Open cut tunnel soft foundation comprehensive reinforcing structure

The comprehensive reinforcement structure for open-cut tunnels addresses the instability of soft foundations by using retaining walls, resistance piles, and anti-floating structures to provide robust support and stability, ensuring safety and structural integrity.

CN119061934APending Publication Date: 2024-12-03ZHENGZHOU ENG CO LTD CHINA RAILWAY SEVENTH GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411155932.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Open-cut tunnels passing through soft foundations composed of silt, silty soil, and other highly compressible layers experience low bearing capacity, leading to uneven settlement and instability of the retaining and main structures due to high water content, sensitivity, and low strength, affecting the stability and safety of the tunnel.

Method used

A comprehensive reinforcement structure for soft foundations, including retaining walls, resistance structures, shear support structures, and anti-floating structures, with components like resistance piles and walls, transverse and inclined walls, and grouting with steel bars to enhance support and stability.

Benefits of technology

The reinforcement structure provides robust support to retaining walls, prevents sinking and floating of the tunnel, maintains structural integrity, and ensures stability even with soft foundation settlement, enhancing safety and stability of the open-cut tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061934A_ABST
    Figure CN119061934A_ABST
Patent Text Reader

Abstract

The invention provides a comprehensive reinforcing structure for a soft foundation of an open-cut tunnel, which comprises enclosure walls and a reinforcing structure, the enclosure walls are respectively arranged on two sides of a main body structure of the open-cut tunnel, and the enclosure walls penetrate through the soft foundation and are inserted into a bearing stratum; a plurality of resisting structures are arranged on the outer side of each enclosure wall, and the bottoms of the resisting structures are inserted into the bearing layer; the shear-resistant supporting structure is located between the two enclosure walls, the shear-resistant supporting structure is located below the open cut tunnel body, and the bottom of the shear-resistant supporting structure is inserted into the bearing stratum; and the anti-floating structure is located between the two enclosure walls, the two ends of the anti-floating structure are connected with the enclosure walls on the two sides correspondingly, and the anti-floating structure is located above the open cut tunnel body. In the reinforcing structure, under the combined action of the resisting structure arranged on the periphery of the enclosure wall, the shear-resistant supporting structure arranged below the open-cut tunnel main body and the anti-floating structure arranged above the shear-resistant supporting structure, the safety and stability of the open-cut tunnel main body structure are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel soft foundation treatment, and in particular relates to a comprehensive reinforcement structure for soft foundation of an open-cut tunnel. Background Art

[0002] Cut-and-cover tunneling is a method of underground railway construction, also known as vertical excavation. This method involves first excavating the ground surface, then building the lining in the open air, and finally covering and backfilling. Cut-and-cover tunneling is suitable for tunnels with a small burial depth. According to the different shapes of the surface openings, it is divided into foundation pit method, trench method, trench wall method, etc. The advantages of the cut-and-cover method include simple, fast, economical construction technology and good stress conditions of the main structure. According to the different ways of maintaining the slope, the cut-and-cover method can be divided into slope cut-and-cover method, cantilever support cut-and-cover method and retaining structure plus support cut-and-cover method. The slope cut-and-cover method is mainly suitable for tunnel projects with extremely shallow burial, good slope soil stability, and no excessive restrictions on the surface. The cantilever support cut-and-cover method is suitable for problems that require deep foundation pit maintenance. Common retaining structures include driven wooden piles, steel piles, reinforced concrete precast piles, in-situ excavated or bored reinforced concrete piles, bored and cast reinforced concrete continuous walls, etc.

[0003] In the prior art, when an open-cut tunnel passes through a soft foundation system composed of silt, silty soil, part of the backfill, miscellaneous fill and other highly compressible soil layers, the soft foundation has the characteristics of high water content, high sensitivity, easy thixotropy, low strength, etc., which makes the soft foundation have low bearing capacity; the soft foundation layer is prone to uneven settlement, so that the open-cut tunnel structure cannot be well supported, which has a great impact on the stability of the retaining structure and the main structure in the open-cut tunnel.

