Combined stress type fan foundation and construction method thereof
By setting up foundation beams, concealed beams and top beams on the old wind farm fans, an integrated structure is formed, the stability and economic problems of the fan foundation are solved, resource utilization is realized, and transformation efficiency and safety are significantly improved saving engineering costs.
Patent Information
- Application Number
- CN202411409421.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-12-03
AI Technical Summary
The foundation of old wind farm fans has poor safety and economy due to problems such as larger gaps between the foundation ring and concrete and cracking of the foundation. The existing transformation technology is not yet mature and difficult to effectively solve.
Using a combined stress fan foundation, the foundation beam, concealed beam and top beam are set on the original fan foundation, and the prestressed anchor bolts and dense piles are reinforced to form an integrated structure to enhance the stability and integrity of the foundation, and realize the Resource utilization.
It improves the safety and economy of the fan foundation, reduces the concrete usage of the new foundation, saves project costs and construction period, solves the problem of restricted land acquisition, and significantly improves the transformation efficiency.
Smart Images

Figure CN119061929A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind power generation, and in particular to a combined force-bearing wind turbine foundation and a construction method thereof. Background Art
[0002] With the development of high-power wind turbines, some units have entered the late stage of their life cycle, resulting in problems such as the gap between the foundation ring and the concrete becoming larger and the foundation cracking in the wind turbine foundation of some wind turbines, which seriously threatens the safe and stable operation of wind turbines. In June 2023, the National Energy Administration promulgated the "Management Measures for the Renovation, Upgrading and Decommissioning of Wind Farms", which encourages wind farms that have been connected to the grid for more than 15 years and are below 1.5MW to carry out renovation, upgrading and decommissioning. According to this measure, many old wind farms across the country are planning equal capacity or expansion renovation work.
[0003] In the process of renovating old wind turbines, it is usually necessary to deeply renovate the head and tower parts to create a high-quality, high-yield wind farm. This will increase the load of the new wind turbine, and the tower of the new wind turbine will be larger, which will not match the original foundation ring. Therefore, upgrading and renovating the existing wind turbine foundation is an important direction for the development of new wind power in my country. At present, in the wind farm wind turbine renovation project, the method of dismantling the original foundation and building a new foundation is basically adopted for the existing wind turbine foundation. There is no mature advanced technology for in-situ renovation technology, and its safety and economy are poor. Summary of the invention
[0004] The purpose of the present invention is to provide a combined force-bearing wind turbine foundation, which can be directly improved on the basis of the original wind turbine, and on the basis of safety, it can maximize the resource utilization of the original foundation and facilities, thereby improving the economy.
[0005] The present invention provides a combined force-bearing fan foundation, comprising an original fan foundation and a reinforced fan foundation, wherein the reinforced fan foundation is arranged on the original fan foundation;
[0006] The original wind turbine foundation includes a foundation truncated cone, and a top platform is provided at the center of the top of the foundation truncated cone. The reinforced wind turbine foundation includes a foundation beam, a hidden beam and a top platform beam of an integrated structure. The foundation beam is arranged above the foundation truncated cone, and the hidden beam is arranged along the outer periphery of the foundation truncated cone. A reinforced top platform is provided on the top of the top platform, and the top platform beam is arranged along the periphery of the reinforced top platform. The top platform beam is connected to the foundation truncated cone by vertically arranged prestressed anchor bolts. The bottom height of the hidden beam is lower than the bottom of the foundation truncated cone, and a beam axil is provided between the bottom of the hidden beam and the bottom of the foundation truncated cone.
[0007] Preferably, a plurality of reinforcing steel bars are provided in the foundation beam, and the reinforcing steel bars are anchored into the foundation truncated cone.
[0008] Preferably, the reinforcing steel bars are welded to the anchor cage steel bars inside the foundation truncated cone.
[0009] Preferably, a plurality of groups of the prestressed anchor bolts are provided on the top platform beam, and each group of the prestressed anchor bolts is distributed circumferentially on the top platform beam.
[0010] Preferably, a connecting plate is provided on the top platform beam, a through hole is provided on the connecting plate, and the prestressed anchor bolts extend downward through the connecting plate.
[0011] Preferably, a plurality of pile foundations are provided around the bottom of the base truncated cone, and the pile foundations are arranged vertically.
[0012] Preferably, a plurality of densely distributed piles are provided at the bottom of the hidden beam, and the densely distributed piles are symmetrically arranged around the center of the hidden beam.
