and before the tide goes out, apply pre-tension to the tension jacks and retract the supporting jacks simultaneously to balance the lateral pressure of the concrete in the cofferdam;
[0015] S5. After the concrete has initially set, release the connection between the inner core tube and the cofferdam.
[0016] Compared with the prior art, the present invention has the following advantages:
[0017] The present invention aims at the cofferdam construction under the influence of bridge tides. By improving the construction method, it can effectively control the structural deformation, optimize the structural force, and reduce the structural stress, thereby saving material usage, reducing operation risks and costs. It has a wide range of applications, greatly improves the economy and safety of the construction process, and has good engineering use value. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0019] Figure 1 A schematic diagram of the structure created by the present invention;
[0020] Figure 2 A schematic diagram of the installation application status is created for the present invention. DETAILED DESCRIPTION
[0021] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0022] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0023] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.
[0024] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0025] A prestressed internal support system for cofferdams under tidal influence, such as Figure 1 and Figure 2 As shown, it includes two coaxially arranged inner core tubes 1, a supporting jack 4 is provided at the butt joint of the two inner core tubes, a reaction seat 5 is provided on each inner core tube, and a pulling jack 3 is provided between the reaction seats on the two inner core tubes; an outer sleeve 2 is provided on the outside of the supporting jack, and the two ends of the outer sleeve are respectively mounted on the outside of the corresponding inner core tube, and the outer sleeve is restricted by the reaction seats on both sides and is confined between the two reaction seats, the pulling jack is linked with the supporting jack, and when the pulling jack applies pre-tension to the inner core tubes on both sides, the supporting jack is retracted, and when the supporting jack applies pre-tension to the inner core tubes on both sides, the pulling jack is released.
[0026] The outer sleeve is used to connect the inner tubes on both sides. The inner tubes can slide in the axial direction to transfer the bending moment of the inner tubes on both sides and balance the deadweight of the inner support structure. Usually, the outer sleeve and the inner tube slide together. A tension jack is provided between the reaction seats on the two inner tubes, and the support jack is installed and fixed in the outer sleeve. Pre-tension and pre-tension are applied to the inner tube to balance the water pressure outside the cofferdam and the side pressure of the concrete inside the cofferdam. It is a key component to control the deformation of the cofferdam and reduce the stress of the cofferdam structure.
[0027] In an optional embodiment, 2-4 sets of tensioning jacks are arranged between the reaction seats on the two inner core tubes, and each tensioning jack is evenly arranged along the outer circumference of the inner core tube, and each tensioning jack is synchronously driven by a hydraulic pump station, so that the structural stability is better and the force applied to the inner core tube is more uniform and stable. The reaction seat is used to limit the relative position of the outer sleeve and the inner core tube to avoid over-tensioning, and is also used to apply pre-tensioning force.
[0028] The control system on the hydraulic pump station controls the support jacks and each pulling jack at the same time.
[0029] A method for controlling the deformation of a cofferdam structure under the influence of tides using the internal support system comprises the following steps:
[0030] S1, pre-install the support jack in the outer tube, then install the core tube, so that the support jack forms a support between the two inner core tubes, and then install the tension jack between the reaction seats of the two inner core tubes;
[0031] S2, respectively connect the ends of the two inner core tubes away from the supporting jacks to the cofferdam 6;
[0032] S3. After the water is pumped out from the cofferdam and before the tide rises, a pre-load is applied to the supporting jacks and the tensioning jacks are released simultaneously to balance the water pressure outside the cofferdam;
[0033] S4. After pouring concrete in the cofferdam and before the tide goes out, apply pre-tension to the tension jacks and retract the supporting jacks simultaneously to balance the lateral pressure of the concrete in the cofferdam;
[0034] S5. After the concrete has initially set, release the connection between the inner core tube and the cofferdam.
[0035] Aiming at the cofferdam construction under the influence of bridge tides, the present invention designs the inner support system of the cofferdam as a supporting and tensioning system as an active force-bearing structure, controls the deformation of the cofferdam structure by applying prestress in advance, and reduces the stress of the cofferdam structure. The structure is safe and economical to bear force, can improve the construction method, reduce the material cost, has a wide range of applications, greatly improves the economy and safety of the construction process, and has good engineering use value.
[0036] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A prestressed internal support system for cofferdams under tidal influence, Features: It comprises two inner core tubes arranged coaxially, wherein a support jack is provided at the joint of the two inner core tubes, a reaction seat is provided on each inner core tube, and a tension jack is provided between the reaction seats on the two inner core tubes; an outer sleeve is provided on the outer side of the support jack, and the two ends of the outer sleeve are respectively sleeved on the outer side of the corresponding inner core tube, and the outer sleeve is limited between the two reaction seats, and the tension jack is linked with the support jack, and when a pre-tensioning force is applied to the inner core tubes on both sides by the tension jack, the support jack is retracted, and when a pre-tensioning force is applied to the inner core tubes on both sides by the support jack, the tension jack is released.
2. According to claim 1, a prestressed internal support system for cofferdams under tidal influence, Features: The support jack is installed and fixed in the outer casing.
3. According to claim 1, a prestressed internal support system for cofferdams under tidal influence, Features: The outer sleeve and the inner core tube are slidably matched.
4. According to claim 1, a prestressed internal support system for cofferdams under tidal influence, Features: 2-4 groups of pulling jacks are arranged between the reaction seats on the two inner core tubes. The pulling jacks are evenly arranged along the outer circumference direction of the inner core tube, and the pulling jacks are synchronously driven by the hydraulic pump station.
5. A prestressed inner support system for cofferdams under tidal influence according to claim 4, Features: The control system on the hydraulic pump station controls the support jacks and each pulling jack at the same time.
6. A method for controlling the deformation of a cofferdam structure under the influence of tides by using the internal support system according to any one of claims 1 to 5, It is characterized in that The steps include: S1, pre-install the support jack in the outer tube, then install the core tube, so that the support jack forms a support between the two inner core tubes, and then install the tension jack between the reaction seats of the two inner core tubes; S2, respectively connect the ends of the two inner core tubes away from the supporting jacks to the cofferdam; S3. After the water is pumped out from the cofferdam and before the tide rises, a pre-load is applied to the supporting jacks and the tensioning jacks are released simultaneously to balance the water pressure outside the cofferdam; S4. After pouring concrete in the cofferdam and before the tide goes out, apply pre-tension to the tension jacks and retract the supporting jacks simultaneously to balance the lateral pressure of the concrete in the cofferdam; S5. After the concrete has initially set, release the connection between the inner core tube and the cofferdam.