[0004] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention

[0005] The object of the present invention is to provide a comprehensive reinforcement structure for soft foundation of an open-cut tunnel, so as to at least solve the above-mentioned problems existing in the prior art.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A comprehensive reinforcement structure for soft foundation of an open-cut tunnel, the reinforcement structure comprising:

[0008] A retaining wall is provided on each side of the main structure of the open-cut tunnel. The retaining wall penetrates the soft foundation and is inserted into the bearing layer;

[0009] Resistance structure: multiple resistance structures are arranged on the outside of each retaining wall, and the bottom of the resistance structure is inserted into the bearing layer;

[0010] A shear support structure, wherein the shear support structure is located between two retaining walls and below the main body of the open-cut tunnel, and is used to support the main body of the open-cut tunnel, and the bottom of the shear support structure is inserted into the bearing layer;

[0011] The anti-floating structure is located between two retaining walls, with two ends of the anti-floating structure connected to the retaining walls on both sides respectively, and the anti-floating structure is located above the main body of the open-cut tunnel to prevent the main body of the open-cut tunnel from floating up.

[0012] As described above, in the open-cut tunnel soft foundation comprehensive reinforcement structure, preferably, each of the resistance structures comprises a resistance wall and a plurality of resistance piles, the resistance piles are inserted into the bearing layer, and the resistance wall is located above the resistance piles.

[0013] In the above-mentioned comprehensive reinforcement structure for soft foundation of open-cut tunnel, preferably, the resistance piles are connected to the resistance wall as a whole, and the resistance wall and the surrounding wall are connected to each other as a whole.

[0014] As described above, in the comprehensive reinforcement structure for soft foundation of open-cut tunnel, preferably, the plane where the resistance structure is located is perpendicular to the retaining wall.

[0015] As described above, in the comprehensive reinforcement structure for soft foundation of open-cut tunnel, preferably, the shear support structure comprises at least a transverse wall, both ends of the transverse wall are respectively connected to the retaining walls on both sides, and the transverse wall is perpendicular to the retaining walls.

[0016] As described above, in the open-cut tunnel soft foundation comprehensive reinforcement structure, preferably, the shear support structure further comprises an inclined wall, and the inclined wall is located between two adjacent transverse walls.

[0017] As described above, the comprehensive reinforcement structure for soft foundation of open-cut tunnel, preferably, the two ends of the inclined wall are respectively connected to the diagonal positions of the rectangular structure formed by two adjacent transverse walls and two enclosing walls, so that a triangular reinforcement unit is formed between any adjacent inclined walls, transverse walls and enclosing walls.

[0018] In the above-mentioned open-cut tunnel soft foundation comprehensive reinforcement structure, preferably, the anti-floating structure is a frame structure, diagonal braces are arranged in the frame structure, and both ends of the frame structure are connected to the retaining walls on both sides.

[0019] As described above, the comprehensive reinforcement structure for soft foundation of open-cut tunnel is preferably such that when the soft foundation below the main structure of the open-cut tunnel settles, holes are drilled from the ground toward the triangular reinforcement unit formed between the oblique wall, the transverse wall and the retaining wall and grouting is performed.

[0020] As described above, for the comprehensive reinforcement structure for soft foundation of open-cut tunnel, preferably, after grouting into the triangular reinforcement unit is completed, steel bars are inserted into the drilled hole and the steel bars are inserted into the triangular reinforcement unit.

[0021] Beneficial effects:

[0022] In this comprehensive reinforcement structure, the resistance wall is perpendicular to the retaining wall, so that the resistance wall can provide the greatest possible support force to the retaining wall on the side, thereby ensuring the stability of the retaining wall in the soft foundation. The shear support structure can prevent the retaining wall from invading and squeezing the main body of the open-cut tunnel; and can play a good supporting role for the main body of the open-cut tunnel. Even when the soft foundation sinks, the main body of the open-cut tunnel can always be effectively supported by the shear support structure, ensuring the safety and stability of the main body of the open-cut tunnel. The anti-floating structure is set above the main body of the open-cut tunnel, and the two ends of the anti-floating structure are connected to the retaining walls on both sides, which not only greatly improves the structural stability of the retaining wall, but also the retaining wall can directly provide strong support for the anti-floating structure to avoid the tunnel from floating upward displacement; that is, the resistance structure is set outside the retaining wall, and the shear support structure is set below the main body of the open-cut tunnel and the anti-floating structure is set above it. The safety and stability of the main structure of the open-cut tunnel is guaranteed.