[0013] Preferably, the surface of the original fan foundation is roughened.
[0014] Preferably, the top height of the foundation beam is lower than the outdoor floor, and the top height of the top platform beam is higher than the outdoor floor.
[0015] The present invention also provides a construction method for a combined force-bearing wind turbine foundation, comprising the following steps:
[0016] S1. Roughen the outer surface of the original wind turbine foundation, set a number of reinforcing steel bars in the foundation beam, anchor the reinforcing steel bars into the foundation truncated platform, the top platform beam and the hidden beam; and weld the reinforcing steel bars to the original anchor cage steel bars in the foundation truncated platform,
[0017] S2. Cast the reinforced top platform, the foundation beam, the hidden beam and the top platform beam on the surface of the original wind turbine foundation, so that the foundation beam, the hidden beam and the top platform beam form an integrated structure, and a plurality of densely distributed piles are symmetrically arranged along the center of the hidden beam at the bottom of the hidden beam; the connecting plate is arranged at the top of the top platform beam, and the prestressed anchor bolt passes through the connecting plate and the top platform beam and is anchored into the foundation truncated cone, and the top of the top platform beam is higher than the outdoor floor;
[0018] S3. The top height of the foundation beam is lower than the outdoor floor. After the overall combined force-bearing wind turbine foundation transformation is completed, the outdoor floor surface is covered with green plants.
[0019] Beneficial effects:
[0020] The present invention is improved directly on the basis of the original wind turbine, and foundation beams are arranged on the top and periphery of the foundation cone, and beam axils are arranged between the bottom of the hidden beam and the bottom of the foundation cone to enhance stability; the top platform beam is fixedly connected to the foundation cone by prestressed anchor bolts, thereby improving the integrity between the reinforced wind turbine foundation and the original wind turbine foundation, making the reinforced wind turbine foundation and the original wind turbine foundation combined with force, enhancing the safety of the wind turbine foundation, making resource utilization of the original foundation and facilities to the greatest extent, and improving economy. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a top view of the overall structure of the present invention;
[0023] Figure 2 It is a partial cross-sectional schematic diagram of the present invention.
[0024] Description of reference numerals:
[0025] 1- original wind turbine foundation, 2- hidden beam, 201- beam armpit, 3- densely distributed piles, 4- foundation beam, 401- reinforced steel bars, 5- connecting plate, 6- top platform beam, 7- prestressed anchor bolts, 8- wind turbine tower, 9- original pile foundation. DETAILED DESCRIPTION
[0026] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0028] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] Example 1
[0030] like Figure 1-2 As shown, a combined force-bearing fan foundation includes an original fan foundation 1 and a reinforced fan foundation, wherein the reinforced fan foundation is arranged on the original fan foundation 1; the surface of the original fan foundation 1 is provided with roughening, which helps to better bond and fix the original fan foundation 1 and the reinforced fan foundation.
[0031] The original wind turbine foundation 1 comprises a foundation truncated cone, a plurality of pile foundations 9 are arranged circumferentially at the bottom of the foundation truncated cone, the pile foundations 9 are arranged vertically, and a top platform is arranged at the center of the top of the foundation truncated cone.
[0032] The reinforced wind turbine foundation includes a foundation beam 4, a hidden beam 2 and a top beam 6 of an integrated structure, and the reinforced wind turbine foundation is cast on the surface of the original wind turbine foundation 1. The foundation beam 4 is arranged above the foundation truncated cone, and a plurality of steel beams are arranged radially inside the foundation beam 4, which improves the stability of the foundation beam 4. A plurality of reinforcing steel bars 401 are arranged inside the foundation beam 4, and the reinforcing steel bars 401 are anchored into the foundation truncated cone, the top beam 6 and the hidden beam 2, and the reinforcing steel bars 401 are welded to the anchor cage steel bars inside the foundation truncated cone. The reinforcing steel bars 401 are stably connected to the steel beams, which improves the integrity between the reinforced wind turbine foundation and the original wind turbine foundation 1, so that the reinforced wind turbine foundation and the original wind turbine foundation 1 are combined to bear force, thereby enhancing the safety of the wind turbine foundation.