[0023] After the grouting is completed, steel bars are inserted into the triangular reinforcement unit. The steel bar structure and the grouting liquid are solidified together, which not only improves the structural strength of the grouting liquid, but also the steel bars can play the role of sealing the grouting holes. The solidified grouting liquid is condensed into one with the retaining wall through the steel bars, ensuring that the main structure of the open-cut tunnel is effectively supported. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:

[0025] Figure 1 A vertical cross-sectional view of a comprehensive reinforcement structure for soft foundation of an open-cut tunnel according to an embodiment of the present invention;

[0026] Figure 2 The figure is a top view of a comprehensive reinforcement structure for soft foundation of an open-cut tunnel according to an embodiment of the present invention.

[0027] In the figure: 1. Main structure of open-cut tunnel; 2. Retaining wall; 3. Anti-floating structure; 4. Resistance wall; 5. Drilling hole; 6. Resistance pile; 7. Shear support structure; 71. Transverse wall; 72. Diagonal wall; 8. Reinforcement. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention belong to the scope of protection of the present invention.

[0029] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention. The terms "connected" and "connected" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0030] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0031] According to a specific embodiment of the present invention, Figure 1-2 As shown, the present invention provides a comprehensive reinforcement structure for soft foundation of open-cut tunnel, the reinforcement structure comprising:

[0032] A retaining wall 2 is provided on each side of the main structure 1 of the open-cut tunnel. The retaining wall 2 penetrates the soft foundation and is inserted into the bearing layer.

[0033] Resistance structure: multiple resistance structures are arranged on the outside of each retaining wall 2, and the bottom of the resistance structure is inserted into the bearing layer.

[0034] The shear support structure 7 is located between the two retaining walls 2 and below the main body of the open-cut tunnel, and is used to support the main body of the open-cut tunnel. The bottom of the shear support structure 7 is inserted into the bearing layer.

[0035] The anti-floating structure 3 is located between the two retaining walls 2, the two ends of the anti-floating structure 3 are respectively connected to the retaining walls 2 on both sides, and the anti-floating structure 3 is located above the main body of the open-cut tunnel to prevent the main body of the open-cut tunnel from floating up.

[0036] In the comprehensive reinforcement structure, a resistance structure is arranged on the outside of the retaining wall 2. The resistance structure is inserted into the bearing layer and resists on the outside of the retaining wall 2, so that the outside of the retaining wall 2 is effectively supported. This can prevent the settlement of the soft foundation on the outside of the retaining wall 2, which may cause stress concentration and tilt of the retaining wall 2 due to uneven force, thereby ensuring the structural stability of the retaining wall 2.

[0037] The shear support structure 7 is arranged on the inner side between the two retaining walls 2, so that the inner side of the retaining wall 2 is effectively supported, which can prevent the retaining wall 2 from invading and squeezing the open-cut tunnel body; at the same time, the shear support structure 7 is located below the open-cut tunnel body, which can provide good support for the open-cut tunnel body. Even when the soft foundation sinks, the open-cut tunnel body can always be effectively supported by the shear support structure 7, thereby ensuring the safety and stability of the open-cut tunnel body.

[0038] The anti-floating structure 3 is arranged above the main body of the open-cut tunnel, and the two ends of the anti-floating structure 3 are connected to the retaining walls 2 on both sides, which not only greatly improves the structural stability of the retaining walls 2, but also the retaining walls 2 can directly provide strong support for the anti-floating structure 3. When the groundwater level in the soft foundation changes, the main body of the open-cut tunnel will also be subject to the buoyancy of water of different magnitudes and produce an upward tendency. At this time, under the limiting effect of the anti-floating structure 3, the tunnel is prevented from floating upward. That is, the resistance structure is arranged outside the retaining wall 2, and the shear support structure 7 is arranged below the main body of the open-cut tunnel and the anti-floating structure 3 is arranged above it. Under the combined effect, the safety and stability of the main structure 1 of the open-cut tunnel is guaranteed.