[0033] The hidden beam 2 is arranged along the outer periphery of the foundation truncated cone. The top of the hidden beam 2 and the bottom of the foundation beam 4 can be welded to form an integrated structure. A number of dense piles 3 are arranged at the bottom of the hidden beam 2, and the dense piles 3 are arranged symmetrically with the center of the hidden beam 2. The bottom height of the hidden beam 2 is lower than the bottom of the foundation truncated cone, and a beam axil 201 is arranged between the bottom of the hidden beam 2 and the bottom of the foundation truncated cone. The side and bottom adjacent to the foundation truncated cone and the hidden beam 2 are fixedly connected to the hidden beam 2 by steel bars, which enhances the integrity of the hidden beam 2 and the original wind turbine foundation 1. The above structure makes full use of the force performance of the dense piles 3. The pile spacing of the dense piles 3 is less than the minimum pile spacing required by the specification. The number of piles is large, and the vertical and horizontal bearing force and stiffness are more significant than the conventional specification requirements. The dense piles 3 and the top original wind turbine foundation 1 and the reinforced wind turbine foundation form a combined force, which greatly reduces the bottom area of the reinforced foundation, meets the area requirements for improving the original wind turbine foundation 1, and effectively reduces the project cost and construction period.
[0034] A reinforced roof is provided on the top of the roof, and a wind turbine tower 8 is provided on the top of the reinforced roof. A roof beam 6 is provided along the periphery of the reinforced roof, and the roof beam 6 is located above the foundation truncated cone. The roof beam 6 and the foundation truncated cone are connected by a vertically arranged prestressed anchor bolt 7. One end of the steel bar beam in the foundation beam 4 is anchored into the roof beam 6 to strengthen the connection between the foundation beam 4 and the roof beam 6. Several groups of prestressed anchor bolts 7 are provided on the roof beam 6, and each group of prestressed anchor bolts 7 is distributed circumferentially on the roof beam 6. Preferably, two groups of prestressed anchor bolts 7 are provided on the roof beam 6 from the inside to the outside, and are connected to the prestressed anchor bolts in the original foundation through a connecting plate 5. An annular connecting plate 5 is provided on the roof beam 6, and a through hole is provided on the connecting plate 5. The prestressed anchor bolts 7 all pass through the connecting plate 5 and extend downward to the foundation truncated cone. The connecting plate 5 is provided to connect with the prestressed anchor bolts in the original wind turbine foundation, thereby improving the overall force effect.
[0035] The top of the foundation beam 4 is lower than the outdoor floor, which is convenient for covering the outdoor floor surface with green plants after the overall combined force-bearing wind turbine foundation is transformed to increase the greening area. The top of the top beam 6 is more than 1 meter above the outdoor floor, which is convenient for installing the wind turbine tower 8.
[0036] A construction method for a combined force-bearing wind turbine foundation comprises the following steps:
[0037] S1. Roughen the outer surface of the original wind turbine foundation 1, set a number of reinforcing steel bars 401 in the foundation beam 4, and anchor the reinforcing steel bars 401 into the foundation truncated platform, the top platform beam 6 and the hidden beam 2; and weld the reinforcing steel bars 401 to the original anchor cage steel bars in the foundation truncated platform to improve the overall stiffness between the reinforcing steel bars 401 and the original wind turbine foundation 1, so that the foundation beam 4 is tightly connected to the original wind turbine foundation 1, and the integrity between the foundation beam 4 and the top platform beam 6 and the hidden beam 2 is enhanced; strengthen the connection between the hidden beam 2 and the foundation truncated platform through steel bars;
[0038] S2. Cast and reinforce the top platform, foundation beam 4, hidden beam 2 and top platform beam 6 on the surface of the original wind turbine foundation 1, and form an integrated structure through casting; a number of dense piles 3 are set at the bottom of the hidden beam 2, and the dense piles 3 are symmetrically arranged along the center of the hidden beam 2; one end of the steel bar beam in the foundation beam 4 is anchored into the top platform beam 6, and the other end is anchored into the hidden beam 2; a connecting plate 5 is set at the top of the top platform beam 6, and the prestressed anchor bolt 7 passes through the connecting plate 5 and the top platform beam 6 and is anchored in the foundation truncated platform; the height of the top platform beam 6 can be determined according to the length of the prestressed anchor bolt 7, and the top of the top platform beam 6 is more than 1 meter higher than the outdoor floor;
[0039] S3. The top height of the foundation beam 4 is lower than the outdoor floor, so that the outdoor floor surface can be covered with green plants after the overall combined force-bearing wind turbine foundation is reconstructed.
[0040] A 1.5MW wind turbine unit was upgraded to a 6.25MW unit. The original wind turbine foundation was a 15-meter-diameter truncated cone gravity foundation with a rock foundation and a red line width of 17 meters. The original foundation steel and concrete consumption was about 700m 3 .
[0041] If the traditional technology of dismantling the newly reduced or enlarged section is adopted, the wind load bending moment of the 1.5MW unit after upgrading to a 6.25MW unit will be more than three times the original bending moment of 46000kN·m, the new foundation diameter will be about 22 meters, and the amount of concrete used will be about 1800m 3 , and the new foundation far exceeds the original foundation red line, and conventional technology cannot solve the problem of limited land acquisition. Using the structure and construction method provided by the present invention, the width of the new foundation hidden beam is only 0.8m, and the diameter of the new fan foundation is about 16.6m, which is within the red line range, solving the problem of limited land acquisition, and the amount of reinforced concrete used for the new foundation is about 1200m 3 , saving 600m3 of reinforced concrete compared with conventional technology 3 , saving about 33.3% of the engineering workload, with obvious results.
[0042] The construction method provided by the present invention can carry out in-situ transformation of the original wind turbine foundation, solve the problem of limited land acquisition within the red line range, and use less concrete to reinforce the wind turbine foundation, saving engineering workload.
[0043] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A combined force-bearing fan foundation, It is characterized in that It comprises an original fan foundation and a reinforced fan foundation, wherein the reinforced fan foundation is arranged on the original fan foundation; The original wind turbine foundation includes a foundation truncated cone, and a top platform is provided at the center of the top of the foundation truncated cone. The reinforced wind turbine foundation includes a foundation beam, a hidden beam and a top platform beam of an integrated structure. The foundation beam is arranged above the foundation truncated cone, and the hidden beam is arranged along the outer periphery of the foundation truncated cone. A reinforced top platform is provided on the top of the top platform, and the top platform beam is arranged along the periphery of the reinforced top platform. The top platform beam is connected to the foundation truncated cone by vertically arranged prestressed anchor bolts. The bottom height of the hidden beam is lower than the bottom of the foundation truncated cone, and a beam axil is provided between the bottom of the hidden beam and the bottom of the foundation truncated cone.
2. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that A plurality of reinforcing steel bars are arranged in the foundation beam, and the reinforcing steel bars are anchored into the foundation truncated cone.
3. The combined force-bearing wind turbine foundation according to claim 2, It is characterized in that The reinforcing steel bars are welded to the anchor cage steel bars inside the foundation truncated cone.
4. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that A plurality of groups of prestressed anchor bolts are arranged on the top platform beam, and each group of prestressed anchor bolts is distributed in a circumferential direction on the top platform beam.
5. The combined force-bearing wind turbine foundation according to claim 4, It is characterized in that A connecting plate is provided on the top platform beam, and a through hole is provided on the connecting plate. The prestressed anchor bolts all extend downward through the connecting plate.
6. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that A plurality of pile foundations are arranged circumferentially at the bottom of the base truncated cone, and the pile foundations are arranged vertically.
7. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that A plurality of densely distributed piles are arranged at the bottom of the hidden beam, and the densely distributed piles are symmetrically arranged around the center of the hidden beam.
8. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that The surface of the original fan foundation is roughened.
9. The combined force-bearing wind turbine foundation according to claim 1, It is characterized in that The top of the foundation beam is lower than the outdoor floor, and the top of the top platform beam is higher than the outdoor floor.
10. A construction method for a combined force-bearing wind turbine foundation according to any one of claims 1 to 9, It is characterized in that The following steps are involved: S1. Roughen the outer surface of the original wind turbine foundation, set a number of reinforcing steel bars in the foundation beam, anchor the reinforcing steel bars into the foundation truncated platform, the top platform beam and the hidden beam; and weld the reinforcing steel bars to the original anchor cage steel bars in the foundation truncated platform, S2. Cast the reinforced top platform, the foundation beam, the hidden beam and the top platform beam on the surface of the original wind turbine foundation, so that the foundation beam, the hidden beam and the top platform beam form an integrated structure, and a plurality of densely distributed piles are symmetrically arranged along the center of the hidden beam at the bottom of the hidden beam; the connecting plate is arranged at the top of the top platform beam, and the prestressed anchor bolt passes through the connecting plate and the top platform beam and is anchored into the foundation truncated cone, and the top of the top platform beam is higher than the outdoor floor; S3. The top height of the foundation beam is lower than the outdoor floor. After the overall combined force-bearing wind turbine foundation transformation is completed, the outdoor floor surface is covered with green plants.