[0039] Each resistance structure includes a resistance wall 4 and a plurality of resistance piles 6, the resistance piles 6 are inserted into the bearing layer, and the resistance wall 4 is located above the resistance piles 6. In one embodiment of the present application, the lower part of the resistance structure is set as the resistance piles 6, which is more convenient for construction into the bearing layer, and the upper part of the resistance structure is the resistance wall 4, which is used to support the enclosure wall 2. Such a setting can also greatly save construction costs and save construction time.

[0040] The resistance pile 6 is connected to the resistance wall 4 as a whole, and the resistance wall 4 is connected to the enclosure wall 2 as a whole. In one embodiment of the present application, the resistance pile 6 is a bored pile 5, and the resistance wall 4 and the maintenance wall are both ground-connected walls, wherein the steel bars in the resistance pile 6 and the steel bars in the resistance wall 4 have overlapping parts, so that the resistance pile 6 and the resistance wall 4 are connected as a whole, so that the resistance pile 6 can better support the resistance wall 4; the steel bars in the resistance wall 4 and the steel bars in the enclosure wall 2 have overlapping parts, so that the resistance wall 4 and the enclosure wall 2 are connected as a whole, so that the resistance wall 4 can effectively support the enclosure wall 2.

[0041] The plane where the resistance structure is located is perpendicular to the retaining wall 2. In one embodiment of the present application, the resistance wall 4 is perpendicular to the retaining wall 2. Such a configuration can maximize the cross-sectional area of ​​the retaining wall 2 in the soft foundation, so that the resistance wall 4 can provide the greatest possible support force to the side of the retaining wall 2, thereby ensuring the stability of the retaining wall 2 in the soft foundation.

[0042] The shear-resistant support structure 7 at least includes a transverse wall 71 , two ends of which are respectively connected to the enclosure walls 2 on both sides, and the transverse wall 71 is perpendicular to the enclosure walls 2 .

[0043] In one embodiment of the present application, both ends of the transverse wall 71 are connected to the retaining walls 2 on both sides, which not only ensures that the structure of the transverse wall 71 is more stable, but also makes it easier for the transverse wall 71 to effectively and stably support the main body of the open-cut tunnel; it also plays an internal support role between the two retaining walls 2 to ensure the stability of the overall structure of the retaining wall 2.

[0044] The shear support structure 7 further includes an inclined wall 72, which is located between two adjacent transverse walls 71. In one embodiment of the present application, the inclined wall 72 plays a reinforcing role to improve the structural strength of the shear support structure 7, thereby improving the supporting capacity of the shear support structure 7, and ensuring that the shear support structure 7 can always effectively support the main structure 1 of the open-cut tunnel.

[0045] The two ends of the oblique wall 72 are respectively connected to the diagonal positions of the rectangular structure formed by the two adjacent transverse walls 71 and the two enclosure walls 2, so that a triangular reinforcement unit is formed between any adjacent oblique walls 72, transverse walls 71 and enclosure walls 2. In one embodiment of the present application, the oblique wall 72 and the transverse wall 71 can adopt a ground-connected wall or a snap pile structure, and the oblique wall 72 and the transverse wall 71 are both connected to the enclosure wall 2. The triangular reinforcement unit formed between the oblique wall 72, the transverse wall 71 and the enclosure wall 2 can greatly strengthen the structural strength of the shear support structure 7 and the enclosure wall 2, ensure that the enclosure wall 2 will not have a tendency to tilt inward, and make the shear support structure 7 more powerful to support the main structure 1 of the open-cut tunnel.

[0046] The anti-floating structure 3 is a frame structure, and a diagonal brace is arranged inside the frame structure, and the two ends of the frame structure are connected to the enclosure walls 2 on both sides. In one embodiment of the present application, the frame structure can be a reinforced concrete frame, and the steel bars in the frame structure are welded and connected to the steel bars in the enclosure wall 2, so that the frame structure and the enclosure wall 2 are connected as a whole, and backfill is performed on the top of the open-cut tunnel main structure 1, so as to ensure that when the groundwater level changes in the soft foundation, the anti-floating structure 3 can always limit the floating of the open-cut tunnel main structure 1.

[0047] When the soft foundation below the main structure 1 of the open-cut tunnel settles, a hole 5 is drilled from the ground toward the triangular reinforcement unit formed between the oblique wall 72, the transverse wall 71 and the retaining wall 2 and grouting is performed. In one embodiment of the present application, when the soft foundation below the main structure 1 of the open-cut tunnel settles, a local void will appear below the main structure 1 of the open-cut tunnel, and this problem can be well solved by grouting below the main structure 1 of the open-cut tunnel. In the present application, a hole 5 is drilled directly toward the triangular reinforcement unit formed between the oblique wall 72, the transverse wall 71 and the retaining wall 2 and grouting is performed. The triangular reinforcement unit acts as a template, which can better retain the grouting liquid and prevent the grouting liquid from spreading everywhere, thereby further reducing the grouting amount and saving construction costs.

[0048] After grouting is completed in the triangular reinforcement unit, the steel bar 8 is inserted into the borehole 5, and the steel bar 8 is inserted into the triangular reinforcement unit. In one embodiment of the present application, the length of the steel bar 8 can be selected according to actual needs. Since the structural strength of a single grouting liquid is limited, after the grouting is completed, the steel bar 8 is inserted into the triangular reinforcement unit, and a small amount of supplementary grouting is performed in the borehole 5 after the steel bar 8 is inserted to ensure that the steel bar 8 is fully in contact with the grouting liquid; so that the steel bar structure and the grouting liquid are solidified together, which can not only improve the structural strength of the grouting liquid, but also the steel bar 8 can play the role of blocking the grouting hole. The solidified grouting liquid is condensed into one with the retaining wall 2 through the steel bar 8, ensuring that the main structure 1 of the open-cut tunnel is effectively supported.

[0049] It should be understood that the above description is merely exemplary and the embodiments of the present application do not limit this.

[0050] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.

Claims

1. A comprehensive reinforcement structure for soft foundation of open-cut tunnel, characterized in that: The reinforcement structure comprises: A retaining wall is provided on each side of the main structure of the open-cut tunnel. The retaining wall penetrates the soft foundation and is inserted into the bearing layer; A resistance structure, wherein a plurality of resistance structures are arranged on the outside of each retaining wall, and the bottom of the resistance structure is inserted into the bearing layer; A shear support structure, wherein the shear support structure is located between two retaining walls and below the main body of the open-cut tunnel, and is used to support the main body of the open-cut tunnel, and the bottom of the shear support structure is inserted into the bearing layer; The anti-floating structure is located between two retaining walls, with two ends of the anti-floating structure connected to the retaining walls on both sides respectively, and the anti-floating structure is located above the main body of the open-cut tunnel to prevent the main body of the open-cut tunnel from floating up.

2. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 1 is characterized in that: Each of the resistance structures includes a resistance wall and a plurality of resistance piles, wherein the resistance piles are inserted into the bearing layer, and the resistance wall is located above the resistance piles.

3. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 2 is characterized in that: The resistance piles are connected to the resistance wall as a whole, and the resistance wall and the surrounding wall are connected to each other as a whole.

4. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 3 is characterized in that: The plane where the resistance structure is located is perpendicular to the retaining wall.

5. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 1 is characterized in that: The shear-resistant support structure at least includes a transverse wall, two ends of which are respectively connected to the retaining walls on both sides, and the transverse wall is perpendicular to the retaining walls.

6. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 5 is characterized in that: The shear-resistant support structure further includes an inclined wall, and the inclined wall is located between two adjacent transverse walls.

7. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 6 is characterized in that: The two ends of the oblique wall are respectively connected to the diagonal positions of the rectangular structure formed by two adjacent transverse walls and two enclosure walls, so that a triangular reinforcement unit is formed between any adjacent oblique walls, transverse walls and enclosure walls.

8. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 1 is characterized in that: The anti-floating structure is a frame structure, in which diagonal braces are arranged, and two ends of the frame structure are connected to the retaining walls on both sides.

9. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 7 is characterized in that: When settlement occurs in the soft foundation below the main structure of the open-cut tunnel, holes are drilled from the ground toward the triangular reinforcement unit formed between the diagonal wall, transverse wall and retaining wall and grouting is carried out.

10. The open-cut tunnel soft foundation comprehensive reinforcement structure according to claim 9 is characterized in that: After grouting is completed in the triangular reinforcement unit, reinforcing bars are inserted into the drilled holes and the reinforcing bars are inserted into the triangular reinforcement unit.